Anda di halaman 1dari 272

DIRECCION GENERAL DEL CENTRO SCT COLIMA

SUBDIRECCION DE OBRAS
RESIDENCIA GENERAL DE CARRETERAS FEDERALES
DEPARTAMENTO DE CONTRATOS Y ESTIMACIONES
OBRA:

CONSTRUCCIN DEL DESVO FERROVIARIO EN EL VASO II DE


LA LAGUNA DE CUYUTLN, EN MANZANILLO, COLIMA.

UBICACIN:
TRAMO:
No.

FECHA DE INICIO:
FECHA DE TERMINO:

LAGUNA DE CUYUTLN MANZANILLO, COLIMA.


MARGEN NORTE
CONCEPTO

CLAVE

UNIDAD

PRECIO
UNITARIO

CANTIDAD

VIADUCTO III; TRAMO VII KM DEL 5+305 - 11+098

TRAMO VII (5+302 - 7+850)

VOLUMEN

TRAMO VIII (7+878 - 8+158)

IMPORTE

VOLUMEN

TRAMO IX (8+186 - 9+390)

IMPORTE

VOLUMEN

TRAMO X (9+418 - 11+098)

IMPORTE

VOLUMEN

IMPORTE

INFRAESTRUCTURA
N-CTR-CAR-1-06-003/01
57

EP.01
N-CTR-CAR-1-01-007/00

Pilotes colados en el lugar


Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.

0.00

$0.00

m3

75.00

$93.09

Excavacin para Estructuras


Excavacin p.u.o.t. en caballetes extremos

58

SUBESTRUCTURA
N-CTR-CAR-1-02-003/04

Concreto hidrulico

59

EP.02

Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

m3

2,255.10

$2,218.77

1,503.60

$3,336,142.57

0.19%

94.40

$209,451.89

0.01%

198.80

$441,091.48

0.02%

230.40

60

EP.03

Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

m3

998.60

$2,155.64

337.82

$728,226.93

0.04%

37.00

$79,758.68

0.00%

162.00

$349,213.68

0.02%

128.52

$277,042.85

EP.04

Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes
Antissmicos

m3

6,791.30

$2,349.02

2,208.00

$5,186,636.16

0.29%

224.85

$528,168.69

0.03%

990.00

$2,325,529.80

0.13%

1,265.43

$2,972,511.36

61

N-CTR-CAR-1-02-004/02

$511,204.61

Acero para Concreto Hidrulico

62

Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

Kg

685,706.00

$14.40

233,017.60

$3,355,453.44

0.19%

13,348.80

$192,222.72

0.01%

$466,124.54

0.03%

63

Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

Kg

265,680.00

$14.40

89,884.00

$1,294,329.60

0.07%

9,770.00

$140,688.00

0.01%

42,988.00

$619,027.20

0.03%

55,200.50

$794,887.20

64

Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales, Bancos y Topes


Antissmicos

Kg

982,561.00

$14.40

520,822.10

$7,499,838.24

0.42%

56,611.00

$815,198.40

0.05%

249,088.40

$3,586,872.96

0.20%

319,852.15

$4,605,870.96

65

EP.05

Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 7.1 cm en


topes antissmicos

66

EP.06

Mortero grout, p.u.o.t. para nivelacin de apoyos

32,369.76

37,200.00

$535,680.00

4,968.00

$88.13

1,472.00

$129,727.36

0.01%

160.00

$14,100.80

0.00%

704.00

$62,043.52

0.00%

824.00

$72,619.12

dm3

166,322.00

$5.83

54,138.72

$315,628.74

0.02%

6,212.64

$36,219.69

0.00%

25,146.40

$146,603.51

$0.00

13,312.80

$77,613.62

3,205.89

8,725,288.26

0.00

1,221.29

3,323,919.34

$0.00

$0.00

0.00

$0.00

7,652.32

34,146,926.84

SUPERESTRUCTURA
N-CTR-CAR-1-02-003/04

Concreto hidrulico

67

EP.07

Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: Losas entre trabes

m3

21,416.30

$2,721.64

6,867.00

$18,689,501.88

1.05%

839.64

2,285,194.54

$0.00

68

EP.08

Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: trabes presforzadas (incluye
montaje de trabes con gruas)

m3

27,056.00

$4,485.63

13,892.21

$62,315,294.21

3.51%

1,679.28

7,532,617.98

$0.00

EP.08

Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: trabes presforzadas (incluye
montaje de trabes con chaln)

m3

14,400.20

$4,462.30

69

N-CTR-CAR-1-02-004/02

$0.00

6,663.98

29,736,696.53

Acero para Concreto Hidrulico

70

Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas

Kg

2,472,896.00

$13.54

779,688.08

$10,556,976.64

0.60%

95,295.21

1,290,297.15

$0.00

363,854.44

4,926,589.10

0.00

138,611.21

1,876,795.85

71

Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: trabes

Kg

4,040,208.00

$14.03

1,315,390.44

$18,454,927.87

1.04%

159,002.80

2,230,809.28

$0.00

636,011.20

8,923,237.14

0.01

852,833.20

11,965,249.80

72

EP.05

Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 2" cm en


trabes

5,908.00

$54.13

1,965.60

$106,397.93

0.01%

237.60

12,861.29

$0.00

950.40

51,445.15

0.00

1,274.40

68,983.27

73

EP.09

Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T15 en trabes

Kg

1,005,788.00

$73.23

338,297.96

$24,773,559.61

1.40%

40,893.18

2,994,607.40

$0.00

159,855.15

11,706,192.55

0.01

222,473.99

16,291,770.32

74

EP.10

Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T13 en losa

Kg

1,254,620.00

$73.23

104,832.50

$7,676,883.98

0.00

$0.00

0.00

$0.00

75

EP.11

Malla galvanizada, p.u.o.t. calibre 10 en: zona de drenes

m2

244.80

$122.60

72.90

$8,937.54

0.00%

8.91

1,092.37

$0.00

34.02

4,170.85

76

EP.12

Dren de PVC de 3" de dimetro L= 70cm, p.u.o.t. en Losas

Pza

2,448.00

$25.49

810.00

$20,646.90

0.00%

99.00

2,523.51

$0.00

378.00

9,635.22

77

EP.13

Apoyo tipo TETRON o similar p.u.o.t., fijo con capacidad vertical =350 Ton, capacidad
horizontal 100 Ton

Pza

546.00

$35,654.08

182.00

$6,489,042.56

0.37%

22.00

784,389.76

$0.00

87.00

78

EP.14

Pza

546.00

$35,560.04

180.50

$6,418,587.22

0.36%

22.00

782,320.88

$0.00

87.00

79

EP.15

horizontal 100 Ton, rotacin long. 016 rad y desplazamiento longitudinal 40 mm


Neopreno dureza Shore 60, ASTM-D2240 P.U.O.T. en topes laterales

dm3

2,736.00

$334.62

0.00

$0.00

0.00

$0.00

0.00

$0.00

EP.16

Tapa junta de acero estructural A-36 galvanizado, p.u.o.t. a base de PL de 4" x 3/8" y
angulos de 3" x3" x 3/8"

1,715.60

$1,429.56

0.00

$0.00

$0.00

$0.00

$0.00

0.00

$0.00

0.00

12.96

1,588.90

0.00

144.00

3,670.56

3,101,904.96

0.00

92.50

3,298,002.40

3,093,723.48

0.00

92.50

3,289,303.70

0.00

$0.00

Apoyo tipo TETRON o similar p.u.o.t., movil con capacidad vertical =350 Ton, capacidad

TAPA JUNTA
80

LOSA DE TRANSICION
N-CTR-CAR-1-02-003/04 Concreto hidrulico
81

EP.17
N-CTR-CAR-1-02-004/02

82
83

EP.18

Concreto hidrulico simple p.u.o.t. de f'c= 300 Kg/cm2 en: Losa de transicin

m3

54.00

$2,058.67

$0.00

$0.00

$0.00

$0.00

Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losa de transicin

Kg

10,800.00

$13.54

$0.00

$0.00

$0.00

$0.00

Cartn asfaltado p.u.o.t. de 2 cm de espesor en: Losa de transicin

m2

6.60

$171.92

$0.00

$0.00

$0.00

$0.00

m3

11,500.00

$276.73

$0.00

$0.00

$0.00

$0.00

Acero para Concreto Hidrulico

PEDRAPLEN
84

E.P.21
N-CTR-PUE-1-02-007/07

Pedrapln ronseado con tamao mximo de agregado de 10" p.u.o.t.


Geotextiles

85

E.P.22

Geomalla biaxial BX - 1200 o similar, p.u.o.t.

m2

4,250.00

$60.41

$0.00

$0.00

$0.00

$0.00

86

E.P.23

Geotextil PIVYTEC GEO 350 o similar p.u.o.t., para evitar la filtracin de finos

m2

5,750.00

$38.28

$0.00

$0.00

$0.00

$0.00

CAMINO PROVISIONAL
N-CTR-CAR-1-03-001/00

Tubo de lmina corrugada galvanizada p.u.o.t. = 24" calibre 12

87

6,500.00

$2,088.07

$2,761.10

$5,765,370.08

0.33%

E.P.22

Geomalla biaxial BX - 1200 o similar, p.u.o.t.

m2

90,600.00

$60.41

$52,209.00

$3,153,945.69

0.18%

E.P.23

Geotextil PIVYTEC GEO 350 o similar p.u.o.t., para evitar la filtracin de finos

m2

90,600.00

$38.28

$80,067.79

$3,064,995.00

0.17%

N-CTR-PUE-1-02-007/07
88
89

Alcantarillas de Lmina Corrugada de Acero

N-CTR-CAR-1-01-009/00

Geotextiles

Terraplenes

90

E.P.19

Formacin de Terrapln p.u.o.t, de arena compactado al 90%

m3

175,000.00

$71.64

$76,724.21

$5,496,522.40

0.31%

91

E.P.20

Capa de grava. p.u.o.t. para revestimiento de camino

m3

14,000.00

$401.29

$7,897.09

$3,169,023.25

0.18%

m3

34,185.00

$312.13

N-CTR-PUE-1-02-005/06
92

E.P.24

85,225.00

$6,105,519.00

Bolsas
Costaleras de arena, p.u.o.t.

$198,006,595.79

$19,932,523.02

$78,275,389.93

$90,219,159.69

$198,006,595.79

$19,932,523.02

$78,275,389.93

$90,219,159.69

TRAMO XI (11+098-

DIRECCION GENERAL DEL CENTRO SCT COLIMA


SUBDIRECCION DE OBRAS
RESIDENCIA GENERAL DE CARRETERAS FEDERALES
DEPARTAMENTO DE CONTRATOS Y ESTIMACIONES
OBRA:

CONSTRUCCIN DEL DESVO FERROVIARIO EN EL VASO II DE


LA LAGUNA DE CUYUTLN, EN MANZANILLO, COLIMA.

UBICACIN:
TRAMO:
No.

FECHA DE INICIO:
FECHA DE TERMINO:

LAGUNA DE CUYUTLN MANZANILLO, COLIMA.


MARGEN NORTE
CONCEPTO

CLAVE

UNIDAD

PRECIO
UNITARIO

CANTIDAD

TRAMO VII (5+302 - 7+850)

TRAMO VIII (7+878 - 8+158)

TRAMO IX (8+186 - 9+390)

TRAMO X (9+418 - 11+098)

TRAMO XI (11+098-

VIADUCTO IV DEL KM 0+147 - KM 0+805 (KM 10+587.01 = KM


0+000)
INFRAESTRUCTURA
N-CTR-CAR-1-06-003/01
93

EP.01

Pilotes colados en el lugar


Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.

0.00

$0.00

N-CTR-CAR-1-02-003/04

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

SUBESTRUCTURA

$0.00

Concreto hidrulico

94

EP.03

Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

m3

48.10

$2,352.66

$0.00

$0.00

$0.00

$0.00

$0.00

95

EP.04

Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes
Antissmicos

m3

329.40

$2,660.39

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

N-CTR-CAR-1-02-004/02

Acero para Concreto Hidrulico

96

Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

Kg

12,792.00

$15.15

$0.00

$0.00

97

Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales, Bancos y Topes


Antissmicos

Kg

50,361.00

$15.15

$0.00

$0.00

248.40

$88.13

$0.00

$0.00

$0.00

$0.00

$0.00

8,316.00

$5.83

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

98

EP.05

Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 7.1 cm en


topes antissmicos

99

EP.06

Mortero grout, p.u.o.t. para nivelacin de apoyos

m
dm3

SUPERESTRUCTURA
N-CTR-CAR-1-02-003/04
100
101

Concreto hidrulico

EP.07

Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: Losas entre trabes

m3

985.90

$2,893.74

$0.00

$0.00

$0.00

$0.00

$0.00

EP.08

Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: trabes presforzadas (incluye
montaje de trabes con chaln)

m3

1,983.80

$4,462.30

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

N-CTR-CAR-1-02-004/02

Acero para Concreto Hidrulico

102

Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas

Kg

113,178.00

$13.54

$0.00

$0.00

$0.00

$0.00

$0.00

103

Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: trabes

Kg

192,531.00

$14.03

$0.00

$0.00

$0.00

$0.00

$0.00

104

EP.05

Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 2" cm en


trabes

281.00

$54.13

$0.00

$0.00

$0.00

$0.00

$0.00

105

EP.09

Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T15 en trabes

Kg

47,676.00

$73.23

$0.00

$0.00

$0.00

$0.00

$0.00

106

EP.10

Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T13 en losa

Kg

59,969.00

$73.23

$0.00

$0.00

$0.00

$0.00

$0.00

107

EP.11

Malla galvanizada, p.u.o.t. calibre 10 en: zona de drenes

m2

11.70

$122.60

$0.00

$0.00

$0.00

$0.00

$0.00

108

EP.12

Dren de PVC de 3" de dimetro L= 70cm, p.u.o.t. en Losas

Pza

117.00

$25.49

$0.00

$0.00

109

EP.13

Apoyo tipo TETRON o similar p.u.o.t., fijo con capacidad vertical =350 Ton, capacidad
horizontal 100 Ton

Pza

26.00

$35,654.08

$0.00

$0.00

$0.00

$0.00

$0.00

110

EP.14

horizontal 100 Ton, rotacin long. 016 rad y desplazamiento longitudinal 40 mm

Pza

24.00

$35,560.04

$0.00

$0.00

111

EP.15

Neopreno dureza Shore 60, ASTM-D2240 P.U.O.T. en topes laterales

dm3

127.20

$334.62

$0.00

$0.00
$0.00

$0.00

$0.00

EP.16

Tapa junta de acero estructural A-36 galvanizado, p.u.o.t. a base de PL de 4" x 3/8" y
angulos de 3" x3" x 3/8"

88.20

$1,429.56

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

m3

27.00

$2,058.67

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Apoyo tipo TETRON o similar p.u.o.t., movil con capacidad vertical =350 Ton, capacidad

TAPA JUNTA
112

LOSA DE TRANSICION
N-CTR-CAR-1-02-003/04 Concreto hidrulico
113

EP.17
N-CTR-CAR-1-02-004/02

Acero para Concreto Hidrulico


Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losa de transicin

Kg

5,400.00

$13.54

$0.00

$0.00

EP.18

Cartn asfaltado p.u.o.t. de 2 cm de espesor en: Losa de transicin

m2

3.30

$171.92

$0.00

$0.00

E.P.21

Pedrapln ronseado con tamao mximo de agregado de 10" p.u.o.t.

m3

23,500.00

$276.73

$0.00

$0.00

m2

8,700.00

$60.41

$0.00

$0.00

m2

11,500.00

$43.78

$0.00

$0.00

114
115

Concreto hidrulico simple p.u.o.t. de f'c= 300 Kg/cm2 en: Losa de transicin

PEDRAPLEN
116

N-CTR-PUE-1-02-007/07
117

E.P.22

118

E.P.23

$16,349.00

Geotextiles
Geomalla biaxial BX - 1200 o similar, p.u.o.t.
Geotextil PIVYTEC GEO 350 o similar p.u.o.t., para evitar la filtracin de finos

$1,600.00
$1,600.00

$0.00

$0.00

$0.00

$0.00

$198,006,595.79

$19,932,523.02

$78,275,389.93

$90,219,159.69

DIRECCION GENERAL DEL CENTRO SCT COLIMA


SUBDIRECCION DE OBRAS
RESIDENCIA GENERAL DE CARRETERAS FEDERALES
DEPARTAMENTO DE CONTRATOS Y ESTIMACIONES
OBRA:

CONSTRUCCIN DEL DESVO FERROVIARIO EN EL VASO II DE


LA LAGUNA DE CUYUTLN, EN MANZANILLO, COLIMA.

UBICACIN:
TRAMO:
No.

FECHA DE INICIO:
FECHA DE TERMINO:

LAGUNA DE CUYUTLN MANZANILLO, COLIMA.


MARGEN NORTE
CONCEPTO

CLAVE

UNIDAD

PRECIO
UNITARIO

CANTIDAD

TRAMO VII (5+302 - 7+850)

TRAMO VIII (7+878 - 8+158)

PLATAFORMAS DESMONTABLES PARA MONTAJE


DE TRABES EN VIADUCTOS II Y III (10 plataformas)
N-CTR-CAR-1-02-003/04

N-CTR-CAR-1-02-004/02
120
121

EP.25
N-CTR-CAR-1-02-005/01

$0.00

TRAMO XI (11+098-

m3

546.00

$0.00

$1,516.97

Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: plataformas

Kg

109,200.00

$13.54

Barras de presfuerzo, p.u.o.t. L.R. 10,500 kg/cm2, barra de 50 mm de dimetro en


plataforma

Kg

3,840.00

$205.43

Kg

24,000.00

$38.33

Acero para Concreto Hidrulico

Acero estructural y elementos metlicos


Placas de acero estructural Grado 50 en plataformas

122

$0.00

TRAMO X (9+418 - 11+098)

Concreto hidrulico
Concreto hidrulico simple p.u.o.t. de f'c= 300 Kg/cm2 en plataformas

119

TRAMO IX (8+186 - 9+390)

$0.00

$0.00

$0.00

$0.00

$198,006,595.79

$19,932,523.02

$78,275,389.93

$90,219,159.69

$0.00

RETIRO DE CAMINO AUXILIAR E ISLETAS DE TRABAJO


N-CTR-CAR-1-02-013/00
123

EP.26

Demoliciones y desmantelamientos
Retiro de camino auxiliar e isletas de trabajo de viaductos II y III, p.u.o.t.

Km

4.872

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$198,006,595.79

$19,932,523.02

$78,275,389.93

$90,219,159.69

$2,978,526.30

DRAGADO PARA CONSTRUCCION DE VIADUCTOS III


Y IV
N-CTR-PUE-1-03-001/06

124

E.P.27

Dragado con Equipo Marino


Dragado p.u.o.t. de canal de 36 m de ancho y cota -2m, en zona de trazo de viaducto
para operaciones de construccin de infraestructura y montaje de trabes, incluyendo
disposicin de lodos de acuerdo a lo sealado en la MIA

m3

400,000.00

166,761.26

$138.65

$23,121,448.70

1.30%

190,278.60

$26,382,127.89

$0.00

$0.00

$23,121,448.70

$26,382,127.89

$198,006,595.79

$19,932,523.02

$101,396,838.63

$116,601,287.58

VIA FERREA INCLUYE VIADUCTOS I, II, III, IV Y ZONA


DE TIERRA (11.618 KM)

1.49%

$0.00

$0.00

$0.00

136

EP.29

Suministro y distribucin de balasto, p.u.o.t. en va ferrea

m3

16,761.00

$395.95

$0.00

$0.00

$0.00

$0.00

$0.00

137

EP.30

Suministro y distribucin de riel de RE 115 lb/yd p.u.o.t. nuevo de primera de 78'

pza

910.00

$26,968.09

$0.00

$0.00

$0.00

$0.00

$0.00

138

EP.30

Suministro y distribucin de riel de RE 115 lb/yd p.u.o.t. nuevo de primera de 39'

pza

238.00

$13,294.31

$0.00

$0.00

$0.00

$0.00

$0.00

139

EP.31

Suministro y colocacin de riel de 115 lb/yd de 39' de segunda para contrariel p.u.o.t.

pza

1,558.00

$4,632.01

$0.00

$0.00

$0.00

$0.00

$0.00

140

EP.32

Suministro y colocacin de fijacin RN nuevo para riel de 115 lb/yd p.u.o.t.

jgo

19,564.00

$384.32

$0.00

$0.00

$0.00

$0.00

$0.00

$3,050.00

141

EP.33

Suministro y distribucin de durmiente de concreto I-84 (pretensado) nuevo p.u.o.t.

pza

19,564.00

$1,193.64

$0.00

$0.00

$0.00

$0.00

$0.00

$3,101.00

142

EP.34

Suministro y colocacion de durmiente de pino impregnado de 7" X 8" X 8' nuevo p.u.o.t

pza

7,682.00

$498.96

$0.00

$0.00

$0.00

$0.00

$0.00

$1,068.00

EP.35

Suministro y colocacion de clavo de va nuevo p.u.o.t.

pza

61,456.00

$22.84

$0.00

$0.00

$0.00

$0.00

$0.00

144

EP.36

Suministro y colocacion de placa de doble hombro para riel de 115 lbs/yda de segunda
p.u.o.t.

145

EP.37

Suministro y colocacion de planchuela para riel de 115 lbs/yda de segunda p.u.o.t.

146
147

EP.38
EP.39

Suministro y colocacion de tornillo con arandela y tuerca nuevo p.u.o.t.


Suministro y aplicacin de kit de soldadura aluminotermica tipo QP Crisol CJ
(Desechable) p.u.o.t.

148

EP.40

149
150

143

pza

15,364.00

$106.46

$0.00

$0.00

$0.00

$0.00

$0.00

pares

1,558.00

$853.38

$0.00

$0.00

$0.00

$0.00

$0.00

jgo

6,232.00

$123.23

$0.00

$0.00

$0.00

$0.00

$0.00

pza

1,150.00

$3,612.08

$0.00

$0.00

$0.00

$0.00

$0.00

Suministro y colocacion de herraje de cambio No 10 con aguja de 16' 6", arbol de


cambio alto 1008 ARS de 1 p.u.o.t.

jgo

4.00

$336,175.17

$0.00

$0.00

$0.00

$0.00

$0.00

EP.41

Suministro y colocacion de juego de madera de cambio No 10 de encino impregnado de


1 p.u.o.t.

jgo

4.00

$70,674.95

$0.00

$0.00

$0.00

$0.00

$0.00

EP.42

Armado de va elstica p.u.o.t.

ml

11,738.00

$1,347.08

$0.00

$0.00

151

EP.43

Alineamiento y nivelacion de via en forma mecanizada p.u.o.t.

mts

11,738.00

$66.95

$0.00

$0.00

$0.00

$0.00

$0.00

152

EP.44

Alineamiento y nivelacion mecanizada de herraje de cambio No 10 p.u.o.t.

jgo

4.00

$16,976.46

$0.00

$0.00

$0.00

$0.00

$0.00

153

EP.45

Colocacion de contrareles con rieles de 39' de 115 Lb/yd de segunda p.u.o.t.

154
155

EP.46
EP.47

Liberacion de esfuerzos en el riel p.u.o.t.


Placas de sealamiento requeridas de acuerdo al Reglamento para Conservacin de
Vas y Estructuras p.u.o.t.

ml

9,218.00

$431.67

$0.00

$0.00

ml

11,738.00

$127.78

$0.00

$0.00

1.00

$42,717.68

$0.00

$0.00

Lote

$2,478.00

$0.00

$0.00

$0.00

$0.00

$198,006,595.79

$19,932,523.02

$101,396,838.63

$116,601,287.58

OBRA AMBIENTAL
168

EP.65

Obra de mitigacin ambiental,

lote

1.00

$82,384,313.14

0.87

71509583.81

$187.00

4.03%

71,509,583.81

0.00

0.00

0.00

269,516,179.59

19,932,523.02

101,396,838.63

116,601,287.58

DIRECCION GENERAL DEL CENTRO SCT COLIMA


SUBDIRECCION DE OBRAS
RESIDENCIA GENERAL DE CARRETERAS FEDERALES
DEPARTAMENTO DE CONTRATOS Y ESTIMACIONES
OBRA:

CONSTRUCCIN DEL DESVO FERROVIARIO EN EL VASO II DE


LA LAGUNA DE CUYUTLN, EN MANZANILLO, COLIMA.

UBICACIN:
TRAMO:
No.

FECHA DE INICIO:
FECHA DE TERMINO:

LAGUNA DE CUYUTLN MANZANILLO, COLIMA.


MARGEN NORTE
CONCEPTO

CLAVE

UNIDAD

PRECIO
UNITARIO

CANTIDAD

TRAMO VII (5+302 - 7+850)

TRAMO VIII (7+878 - 8+158)

TRAMO IX (8+186 - 9+390)

TRAMO X (9+418 - 11+098)

TRAMO XI (11+098-

EXTRAORDINARIOS
170

EXT.- 001

Reubicacin de lnea de telfonos de Mxico area, en la Zona Urbana Punta Grande


en Manzanillo, Col. ubicada entre el km 7+900 y el km 8+068 del Desvi Ferroviario
(P.U. definitivo)

lote

1.00

$180,336.13

$0.00

$0.00

1.00

$180,336.13

0.01%

171

EXT.- 002

Reubicacin de lnea de media tensin de Comisin Federal de Electricidad, area y


subterrnea en la Zona Urbana Punta Grande en Manzanillo, Col., entre el km 7+900 al
km 8+068 en el Desvi Ferroviario. (P.U. definitivo)

lote

1.00

$345,565.93

$0.00

$0.00

1.00

$345,565.93

0.02%

reubicacion de lineas de agua potable y drenaje

lote

1.00

$226,708.93

$0.00

$0.00

1.00

$226,708.93

0.01%

616.60

12,662,997.05

0.71%

172

EXT.- 003

Pilastrones de 1.50 m de dimetro colados en el lugar p.u.o.t. en viaducto III, con ademe
metlico de 1.60 m de dimetro. (P.U. provisional autorizado, costo directo del P.U.
presentado por la empresa)

173

EXT.- 004

Pilastrones de 1.50 m de dimetro colados en el lugar p.u.o.t. en Viaducto I. (P.U.


provisional autorizado, costo directo del P.U. presentado por la empresa)

997.00

$20,119.29

$0.00

174

EXT.- 005

Pilastrones de 1.50 m de dimetro colados en el lugar p.u.o.t. en Viaducto II. (P.U.


provisional autorizado, costo directo del P.U. presentado por la empresa)

545.40

$17,797.66

$0.00

$0.00

175

EXT.- 006

Pilastrones de 1.50 m de dimetro colados en el lugar p.u.o.t. en Viaducto III. (P.U.


provisional autorizado, costo directo del P.U. presentado por la empresa)

18,322.71

$20,536.81

148,217,443.66

8.36%

176

EXT.- 007

Pilastrones de 1.50 m de dimetro colados en el lugar p.u.o.t. en Viaducto III antes


Viaducto IV. (P.U. provisional autorizado, costo directo del P.U. presentado por la
empresa)

710.80

$20,916.50

177

EXT.- 008

Estabilizacin de la capa de revestimiento (P.U. provisional autorizado, costo directo del


P.U. presentado por la empresa)

m2

46,200.00

$314.60

EXT.-

1,449.29

$13,592.66

$0.00

$0.00

$0.00

8,016,008.00

0.45%

$104.82

$0.00

0.00%

80.00

$8,385.60

0.00

Tala de arbol hasta 11 cm a 20 cm

$174.70

$0.00

0.00%

46.00

$8,036.20

0.00

tala de arbol hasta 21 a 30 cm

$349.39

$0.00

0.00%

30.00

$10,481.70

0.00

tala de arbol de 31-40 cm

$524.09

$0.00

0.00%

14.00

$7,337.26

$1,048.18

$0.00

0.00%

6.00

$6,289.08

construccion de muelle 1 y 2 en km 9+500


construccion de puente para cruzar tuberia de agua potable en km 9+500
extraccion desarmado y botado de draga

199

EXT-030
EXT-036

25,480.00

ET-02

196

ET-03

0.00
0.00

$0.00

0.00%

$0.00

1.00

$9,557,092.38

pz

1.00

$2,107,759.43

$0.00

0.00%

$0.00

1.00

$2,107,759.43

lote

1.00

$1,082,018.43

$0.00

0.00%

$0.00

1.00

$1,082,018.43

$49.18

$0.00

0.00%

2,978.10

$0.00

$0.00

1,751.92

$0.00

$0.00

m2

1,751.92

$308.34

m2

27,056.00

$5,098.12

$146,462.96

0.00

$540,187.01

$0.00

$14,142,787.85

$52,759,886.36

$77,602,116.22

$425,749,631.25

$34,075,310.87

$154,156,724.99

$194,203,403.80

10,400.00

$115.72

$0.00

$0.00

$0.00

$0.00

10,400.00

$869.38

$0.00

$0.00

$0.00

$0.00

ET-04

Suministro instalacin y colocacin de barras de acero con capacidad de 17


toneladas a la tensin perforando con sistema de roto percusin autoperforante o
convencional en barre nacin de 3 de dimetro, de 12 mts. de longitud, a cada 3.6
mts en sentido vertical y horizontal.

PZA

575.00

$23,462.25

$0.00

$0.00

$0.00

$0.00

198

ET-05

Suministro instalacin y colocacin de barras de acero con capacidad de 17


toneladas a la tensin perforando con sistema de roto percusin autoperforante o
convencional en barrenacin de 3 de dimetro, de 6 mts de longitud, a cada 3.6
mts en sentido vertical y horizontal.

PZA

627.00

$13,052.86

$0.00

$0.00

$0.00

$0.00

199

ET-06

PZA

1,202.00

$579.23

$0.00

$0.00

$0.00

$0.00

200

201

202

203

204

EXT-69

Construccion de Muelles 1 y 2 ubicados en el km 9+500. Derivado por interferencia


de tuberia de agua potable localizada en el km 9+500, que cruza ele de proyecto y
poder cumplir plazo de ejecucion. Segn minuta de campo D-067 de fecha 14 de
diciembre de 2010.

LOTE

2.00

$9,557,092.37

$0.00

$0.00

$0.00

$0.00

EXT-70

Construccion de Puente para cruzar trabes sobre tuberias de agua potable en el km


9+500. Derivado por interferencia de Tuberia de Agua potable localizada en el km
9+500 que cruza eje de proyecto y poder cumplir con fecha de terminacion de
programada segun minuta de campo D-067 de fecha 14 de Diciembre de 2010

LOTE

1.00

$2,107,759.43

$0.00

$0.00

$0.00

$0.00

TF-001

Excavacin para estructuras de tnel en material Tipo C. Inc. Excavacin vertical en


talud y horizontal en piso, afine, limpieza, retiro del material producto de la
excavacin y transporte a cualquier distancia por PUOT.

M3

2,416.00

$161.10

$0.00

$0.00

$0.00

$0.00

TF-002

Suministro de Bveda y pico de flauta Techspan prefabricada tipo 11 x 10- para 4 m


de carga de relleno y cados. Inc. Suministro, almacenaje, derechos de patente y
todo lo necesario PUOT. (Segn cotizacin presentada).

ML

460.00

$198,476.05

$0.00

$0.00

$0.00

$0.00

TF-003

Carga, transporte y montaje de Bveda y picos de flauta Techspan prefabricada


tipo 11x10 para 4 m de carga de relleno y cados. Inc. Nivelacin, apuntalamientos
provisionales y todo lo necesario para su correcta ejecucin PUOT. (Segn
cotizacin presentada).

ML

460.00

$18,913.50

$0.00

$0.00

$0.00

$0.00

Apoyo Fijo o Mvil a base de dos placas de acero de 29x39x30cm, Neopreno dureza
Shore de 30x40x2.5cm, incluye; Cargo Directo por el costo de los materiales,
ensaye de material, mano de obra, trazo, colocacin, acarreos hasta el lugar de su
utilizacin, limpieza, retiro de sobrantes, depreciacin de herramienta y equipo.
DM3

205

EXT-031

147.00

$293.80

$0.00

$0.00

$0.00

$0.00

207

TF-018

Suministro y colocacion de mortero Fluido fC=10 kg/cm2 entre boveda y corte del
terreno, de acuerdo a proyecto, colocacion y todo lo necesario para su correcta
ejecucion P.U.O.T.

M3

37,292.40

$1,228.28

$0.00

$0.00

$0.00

$0.00

208

TF-019

Suministro y colocacion de Geodren en taludes para desalojo de filtraciones, de


acuerdo a proyecto, colocacion y todo lo necesario para su correcta ejecucion

M2

1,840.00

$488.40

$0.00

$0.00

$0.00

$0.00

209

TF-024

Contracunetas

ML

370.00

$268.00

$0.00

$0.00

$0.00

$0.00

Reubicacin de lneas de Agua potable y drenaje existentes en el tramo


comprendido en el cadenamiento 7+920 y 8+025 que corresponde a un tramo del
proyecto del desvo ferroviario y que cruza una zona urbana denominada punta
grande en el municipio de Manzanillo, en virtud de que interfieren con los trabajos
de dicho proyecto, incluye; construccin de red de agua potable, suministro e
instalacin de 180ml. de tubera de pvc hidrulico de 21/2" de diam. RD-26 y piezas
especiales para entronques, excavaciones y rellenos; construccin de red de
drenaje sanitario, suministro e instalacin de 180ml de tubera de pvc sanitario de
8" de diam. construccin de pozos de visita completos, excavaciones y rellenos.
206

EXT-033

210

EXT-034

214

EXT-057

215

EXT-058

216

EXT-064

LOTE

Extraccion de Material Producto de Derrumbes, no imputable al contratista con


cualquier clase de material a cielo abierto.
Alcantarillas de Lamina Corrugada de Acero, alcantarilla anidable y seccionable de
lamina cal. =150 cm
Revestimiento de canal de alivio en obras de drenaje con concreto hidrulico f'c=
150 kg/cm2 colado en el lugar, reforzado con malla electrosoldada E66/66.
Retiro de material (turba) producto de bufamiento lateral generado por
hundimientos en camino provisional en diferentes cadenamientos, aperturando
caja y disposicin final de material.

$0.00

$156,233,451.66

M2

Tensado de anclas con equipo hidrulico a su capacidad de diseo de 17


toneladas incluye: materiales, mano de obra y equipo.

64,855,245.98

$9,557,092.38

M2

197

3,158.00

1.00

Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: trabes presforzadas (incluye
montaje de trabes con gruas)

Suministro y colocacin de malla maccaferri sistema rock mesh b600 y malla


retenedora, incluye: fletes, material, equipo y mano de obra.

2.98%

pz

cortes y escavaciones
Demolicion de Construcciones existentes a base de muros de tanbique y block, losas,
cadenas y castillos de concreto armado, firmes y pisos de concreto por medios
mecanicos, utilizando retroexcavadora CAT 315

Amacize manual de talud, retirando rocas sueltas de hasta 20 cms. de dimetro, no


incluye retiro de material fuera de la obra.

52,759,886.36

#VALUE!

ANEXOS A REPROGRAMACION
195

2,569.04

$0.00

Tala de arbol hasta 10 cm

taka de arbol de 41-60 cm

127

7,217.16

1.00

$226,708.93

$0.00

$0.00

$0.00

$0.00

M3

30,000.00

$15.77

$0.00

$0.00

$0.00

$0.00

ML

74.00

$3,537.50

$0.00

$0.00

$0.00

$0.00

M3

100.80

$1,749.79

$0.00

$0.00

$0.00

$0.00

M3

2,500.00

$69.70

$0.00

$0.00

$0.00

$0.00

14133601161.79%

DIRECCION GENERAL DEL CENTRO SCT COLIMA


SUBDIRECCION DE OBRAS
RESIDENCIA GENERAL DE CARRETERAS FEDERALES
DEPARTAMENTO DE CONTRATOS Y ESTIMACIONES
OBRA:

CONSTRUCCIN DEL DESVO FERROVIARIO EN EL VASO II DE


LA LAGUNA DE CUYUTLN, EN MANZANILLO, COLIMA.

UBICACIN:
TRAMO:
No.

211

212

213

217

CONCEPTO

EXT-065

Muros de proteccin a base de gaviones rectangulares de malla metlica de triple


torsin con alambre galvanizado clase III, calibre 12 reforzado con calibre 10 con
escuadra 8 x 10 cm. De 0.5 x 1.0 x 2.0 m P.U.O.T.

EXT-068

Trabajos de exploracin y rescate de vestigios arqueolgicos por parte del personal


del INAH, comprendidos del 07 de junio al 28 de febrero de 2011, incluye; cargo
por el costo de los materiales requeridos y mano de obra.

EXT-073

Extraccin, Desarmado y botado de Draga, Incluye; Equipo, Mano de Obra y todo lo


necesario para cruzar tubera de agua potable que cruza el eje de proyecto
localizada en el km 9+500. Segn minuta de campo D-067 de fecha 14 de diciembre
de 2010

EXT-036

Concreto hidrulico simple P.U.O.T. fc= 350 kg/cm2, en trabes presforzadas


derivado de usar gras de 300Ton en lugar de 200Ton. Consideradas en la
propuesta por falta de capacidad de estas ltimas.

A
A01
126

127

190

225

185

5
A02

184

126

127

131

9
A03

138

10

141

11

140

12

145

13

DESPALMES Despalmes, desperdiciando el material, P.U.O.T. De cortes y desplante


de terraplenes
CORTES Excavaciones, P.U.O.T. En cortes y adicionales abajo de la subrasante:
Cuando el material se aproveche
Plantilla de concreto f'c= 100 kgs/cm2, e= 10 cms.
Acero de refuerzo en zapata y muro de contencion, Fy= 4200 kgs/cm2
Concreto F'c=250 kg/cm2
DESMONTE DE AREA DE TRABAJOS PUOT (E.P. 003)
DESPALMES Despalmes, desperdiciando el material, P.U.O.T. De cortes y desplante
de terraplenes
EXCAVACION EN CORTE DEBAJO DE LA SUBRASANTE PUOT
SUMINISTRO, FORMACION Y COMPACTACION DE LA CAPA DE SUB-BALASTO
COMPACTADOS AL 100 % DE SU PVSM PUOT
MATERIALES VA FRREA
SUMINISTRO, DESCARGA Y DISTRIBUCION DE RIEL NUEVO DE 115 LBS/YDA DE 39'
DE LONGITUD PUOT
SUMINISTRO, DESCARGA Y DISTRIBUCION DE DURMIENTE NUEVO DE CONCRETO
TIPO I-84 PARA RIEL DE 115 LBS/YDA PUOT
SUMINISTRO Y COLOCACION DE JUEGO DE FIJACION RIEL-DURMIENTE DE
CONCRETO TIPO RN PUOT
SUMINISTRO Y DISTRIBUCION DE PLANCHUELA PARA RIEL DE 115 LBS/YDA PUOT

14
15

SUMINISTRO Y COLOCACION DE HERRAJE DEL No. 10, PUOT

136

16

SUMINISTRO Y DISTRIBUCION DE BALASTO BASALTICO TIPO 4A, SOBRE VIA PUOT


SUMINISTRO Y APLICACION DE SOLDADURA ALUMINOTERMICA, TIPO QP PUOT

$0.00

$0.00

$0.00

$0.00

LOTE

1.00

$1,169,466.77

$0.00

$0.00

$0.00

$0.00

LOTE

1.00

$1,082,018.43

$0.00

$0.00

$0.00

$0.00

M3

0.00

$5,098.12

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

M3

27.00

$27.86

$0.00

$0.00

$0.00

$0.00

M3

324.00

$49.18

$0.00

$0.00

$0.00

$0.00

M3

270.00

$1,626.86

$0.00

$0.00

$0.00

$0.00

KG

19,043.00

$22.22

$0.00

$0.00

$0.00

$0.00

M3

216.00

$2,036.64

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Ha

6,000.00

$10.92

$0.00

$0.00

$0.00

$0.00

M3

2,146.00

$27.86

$0.00

$0.00

$0.00

$0.00

M3

646.00

$49.18

$0.00

$0.00

$0.00

$0.00

M3

1,214.00

$210.10

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

PZA

323.00

$13,294.31

$0.00

$0.00

$0.00

$0.00

PZA

2,864.00

$1,193.64

$0.00

$0.00

$0.00

$0.00

JGO

2,864.00

$384.32

$0.00

$0.00

$0.00

$0.00

PAR

323.00

$853.38

$0.00

$0.00

$0.00

$0.00

JGO

1.00

$70,674.95

$0.00

$0.00

$0.00

$0.00

HERRAJE

1.00

$336,175.17

$0.00

$0.00

$0.00

$0.00

M3

2297.00

$395.95

$0.00

$0.00

$0.00

$0.00

KIT

323.00

$3,612.08

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TRABAJOS VA FRREA
DESMANTELAMIENTO DE HERRAJE DE CAMBIO No. 10

219

19

DEMOLICION DE CIMENTACION EXISTENTE DE BASCULA

150

20

ARMADO DE VIA PUOT

151

21

ALINEAMIENTO Y NIVELACIN DE VIA EN FORMA MECANIZADA P.U.O.T

M-VIA

151

22

ALINEAMIENTO Y NIVELACIN DE VIA EN FORMA MECANIZADA P.U.O.T

M-VIA

154

23

LIBERACION DE ESFUERZOS DE VIA PUOT

M-VIA

A05

DESMANTELAMIENTO DE VIA ELASTICA

221

25

RECOBRO, CARGA, DESCARGA, CLASIFICACION Y ENTONGUE DE RIEL


RECOBRO, CARGA, DESCARGA, CLASIFICACION Y ENTONGUE DE FIJACION

TRAMO IX (8+186 - 9+390)

$1,704.83

18

24

TRAMO VIII (7+878 - 8+158)

400.00

218

220

TRAMO VII (5+302 - 7+850)

PRELIMINARES Y TERRACERIAS

148

17

M3

PRECIO
UNITARIO

CANTIDAD

TERRACERIAS (N.CTR.CAR.1.01)

149

A04

UNIDAD

CONEXION FINAL DE LIBRAMIENTO CON PATIO DE MANIOBRAS

SUMINISTRO Y COLOCACION DE JUEGO DE MADERA DEL No. 10, PUOT

147

FECHA DE INICIO:
FECHA DE TERMINO:

LAGUNA DE CUYUTLN MANZANILLO, COLIMA.


MARGEN NORTE

CLAVE

HERRAJE

1.00

$12,363.93

$0.00

$0.00

$0.00

$0.00

LOTE

1.00

$61,668.00

$0.00

$0.00

$0.00

$0.00

M-VIA

1,919.00

$1,347.08

$0.00

$0.00

$0.00

$0.00

1,855.00

$66.95

$0.00

$0.00

$0.00

$0.00

1,855.00

$66.95

$0.00

$0.00

$0.00

$0.00

1,919.00

$127.78

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

PZA

37.00

$552.63

$0.00

$0.00

$0.00

$0.00

JGO

367.00

$78.66

$0.00

$0.00

$0.00

$0.00

PZA

367.00

$215.44

$0.00

$0.00

$0.00

$0.00

m3

2,200.0000

26

RECOBRO, CARGA, DESCARGA, CLASIFICACION Y ENTONGUE DE DURMIENTE DE


CONCRETO

223

27

COMPACTACION AL 90 % DE LA CAMA DE LOS CORTES DEBAJO DE LA


SUBRASANTE PUOT

$24.38

$0.00

$0.00

$0.00

$0.00

224

28

DESMANTELAMIENTO DE VA DE BASCULA

LOTE

1.0000

$10,295.27

$0.00

$0.00

$0.00

$0.00

151

29

ALINEAMIENTO Y NIVELACIN DE VIA EN FORMA MECANIZADA P.U.O.T

M-VIA

2,450.38

$66.95

$0.00

$0.00

$0.00

$0.00

30

SUMINISTRO, FORMACION Y COMPACTACION DE SUBRASANTE AL 100 % DE


SU PVSM PUOT

$214.64

$0.00

$0.00

$0.00

$0.00

222

226

m3

0.000

TRAMO X (9+418 - 11+098)

TRAMO XI (11+098-

$189.00

VOLUMENES ADICIONALES

CAMINO PROVISIONAL
N-CTR-PUE-1-02-007/07
88
89

Geotextiles

E.P.22

Geomalla biaxial BX - 1200 o similar, p.u.o.t.

m2

40,892.40

$60.41

$0.00

$0.00

$0.00

$0.00

E.P.23

Geotextil PIVYTEC GEO 350 o similar p.u.o.t., para evitar la filtracin de finos

m2

77,897.29

$38.28

$0.00

$0.00

$0.00

$0.00

N-CTR-CAR-1-01-009/00

Terraplenes

90

E.P.19

Formacin de Terrapln p.u.o.t, de arena compactado al 90%

m3

126,175.97

$71.64

$0.00

$0.00

$0.00

$0.00

91

E.P.20

Capa de grava. p.u.o.t. para revestimiento de camino

m3

19,529.14

$401.29

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

EJECTUTADO
TRAMO VII
TRAMO VIII
TRAMO IX
TRAMO X

O. AMBIENTAL

19.98%
1.94%
8.69%
17.53%
4.03%

$354,240,047.45
$34,420,876.80
$154,156,724.99
$310,804,691.37
$71,509,583.81
$925,131,924.41

PROGRAMADO

$0.00

$0.00

425,749,631.25

34,075,310.87

154,156,724.99

194,203,403.80

425,749,631.25

34,075,310.87

154,156,724.99

194,203,403.80
EJEC. TOTAL $

agregar

talas

40,529.84

corte

146,462.96

IMPORTE DEL CONTRATO

813,558,716.80

Dato del Dia $

1,602,587,052.35

AV. FISICO PROG.

90.39%

1,772,950,553.37

AV. FISICO EJEC.

45.89%

1,649,647,572.27

AV, FINANCIERO PROG.

93.05%

1,644,622,611.03

AV, FINANCIERO EJEC.

92.76%

$836,782,298.10

47.20%

GENERAL DEL CENTRO SCT COLIMA


SUBDIRECCION DE OBRAS
GENERAL DE CARRETERAS FEDERALES
NTO DE CONTRATOS Y ESTIMACIONES

E-7
CONTRATO No. 9-F-DD-A-547-W-0-9
15 DE DICIEMBRE DE 2009
CONVENIO No. 9-F-DD-A-547-W-2-0
22 DE JULIO DE 2010
01 DE MARZO DE 2010
02 DE MAYO DE 2011
TRAMO XI (11+098-

IMPORTE ($) EN
MILES

IMPORTE

$0.00

2,027.20

$0.00

665.34

1,434,242.14

$0.00

4,688.27

11,012,846.01

$0.00

315,936.16

4,497,890.54

4,549,480.70

$0.00

197,842.50

2,848,932.00

$0.00

1,146,373.65

16,507,780.56

$0.00

3,160.00

278,490.80

$0.00

98,810.56

576,065.56

$0.00

12,133.83

$33,023,904.02

$0.00

165.61

$742,879.54

$0.00

14,316.30

$63,883,623.37

$0.00

1,377,448.95

$18,650,658.73

$0.00

2,963,237.64

$41,574,224.09

$0.00

4,428.00

$239,687.64

$0.00

761,520.28

$55,766,129.87

$0.00

104,832.50

$7,676,883.98

$0.00

128.79

$0.00

1,431.00

$36,476.19

$0.00

383.50

$13,673,339.68

$0.00

382.00

$13,583,935.28

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$15,789.65

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$2,761.10

$5,765,370.08

$52,209.00

$3,153,945.69

$80,067.79

$3,064,995.00

$161,949.21

$11,602,041.40

$7,897.09

$3,169,023.25

$0.00

$0.00

$0.00

SUMA ESTA HOJA

$317,328,635.78

$0.00

SUMA ACUMULADA

$317,328,635.78

GENERAL DEL CENTRO SCT COLIMA


SUBDIRECCION DE OBRAS
GENERAL DE CARRETERAS FEDERALES
NTO DE CONTRATOS Y ESTIMACIONES

E-7
CONTRATO No. 9-F-DD-A-547-W-0-9
15 DE DICIEMBRE DE 2009
CONVENIO No. 9-F-DD-A-547-W-2-0
22 DE JULIO DE 2010
01 DE MARZO DE 2010
02 DE MAYO DE 2011
TRAMO XI (11+098-

IMPORTE ($) EN
MILES

$0.00

$0.00

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00
$0.00
$0.00

$0.00

$0.00

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00
$0.00
$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00
$0.00

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00
$4,524,258.77
$96,656.00
$70,048.00

$0.00
$16,349.00
$1,600.00
$1,600.00

$4,524,258.77

$96,656.00
$70,048.00

$4,690,962.77

SUMA ESTA HOJA

$4,690,962.77

$4,690,962.77

SUMA ACUMULADA

$322,019,598.55

GENERAL DEL CENTRO SCT COLIMA


SUBDIRECCION DE OBRAS
GENERAL DE CARRETERAS FEDERALES
NTO DE CONTRATOS Y ESTIMACIONES

E-7
CONTRATO No. 9-F-DD-A-547-W-0-9
15 DE DICIEMBRE DE 2009
CONVENIO No. 9-F-DD-A-547-W-2-0
22 DE JULIO DE 2010
01 DE MARZO DE 2010
02 DE MAYO DE 2011
TRAMO XI (11+098-

IMPORTE ($) EN
MILES

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

SUMA ESTA HOJA

$0.00

$4,690,962.77

SUMA ACUMULADA

$322,019,598.55

$0.00

$0.00

SUMA ESTA HOJA

$0.00

$4,690,962.77

SUMA ACUMULADA

$322,019,598.55

$0.00

$357,039.86

$49,503,576.59

$0.00

SUMA ESTA HOJA

$49,503,576.59

$4,690,962.77

SUMA ACUMULADA

$371,523,175.14

$0.00
$0.00

$0.00

$0.00

$0.00

$187.00

$5,043,032.83

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$3,050.00

$1,172,176.00

$0.00

$3,101.00

$3,701,477.64

$0.00

$1,068.00

$532,889.28

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$2,478.00

$3,338,064.24

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

SUMA ESTA HOJA

$13,787,639.99

$4,690,962.77

SUMA ACUMULADA

$385,310,815.13

$0.00

$0.87

$71,509,583.81

0.00

SUMA ESTA HOJA

$71,509,583.81

4,690,962.77

SUMA ACUMULADA

$456,820,398.93

GENERAL DEL CENTRO SCT COLIMA


SUBDIRECCION DE OBRAS
GENERAL DE CARRETERAS FEDERALES
NTO DE CONTRATOS Y ESTIMACIONES

E-7
CONTRATO No. 9-F-DD-A-547-W-0-9
15 DE DICIEMBRE DE 2009
CONVENIO No. 9-F-DD-A-547-W-2-0
22 DE JULIO DE 2010
01 DE MARZO DE 2010
02 DE MAYO DE 2011
TRAMO XI (11+098-

IMPORTE ($) EN
MILES

$0.00 HOJA 7 DE 8

$0.00

$1.00

$180,336.13

$0.00

$1.00

$345,565.93

$1.00

$226,708.93

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$13,560.80

$278,495,573.05

$0.00

$0.00

$25,480.00

$8,016,008.00

$80.00

$8,036.20

$30.00

$10,481.70

$14.00

$0.00

$8,385.60

$46.00

$7,337.26

$6.00

$6,289.08

$1.00

$9,557,092.38

$1.00

$2,107,759.43

$1.00

$1,082,018.43

$2,978.10

$146,462.96

$1,751.92

$15,405.87

$540,187.01

$78,540,973.96

$0.00

$379,279,216.05

$4,690,962.77

$836,099,614.98

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

GENERAL DEL CENTRO SCT COLIMA


SUBDIRECCION DE OBRAS
GENERAL DE CARRETERAS FEDERALES
NTO DE CONTRATOS Y ESTIMACIONES

E-7
CONTRATO No. 9-F-DD-A-547-W-0-9
15 DE DICIEMBRE DE 2009
CONVENIO No. 9-F-DD-A-547-W-2-0
22 DE JULIO DE 2010
01 DE MARZO DE 2010
02 DE MAYO DE 2011
TRAMO XI (11+098-

IMPORTE ($) EN
MILES

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$682,683.12

$189.00

$682,683.12

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

5,373,645.89

SUMA ESTA HOJA

$682,683.12

5,373,645.89

SUMA ACUMULADA

$836,782,298.10

I.V.A. 16%

$133,885,167.70

COSTO TOTAL

$970,667,465.80

$682,683.12

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

(m2)

LONGITUD (m)
Nivel de
desplante

Nivel de primer
colado

EJE
ELEMENTO

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

TRAMO VI APOYO 1 a 75
APOYO N.1
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

3.10

4.03

0.5

17.10

16.60

APOYO N.2
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.58

0.5

20.30

19.80

APOYO N.3
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.58

0.5

20.30

19.80

APOYO N.4
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.46

0.5

20.30

19.80

APOYO N.5
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.03

0.5

20.30

19.80

APOYO N.6
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.06

0.5

20.30

19.80

APOYO N.7
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

APOYO N.8
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.10

0.5

20.30

19.80

APOYO N.9
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.12

0.5

20.30

19.80

APOYO N.10
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.14

0.5

20.30

19.80

APOYO N.11
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.42

0.5

20.30

19.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

APOYO N.12
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.37

0.5

20.30

19.80

APOYO N.13
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.36

0.5

20.30

19.80

APOYO N.14
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.28

0.5

20.30

19.80

APOYO N.15
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.31

0.5

20.30

19.80

APOYO N.16
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

1.43

0.5

20.30

19.80

APOYO N.17
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.59

0.5

20.30

19.80

APOYO N.18
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.65

0.5

20.30

19.80

APOYO N.19
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.53

0.5

20.30

19.80

APOYO N.20
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.58

0.5

20.30

19.80

APOYO N.21
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.65

0.5

20.30

19.80

APOYO N.22
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.63

0.5

20.30

19.80

APOYO N.23
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.72

0.5

20.30

19.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

EJE
ELEMENTO

__________________________
SUPERVISION EJECUTIVA

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

APOYO N.24
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.55

0.5

20.30

19.80

APOYO N.25
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.38

0.5

20.30

19.80

APOYO N.26
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.13

0.5

20.30

19.80

APOYO N.27
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

APOYO N.28
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.04

0.5

20.30

19.80

APOYO N.29
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.06

0.5

20.30

19.80

APOYO N.30
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.09

0.5

20.30

19.80

APOYO N.31
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.05

0.5

20.30

19.80

APOYO N.32
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

APOYO N.33
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.11

0.5

20.30

19.80

APOYO N.34
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

APOYO N.35
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

EJE
ELEMENTO

__________________________
SUPERVISION EJECUTIVA

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

APOYO N.36
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.10

0.5

20.30

19.80

APOYO N.37
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.53

0.5

20.30

19.80

APOYO N.38
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.58

0.5

20.30

19.80

APOYO N.39
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.65

0.5

20.30

19.80

APOYO N.40
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.63

0.5

20.30

19.80

APOYO N.
41
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.72

0.5

20.30

19.80

APOYO N.
42
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.55

0.5

20.30

19.80

APOYO N.
43
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.38

0.5

20.30

19.80

APOYO N.
44
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.13

0.5

20.30

19.80

APOYO N.
45
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

APOYO N.
46
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.04

0.5

20.30

19.80

APOYO N.
47
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.06

0.5

20.30

19.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

EJE
ELEMENTO

__________________________
SUPERVISION EJECUTIVA

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

APOYO N.
48
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.09

0.5

20.30

19.80

APOYO N.
49
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.05

0.5

20.30

19.80

APOYO N.
50
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

APOYO N.
51
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.11

0.5

20.30

19.80

APOYO N.
52
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

APOYO N.
53
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

APOYO N.
54
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.10

0.5

20.30

19.80

APOYO N.
55
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.53

0.5

20.30

19.80

APOYO N.
56
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.58

0.5

20.30

19.80

APOYO N.
57
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.65

0.5

20.30

19.80

APOYO N.
58
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.63

0.5

20.30

19.80

APOYO N.
59
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.72

0.5

20.30

19.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

EJE
ELEMENTO

__________________________
SUPERVISION EJECUTIVA

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

APOYO N.
60
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.55

0.5

20.30

19.80

APOYO N.
61
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.38

0.5

20.30

19.80

APOYO N.
62
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.13

0.5

20.30

19.80

APOYO N.
63
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

APOYO N.
64
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.04

0.5

20.30

19.80

APOYO N.
65
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.06

0.5

20.30

19.80

APOYO N.
66
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.09

0.5

20.30

19.80

APOYO N.
67
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.05

0.5

20.30

19.80

APOYO N.
68
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

APOYO N.
69
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.11

0.5

20.30

19.80

APOYO N.
70
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

APOYO N.
71
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

EJE
ELEMENTO

__________________________
SUPERVISION EJECUTIVA

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

APOYO N.
72
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.10

0.5

20.30

19.80

APOYO N.
73
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.53

0.5

20.30

19.80

APOYO N.
74
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.58

0.5

20.30

19.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

EJE
ELEMENTO

__________________________
SUPERVISION EJECUTIVA

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

(m2)

LONGITUD (m)
Nivel de
desplante

Nivel de primer
colado

EJE
ELEMENTO

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

TRAMO VII APOYO 75 a 166


APOYO N.
75
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.65

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
76
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.63

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
77
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.72

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
78
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.55

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
79
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.38

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
80
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.13

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
81
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
82
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.04

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
83
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.06

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
84
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.09

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
85
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.05

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
86
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

4.00

81.20

79.20

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
87
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.11

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
88
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
89
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
90
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.10

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
91
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.53

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
92
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.58

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
93
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.65

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
94
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.63

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
95
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.72

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
96
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.55

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
97
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.38

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
98
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.13

0.5

20.30

19.80

4.00

81.20

79.20

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
99
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
100
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.04

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
101
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.06

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
102
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.09

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
103
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.05

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
104
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
105
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.11

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
106
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
107
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
108
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.10

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
109
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.53

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
110
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.58

0.5

20.30

19.80

4.00

81.20

79.20

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
111
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.65

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
112
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.63

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
113
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.72

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
114
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.55

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
115
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.38

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
116
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.13

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
117
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
118
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.04

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
119
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.06

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
120
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.09

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
121
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.05

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
122
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

4.00

81.20

79.20

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
123
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.11

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
124
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
125
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
126
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.10

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
127
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.53

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
128
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.58

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
129
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.65

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
130
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.63

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
131
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.72

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
132
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.55

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
133
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.38

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
134
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.13

0.5

20.30

19.80

4.00

81.20

79.20

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
135
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
136
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.04

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
137
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.06

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
138
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.09

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
139
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.05

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
140
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
141
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.11

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
142
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
143
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
144
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.10

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
145
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.53

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
146
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.58

0.5

20.30

19.80

4.00

81.20

79.20

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
147
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.65

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
148
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.63

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
149
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.72

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
150
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.55

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
151
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.38

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
152
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

0.13

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
153
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.07

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
154
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.04

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
155
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.06

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
156
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.09

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
157
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.05

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
158
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

4.00

81.20

79.20

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
159
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.11

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
160
Pilas coladas en el lugar

1.5

0.75

1.77

-19.00

1.30

-0.08

0.5

20.30

19.80

4.00

81.20

79.20

APOYO N.
161
Pilas coladas en el lugar

1.5

0.75

1.77

-18.00

1.30

-0.07

0.5

19.30

18.80

4.00

77.20

75.20

APOYO N.
162
Pilas coladas en el lugar

1.5

0.75

1.77

-18.00

1.30

-0.10

0.5

19.30

18.80

4.00

77.20

75.20

APOYO N.
163
Pilas coladas en el lugar

1.5

0.75

1.77

-18.00

1.30

-0.29

0.5

19.30

18.80

4.00

77.20

75.20

APOYO N.
164
Pilas coladas en el lugar

1.5

0.75

1.77

-18.00

1.30

-0.07

0.5

19.30

18.80

4.00

77.20

75.20

APOYO N.
165
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

1.30

0.23

0.5

13.30

12.80

4.00

53.20

51.20

APOYO N.
166
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

1.99

1.49

0.5

13.99

13.49

4.00

55.96
Pilastron
Concreto

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

53.96
7,217.16 ML
12,774.37 M3

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

(m2)

LONGITUD (m)
Nivel de
desplante

Nivel de primer
colado

EJE
ELEMENTO

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

TRAMO VIII APOYO 166-177


APOYO N.
167
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

3.04

3.50

0.5

15.04

14.54

4.00

60.16

58.16

APOYO N.
168
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

2.93

3.07

0.5

14.93

14.43

4.00

59.72

57.72

APOYO N.
169
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

2.82

2.83

0.5

14.82

14.32

4.00

59.28

57.28

APOYO N.
170
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

2.71

2.44

0.5

14.71

14.21

4.00

58.84

56.84

APOYO N.
171
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

2.60

2.16

0.5

14.60

14.10

4.00

58.40

56.40

APOYO N.
172
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

2.14

1.64

0.5

14.14

13.64

4.00

56.56

54.56

APOYO N.
173
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.64

0.14

0.5

12.64

12.14

4.00

50.56

48.56

APOYO N.
174
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.50

0.5

14.50

14.00

4.00

58.00

56.00

APOYO N.
175
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.50

0.5

14.50

14.00

4.00

58.00

56.00

APOYO N.
176
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.82

0.32

0.5

14.82

14.32

4.00

59.28

57.28

APOYO N.
177
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.95

0.45

0.5

14.95

14.45

4.00

59.80
Pilastron
Concreto

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

57.80
616.60 ML
1,091.38 M3

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

(m2)

LONGITUD (m)
Nivel de
desplante

Nivel de primer
colado

EJE
ELEMENTO

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

TRAMO IX APOYO 177-221


APOYO N.
178
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.80

0.30

0.5

14.80

14.30

4.00

59.20

57.20

APOYO N.
179
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.77

0.27

0.5

14.77

14.27

4.00

59.08

57.08

APOYO N.
180
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.78

0.26

0.5

14.78

14.28

4.00

59.12

57.12

APOYO N.
181
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

1.51

0.27

0.5

15.51

14.28

4.00

62.04

57.12

APOYO N.
182
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

1.40

0.24

0.5

15.40

14.28

4.00

61.60

57.12

APOYO N.
183
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

1.29

0.19

0.5

17.29

16.28

4.00

69.16

65.12

APOYO N.
184
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

1.18

0.20

0.5

17.18

16.28

4.00

68.72

65.12

APOYO N.
185
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

1.07

0.05

0.5

17.07

16.28

4.00

68.28

65.12

APOYO N.
186
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.97

0.07

0.5

16.97

16.28

4.00

67.88

65.12

APOYO N.
187
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.86

0.07

0.5

16.86

16.28

4.00

67.44

65.12

APOYO N.
188
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.75

0.04

0.5

16.75

16.25

4.00

67.00

65.00

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
189
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.64

0.24

0.5

16.64

16.14

4.00

66.56

64.56

APOYO N.
190
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.53

0.02

0.5

16.53

16.03

4.00

66.12

64.12

APOYO N.
191
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.42

-0.04

0.5

16.42

15.92

4.00

65.68

63.68

APOYO N.
192
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.31

-0.10

0.5

16.31

15.81

4.00

65.24

63.24

APOYO N.
193
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.20

0.12

0.5

16.20

15.70

4.00

64.80

62.80

APOYO N.
194
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.20

0.22

0.5

16.20

15.70

4.00

64.80

62.80

APOYO N.
195
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.20

-0.17

0.5

16.20

15.70

4.00

64.80

62.80

APOYO N.
196
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.20

-0.09

0.5

16.20

15.70

4.00

64.80

62.80

APOYO N.
197
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.20

0.04

0.5

16.20

15.70

4.00

64.80

62.80

APOYO N.
198
Pilas coladas en el lugar

1.5

0.75

1.77

-16.00

0.20

0.08

0.5

16.20

15.70

4.00

64.80

62.80

APOYO N.
199
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

0.06

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
200
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

0.02

0.5

14.20

13.70

4.00

56.80

54.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
201
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

0.08

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
202
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.02

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
203
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.03

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
204
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.09

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
205
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.11

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
206
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.14

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
207
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.16

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
208
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.21

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
209
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.26

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
210
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.21

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
211
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.20

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
212
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.21

0.5

14.20

13.70

4.00

56.80

54.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
213
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.24

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
214
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.27

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
215
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.30

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
216
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.26

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
217
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.26

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
218
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-0.27

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
219
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

0.07

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
220
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

0.12

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
221
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

0.76

0.5

14.20

13.70

4.00

56.80
Pilastron
Concreto

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

54.80
2,569.04 ML
4,547.20 M3

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

(m2)

LONGITUD (m)
Nivel de
desplante

Nivel de primer
colado

EJE
ELEMENTO

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

TRAMO X APOYO 221-282


APOYO N.
222
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

0.75

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
223
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

0.54

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
224
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

0.13

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
225
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

0.13

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
226
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

0.90

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
227
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

0.54

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
228
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

0.11

0.5

12.20

11.70

8.00

97.60

93.60

APOYO N.
229
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

0.08

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
230
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

0.05

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
231
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

0.15

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
232
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

0.21

0.5

12.20

11.70

4.00

48.80

46.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
233
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-0.01

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
234
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-0.30

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
235
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-0.70

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
236
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-0.97

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
237
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.07

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
238
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.15

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
239
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.28

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
240
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.47

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
241
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.40

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
242
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.26

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
243
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.34

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
244
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.37

0.5

12.20

11.70

4.00

48.80

46.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
245
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.40

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
246
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.37

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
247
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.33

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
248
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.21

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
249
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.18

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
250
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.21

0.5

12.20

11.70

5.00

61.00

58.50

APOYO N.
251
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.22

0.5

12.20

11.70

6.00

73.20

70.20

APOYO N.
252
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.20

0.5

12.20

11.70

7.00

85.40

81.90

APOYO N.
253
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.22

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
254
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.19

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
255
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.10

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
256
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.07

0.5

12.20

11.70

4.00

48.80

46.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
257
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-0.96

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
258
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.03

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
259
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.02

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
260
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.00

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
261
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.06

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
262
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.00

0.5

12.20

11.70

9.00

109.80

105.30

APOYO N.
263
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.01

0.5

12.20

11.70

6.00

73.20

70.20

APOYO N.
264
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.13

0.5

12.20

11.70

5.00

61.00

58.50

APOYO N.
265
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.28

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
266
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.30

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
267
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.28

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
268
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-1.31

0.5

14.20

13.70

4.00

56.80

54.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
269
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-1.29

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
270
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-1.32

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
271
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.33

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
272
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.00

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
273
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.06

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
274
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.00

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
275
Pilas coladas en el lugar

1.5

0.75

1.77

-12.00

0.20

-1.01

0.5

12.20

11.70

4.00

48.80

46.80

APOYO N.
276
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-1.13

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
277
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-1.28

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
278
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-1.30

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
279
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-1.28

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
280
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-1.31

0.5

14.20

13.70

4.00

56.80

54.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

_____________________________
DIRECCION EJECUTIVA DE OBRA.

FECHA
UNIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
CONTRATISTA: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO : Pilastrones de 1.50 m de diametro colados en el lugar p.u.o.t.
MATERIAL:

CONCRETO

Area Transv
DIAMETRO

RADIO

EJE
ELEMENTO
LONGITUD (m)

(m2)

Nivel de
desplante

Nivel de primer
colado

N.T.N

Descabece

De primer
colado

Longitud
efectiva

NUM
PILASTRONES
(pzas)

LONG(m)
DE PRIMER
COLADO

LONG(m)
TOTAL
EFECTIVA

APOYO N.
281
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-1.29

0.5

14.20

13.70

4.00

56.80

54.80

APOYO N.
282
Pilas coladas en el lugar

1.5

0.75

1.77

-14.00

0.20

-1.32

0.5

14.20

13.70

2.00

28.40

27.40

Pilastron
Concreto

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

3,158.00 ML
5,589.66 M3

_____________________________
DIRECCION EJECUTIVA DE OBRA.

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

N1

LONGITUD:

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM
Kg

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

(Kg/ml)

Kg

TRAMO VI
APOYO 1 a 75

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.1
VARS. A
VARS. B

16.6
4.76

25
122

12
5

16.60
16.6

9.0
1.57

3735.0
911.7

225.00
54.92

0.0
0.0

APOYO N.2
VARS. A
VARS. A1
VARS. B

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

APOYO N.3
VARS. A
VARS. A1
VARS. B

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

APOYO N.4
VARS. A
VARS. A1
VARS. B

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

APOYO N.5
VARS. A
VARS. A1
VARS. B

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

APOYO N.6
VARS. A
VARS. A1
VARS. B

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

APOYO N.7
VARS. A
VARS. A1
VARS. B

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

APOYO N.8
VARS. A
VARS. A1
VARS. B

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

APOYO N.9
VARS. A
VARS. A1
VARS. B

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

APOYO N.10
VARS. A
VARS. A1
VARS. B

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

APOYO N.11
VARS. A
VARS. A1
VARS. B

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

APOYO N.12
VARS. A
VARS. A1
VARS. B

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

APOYO N.
VARS. A
VARS. A1
VARS. B

13

Suma parcial por hoja =

0.00

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

14

APOYO N.
VARS. A
VARS. A1
VARS. B

15

APOYO N.
VARS. A
VARS. A1
VARS. B

16

APOYO N.
VARS. A
VARS. A1
VARS. B

17

APOYO N.
VARS. A
VARS. A1
VARS. B

18

APOYO N.
VARS. A
VARS. A1
VARS. B

19

APOYO N.
VARS. A
VARS. A1
VARS. B

20

APOYO N.
VARS. A
VARS. A1
VARS. B

21

APOYO N.
VARS. A
VARS. A1
VARS. B

22

APOYO N.
VARS. A
VARS. A1
VARS. B

23

APOYO N.
VARS. A
VARS. A1
VARS. B

24

APOYO N.
VARS. A
VARS. A1
VARS. B

25

APOYO N.
VARS. A
VARS. A1
VARS. B

26

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM
Kg

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

(Kg/ml)

Kg

TRAMO VI
APOYO 1 a 75

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

19.8
12
4.76

25
25
147

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1098.6

225.00
225.00
55.48

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

Suma parcial por hoja =

0.00

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

27

APOYO N.
VARS. A
VARS. A1
VARS. B

28

APOYO N.
VARS. A
VARS. A1
VARS. B

29

APOYO N.
VARS. A
VARS. A1
VARS. B

30

APOYO N.
VARS. A
VARS. A1
VARS. B

31

APOYO N.
VARS. A
VARS. A1
VARS. B

32

APOYO N.
VARS. A
VARS. A1
VARS. B

33

APOYO N.
VARS. A
VARS. A1
VARS. B

34

APOYO N.
VARS. A
VARS. A1
VARS. B

35

APOYO N.
VARS. A
VARS. A1
VARS. B

36

APOYO N.
VARS. A
VARS. A1
VARS. B

37

APOYO N.
VARS. A
VARS. A1
VARS. B

38

APOYO N.
VARS. A
VARS. A1
VARS. B

39

APOYO N.
VARS. A
VARS. A1
VARS. B

40

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM
Kg

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

(Kg/ml)

Kg

TRAMO VI
APOYO 1 a 75

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

Suma parcial por hoja =

0.00

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

41

APOYO N.
VARS. A
VARS. A1
VARS. B

42

APOYO N.
VARS. A
VARS. A1
VARS. B

43

APOYO N.
VARS. A
VARS. A1
VARS. B

44

APOYO N.
VARS. A
VARS. A1
VARS. B

45

APOYO N.
VARS. A
VARS. A1
VARS. B

46

APOYO N.
VARS. A
VARS. A1
VARS. B

47

APOYO N.
VARS. A
VARS. A1
VARS. B

48

APOYO N.
VARS. A
VARS. A1
VARS. B

49

APOYO N.
VARS. A
VARS. A1
VARS. B

50

APOYO N.
VARS. A
VARS. A1
VARS. B

51

APOYO N.
VARS. A
VARS. A1
VARS. B

52

APOYO N.
VARS. A
VARS. A1
VARS. B

53

APOYO N.
VARS. A
VARS. A1
VARS. B

54

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM
Kg

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

(Kg/ml)

Kg

TRAMO VI
APOYO 1 a 75

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

19.8
12
4.76

25
25
155

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1158.3

225.00
225.00
58.50

0.0
0.0
0.0

Suma parcial por hoja =

0.00

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

55

APOYO N.
VARS. A
VARS. A1
VARS. B

56

APOYO N.
VARS. A
VARS. A1
VARS. B

57

APOYO N.
VARS. A
VARS. A1
VARS. B

58

APOYO N.
VARS. A
VARS. A1
VARS. B

59

APOYO N.
VARS. A
VARS. A1
VARS. B

60

APOYO N.
VARS. A
VARS. A1
VARS. B

61

APOYO N.
VARS. A
VARS. A1
VARS. B

62

APOYO N.
VARS. A
VARS. A1
VARS. B

63

APOYO N.
VARS. A
VARS. A1
VARS. B

64

APOYO N.
VARS. A
VARS. A1
VARS. B

65

APOYO N.
VARS. A
VARS. A1
VARS. B

66

APOYO N.
VARS. A
VARS. A1
VARS. B

67

APOYO N.
VARS. A
VARS. A1
VARS. B

68

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM
Kg

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

(Kg/ml)

Kg

TRAMO VI
APOYO 1 a 75

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

Suma parcial por hoja =

0.00

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

69

APOYO N.
VARS. A
VARS. A1
VARS. B

70

APOYO N.
VARS. A
VARS. A1
VARS. B

71

APOYO N.
VARS. A
VARS. A1
VARS. B

72

APOYO N.
VARS. A
VARS. A1
VARS. B

73

APOYO N.
VARS. A
VARS. A1
VARS. B

74

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM
Kg

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

(Kg/ml)

Kg

TRAMO VI
APOYO 1 a 75

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

225.00
225.00
56.90

0.0
0.0
0.0

Suma parcial por hoja =

0.00

TRAMO VI =

0.0

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

75

APOYO N.
VARS. A
VARS. A1
VARS. B

76

APOYO N.
VARS. A
VARS. A1
VARS. B

77

APOYO N.
VARS. A
VARS. A1
VARS. B

78

APOYO N.
VARS. A
VARS. A1
VARS. B

79

APOYO N.
VARS. A
VARS. A1
VARS. B

80

APOYO N.
VARS. A
VARS. A1
VARS. B

81

APOYO N.
VARS. A
VARS. A1
VARS. B

82

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO VII
APOYO 76 a 166

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

Suma parcial por hoja =

265010.72

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

83

APOYO N.
VARS. A
VARS. A1
VARS. B

84

APOYO N.
VARS. A
VARS. A1
VARS. B

85

APOYO N.
VARS. A
VARS. A1
VARS. B

86

APOYO N.
VARS. A
VARS. A1
VARS. B

87

APOYO N.
VARS. A
VARS. A1
VARS. B

88

APOYO N.
VARS. A
VARS. A1
VARS. B

89

APOYO N.
VARS. A
VARS. A1
VARS. B

90

APOYO N.
VARS. A
VARS. A1
VARS. B

91

APOYO N.
VARS. A
VARS. A1
VARS. B
APOYO N.
VARS. A
VARS. A1
VARS. B

92

APOYO N.
VARS. A
VARS. A1
VARS. B

94

APOYO N.
VARS. A
VARS. A1
VARS. B

95

APOYO N.
VARS. A
VARS. A1
VARS. B

96

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO VII
APOYO 76 a 166

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
151

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1126.6

4
4
4

225.00
225.00
56.90

17820.0
10800.0
4506.3

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

93

Suma parcial por hoja =

462871.97

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

97

APOYO N.
VARS. A
VARS. A1
VARS. B

98

APOYO N.
VARS. A
VARS. A1
VARS. B

99

APOYO N.
VARS. A
VARS. A1
VARS. B

100

APOYO N.
VARS. A
VARS. A1
VARS. B

101

APOYO N.
VARS. A
VARS. A1
VARS. B

102

APOYO N.
VARS. A
VARS. A1
VARS. B

103

APOYO N.
VARS. A
VARS. A1
VARS. B

104

APOYO N.
VARS. A
VARS. A1
VARS. B

105

APOYO N.
VARS. A
VARS. A1
VARS. B

106

APOYO N.
VARS. A
VARS. A1
VARS. B

107

APOYO N.
VARS. A
VARS. A1
VARS. B

108

APOYO N.
VARS. A
VARS. A1
VARS. B

109

APOYO N.
VARS. A
VARS. A1
VARS. B

110

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO VII
APOYO 76 a 166

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

Suma parcial por hoja =

461676.26

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

111

APOYO N.
VARS. A
VARS. A1
VARS. B

112

APOYO N.
VARS. A
VARS. A1
VARS. B

113

APOYO N.
VARS. A
VARS. A1
VARS. B

114

APOYO N.
VARS. A
VARS. A1
VARS. B

115

APOYO N.
VARS. A
VARS. A1
VARS. B

116

APOYO N.
VARS. A
VARS. A1
VARS. B

117

APOYO N.
VARS. A
VARS. A1
VARS. B

118

APOYO N.
VARS. A
VARS. A1
VARS. B

119

APOYO N.
VARS. A
VARS. A1
VARS. B

120

APOYO N.
VARS. A
VARS. A1
VARS. B

121

APOYO N.
VARS. A
VARS. A1
VARS. B

122

APOYO N.
VARS. A
VARS. A1
VARS. B

123

APOYO N.
VARS. A
VARS. A1
VARS. B

124

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO VII
APOYO 76 a 166

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

Suma parcial por hoja =

461676.26

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

125

APOYO N.
VARS. A
VARS. A1
VARS. B

126

APOYO N.
VARS. A
VARS. A1
VARS. B

127

APOYO N.
VARS. A
VARS. A1
VARS. B

128

APOYO N.
VARS. A
VARS. A1
VARS. B

129

APOYO N.
VARS. A
VARS. A1
VARS. B

130

APOYO N.
VARS. A
VARS. A1
VARS. B

131

APOYO N.
VARS. A
VARS. A1
VARS. B

132

APOYO N.
VARS. A
VARS. A1
VARS. B

133

APOYO N.
VARS. A
VARS. A1
VARS. B

134

APOYO N.
VARS. A
VARS. A1
VARS. B

135

APOYO N.
VARS. A
VARS. A1
VARS. B

136

APOYO N.
VARS. A
VARS. A1
VARS. B

137

APOYO N.
VARS. A
VARS. A1
VARS. B

138

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO VII
APOYO 76 a 166

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

Suma parcial por hoja =

461676.26

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

139

APOYO N.
VARS. A
VARS. A1
VARS. B

140

APOYO N.
VARS. A
VARS. A1
VARS. B

141

APOYO N.
VARS. A
VARS. A1
VARS. B

142

APOYO N.
VARS. A
VARS. A1
VARS. B

143

APOYO N.
VARS. A
VARS. A1
VARS. B

144

APOYO N.
VARS. A
VARS. A1
VARS. B

145

APOYO N.
VARS. A
VARS. A1
VARS. B

146

APOYO N.
VARS. A
VARS. A1
VARS. B

147

APOYO N.
VARS. A
VARS. A1
VARS. B

148

APOYO N.
VARS. A
VARS. A1
VARS. B

149

APOYO N.
VARS. A
VARS. A1
VARS. B
APOYO N.
VARS. A
VARS. A1
VARS. B

150

APOYO N.
VARS. A
VARS. A1
VARS. B

152

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO VII
APOYO 76 a 166

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

151

Suma parcial por hoja =

461676.26

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

153

APOYO N.
VARS. A
VARS. A1
VARS. B

154

APOYO N.
VARS. A
VARS. A1
VARS. B

155

APOYO N.
VARS. A
VARS. A1
VARS. B

156

APOYO N.
VARS. A
VARS. A1
VARS. B

157

APOYO N.
VARS. A
VARS. A1
VARS. B

158

APOYO N.
VARS. A
VARS. A1
VARS. B

159

APOYO N.
VARS. A
VARS. A1
VARS. B

160

APOYO N.
VARS. A
VARS. A1
VARS. B

161

APOYO N.
VARS. A
VARS. A1
VARS. B

162

APOYO N.
VARS. A
VARS. A1
VARS. B

163

APOYO N.
VARS. A
VARS. A1
VARS. B

164

APOYO N.
VARS. A
VARS. A1
VARS. B

165

APOYO N.
VARS. A
VARS. A1
VARS. B

166

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO VII
APOYO 76 a 166

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

19.8
12
4.76

25
25
146

12
12
5

19.80
12
19.8

9.0
9.0
1.57

4455.0
2700.0
1089.2

4
4
4

225.00
225.00
55.01

17820.0
10800.0
4356.9

18.8
12
4.76

25
25
141

12
12
5

18.80
12
18.8

9.0
9.0
1.57

4230.0
2700.0
1051.9

4
4
4

225.00
225.00
55.95

16920.0
10800.0
4207.4

18.8
12
4.76

25
25
141

12
12
5

18.80
12
18.8

9.0
9.0
1.57

4230.0
2700.0
1051.9

4
4
4

225.00
225.00
55.95

16920.0
10800.0
4207.4

18.8
12
4.76

25
25
141

12
12
5

18.80
12
18.8

9.0
9.0
1.57

4230.0
2700.0
1051.9

4
4
4

225.00
225.00
55.95

16920.0
10800.0
4207.4

18.8
12
4.76

25
25
141

12
12
5

18.80
12
18.8

9.0
9.0
1.57

4230.0
2700.0
1051.9

4
4
4

225.00
225.00
55.95

16920.0
10800.0
4207.4

12.8
12
4.76

25
25
111

12
12
5

12.80
12
12.8

9.0
9.0
1.57

2880.0
2700.0
827.7

4
4
4

225.00
225.00
64.66

11520.0
10800.0
3310.6

13.49
12
4.76

25
25
92

12
12
5

13.49
12
13.49

9.0
9.0
1.57

3035.3
2700.0
690.5

2
2
2

225.00
225.00
51.19

6070.5
5400.0
1381.0

Suma parcial por hoja =

430006.83

TRAMO VII=

3004594.55

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

166

APOYO N.
VARS. A
VARS. A1
VARS. B

167

APOYO N.
VARS. A
VARS. A1
VARS. B

168

APOYO N.
VARS. A
VARS. A1
VARS. B

169

APOYO N.
VARS. A
VARS. A1
VARS. B

170

APOYO N.
VARS. A
VARS. A1
VARS. B

171

APOYO N.
VARS. A
VARS. A1
VARS. B

172

APOYO N.
VARS. A
VARS. A1
VARS. B

173

APOYO N.
VARS. A
VARS. A1
VARS. B

174

APOYO N.
VARS. A
VARS. A1
VARS. B

175

APOYO N.
VARS. A
VARS. A1
VARS. B

176

APOYO N.
VARS. A
VARS. A1
VARS. B

177

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO VIII
APOYO 167 A 177

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

14.54
12
4.76

25
25
103

12
12
5

14.54
12
14.54

9.0
9.0
1.57

3271.5
2700.0
769.0

2
2
2

225.00
225.00
52.89

6543.0
5400.0
1538.0

14.54
12
4.76

25
25
103

12
12
5

14.54
12
14.54

9.0
9.0
1.57

3271.5
2700.0
769.0

4
4
4

225.00
225.00
52.89

13086.0
10800.0
3076.0

14.43
12
4.76

25
25
102

12
12
5

14.43
12
14.43

9.0
9.0
1.57

3246.8
2700.0
760.8

4
4
4

225.00
225.00
52.72

12987.0
10800.0
3043.1

14.32
12
4.76

25
25
101

12
12
5

14.32
12
14.32

9.0
9.0
1.57

3222.0
2700.0
752.6

4
4
4

225.00
225.00
52.55

12888.0
10800.0
3010.2

14.21
12
4.76

25
25
100

12
12
5

14.21
12
14.21

9.0
9.0
1.57

3197.3
2700.0
744.3

4
4
4

225.00
225.00
52.38

12789.0
10800.0
2977.3

14.1
12
4.76

25
25
99

12
12
5

14.10
12
14.1

9.0
9.0
1.57

3172.5
2700.0
736.1

4
4
4

225.00
225.00
52.21

12690.0
10800.0
2944.4

13.64
12
4.76

25
25
94

12
12
5

13.64
12
13.64

9.0
9.0
1.57

3069.0
2700.0
701.7

4
4
4

225.00
225.00
51.45

12276.0
10800.0
2806.9

12.14
12
4.76

25
25
79

12
12
5

12.14
12
12.14

9.0
9.0
1.57

2731.5
2700.0
589.6

4
4
4

225.00
225.00
48.57

10926.0
10800.0
2358.5

14
12
4.76

25
25
114

12
12
5

14.00
12
14

9.0
9.0
1.57

3150.0
2700.0
850.5

4
4
4

225.00
225.00
60.75

12600.0
10800.0
3401.8

14
12
4.76

25
25
114

12
12
5

14.00
12
14

9.0
9.0
1.57

3150.0
2700.0
850.5

4
4
4

225.00
225.00
60.75

12600.0
10800.0
3401.8

14.32
12
4.76

25
25
117

12
12
5

14.32
12
14.32

9.0
9.0
1.57

3222.0
2700.0
874.4

4
4
4

225.00
225.00
61.06

12888.0
10800.0
3497.5

14.45
12
4.76

25
25
113

12
12
5

14.45
12
14.45

9.0
9.0
1.57

3251.3
2700.0
840.7

2
2
2

225.00
225.00
58.18

6502.5
5400.0
1681.5

Suma parcial por hoja =

291312.51

TRAMO VIII=

291312.51

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

177

APOYO N.
VARS. A
VARS. A1
VARS. B

178

APOYO N.
VARS. A
VARS. A1
VARS. B

179

APOYO N.
VARS. A
VARS. A1
VARS. B

180

APOYO N.
VARS. A
VARS. A1
VARS. B

181

APOYO N.
VARS. A
VARS. A1
VARS. B

182

APOYO N.
VARS. A
VARS. A1
VARS. B

183

APOYO N.
VARS. A
VARS. A1
VARS. B

184

APOYO N.
VARS. A
VARS. A1
VARS. B

185

APOYO N.
VARS. A
VARS. A1
VARS. B

186

APOYO N.
VARS. A
VARS. A1
VARS. B
APOYO N.
VARS. A
VARS. A1
VARS. B

187

APOYO N.
VARS. A
VARS. A1
VARS. B

189

APOYO N.
VARS. A
VARS. A1
VARS. B

190

APOYO N.
VARS. A
VARS. A1
VARS. B

191

APOYO N.
VARS. A
VARS. A1
VARS. B

192

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO IX
APOYO 178 a 221

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

14.45
12
4.76

25
25
113

12
12
5

14.45
12
14.45

9.0
9.0
1.57

3251.3
2700.0
840.7

2
2
2

225.00
225.00
58.18

6502.5
5400.0
1681.5

14.3
12
4.76

25
25
111

12
12
5

14.30
12
14.3

9.0
9.0
1.57

3217.5
2700.0
829.5

4
4
4

225.00
225.00
58.01

12870.0
10800.0
3318.1

14.27
12
4.76

25
25
111

12
12
5

14.27
12
14.27

9.0
9.0
1.57

3210.8
2700.0
827.3

4
4
4

225.00
225.00
57.97

12843.0
10800.0
3309.1

14.28
12
4.76

25
25
111

12
12
5

14.28
12
14.28

9.0
9.0
1.57

3213.0
2700.0
828.0

4
4
4

225.00
225.00
57.99

12852.0
10800.0
3312.1

14.28
12
4.76

25
25
113

12
12
5

14.28
12
14.28

9.0
9.0
1.57

3213.0
2700.0
846.0

4
4
4

225.00
225.00
59.24

12852.0
10800.0
3383.9

14.28
12
4.76

25
25
113

12
12
5

14.28
12
14.28

9.0
9.0
1.57

3213.0
2700.0
846.0

4
4
4

225.00
225.00
59.24

12852.0
10800.0
3383.9

16.28
12
4.76

25
25
133

12
12
5

16.28
12
16.28

9.0
9.0
1.57

3663.0
2700.0
995.4

4
4
4

225.00
225.00
61.14

14652.0
10800.0
3981.7

16.28
12
4.76

25
25
133

12
12
5

16.28
12
16.28

9.0
9.0
1.57

3663.0
2700.0
995.4

4
4
4

225.00
225.00
61.14

14652.0
10800.0
3981.7

16.28
12
4.76

25
25
131

12
12
5

16.28
12
16.28

9.0
9.0
1.57

3663.0
2700.0
976.0

4
4
4

225.00
225.00
59.95

14652.0
10800.0
3904.0

16.28
12
4.76

25
25
131

12
12
5

16.28
12
16.28

9.0
9.0
1.57

3663.0
2700.0
976.0

4
4
4

225.00
225.00
59.95

14652.0
10800.0
3904.0

16.28
12
4.76

25
25
131

12
12
5

16.28
12
16.28

9.0
9.0
1.57

3663.0
2700.0
976.0

4
4
4

225.00
225.00
59.95

14652.0
10800.0
3904.0

16.25
12
4.76

25
25
130

12
12
5

16.25
12
16.25

9.0
9.0
1.57

3656.3
2700.0
973.8

4
4
4

225.00
225.00
59.92

14625.0
10800.0
3895.0

16.14
12
4.76

25
25
129

12
12
5

16.14
12
16.14

9.0
9.0
1.57

3631.5
2700.0
965.5

4
4
4

225.00
225.00
59.82

14526.0
10800.0
3862.1

16.03
12
4.76

25
25
128

12
12
5

16.03
12
16.03

9.0
9.0
1.57

3606.8
2700.0
957.3

4
4
4

225.00
225.00
59.72

14427.0
10800.0
3829.3

15.92
12
4.76

25
25
127

12
12
5

15.92
12
15.92

9.0
9.0
1.57

3582.0
2700.0
949.1

4
4
4

225.00
225.00
59.62

14328.0
10800.0
3796.4

15.81
12
4.76

25
25
126

12
12
5

15.81
12
15.81

9.0
9.0
1.57

3557.3
2700.0
940.9

4
4
4

225.00
225.00
59.51

14229.0
10800.0
3763.5

188

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

N1

Cantidad (m)
N2
NPROM

LONGITUD:

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM
Kg

Num Apoyos
DEN. ACERO
(pzas)
(Kg/ml)
Suma parcial por hoja =

PESOTotal
Kg

440776.84

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

193

APOYO N.
VARS. A
VARS. A1
VARS. B

194

APOYO N.
VARS. A
VARS. A1
VARS. B

195

APOYO N.
VARS. A
VARS. A1
VARS. B

196

APOYO N.
VARS. A
VARS. A1
VARS. B

197

APOYO N.
VARS. A
VARS. A1
VARS. B

198

APOYO N.
VARS. A
VARS. A1
VARS. B

199

APOYO N.
VARS. A
VARS. A1
VARS. B

200

APOYO N.
VARS. A
VARS. A1
VARS. B

201

APOYO N.
VARS. A
VARS. A1
VARS. B

202

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO IX
APOYO 178 a 221

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

15.7
12
4.76

25
25
121

12
12
5

15.70
12
15.7

9.0
9.0
1.57

3532.5
2700.0
902.4

4
4
4

225.00
225.00
57.48

14130.0
10800.0
3609.6

15.7
12
4.76

25
25
121

12
12
5

15.70
12
15.7

9.0
9.0
1.57

3532.5
2700.0
902.4

4
4
4

225.00
225.00
57.48

14130.0
10800.0
3609.6

15.7
12
4.76

25
25
121

12
12
5

15.70
12
15.7

9.0
9.0
1.57

3532.5
2700.0
902.4

4
4
4

225.00
225.00
57.48

14130.0
10800.0
3609.6

15.7
12
4.76

25
25
121

12
12
5

15.70
12
15.7

9.0
9.0
1.57

3532.5
2700.0
902.4

4
4
4

225.00
225.00
57.48

14130.0
10800.0
3609.6

15.7
12
4.76

25
25
121

12
12
5

15.70
12
15.7

9.0
9.0
1.57

3532.5
2700.0
902.4

4
4
4

225.00
225.00
57.48

14130.0
10800.0
3609.6

15.7
12
4.76

25
25
121

12
12
5

15.70
12
15.7

9.0
9.0
1.57

3532.5
2700.0
902.4

4
4
4

225.00
225.00
57.48

14130.0
10800.0
3609.6

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

Suma parcial por hoja =

277687.38

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

203

APOYO N.
VARS. A
VARS. A1
VARS. B

204

APOYO N.
VARS. A
VARS. A1
VARS. B

205

APOYO N.
VARS. A
VARS. A1
VARS. B

206

APOYO N.
VARS. A
VARS. A1
VARS. B

207

APOYO N.
VARS. A
VARS. A1
VARS. B

208

APOYO N.
VARS. A
VARS. A1
VARS. B

209

APOYO N.
VARS. A
VARS. A1
VARS. B

210

APOYO N.
VARS. A
VARS. A1
VARS. B

211

APOYO N.
VARS. A
VARS. A1
VARS. B

212

APOYO N.
VARS. A
VARS. A1
VARS. B

213

APOYO N.
VARS. A
VARS. A1
VARS. B

214

APOYO N.
VARS. A
VARS. A1
VARS. B

215

APOYO N.
VARS. A
VARS. A1
VARS. B

216

APOYO N.
VARS. A
VARS. A1
VARS. B

217

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO IX
APOYO 178 a 221

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

Suma parcial por hoja =

399187.67

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

218

APOYO N.
VARS. A
VARS. A1
VARS. B

219

APOYO N.
VARS. A
VARS. A1
VARS. B

220

APOYO N.
VARS. A
VARS. A1
VARS. B

221

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO IX
APOYO 178 a 221

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

Suma parcial por hoja =

106450.04

TRAMO IX =

1224101.93

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

222

APOYO N.
VARS. A
VARS. A1
VARS. B

223

APOYO N.
VARS. A
VARS. A1
VARS. B

224

APOYO N.
VARS. A
VARS. A1
VARS. B

225

APOYO N.
VARS. A
VARS. A1
VARS. B

226

APOYO N.
VARS. A
VARS. A1
VARS. B

227

APOYO N.
VARS. A
VARS. A1
VARS. B

228

APOYO N.
VARS. A
VARS. A1
VARS. B

229

APOYO N.
VARS. A
VARS. A1
VARS. B

230

APOYO N.
VARS. A
VARS. A1
VARS. B

231

APOYO N.
VARS. A
VARS. A1
VARS. B

232

APOYO N.
VARS. A
VARS. A1
VARS. B

233

APOYO N.
VARS. A
VARS. A1
VARS. B

234

APOYO N.
VARS. A
VARS. A1
VARS. B

235

APOYO N.
VARS. A
VARS. A1
VARS. B

236

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO X
APOYO 222 a 271

Acero de refuerzo de fy=4200Kg/cm2

APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

13.7
12
4.76

25
25
117

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
870.6

4
4
4

225.00
225.00
63.55

12330.0
10800.0
3482.5

11.7
12
4.76

25
25
97

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
721.2

4
4
4

225.00
225.00
61.64

10530.0
10800.0
2884.7

11.7
12
4.76

25
25
97

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
721.2

8
8
8

225.00
225.00
61.64

21060.0
21600.0
5769.3

11.7
12
4.76

25
25
97

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
721.2

4
4
4

225.00
225.00
61.64

10530.0
10800.0
2884.7

11.7
12
4.76

25
25
97

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
721.2

4
4
4

225.00
225.00
61.64

10530.0
10800.0
2884.7

11.7
12
4.76

25
25
97

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
721.2

4
4
4

225.00
225.00
61.64

10530.0
10800.0
2884.7

11.7
12
4.76

25
25
97

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
721.2

4
4
4

225.00
225.00
61.64

10530.0
10800.0
2884.7

11.7
12
4.76

25
25
97

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
721.2

4
4
4

225.00
225.00
61.64

10530.0
10800.0
2884.7

11.7
12
4.76

25
25
97

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
721.2

4
4
4

225.00
225.00
61.64

10530.0
10800.0
2884.7

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
225.00
4
225.00
4
64.19
Suma parcial por hoja =

10530.0
10800.0
3004.2
399662.91

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

237

APOYO N.
VARS. A
VARS. A1
VARS. B

238

APOYO N.
VARS. A
VARS. A1
VARS. B

239

APOYO N.
VARS. A
VARS. A1
VARS. B

240

APOYO N.
VARS. A
VARS. A1
VARS. B

241

APOYO N.
VARS. A
VARS. A1
VARS. B

242

APOYO N.
VARS. A
VARS. A1
VARS. B

243

APOYO N.
VARS. A
VARS. A1
VARS. B

244

APOYO N.
VARS. A
VARS. A1
VARS. B

245

APOYO N.
VARS. A
VARS. A1
VARS. B

246

APOYO N.
VARS. A
VARS. A1
VARS. B

247

APOYO N.
VARS. A
VARS. A1
VARS. B

248

APOYO N.
VARS. A
VARS. A1
VARS. B

249

APOYO N.
VARS. A
VARS. A1
VARS. B

250

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO X
APOYO 222 a 271

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

4
4
4

225.00
225.00
64.19

10530.0
10800.0
3004.2

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

5
5
5

225.00
225.00
64.19

13162.5
13500.0
3755.3

Suma parcial por hoja =

346762.73

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

251

APOYO N.
VARS. A
VARS. A1
VARS. B

252

APOYO N.
VARS. A
VARS. A1
VARS. B

253

APOYO N.
VARS. A
VARS. A1
VARS. B

254

APOYO N.
VARS. A
VARS. A1
VARS. B

255

APOYO N.
VARS. A
VARS. A1
VARS. B

256

APOYO N.
VARS. A
VARS. A1
VARS. B

257

APOYO N.
VARS. A
VARS. A1
VARS. B

258

APOYO N.
VARS. A
VARS. A1
VARS. B

259

APOYO N.
VARS. A
VARS. A1
VARS. B

260

APOYO N.
VARS. A
VARS. A1
VARS. B

261

APOYO N.
VARS. A
VARS. A1
VARS. B

262

APOYO N.
VARS. A
VARS. A1
VARS. B

263

APOYO N.
VARS. A
VARS. A1
VARS. B

264

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO X
APOYO 222 a 271

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

6
6
6

225.00
225.00
64.19

15795.0
16200.0
4506.3

11.7
12
4.76

25
25
101

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
751.1

7
7
7

225.00
225.00
64.19

18427.5
18900.0
5257.4

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

4
4
4

225.00
225.00
69.30

10530.0
10800.0
3243.4

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

4
4
4

225.00
225.00
69.30

10530.0
10800.0
3243.4

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

4
4
4

225.00
225.00
69.30

10530.0
10800.0
3243.4

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

4
4
4

225.00
225.00
69.30

10530.0
10800.0
3243.4

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

4
4
4

225.00
225.00
69.30

10530.0
10800.0
3243.4

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

4
4
4

225.00
225.00
69.30

10530.0
10800.0
3243.4

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

4
4
4

225.00
225.00
69.30

10530.0
10800.0
3243.4

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

4
4
4

225.00
225.00
69.30

10530.0
10800.0
3243.4

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

4
4
4

225.00
225.00
69.30

10530.0
10800.0
3243.4

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

9
9
9

225.00
225.00
69.30

23692.5
24300.0
7297.6

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

6
6
6

225.00
225.00
69.30

15795.0
16200.0
4865.1

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

5
5
5

225.00
225.00
69.30

13162.5
13500.0
4054.2

Suma parcial por hoja =

423113.40

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
- INFRA-ESTRUCTURA

L1

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM

265

APOYO N.
VARS. A
VARS. A1
VARS. B

266

APOYO N.
VARS. A
VARS. A1
VARS. B

267

APOYO N.
VARS. A
VARS. A1
VARS. B

268

APOYO N.
VARS. A
VARS. A1
VARS. B

269

APOYO N.
VARS. A
VARS. A1
VARS. B

270

APOYO N.
VARS. A
VARS. A1
VARS. B

271

APOYO N.
VARS. A
VARS. A1
VARS. B

272

APOYO N.
VARS. A
VARS. A1
VARS. B

273

APOYO N.
VARS. A
VARS. A1
VARS. B

274

APOYO N.
VARS. A
VARS. A1
VARS. B

275

APOYO N.
VARS. A
VARS. A1
VARS. B

276

APOYO N.
VARS. A
VARS. A1
VARS. B

277

APOYO N.
VARS. A
VARS. A1
VARS. B

278

APOYO N.
VARS. A
VARS. A1
VARS. B

279

APOYO N.
VARS. A
VARS. A1

280

Cantidad (m)
N2
NPROM

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

Diametro No.

Altura (m)
H1

H2

Peso / ml
POR VAR.

PESO/ELEM

Num Apoyos
(pzas)

DEN. ACERO

PESOTotal

Kg

(Kg/ml)

Kg

TRAMO X
APOYO 222 a 271

Acero de refuerzo de fy=4200Kg/cm2


APOYO N.
VARS. A
VARS. A1
VARS. B

N1

LONGITUD:

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
810.8

4
4
4

225.00
225.00
69.30

10530.0
10800.0
3243.4

11.7
12
4.76

25
25
104

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
773.5

4
4
4

225.00
225.00
66.11

10530.0
10800.0
3093.9

11.7
12
4.76

25
25
104

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
773.5

4
4
4

225.00
225.00
66.11

10530.0
10800.0
3093.9

13.7
12
4.76

25
25
114

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
848.2

4
4
4

225.00
225.00
61.91

12330.0
10800.0
3392.8

13.7
12
4.76

25
25
129

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
961.8

4
4
4

225.00
225.00
70.20

12330.0
10800.0
3847.2

13.7
12
4.76

25
25
129

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
960.3

4
4
4

225.00
225.00
70.10

12330.0
10800.0
3841.2

11.7
12
4.76

25
25
111

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
831.8

4
4
4

225.00
225.00
71.09

10530.0
10800.0
3327.1

11.7
12
4.76

25
25
104

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
773.5

4
4
4

225.00
225.00
66.11

10530.0
10800.0
3093.9

11.7
12
4.76

25
25
104

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
773.5

4
4
4

225.00
225.00
66.11

10530.0
10800.0
3093.9

11.7
12
4.76

25
25
94

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
698.7

4
4
4

225.00
225.00
59.72

10530.0
10800.0
2795.0

11.7
12
4.76

25
25
109

12
12
5

11.70
12
11.7

9.0
9.0
1.57

2632.5
2700.0
812.3

4
4
4

225.00
225.00
69.43

10530.0
10800.0
3249.3

13.7
12
4.76

25
25
129

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
960.3

4
4
4

225.00
225.00
70.10

12330.0
10800.0
3841.2

13.7
12
4.76

25
25
124

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
922.9

4
4
4

225.00
225.00
67.37

12330.0
10800.0
3691.8

13.7
12
4.76

25
25
124

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
922.9

4
4
4

225.00
225.00
67.37

12330.0
10800.0
3691.8

13.7
12
4.76

25
25
114

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
848.2

4
4
4

225.00
225.00
61.91

12330.0
10800.0
3392.8

13.7
12

25
25

12
12

13.70
12

9.0
9.0

3082.5
2700.0

4
4

225.00
225.00

12330.0
10800.0

CARRETERA:
OBRA :
UBICACIN:
MATERIAL:
CLAVE:
VARS. B

L1

APOYO N.
VARS. A
VARS. A1
VARS. B

281

APOYO N.
VARS. A
VARS. A1
VARS. B

282

LAGUNA CUYUTLAN
VIADUCTO III
3+230.00-10+790

Longitud (m)
L2
LPROM
4.76

N1

LONGITUD:

Cantidad (m)
N2
NPROM
129

Diametro No.

Altura (m)

H1
13.7

271 Apoyos
270 Tramos
4 PILAS/APOYO

7560.0 m

H2

Peso / ml
POR VAR.
1.57

PESO/ELEM

Num Apoyos
(pzas)
4

DEN. ACERO

PESOTotal

961.8

(Kg/ml)
70.20

3847.2

Kg

Kg

13.7
12
4.76

25
25
129

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
960.3

4
4
4

225.00
225.00
70.10

12330.0
10800.0
3841.2

13.7
12
4.76

25
25
129

12
12
5

13.70
12
13.7

9.0
9.0
1.57

3082.5
2700.0
960.3

2
2
2

225.00
225.00
70.10

6165.0
5400.0
1920.6

Suma parcial por hoja =

450673.26

TRAMO X =

1,620,212.29

Suma total de todos los tramos =

6,140,221.28

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

DIAMETRO

RADIO

m3

ELEMENTO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

TRAMO VI
APOYO N.1
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

2.00

1.80

1.80

APOYO N.2
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.3
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.4
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.5
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.6
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.7
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.8
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.9
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.10
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL: CONCRETO
CLAVE:
APOYO N.11
Columnas coladas en el lugar

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.12
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.13
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.14
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.15
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.16
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.17
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.18
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.19
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.20
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.21
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.22
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

APOYO N.23
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.24
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.25
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.26
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.27
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.28
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.29
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.30
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.31
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL: CONCRETO
CLAVE:
APOYO N.32
Columnas coladas en el lugar

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.33
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.34
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.35
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.36
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.37
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.38
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.39
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.40
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
41
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
42
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
43
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
44
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
45
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

APOYO N.
46
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
47
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
48
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
49
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
50
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
51
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
52
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL: CONCRETO
CLAVE:
APOYO N.
53
Columnas coladas en el lugar

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
54
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
55
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
56
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
57
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
58
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
59
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
60
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
61
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
62
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
63
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

APOYO N.
64
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
65
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
66
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
67
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
68
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
69
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
70
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
71
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
72
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
73
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
74
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

DIAMETRO

RADIO

m3

ELEMENTO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

TRAMO VII
APOYO N.
75
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
76
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
77
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
78
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
79
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
80
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
81
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
82
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
83
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
84
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL: CONCRETO
CLAVE:
APOYO N.
85
Columnas coladas en el lugar

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
86
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
87
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
88
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
89
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
90
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
91
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
92
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
93
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
94
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
95
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
96
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
97
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
98
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL: CONCRETO
CLAVE:
APOYO N.
99
Columnas coladas en el lugar

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
100
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
101
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
102
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
103
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
104
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
105
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
106
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
107
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
108
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
109
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
110
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
111
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
112
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL: CONCRETO
CLAVE:
APOYO N.
113
Columnas coladas en el lugar

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
114
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
115
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
116
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
117
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
118
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
119
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
120
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
121
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
122
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
123
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
124
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
125
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
126
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL: CONCRETO
CLAVE:
APOYO N.
127
Columnas coladas en el lugar

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
128
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
129
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
130
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
131
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
132
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
133
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
134
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
135
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
136
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
137
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
138
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
139
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
140
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

APOYO N.
141
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
142
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL: CONCRETO
CLAVE:
APOYO N.
143
Columnas coladas en el lugar

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
144
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
145
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
146
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
147
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
148
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
149
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
150
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
151
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
152
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
153
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
154
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

APOYO N.
155
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
156
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
157
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
158
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
159
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
160
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
161
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
162
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
163
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
164
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
165
Columnas coladas en el lugar

1.5

0.75

1.77

2.30

4.1

4.00

16.40

16.40

APOYO N.
166
Columnas coladas en el lugar

1.5

0.75

1.77

1.61

2.8

4.00

11.20

11.20

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

DIAMETRO

Area Transv
(m2)

RADIO

m3

ELEMENTO

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL
TOTAL

VOL. (m3)
TOTAL
1,503.60 M3

TRAMO VIII
APOYO N.
167
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
168
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
169
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
170
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
171
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
172
Columnas coladas en el lugar

1.5

0.75

1.77

0.85

1.5

4.00

6.00

6.00

APOYO N.
173
Columnas coladas en el lugar

1.5

0.75

1.77

2.24

4.0

4.00

16.00

16.00

APOYO N.
174
Columnas coladas en el lugar

1.5

0.75

1.77

2.27

4.0

4.00

16.00

16.00

APOYO N.
175
Columnas coladas en el lugar

1.5

0.75

1.77

2.16

3.8

4.00

15.20

15.20

APOYO N.
176
Columnas coladas en el lugar

1.5

0.75

1.77

1.73

3.1

4.00

12.40

12.40

APOYO N.
177
Columnas coladas en el lugar

1.5

0.75

1.77

1.50

2.7

4.00

10.80

10.80

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

DIAMETRO

Area Transv
(m2)

RADIO

m3

ELEMENTO

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL
TOTAL

VOL. (m3)
TOTAL
94.40 M3

TRAMO IX
APOYO N.
178
Columnas coladas en el lugar

1.5

0.75

1.77

1.65

2.9

4.00

11.60

11.60

APOYO N.
179
Columnas coladas en el lugar

1.5

0.75

1.77

1.46

2.6

4.00

10.40

10.40

APOYO N.
180
Columnas coladas en el lugar

1.5

0.75

1.77

1.34

2.4

4.00

9.60

9.60

APOYO N.
181
Columnas coladas en el lugar

1.5

0.75

1.77

1.23

2.2

4.00

8.80

8.80

APOYO N.
182
Columnas coladas en el lugar

1.5

0.75

1.77

1.12

2.0

4.00

8.00

8.00

APOYO N.
183
Columnas coladas en el lugar

1.5

0.75

1.77

1.01

1.8

4.00

7.20

7.20

APOYO N.
184
Columnas coladas en el lugar

1.5

0.75

1.77

0.90

1.6

4.00

6.40

6.40

APOYO N.
185
Columnas coladas en el lugar

1.5

0.75

1.77

0.79

1.4

4.00

5.60

5.60

APOYO N.
186
Columnas coladas en el lugar

1.5

0.75

1.77

0.69

1.2

4.00

4.80

4.80

APOYO N.
187
Columnas coladas en el lugar

1.5

0.75

1.77

0.58

1.0

4.00

4.00

4.00

APOYO N.
188
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
189
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.

190

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL: CONCRETO
CLAVE:
Columnas coladas en el lugar

m3

ELEMENTO

0.75

Area Transv
(m2)
1.77

LONGITUD (m)
Long. Col.
0.50

VOL/ELEM
(m3)
0.9

NUM
(pzas)
4.00

LONG(m)
TOTAL
3.60

VOL. (m3)
TOTAL
3.60

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
192
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
193
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
194
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
195
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
196
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
197
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
198
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
199
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
200
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
201
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
202
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
203
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

DIAMETRO

RADIO

1.5

APOYO N.
191
Columnas coladas en el lugar

APOYO N.

204

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL: CONCRETO
CLAVE:
Columnas coladas en el lugar

m3

ELEMENTO

0.75

Area Transv
(m2)
1.77

LONGITUD (m)
Long. Col.
0.50

VOL/ELEM
(m3)
0.9

NUM
(pzas)
4.00

LONG(m)
TOTAL
3.60

VOL. (m3)
TOTAL
3.60

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
206
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
207
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
208
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
209
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
210
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
211
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
212
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
213
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
214
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
215
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
216
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
217
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

DIAMETRO

RADIO

1.5

APOYO N.
205
Columnas coladas en el lugar

APOYO N.

218

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL: CONCRETO
CLAVE:
Columnas coladas en el lugar

m3

ELEMENTO

0.75

Area Transv
(m2)
1.77

LONGITUD (m)
Long. Col.
0.50

VOL/ELEM
(m3)
0.9

NUM
(pzas)
4.00

LONG(m)
TOTAL
3.60

VOL. (m3)
TOTAL
3.60

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
220
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
221
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

DIAMETRO

RADIO

1.5

APOYO N.
219
Columnas coladas en el lugar

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

DIAMETRO

Area Transv
(m2)

RADIO

m3

ELEMENTO

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL
TOTAL

VOL. (m3)
TOTAL
198.80 M3

TRAMO X
APOYO N.
221
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
222
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
223
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
224
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
225
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
226
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
227
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
228
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

8.00

7.20

7.20

APOYO N.
229
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
230
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
231
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
232
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
233
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

APOYO N.
234
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
235
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
236
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
237
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
238
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
239
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
240
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
241
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
242
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
243
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
244
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
245
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
246
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
247
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

APOYO N.
248
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
249
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
250
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

5.00

4.50

4.50

APOYO N.
251
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

6.00

5.40

5.40

APOYO N.
252
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
253
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
254
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
255
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
256
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
257
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
258
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
259
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
260
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
261
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

APOYO N.
262
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
263
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

6.00

5.40

5.40

APOYO N.
264
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

5.00

4.50

4.50

APOYO N.
265
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
266
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
267
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
268
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
269
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
270
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
271
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
272
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
273
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
274
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
275
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJE

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

m3

ELEMENTO

DIAMETRO

RADIO

Area Transv
(m2)

LONGITUD (m)
Long. Col.

VOL/ELEM
(m3)

NUM
(pzas)

LONG(m)
TOTAL

VOL. (m3)
TOTAL

APOYO N.
276
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
277
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
278
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
279
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
280
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
281
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

4.00

3.60

3.60

APOYO N.
282
Columnas coladas en el lugar

1.5

0.75

1.77

0.50

0.9

2.00

1.80
TOTAL

__________________________
CONSTRUCTORA.
TRADECO INFRAESTRUCTURA

___________________________
SUPERVISION EJECUTIVA

1.80
230.40 M3

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

APOYO No.
VARS A
VARS B

APOYO No.
VARS A
VARS B

APOYO No.
VARS A
VARS B

APOYO No.
VARS A
VARS B

APOYO No.
VARS A
VARS B

APOYO No.
VARS A
VARS B

APOYO No.
VARS A
VARS B

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

2
2

223.40
74.20

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

TRAMO VI

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
APOYO No.
VARS A
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

APOYO No.
VARS A
VARS B

10

APOYO No.
VARS A
VARS B

11

APOYO No.
VARS A
VARS B

12

APOYO No.
VARS A
VARS B

13

APOYO No.
VARS A
VARS B

14

APOYO No.
VARS A
VARS B

15

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:

CONCRETO

APOYO No.
VARS A
VARS B

16

APOYO No.
VARS A
VARS B

17

APOYO No.
VARS A
VARS B

18

APOYO No.
VARS A
VARS B

19

APOYO No.
VARS A
VARS B

20

APOYO No.
VARS A
VARS B

21

APOYO No.
VARS A
VARS B

22

APOYO No.
VARS A
VARS B

23

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:

CONCRETO

APOYO No.
VARS A
VARS B

24

APOYO No.
VARS A
VARS B

25

APOYO No.
VARS A
VARS B

26

APOYO No.
VARS A
VARS B

27

APOYO No.
VARS A
VARS B

28

APOYO No.
VARS A
VARS B

29

APOYO No.
VARS A
VARS B

30

APOYO No.
VARS A
VARS B

31

APOYO No.
VARS A
VARS B

32

APOYO No.
VARS A
VARS B

33

APOYO No.
VARS A
VARS B

34

APOYO No.
VARS A
VARS B

35

APOYO No.
VARS A
VARS B

36

APOYO No.
VARS A

37

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")

2.30

8.938

kg/m

25

513.90

2055.60

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

38

APOYO No.
VARS A
VARS B

39

APOYO No.
VARS A
VARS B

40

APOYO No.
VARS A
VARS B

41

APOYO No.
VARS A
VARS B

42

APOYO No.
VARS A
VARS B

43

APOYO No.
VARS A
VARS B

44

APOYO No.
VARS A
VARS B

45

APOYO No.
VARS A
VARS B

46

APOYO No.
VARS A
VARS B

47

APOYO No.
VARS A
VARS B

48

APOYO No.
VARS A
VARS B

49

APOYO No.
VARS A
VARS B

50

APOYO No.

51

DIAMETRO DE VAR.

LONGITUD

UD.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

f = 5c (5/8")

4.76

PESO VAR.
(ml)
1.557

kg/m

NUM
Vars
17

PESO
Col
126.00

NUM
(pzas)
4

Volumen
TOTAL
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
VARS A
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

52

APOYO No.
VARS A
VARS B

53

APOYO No.
VARS A
VARS B

54

APOYO No.
VARS A
VARS B

55

APOYO No.
VARS A
VARS B

56

APOYO No.
VARS A
VARS B

57

APOYO No.
VARS A
VARS B

58

APOYO No.
VARS A
VARS B

59

APOYO No.
VARS A
VARS B

60

APOYO No.
VARS A
VARS B

61

APOYO No.
VARS A
VARS B

62

APOYO No.
VARS A
VARS B

63

APOYO No.
VARS A
VARS B

64

DIAMETRO DE VAR.

LONGITUD

UD.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

PESO VAR.
(ml)
8.938
1.557

kg/m
kg/m

NUM
Vars
25
17

PESO
Col
513.90
126.00

NUM
(pzas)
4
4

Volumen
TOTAL
2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
APOYO No.
VARS A
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

66

APOYO No.
VARS A
VARS B

67

APOYO No.
VARS A
VARS B

68

APOYO No.
VARS A
VARS B

69

APOYO No.
VARS A
VARS B

70

APOYO No.
VARS A
VARS B

71

APOYO No.
VARS A
VARS B

72

APOYO No.
VARS A
VARS B

73

APOYO No.
VARS A
VARS B

74

65

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

4
4

2055.60
504.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

APOYO No.
VARS A
VARS B

75

APOYO No.
VARS A
VARS B

76

APOYO No.
VARS A
VARS B

77

APOYO No.
VARS A
VARS B

78

APOYO No.
VARS A
VARS B

79

APOYO No.
VARS A
VARS B

80

APOYO No.
VARS A
VARS B

81

APOYO No.
VARS A
VARS B

82

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.94
119.29

360
360

185018.40
42944.40

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

TRAMO VII

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:

CONCRETO

APOYO No.
VARS A
VARS B

83

APOYO No.
VARS A
VARS B

84

APOYO No.
VARS A
VARS B

85

APOYO No.
VARS A
VARS B

86

APOYO No.
VARS A
VARS B

87

APOYO No.
VARS A
VARS B

88

APOYO No.
VARS A
VARS B

89

APOYO No.
VARS A
VARS B

90

APOYO No.
VARS A
VARS B

91

APOYO No.
VARS A
VARS B

92

APOYO No.
VARS A
VARS B

93

APOYO No.
VARS A
VARS B

94

APOYO No.
VARS A
VARS B

95

APOYO No.
VARS A

96

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")

2.30

8.938

kg/m

25

513.90

0.00

__________________________
SUPERVISION EJECUTIVA

NUM
(pzas)

Volumen
TOTAL

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

97

APOYO No.
VARS A
VARS B

98

APOYO No.
VARS A
VARS B

99

APOYO No.
VARS A
VARS B

100

APOYO No.
VARS A
VARS B

101

APOYO No.
VARS A
VARS B

102

APOYO No.
VARS A
VARS B

103

APOYO No.
VARS A
VARS B

104

APOYO No.
VARS A
VARS B

105

APOYO No.
VARS A
VARS B

106

APOYO No.
VARS A
VARS B

107

APOYO No.
VARS A
VARS B

108

APOYO No.
VARS A
VARS B

109

APOYO No.

110

DIAMETRO DE VAR.

LONGITUD

UD.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

f = 5c (5/8")

4.76

PESO VAR.
(ml)
1.557

kg/m

NUM
Vars
17

PESO
Col
126.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

__________________________
SUPERVISION EJECUTIVA

NUM
(pzas)

Volumen
TOTAL
0.00

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
VARS A
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

111

APOYO No.
VARS A
VARS B

112

APOYO No.
VARS A
VARS B

113

APOYO No.
VARS A
VARS B

114

APOYO No.
VARS A
VARS B

115

APOYO No.
VARS A
VARS B

116

APOYO No.
VARS A
VARS B

117

APOYO No.
VARS A
VARS B

118

APOYO No.
VARS A
VARS B

119

APOYO No.
VARS A
VARS B

120

APOYO No.
VARS A
VARS B

121

APOYO No.
VARS A
VARS B

122

APOYO No.
VARS A
VARS B

123

DIAMETRO DE VAR.

LONGITUD

UD.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

PESO VAR.
(ml)
8.938
1.557

kg/m
kg/m

NUM
Vars
25
17

PESO
Col
513.90
126.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

__________________________
SUPERVISION EJECUTIVA

NUM
(pzas)

Volumen
TOTAL
0.00
0.00

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
APOYO No.
VARS A
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

125

APOYO No.
VARS A
VARS B

126

APOYO No.
VARS A
VARS B

127

APOYO No.
VARS A
VARS B

128

APOYO No.
VARS A
VARS B

129

APOYO No.
VARS A
VARS B

130

APOYO No.
VARS A
VARS B

131

APOYO No.
VARS A
VARS B

132

APOYO No.
VARS A
VARS B

133

APOYO No.
VARS A
VARS B

134

APOYO No.
VARS A
VARS B

135

APOYO No.
VARS A
VARS B

136

APOYO No.
VARS A
VARS B

137

124

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

__________________________
SUPERVISION EJECUTIVA

NUM
(pzas)

Volumen
TOTAL

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:

CONCRETO

APOYO No.
VARS A
VARS B

138

APOYO No.
VARS A
VARS B

139

APOYO No.
VARS A
VARS B

140

APOYO No.
VARS A
VARS B

141

APOYO No.
VARS A
VARS B

142

APOYO No.
VARS A
VARS B

143

APOYO No.
VARS A
VARS B

144

APOYO No.
VARS A
VARS B

145

APOYO No.
VARS A
VARS B

146

APOYO No.
VARS A
VARS B

147

APOYO No.
VARS A
VARS B

148

APOYO No.
VARS A
VARS B

149

APOYO No.
VARS A
VARS B

150

APOYO No.
VARS A

151

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")

2.30

8.938

kg/m

25

513.90

0.00

__________________________
SUPERVISION EJECUTIVA

NUM
(pzas)

Volumen
TOTAL

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

152

APOYO No.
VARS A
VARS B

153

APOYO No.
VARS A
VARS B

154

APOYO No.
VARS A
VARS B

155

APOYO No.
VARS A
VARS B

156

APOYO No.
VARS A
VARS B

157

APOYO No.
VARS A
VARS B

158

APOYO No.
VARS A
VARS B

159

APOYO No.
VARS A
VARS B

160

APOYO No.
VARS A
VARS B

161

APOYO No.
VARS A

162

DIAMETRO DE VAR.

LONGITUD

UD.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

f = 5c (5/8")

4.76

PESO VAR.
(ml)
1.557

kg/m

NUM
Vars
17

PESO
Col
126.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")

2.30

8.938

kg/m

25

513.90

0.00

__________________________
SUPERVISION EJECUTIVA

NUM
(pzas)

Volumen
TOTAL
0.00

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

163

APOYO No.
VARS A
VARS B

164

APOYO No.
VARS A
VARS B

165

APOYO No.
VARS A
VARS B

166

DIAMETRO DE VAR.

LONGITUD

UD.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

f = 5c (5/8")

4.76

PESO VAR.
(ml)
1.557

kg/m

NUM
Vars
17

PESO
Col
126.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

2.30
4.76

8.938
1.557

kg/m
kg/m

25
17

513.90
126.00

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

1.61
4.76

8.938
1.557

kg/m
kg/m

25
13

359.80
96.30

4
4

1439.20
385.20

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

__________________________
SUPERVISION EJECUTIVA

NUM
(pzas)

Volumen
TOTAL
0.00

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

DIAMETRO DE VAR.

LONGITUD

FECHA
UNIDAD
EJE
ELEMENTO

Kg

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

TRAMO VIII

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

APOYO No.
VARS A
VARS B

167

APOYO No.
VARS A
VARS B

168

APOYO No.
VARS A
VARS B

169

APOYO No.
VARS A
VARS B

170

APOYO No.
VARS A
VARS B

171

APOYO No.
VARS A
VARS B

172

APOYO No.
VARS A
VARS B

173

APOYO No.
VARS A
VARS B

174

APOYO No.
VARS A
VARS B

175

APOYO No.
VARS A
VARS B

176

APOYO No.
VARS A
VARS B

177

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.85
4.76

8.938
1.557

kg/m
kg/m

25
9

189.90
66.70

4
4

759.60
266.80

f = 12c (3/2")
f = 5c (5/8")

2.24
4.76

8.938
1.557

kg/m
kg/m

25
16

500.50
118.60

4
4

2002.00
474.40

f = 12c (3/2")
f = 5c (5/8")

2.27
4.76

8.938
1.557

kg/m
kg/m

25
16

507.20
118.60

4
4

2028.80
474.40

f = 12c (3/2")
f = 5c (5/8")

2.16
4.76

8.938
1.557

kg/m
kg/m

25
16

482.70
118.60

4
4

1930.80
474.40

f = 12c (3/2")
f = 5c (5/8")

1.73
4.76

8.938
1.557

kg/m
kg/m

25
14

386.60
103.80

4
4

1546.40
415.20

f = 12c (3/2")
f = 5c (5/8")

0.00
4.76

8.938
1.557

kg/m
kg/m

25
0

0.00
0.00

4
4

0.00
0.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

APOYO No.
VARS A
VARS B

178

APOYO No.
VARS A
VARS B

179

APOYO No.
VARS A
VARS B

180

APOYO No.
VARS A
VARS B

181

APOYO No.
VARS A
VARS B

182

APOYO No.
VARS A
VARS B

183

APOYO No.
VARS A
VARS B

184

APOYO No.
VARS A
VARS B

185

APOYO No.
VARS A
VARS B

186

APOYO No.
VARS A
VARS B

187

APOYO No.
VARS A
VARS B

188

APOYO No.
VARS A
VARS B

189

APOYO No.
VARS A
VARS B

190

APOYO No.

191

DIAMETRO DE VAR.

LONGITUD

FECHA
UNIDAD
EJE
ELEMENTO

Kg

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

TRAMO IX

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 5c (5/8")

1.65
4.51

8.938
1.557

kg/m
kg/m

25
13

368.70
91.20

4
4

1474.80
364.80

f = 12c (3/2")
f = 5c (5/8")

1.46
4.51

8.938
1.557

kg/m
kg/m

25
12

326.24
84.20

4
4

1304.96
336.80

f = 12c (3/2")
f = 5c (5/8")

1.34
4.51

8.938
1.557

kg/m
kg/m

25
12

299.40
84.20

4
4

1197.60
336.80

f = 12c (3/2")
f = 5c (5/8")

1.23
4.51

8.938
1.557

kg/m
kg/m

25
11

274.80
77.20

4
4

1099.20
308.80

f = 12c (3/2")
f = 5c (5/8")

1.12
4.51

8.938
1.557

kg/m
kg/m

25
11

250.30
77.20

4
4

1001.20
308.80

f = 12c (3/2")
f = 5c (5/8")

1.01
4.51

8.938
1.557

kg/m
kg/m

25
10

225.70
70.20

4
4

902.80
280.80

f = 12c (3/2")
f = 5c (5/8")

0.90
4.51

8.938
1.557

kg/m
kg/m

25
9

201.10
63.20

4
4

804.40
252.80

f = 12c (3/2")
f = 5c (5/8")

0.79
4.51

8.938
1.557

kg/m
kg/m

25
8

176.50
56.10

4
4

706.00
224.40

f = 12c (3/2")
f = 5c (5/8")

0.69
4.51

8.938
1.557

kg/m
kg/m

25
7

154.20
49.10

4
4

616.80
196.40

f = 12c (3/2")
f = 5c (5/8")

0.58
4.51

8.938
1.557

kg/m
kg/m

25
6

129.60
42.10

4
4

518.40
168.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
VARS A
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

192

APOYO No.
VARS A
VARS B

193

APOYO No.
VARS A
VARS B

194

APOYO No.
VARS A
VARS B

195

APOYO No.
VARS A
VARS B

196

APOYO No.
VARS A
VARS B

197

APOYO No.
VARS A
VARS B

198

APOYO No.
VARS A
VARS B

199

APOYO No.
VARS A
VARS B

200

APOYO No.
VARS A
VARS B

201

APOYO No.
VARS A
VARS B

202

APOYO No.
VARS A
VARS B

203

APOYO No.
VARS A
VARS B

204

DIAMETRO DE VAR.

LONGITUD

UD.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

PESO VAR.
(ml)
8.938
1.557

kg/m
kg/m

NUM
Vars
25
5

PESO
Col
111.70
35.10

NUM
(pzas)
4
4

Volumen
TOTAL
446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
APOYO No.
VARS A
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

206

APOYO No.
VARS A
VARS B

207

APOYO No.
VARS A
VARS B

208

APOYO No.
VARS A
VARS B

209

APOYO No.
VARS A
VARS B

210

APOYO No.
VARS A
VARS B

211

APOYO No.
VARS A
VARS B

212

APOYO No.
VARS A

213

205

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")

0.50

8.938

kg/m

25

111.70

446.80

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

214

APOYO No.
VARS A
VARS B

215

APOYO No.
VARS A
VARS B

216

APOYO No.
VARS A
VARS B

217

APOYO No.
VARS A
VARS B

218

APOYO No.
VARS A
VARS B

219

APOYO No.
VARS A
VARS B

220

APOYO No.
VARS A
VARS B

221

DIAMETRO DE VAR.

LONGITUD

UD.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

f = 5c (5/8")

4.51

PESO VAR.
(ml)
1.557

kg/m

NUM
Vars
5

PESO
Col
35.10

NUM
(pzas)
4

Volumen
TOTAL
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.51

8.938
1.557

kg/m
kg/m

25
5

111.70
35.10

4
4

446.80
140.40

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

MATERIAL:
CLAVE:

CONCRETO

APOYO No.
VARS A
VARS B

222

APOYO No.
VARS A
VARS B

223

APOYO No.
VARS A
VARS B

224

APOYO No.
VARS A
VARS B

225

APOYO No.
VARS A
VARS B

226

APOYO No.
VARS A
VARS B

227

APOYO No.
VARS A
VARS B

228

APOYO No.
VARS A
VARS B

229

APOYO No.
VARS A
VARS B

230

APOYO No.
VARS A
VARS B

231

APOYO No.
VARS A
VARS B

232

APOYO No.
VARS A
VARS B

233

APOYO No.
VARS A
VARS B

234

DIAMETRO DE VAR.

LONGITUD

FECHA
UNIDAD
EJE
ELEMENTO

Kg

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

TRAMO X

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

8
8

893.60
296.80

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
APOYO No.
VARS A
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

236

APOYO No.
VARS A
VARS B

237

APOYO No.
VARS A
VARS B

238

APOYO No.
VARS A
VARS B

239

APOYO No.
VARS A
VARS B

240

APOYO No.
VARS A
VARS B

241

APOYO No.
VARS A
VARS B

242

APOYO No.
VARS A
VARS B

243

APOYO No.
VARS A
VARS B

244

APOYO No.
VARS A
VARS B

245

APOYO No.
VARS A
VARS B

246

APOYO No.
VARS A
VARS B

247

APOYO No.
VARS A
VARS B

248

235

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:

CONCRETO

APOYO No.
VARS A
VARS B

249

APOYO No.
VARS A
VARS B

250

APOYO No.
VARS A
VARS B

251

APOYO No.
VARS A
VARS B

252

APOYO No.
VARS A
VARS B

253

APOYO No.
VARS A
VARS B

254

APOYO No.
VARS A
VARS B

255

APOYO No.
VARS A
VARS B

256

APOYO No.
VARS A
VARS B

257

APOYO No.
VARS A
VARS B

258

APOYO No.
VARS A
VARS B

259

APOYO No.
VARS A
VARS B

260

APOYO No.
VARS A
VARS B

261

APOYO No.
VARS A

262

DIAMETRO DE VAR.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

LONGITUD

PESO VAR.
(ml)

UD.

NUM
Vars

PESO
Col

NUM
(pzas)

Volumen
TOTAL

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

5
5

558.50
185.50

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

6
6

670.20
222.60

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.00
4.76

8.938
1.557

kg/m
kg/m

25
0

0.00
0.00

4
4

0.00
0.00

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")

0.50

8.938

kg/m

25

111.70

670.20

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

263

APOYO No.
VARS A
VARS B

264

APOYO No.
VARS A
VARS B

265

APOYO No.
VARS A
VARS B

266

APOYO No.
VARS A
VARS B

267

APOYO No.
VARS A
VARS B

268

APOYO No.
VARS A
VARS B

269

APOYO No.
VARS A
VARS B

270

APOYO No.
VARS A
VARS B

271

APOYO No.
VARS A
VARS B

272

APOYO No.
VARS A
VARS B

273

APOYO No.
VARS A
VARS B

274

APOYO No.
VARS A
VARS B

275

APOYO No.

276

DIAMETRO DE VAR.

LONGITUD

UD.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

f = 5c (5/8")

4.76

PESO VAR.
(ml)
1.557

kg/m

NUM
Vars
5

PESO
Col
37.10

NUM
(pzas)
6

Volumen
TOTAL
222.60

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

6
6

670.20
222.60

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

5
5

558.50
185.50

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Columnas de Pilas de = 1.50 m

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

MATERIAL:
CLAVE:
VARS A
VARS B

CONCRETO

APOYO No.
VARS A
VARS B

277

APOYO No.
VARS A
VARS B

278

APOYO No.
VARS A
VARS B

279

APOYO No.
VARS A
VARS B

280

APOYO No.
VARS A
VARS B

281

APOYO No.
VARS A
VARS B

282

DIAMETRO DE VAR.

LONGITUD

UD.

FECHA
UNIDAD
EJE
ELEMENTO

Kg

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

PESO VAR.
(ml)
8.938
1.557

kg/m
kg/m

NUM
Vars
25
5

PESO
Col
111.70
37.10

NUM
(pzas)
4
4

Volumen
TOTAL
446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

4
4

446.80
148.40

f = 12c (3/2")
f = 5c (5/8")

0.50
4.76

8.938
1.557

kg/m
kg/m

25
5

111.70
37.10

2
2

223.40
74.20

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

5.52

1.20

6.62

6.6

0.89

1.20

1.07

2.1

1.77

0.70

1.24

2.5

TRAMO VI
APOYO 1 a 74
Caballete No. 1
A)CABEZAL(1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

0.60

9.20

1.50

Radio=

0.75

0.60

0.58

0.35

1.10

0.38

0.60

9.20

5.52

1.20

6.62

13.2

0.89

1.20

1.07

4.3

1.77

0.70

1.24

5.0

0.35

1.10

0.38

1.5

2
SUMA =

0.8
12.0

Pila N.2 a Pila N.75


C)CABEZAL(1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

1.50

Radio=

0.60

0.58

0.75

TRAVESAOS

SUMA POR PILA=

24.0

CONCRETO DE FC = 300KG/CM2
G)TRAVESAO

0.60

2.55

1.53

1.20

1.84

2
SUMA =

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

3.7
3.7

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

5.52

1.20

6.62

13.2

0.89

1.20

1.07

4.3

1.77

0.70

1.24

5.0

0.35

1.10

0.38

1.5

TRAMO VII
APOYO 75 a 166
Pila N.75 a Pila N.166
CONCRETO DE FC = 350KG/CM2
C)CABEZAL(1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

0.60

9.20

1.50

Radio=

0.60

0.58

0.75

SUMA POR PILA=


EJES
CONCRETO

24.0
92.00
2208

TRAVESAOS
CONCRETO DE FC = 300KG/CM2
G)TRAVESAO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

0.60

2.55

1.53

__________________________
SUPERVISION EJECUTIVA

1.20

1.84

3.67

SUMA =
EJES
CONCRETO

3.67
92
337.82

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

5.52

1.20

6.62

13.2

0.89

1.20

1.07

4.3

1.77

0.70

1.24

5.0

0.35

1.10

0.38

0.0

TRAMO VIII
APOYO 167-177
Pila N.167 a Pila N.177
CONCRETO DE FC = 350KG/CM2
C)CABEZAL(1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

0.60

9.20

1.50

Radio=

0.60

0.58

0.75

SUMA POR PILA=


EJES
CONCRETO

TRAVESAOS

22.5
10
225

CONCRETO DE FC = 300KG/CM2
G)TRAVESAO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

0.60

2.55

1.53

__________________________
SUPERVISION EJECUTIVA

1.20

1.84

3.7

SUMA =
EJES
CONCRETO

3.7
10.00
37

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

5.52

1.20

6.62

13.2

0.89

1.20

1.07

4.3

1.77

0.70

1.24

5.0

0.35

1.10

0.38

0.0

TRAMO IX
APOYO 178-221
Pila N.178 a Pila N.221
CONCRETO DE FC = 350KG/CM2
C)CABEZAL(1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

0.60

9.20

1.50

Radio=

0.60

0.58

0.75

SUMA POR PILA=


EJES
CONCRETO

TRAVESAOS

22.5
6.00
145

CONCRETO DE FC = 300KG/CM2
G)TRAVESAO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

0.60

2.55

1.53

__________________________
SUPERVISION EJECUTIVA

1.20

1.84

3.7

SUMA =
EJES
CONCRETO

3.7
44
162

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

5.52

1.20

6.62

13.2

0.89

1.20

1.07

4.3

1.77

0.70

1.24

5.0

0.35

1.10

0.38

1.5

TRAMO X
APOYO 222-282
Pila N.222 a Pila N.249
Pila N.253 a Pila N.261
Pila N.265 a Pila N.281
C)CABEZAL(1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

0.60

9.20

1.50

Radio=

0.60

0.58

0.75

SUMA POR PILA=

24.0
35.0
840.6

TRAVESAOS
CONCRETO DE FC = 300KG/CM2
G)TRAVESAO

0.60

2.55

1.53

1.20

1.84

2
SUMA =

Caballete No. 282


A)CABEZAL(1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

0.60

9.20

1.50

Radio=

0.60

0.58

0.75

3.7
3.7
35.0
128.5

5.52

1.20

6.62

6.6

0.89

1.20

1.07

2.1

1.77

0.70

1.24

2.5

0.35

1.10

0.38

2
SUMA =
EJES
CONCRETO

0.8
12.0
19.0
228.2

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

__________________________
SUPERVISION EJECUTIVA

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

5.74
5.88
0.89

1.20
2.20
1.20

6.89
12.93
1.07

1
1
4

6.9
12.9
4.3

1.77

0.70

1.24

5.0

0.35

1.10

0.38

1.5

TRAMO X
APOYO 250
Pila N.250
CONCRETO DE FC = 350KG/CM2
C)CABEZAL 1 (1er colado)
C)CABEZAL 2 (1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

0.60
0.60

9.56
9.80

1.50

Radio=

0.60

0.58

0.75

SUMA POR PILA=

30.6
0.0

TRAVESAOS
CONCRETO DE FC = 300KG/CM2
G)TRAVESAO

0.60

2.55

1.53

1.20

1.84

2
SUMA =

3.7
3.7
0.0

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

7.29
7.64
0.89

1.20
2.20
1.20

8.75
16.81
1.07

1
1
4

8.7
16.8
4.3

1.77

0.70

1.24

5.0

0.35

1.10

0.38

1.5

TRAMO X
APOYO 251
Pila N.251
CONCRETO DE FC = 350KG/CM2
C)CABEZAL 1 (1er colado)
C)CABEZAL 2 (1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

0.60
0.60

12.15
12.74

1.50

Radio=

0.60

0.58

0.75

SUMA POR PILA=

36.3
0.0

TRAVESAOS
CONCRETO DE FC = 300KG/CM2
G)TRAVESAO

0.60

2.55

1.53

1.20

1.84

2
SUMA =

3.7
3.7
0.0

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

5.52
10.71
0.89

1.20
2.20
1.20

6.62
23.56
1.07

2
1
6

13.2
23.6
6.4

1.77

0.70

1.24

7.4

0.35

1.10

0.38

2.3

TRAMO X
APOYO 252
Pila N.252
CONCRETO DE FC = 350KG/CM2
C)CABEZAL 1 (1er colado)
C)CABEZAL 2 (1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

0.60
0.60

9.20
17.85

1.50

Radio=

0.60

0.58

0.75

SUMA POR PILA=

53.0
0.0

TRAVESAOS
CONCRETO DE FC = 300KG/CM2
G)TRAVESAO

0.60

2.55

1.53

1.20

1.84

2
SUMA =

3.7
3.7
0.0

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

5.52
12.45
0.89

1.20
2.20
1.20

6.62
27.40
1.07

2
1
8

13.2
27.4
8.6

1.77

0.70

1.24

9.9

0.35

1.10

0.38

3.1

TRAMO X
APOYO 262
Pila N.262
CONCRETO DE FC = 350KG/CM2
C)CABEZAL 1 (1er colado)
C)CABEZAL 2 (1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

0.60
0.60

9.20
20.76

1.50

Radio=

0.60

0.58

0.75

SUMA POR PILA=

TRAVESAOS

62.2
0.0

CONCRETO DE FC = 300KG/CM2
G)TRAVESAO

0.60

2.55

1.53

1.20

1.84

4
SUMA =

7.3
7.3
0.0

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

8.55
8.05
0.89

1.20
2.20
1.20

10.26
17.71
1.07

1
1
4

10.3
17.7
4.3

1.77

0.70

1.24

5.0

0.35

1.10

0.38

1.5

TRAMO X
APOYO 263
Pila N.263
CONCRETO DE FC = 350KG/CM2
C)CABEZAL 1 (1er colado)
C)CABEZAL 2 (1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

0.60
0.60

14.25
13.41

1.50

Radio=

0.60

0.58

0.75

SUMA POR PILA=

TRAVESAOS

38.7
0.0

CONCRETO DE FC = 300KG/CM2
G)TRAVESAO

0.60

2.55

1.53

1.20

1.84

2
SUMA =

3.7
3.7
0.0

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico p.u.o.t. De f'c= 350 Kg/cm2 en: Cabezales, Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Concreto hidrulico p.u.o.t. de f'c= 300 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

ANCHO
A1

m3

EJE

LONGITUD
L1

L2

AREA
(m2)

ALTURA
LONG

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

6.13
5.93
0.89

1.20
2.20
1.20

7.35
13.05
1.07

1
1
4

7.4
13.0
4.3

1.77

0.70

1.24

5.0

0.35

1.10

0.38

1.5

TRAMO X
APOYO 264
Pila N.264
CONCRETO DE FC = 350KG/CM2
C)CABEZAL 1 (1er colado)
C)CABEZAL 2 (1er colado)
B)BOCS PROPORCIONAL AL
CABEZAL (1er colado)
D)BCOS. (2do colado)
E)TOPE ANTISISMICO (2do colado)

0.60
0.60

10.21
9.89

1.50

Radio=

0.60

0.58

0.75

SUMA POR PILA=

TRAVESAOS

31.2
0.0

CONCRETO DE FC = 300KG/CM2
G)TRAVESAO

0.60

2.55

1.53

1.20

1.84

2
SUMA =

3.7
3.7
0.0

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO VI
APOYOS 1 AL 75

CABALLETE N.1
ANCLAJES
VARS A
VARS B
CABEZAL

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

16
4

10.41
16.44

1.85
4.76

8.938
1.557

kg/m
kg/m

50
36

826.77
266.81

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

4
4
6
63

374.68
374.68
90.62
332.53

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

28
12
24

55.61
40.87
62.68

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

16
12
8

85.72
257.45
18.35

BANCOS

TOPES

SUMA =

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

2,813.60

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.2 A PILA N.18
ANCLAJES
VARS A
VARS B
CABEZAL

f = 3c (3/8")
f = 5c (5/8")

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO VI

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

(ACERO QUE VIENE DE COLUMNA A 1.20 m)


f = 12c (3/2")
VARS A
1.20
f = 5c (5/8")
VARS B
4.76

8.938
1.557

kg/m
kg/m

100
48

1,072.56
355.74

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

0.65
4.76

8.938
1.557

kg/m
kg/m

100
24

580.97
177.87

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

(ACERO QUE VIENE DE COLUMNA A 0.70 m)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B
TOPES
VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,627.20
95,662.40
352.87
352.87
108.37
162.92
977.00
16,609.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.19 A PILA N.36
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO VI

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,627.20
101,289.60
352.87
352.87
108.37
162.92
977.00
17,586.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.37 A PILA N.54
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO VI

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,627.20
101,289.60
352.87
352.87
108.37
162.92
977.00
17,586.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.55 A PILA N.72
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO VI

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,627.20
101,289.60
352.87
352.87
108.37
162.92
977.00
17,586.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.73 A PILA N.75
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO VI

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

352.87
352.87
108.37
162.92
977.00
2,931.00

Acero fy=4200 kg/cm2 en Travesaos TRAMO VI=

72,298.00

Acero fy=4200 kg/cm2 en Cabezales, Bancos y Topes Antisismicos VI=

419,226.40

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,627.20
16,881.60

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2 TRAMO VII
PILA N.76 A PILA N.108
DEL APOYO 76 AL 166
ANCLAJES
VARS A
VARS B
CABEZAL

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,661.10
186,816.30
352.87
352.87
108.37
162.92
977.00
32,241.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.109 a PILA N.126
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO VII

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,661.10
101,899.80
352.87
352.87
108.37
162.92
977.00
17,586.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.127 a PILA N.144
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO VII

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,661.10
101,899.80
352.87
352.87
108.37
162.92
977.00
17,586.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.145 A PILA N.162
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO VII

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,661.10
101,899.80
352.87
352.87
108.37
162.92
977.00
17,586.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.163 A PILA N.166
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO VII

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

5,661.10
28,305.50

352.87
352.87
108.37
162.92
977.00
4,885.00

Acero fy=4200 kg/cm2 en Travesaos TRAMO VII=

89,884.00

Acero fy=4200 kg/cm2 en Cabezales, Bancos y Topes AntisismicosVII=

520,822.10

__________________________
SUPERVISION EJECUTIVA

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

- SUB-ESTRUCTURA
TRAMO VIII
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
DEL APOYO 167 AL 177
PILA N.167 A PILA N.177
ANCLAJES
VARS A
VARS B
CABEZAL

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

5,661.10
56,611.00
352.87
352.87
108.37
162.92
977.00
9,770.00

Acero fy=4200 kg/cm2 en Travesaos TRAMO VIII=

9,770.00

Acero fy=4200 kg/cm2 en Cabezales, Bancos y Topes Antisismicos VIII=

56,611.00

__________________________
SUPERVISION EJECUTIVA

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

- SUB-ESTRUCTURA
TRAMO IX
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
DEL APOYO 178 AL 221
PILA N.178 A PILA N.180
ANCLAJES
VARS A
VARS B
CABEZAL

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,661.10
249,088.40

352.87
352.87
108.37
162.92
977.00
42,988.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.181 A PILA N.198
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO IX

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,627.20
28,136.00

352.87
352.87
108.37
162.92
977.00
4,885.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.199 A PILA N.216
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO IX

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,627.20
0.00

352.87
352.87
108.37
162.92
977.00
0.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.217 A PILA N.221
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO IX

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

5,627.20
0.00

352.87
352.87
108.37
162.92
977.00
0.00

Acero fy=4200 kg/cm2 en Travesaos TRAMO IX=

47,873.00

Acero fy=4200 kg/cm2 en Cabezales, Bancos y Topes Antisismicos IX=

277,224.40

__________________________
SUPERVISION EJECUTIVA

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

- SUB-ESTRUCTURA
TRAMO X
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
DEL APOYO 222 AL 269
PILA N.222 A PILA N.234
ANCLAJES
VARS A
VARS B
CABEZAL

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,627.20
317,936.80

352.87
352.87
108.37
162.92
977.00
55,200.50

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.235 A PILA N.249
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO X

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,627.20
0.00

352.87
352.87
108.37
162.92
977.00
0.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.250 (APOYO ESPECIAL)
ANCLAJES
VARS A
VARS B
CABEZAL

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO X

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

CABEZAL

Kg

EJES

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

10.48
11.06
10.48
11.06
10.06
10.28

8.938
8.938
8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

4
4
4
4
6
6

374.68
395.42
374.68
395.42
93.98
96.04

VARS C
VARS C1
VARS D
VARS D1
VARS E
VARS E1

f
f
f
f
f
f

VARS F
VARS F1

f = 5c (5/8")
f = 5c (5/8")

3.39
3.39

1.557
1.557

kg/m
kg/m

65
60

343.08
316.69

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f
f
f
f

= 12c (3/2")
= 12c (3/2")
= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

SUMA =

5,672.20

6.0
6.0
12.0
32.0
SUMA =

352.87
352.87
108.37
162.92
977.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.251 (APOYO ESPECIAL)
ANCLAJES
VARS A
VARS B
CABEZAL

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO X

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

CABEZAL

Kg

EJES

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

13.42
14.02
13.42
14.02
12.68
12.97

8.938
8.938
8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

4
4
4
4
6
6

479.79
501.24
479.79
501.24
118.46
121.17

VARS C
VARS C1
VARS D
VARS D1
VARS E
VARS E1

f
f
f
f
f
f

VARS F
VARS F1

f = 5c (5/8")
f = 5c (5/8")

3.39
3.39

1.557
1.557

kg/m
kg/m

74
78

390.59
411.70

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 8c (1")
f = 8c (1")
f = 4c (1/2")

2.44
5.40
2.31

3.973
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

310.21
514.90
36.70

BANCOS

TOPES

TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f
f
f
f

= 12c (3/2")
= 12c (3/2")
= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

SUMA =

6,425.00

6.0
6.0
12.0
32.0
SUMA =

352.87
352.87
108.37
162.92
977.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
PILA N.252 (APOYO ESPECIAL)
ANCLAJES (12 ANCLAJES)
f = 3c (3/8")
VARS A
f = 5c (5/8")
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO X

1.17
2.64

0.556
1.557

kg/m
kg/m

48
12

31.22
49.33

(ACERO QUE VIENE DE COLUMNA 6 COLUMNAS)


f = 12c (3/2")
VARS A
1.85
f = 5c (5/8")
VARS B
4.76

8.938
1.557

kg/m
kg/m

150
108

2,480.30
800.42

CABEZAL (LADO 251-252)


f
VARS C1
f
VARS D1
f
VARS E1
f
VARS E2
f
VARS F1

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")

19.14
19.14
17.71
1.96
3.39

8.938
8.938
1.557
1.557
1.557

kg/m
kg/m
kg/m
kg/m
kg/m

4
4
6
6
100

684.29
684.29
165.45
18.31
527.82

CABEZALES (LADO 252-253)


f = 12c (3/2")
VARS C
f = 12c (3/2")
VARS D
f = 5c (5/8")
VARS E
f = 5c (5/8")
VARS F

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

BANCOS (6 BANCOS)
VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

84
36
72

166.82
122.62
188.03

TOPES (6 TOPES)
VARS O
VARS P
VARS Q

f = 8c (1")
f = 8c (1")
f = 4c (1/2")

2.44
5.40
2.31

3.973
3.973
0.993

kg/m
kg/m
kg/m

48
36
24

465.32
772.35
55.05

TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f
f
f
f

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

SUMA =

9,556.60

6.0
6.0
12.0
32.0
SUMA =

352.87
352.87
108.37
162.92
977.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.253 A N. 261 Y N.265 A N.270
ANCLAJES
VARS A
VARS B
CABEZAL

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO X

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

CABEZAL

Kg

EJES

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS C
VARS D
VARS E
VARS F

f
f
f
f

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f
f
f
f

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,627.20
0.00

352.87
352.87
108.37
162.92
977.00
977.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
DIAMETRO DE LONGITUD DE VAR. PESO VAR.
CLAVE:
VAR.
(m)
(ml)
- SUB-ESTRUCTURA
TRAMO X
PILA N.262 (APOYO ESPECIAL)
ANCLAJES (16 ANCLAJES)
f = 3c (3/8")
VARS A
f = 5c (5/8")
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

1.17
2.64

0.556
1.557

kg/m
kg/m

64
16

41.63
65.77

(ACERO QUE VIENE DE COLUMNA 8 COLUMNAS)


f = 12c (3/2")
VARS A
1.85
f = 5c (5/8")
VARS B
4.76

8.938
1.557

kg/m
kg/m

200
144

3,307.06
1,067.23

CABEZAL (LADO 261-262)


f
VARS C1
f
VARS D1
f
VARS E1
f
VARS E2
f
VARS F1

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")

22.25
22.25
20.51
1.96
3.39

8.938
8.938
1.557
1.557
1.557

kg/m
kg/m
kg/m
kg/m
kg/m

4
4
6
6
137

795.48
795.48
191.60
18.31
723.12

CABEZAL (LADO 262-263)


f
VARS C
f
VARS D
f
VARS E
f
VARS F

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

BANCOS (8 BANCOS)
VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

112
48
96

222.43
163.49
250.71

TOPES (8 TOPES)
VARS O
VARS P
VARS Q

f = 8c (1")
f = 8c (1")
f = 4c (1/2")

2.44
5.40
2.31

3.973
3.973
0.993

kg/m
kg/m
kg/m

64
48
32

620.42
1,029.80
73.40

TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f
f
f
f

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

SUMA =

11,710.90

12.0
12.0
24.0
64.0
SUMA =

705.74
705.74
216.73
325.85
1,954.10

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.263 (APOYO ESPECIAL)
ANCLAJES
VARS A
VARS B
CABEZAL

f = 3c (3/8")
f = 5c (5/8")

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO X

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

(ACERO QUE VIENE DE COLUMNA 4 COLUMNAS)


f = 12c (3/2")
VARS A
1.85
f = 5c (5/8")
VARS B
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

14.71
15.54
14.71
15.54
13.96
14.80
3.39
3.39

8.938
8.938
8.938
8.938
1.557
1.557
1.557
1.557

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

4
4
4
4
6
6
80
86

525.91
555.59
525.91
555.59
130.41
138.26
422.26
453.93

CABEZAL
VARS C
VARS C1
VARS D
VARS D1
VARS E
VARS E1
VARS F
VARS F1

f
f
f
f
f
f
f
f

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 8c (1")
f = 8c (1")
f = 4c (1/2")

2.44
5.40
2.31

3.973
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

310.21
514.90
36.70

BANCOS

TOPES

TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f
f
f
f

= 12c (3/2")
= 12c (3/2")
= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

SUMA =

861.80

6.0
6.0
12.0
32.0
SUMA =

352.87
352.87
108.37
162.92
977.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.264 (APOYO ESPECIAL)
ANCLAJES
VARS A
VARS B
CABEZAL

f = 3c (3/8")
f = 5c (5/8")

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO X

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

(ACERO QUE VIENE DE COLUMNA 4 COLUMNAS)


f = 12c (3/2")
VARS A
1.85
f = 5c (5/8")
VARS B
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

11.16
11.38
11.16
11.38
10.38
10.70
3.39
3.39

8.938
8.938
8.938
8.938
1.557
1.557
1.557
1.557

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

4
4
4
4
6
6
67
62

398.99
406.86
398.99
406.86
96.97
99.96
353.64
327.25

CABEZAL
VARS C
VARS C1
VARS D
VARS D1
VARS E
VARS E1
VARS F
VARS F1

f
f
f
f
f
f
f
f

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

3.973
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

306.40
514.90
36.70

BANCOS

TOPES

TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f
f
f
f

= 12c (3/2")
= 12c (3/2")
= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

SUMA =

5,906.70

6.0
6.0
12.0
32.0
SUMA =

352.87
352.87
108.37
162.92
977.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.271 A N.281
ANCLAJES
VARS A
VARS B
CABEZAL

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO X

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

CABEZAL

Kg

EJES

1.17
2.64

0.556
1.557

kg/m
kg/m

32
8

20.82
32.88

1.85
4.76

8.938
1.557

kg/m
kg/m

100
72

1,653.53
533.62

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

8
8
12
126

749.36
749.36
181.23
665.06

VARS C
VARS D
VARS E
VARS F

f
f
f
f

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

56
24
48

111.22
81.74
125.36

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

32
24
16

171.44
514.90
36.70

BANCOS

TOPES

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

SUMA =
SUMA DE TODAS LAS PILAS=
TRAVESAOS
VARS G
VARS H
VARS I
VARS J

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f
f
f
f

= 12c (3/2")
= 12c (3/2")
= 5c (5/8")
= 5c (5/8")

6.58
6.58
5.80
3.27

8.938
8.938
1.557
1.557

6.0
6.0
12.0
32.0
SUMA =
SUMA DE TODAS LAS PILAS=

__________________________
SUPERVISION EJECUTIVA

kg/m
kg/m
kg/m
kg/m

5,627.20
0.00

352.87
352.87
108.37
162.92
977.00
977.00

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutlnFECHA


en Manzanillo, Col.
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Cabezales,
Bancos y Topes Antissmicos

CANTIDAD

CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Travesaos

CANTIDAD

MATERIAL
CLAVE:

DIAMETRO DE LONGITUD DE VAR. PESO VAR.


VAR.
(m)
(ml)

- SUB-ESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
PILA N.282
ANCLAJES
VARS A
VARS B
CABEZAL

Kg

EJES

UD.

NUM
(pzas)

PESO
TOTAL(Kg)

TRAMO X

f = 3c (3/8")
f = 5c (5/8")

(ACERO QUE VIENE DE COLUMNA)


f = 12c (3/2")
VARS A
f = 5c (5/8")
VARS B

1.17
2.64

0.556
1.557

kg/m
kg/m

16
4

10.41
16.44

1.85
4.76

8.938
1.557

kg/m
kg/m

50
36

826.77
266.81

CABEZAL
VARS C
VARS D
VARS E
VARS F

f = 12c (3/2")
f = 12c (3/2")
f = 5c (5/8")
f = 5c (5/8")

10.48
10.48
9.70
3.39

8.938
8.938
1.557
1.557

kg/m
kg/m
kg/m
kg/m

4
4
6
63

374.68
374.68
90.62
332.53

VARS M
VARS N
VARS N1

f = 4c (1/2")
f = 4c (1/2")
f = 4c (1/2")

2.00
3.43
2.63

0.993
0.993
0.993

kg/m
kg/m
kg/m

28
12
24

55.61
40.87
62.68

VARS O
VARS P
VARS Q

f = 6c (3/4")
f = 8c (1")
f = 4c (1/2")

2.41
5.40
2.31

2.223
3.973
0.993

kg/m
kg/m
kg/m

16
12
8

85.72
257.45
18.35

BANCOS

TOPES

SUMA =

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

2,813.60

Acero fy=4200 kg/cm2 en Travesaos TRAMO X=

63,993.60

Acero fy=4200 kg/cm2 en Cabezales, Bancos y Topes Antisismicos X=

360,883.60

__________________________
SUPERVISION EJECUTIVA

_________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

MATERIAL
CLAVE:

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 7.1
cm en topes antissmicos
N. DE DUC /
DIAMETRO
LONGITUD
APOYO

EJE
CANTIDAD
LONG/
APOYO

NUM
APOYOS

LONG
TOTAL

TRAMO VI
DEL APOYO 1 AL 75

- SUBESTRUCTURA
DUCTOS DE PVC PARA PASO DE BARRAS EN MONTAJE DE TRABES
EN TOPES ANTISISMICOS DE DIAMETRO IGUAL A 7.1CM

APOYO N.1

FECHA
UNIDAD

DUCTOS

f =7.1

2.30

4.00

9.20

0.0

0.00

DUCTOS

f =7.1

2.30

8.00

18.40

49.0

901.60

APOYO N.2 A APOYO N.74

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

MATERIAL
CLAVE:

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 7.1
cm en topes antissmicos
N. DE DUC /
DIAMETRO
LONGITUD
APOYO

- SUBESTRUCTURA
DUCTOS DE PVC PARA PASO DE BARRAS EN MONTAJE DE TRABES
EN TOPES ANTISISMICOS DE DIAMETRO IGUAL A 7.1CM

APOYO N.75 A APOYO N.166


DUCTOS

f =7.1

FECHA
UNIDAD

EJE
CANTIDAD
LONG/
APOYO

NUM
APOYOS

LONG
TOTAL

TRAMO VII
DEL APOYO 75 AL 166

2.00

8.00

16.00

92.0

1,472.00

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

MATERIAL
CLAVE:

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 7.1
cm en topes antissmicos
N. DE DUC /
DIAMETRO
LONGITUD
APOYO

- SUBESTRUCTURA
DUCTOS DE PVC PARA PASO DE BARRAS EN MONTAJE DE TRABES
EN TOPES ANTISISMICOS DE DIAMETRO IGUAL A 7.1CM

APOYO N.166 A APOYO N.177


DUCTOS

f =7.1

FECHA
UNIDAD

EJE
CANTIDAD
LONG/
APOYO

NUM
APOYOS

LONG
TOTAL

TRAMO VIII
DEL APOYO 166 AL 177

2.00

8.00

16.00

10.0

160.00

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

MATERIAL
CLAVE:

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 7.1
cm en topes antissmicos
N. DE DUC /
DIAMETRO
LONGITUD
APOYO

- SUBESTRUCTURA
DUCTOS DE PVC PARA PASO DE BARRAS EN MONTAJE DE TRABES
EN TOPES ANTISISMICOS DE DIAMETRO IGUAL A 7.1CM

APOYO N.178 A APOYO N.222


DUCTOS

f =7.1

FECHA
UNIDAD

EJE
CANTIDAD
LONG/
APOYO

NUM
APOYOS

LONG
TOTAL

TRAMO IX
DEL APOYO 203 AL 221

2.00

8.00

16.00

44.0

704.00

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

MATERIAL
CLAVE:

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 7.1
cm en topes antissmicos
N. DE DUC /
DIAMETRO
LONGITUD
APOYO

- SUBESTRUCTURA
DUCTOS DE PVC PARA PASO DE BARRAS EN MONTAJE DE TRABES
EN TOPES ANTISISMICOS DE DIAMETRO IGUAL A 7.1CM

APOYO N.223 A APOYO N.281

FECHA
UNIDAD
EJE
CANTIDAD
LONG/
APOYO

NUM
APOYOS

LONG
TOTAL

TRAMO X
DEL APOYO 222 AL 271

DUCTOS

f =7.1

2.30

8.00

16.00

DUCTOS

f =7.1

2.30

4.00

9.20

APOYO N.282

51.5

824.00

0.00

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA

DIAMETRO

CANTIDAD
AREA
(dm2)

R2

dm3

EJES

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

TRAMO VI
DEL APOYO 1 AL 75
APOYO N.1
Grout

15

7.5

176.71

0.87

154.00

308.00

APOYO N.2
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.3
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.4
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.5
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.6
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.7
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.8
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.9
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.10
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.11
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.12
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.13
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.14
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.15
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.16
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.17
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.18
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.19
Grout

15

7.5

176.71

0.87

154.00

616.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
APOYO N.20
Grout

DIAMETRO

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

176.71

0.87

154.00

616.00

APOYO N.21
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.22
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.23
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.24
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.25
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.26
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.27
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.28
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.29
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.30
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.31
Grout

15

7.5

176.71

0.87

154.00

616.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA

DIAMETRO

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

APOYO N.32
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.33
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.34
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.35
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.36
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.37
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.38
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.39
Grout

15

7.5

176.71

0.87

154.00

616.00

APOYO N.40
Grout

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

APOYO N.
Grout

41

APOYO N.
Grout

42

APOYO N.
Grout

43

APOYO N.
Grout

44

APOYO N.
Grout

45

APOYO N.
Grout

46

APOYO N.
Grout

47

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
APOYO N.
Grout

48

APOYO N.
Grout

49

APOYO N.
Grout

50

APOYO N.
Grout

51

APOYO N.
Grout

52

APOYO N.
Grout

53

APOYO N.
Grout

54

APOYO N.
Grout

55

APOYO N.
Grout

56

APOYO N.
Grout

57

APOYO N.
Grout

58

APOYO N.
Grout

59

APOYO N.
Grout

60

APOYO N.
Grout

61

APOYO N.
Grout

62

APOYO N.
Grout

63

APOYO N.
Grout

64

APOYO N.
Grout

65

APOYO N.
Grout

66

APOYO N.

67

DIAMETRO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
Grout
APOYO N.
Grout

68

APOYO N.
Grout

69

APOYO N.
Grout

70

APOYO N.
Grout

71

APOYO N.
Grout

72

APOYO N.
Grout

73

APOYO N.
Grout

74

DIAMETRO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

15

7.5

176.71

0.87

154.00

616.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA

DIAMETRO

CANTIDAD
AREA
(dm2)

R2

dm3

EJES

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

TRAMO VII DEL APOYO 76 AL 166


APOYO N.
Grout

75

APOYO N.
Grout

76

APOYO N.
Grout

77

APOYO N.
Grout

78

APOYO N.
Grout

79

APOYO N.
Grout

80

APOYO N.
Grout

81

APOYO N.
Grout

82

APOYO N.
Grout

83

APOYO N.
Grout

84

APOYO N.
Grout

85

APOYO N.
Grout

86

APOYO N.
Grout

87

APOYO N.
Grout

88

APOYO N.
Grout

89

APOYO N.
Grout

90

APOYO N.
Grout

91

APOYO N.
Grout

92

APOYO N.
Grout

93

APOYO N.

94

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

15

7.5

172.00

0.86

147.92

295.84

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
Grout
APOYO N.
Grout

95

APOYO N.
Grout

96

APOYO N.
Grout

97

APOYO N.
Grout

98

APOYO N.
Grout

99

APOYO N.
Grout

100

APOYO N.
Grout

101

APOYO N.
Grout

102

APOYO N.
Grout

103

APOYO N.
Grout

104

APOYO N.
Grout

105

APOYO N.
Grout

106

APOYO N.
Grout

107

APOYO N.
Grout

108

APOYO N.
Grout

109

APOYO N.
Grout

110

APOYO N.
Grout

111

APOYO N.
Grout

112

APOYO N.
Grout

113

DIAMETRO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
APOYO N.
114
Grout
APOYO N.
Grout

115

APOYO N.
Grout

116

APOYO N.
Grout

117

APOYO N.
Grout

118

APOYO N.
Grout

119

APOYO N.
Grout

120

APOYO N.
Grout

121

APOYO N.
Grout

122

APOYO N.
Grout

123

APOYO N.
Grout

124

APOYO N.
Grout

125

APOYO N.
Grout

126

APOYO N.
Grout

127

APOYO N.
Grout

128

APOYO N.
Grout

129

APOYO N.
Grout

130

APOYO N.
Grout

131

APOYO N.
Grout

132

APOYO N.
Grout

133

DIAMETRO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
APOYO N.
Grout

134

APOYO N.
Grout

135

APOYO N.
Grout

136

APOYO N.
Grout

137

APOYO N.
Grout

138

APOYO N.
Grout

139

APOYO N.
Grout

140

APOYO N.
Grout

141

APOYO N.
Grout

142

APOYO N.
Grout

143

APOYO N.
Grout

144

APOYO N.
Grout

145

APOYO N.
Grout

146

APOYO N.
Grout

147

APOYO N.
Grout

148

APOYO N.
Grout

149

APOYO N.
Grout

150

APOYO N.
Grout

151

APOYO N.
Grout

152

APOYO N.

153

DIAMETRO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
Grout
APOYO N.
Grout

154

APOYO N.
Grout

155

APOYO N.
Grout

156

APOYO N.
Grout

157

APOYO N.
Grout

158

APOYO N.
Grout

159

APOYO N.
Grout

160

APOYO N.
Grout

161

APOYO N.
Grout

162

APOYO N.
Grout

163

APOYO N.
Grout

164

APOYO N.
Grout

165

APOYO N.
Grout

166

DIAMETRO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

15

7.5

172.00

0.86

147.92

591.68

__________________________
SUPERVISION EJECUTIVA

54,138.72

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA

DIAMETRO

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

TRAMO VIII DEL APOYO 166 AL 177


APOYO N.
Grout

167

APOYO N.
Grout

168

APOYO N.
Grout

169

APOYO N.
Grout

170

APOYO N.
Grout

171

APOYO N.
Grout

172

APOYO N.
Grout

173

APOYO N.
Grout

174

APOYO N.
Grout

175

APOYO N.
Grout

176

APOYO N.
Grout

177

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

295.84

__________________________
SUPERVISION EJECUTIVA

6,212.64

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA

DIAMETRO

CANTIDAD
AREA
(dm2)

R2

dm3

EJES

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

TRAMO IX DEL APOYO 177 AL 221


APOYO N.
Grout

178

APOYO N.
Grout

179

APOYO N.
Grout

180

APOYO N.
Grout

181

APOYO N.
Grout

182

APOYO N.
Grout

183

APOYO N.
Grout

184

APOYO N.
Grout

185

APOYO N.
Grout

186

APOYO N.
Grout

187

APOYO N.
Grout

188

APOYO N.
Grout

189

APOYO N.
Grout

190

APOYO N.
Grout

191

APOYO N.
Grout

192

APOYO N.
Grout

193

APOYO N.
Grout

194

APOYO N.
Grout
APOYO N.
Grout

195

APOYO N.
Grout

197

15

7.5

176.71

0.87

147.92

295.84

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

196

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
APOYO N.
Grout

198

APOYO N.
Grout

199

APOYO N.
Grout

200

APOYO N.
Grout

201

APOYO N.
Grout

202

APOYO N.
Grout

203

APOYO N.
Grout

204

APOYO N.
Grout

205

APOYO N.
Grout

206

APOYO N.
Grout

207

APOYO N.
Grout

208

APOYO N.
Grout

209

APOYO N.
Grout

210

APOYO N.
Grout

211

APOYO N.
Grout

212

APOYO N.
Grout

213

APOYO N.
Grout

214

APOYO N.
Grout

215

APOYO N.
Grout

216

APOYO N.

217

DIAMETRO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

295.84

15

7.5

176.71

0.87

147.92

295.84

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
Grout
APOYO N.
Grout

218

APOYO N.
Grout

219

APOYO N.
Grout

220

APOYO N.
Grout

221

DIAMETRO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

__________________________
SUPERVISION EJECUTIVA

25,146.40

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA

DIAMETRO

CANTIDAD
AREA
(dm2)

R2

dm3

EJES

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

TRAMO X DEL 222 AL 282


APOYO N.
Grout

222

APOYO N.
Grout

223

APOYO N.
Grout

224

APOYO N.
Grout

225

APOYO N.
Grout

226

APOYO N.
Grout

227

APOYO N.
Grout

228

APOYO N.
Grout

229

APOYO N.
Grout

230

APOYO N.
Grout

231

APOYO N.
Grout

232

APOYO N.
Grout

233

APOYO N.
Grout

234

APOYO N.
Grout

235

APOYO N.
Grout

236

APOYO N.
Grout

237

APOYO N.
Grout

238

APOYO N.
Grout

239

APOYO N.
Grout

240

APOYO N.

241

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

295.84

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

295.84

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
Grout
APOYO N.
Grout

242

APOYO N.
Grout

243

APOYO N.
Grout

244

APOYO N.
Grout

245

APOYO N.
Grout

246

APOYO N.
Grout

247

APOYO N.
Grout

248

APOYO N.
Grout

249

APOYO N.
Grout

250

APOYO N.
Grout

251

APOYO N.
Grout

252

APOYO N.
Grout

253

APOYO N.
Grout

254

APOYO N.
Grout

255

APOYO N.
Grout

256

APOYO N.
Grout

257

APOYO N.
Grout

258

APOYO N.
Grout

259

APOYO N.
Grout

260

DIAMETRO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

591.68

15

7.5

176.71

0.87

147.92

295.84

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
APOYO N.
261
Grout
APOYO N.
Grout

262

APOYO N.
Grout

263

APOYO N.
Grout

264

APOYO N.
Grout

265

APOYO N.
Grout

266

APOYO N.
Grout

267

APOYO N.
Grout

268

APOYO N.
Grout

269

APOYO N.
Grout

270

APOYO N.
Grout

271

APOYO N.
Grout

272

APOYO N.
Grout

273

APOYO N.
Grout

274

APOYO N.
Grout

275

APOYO N.
Grout

276

APOYO N.
Grout

277

APOYO N.
Grout

278

APOYO N.
Grout

279

APOYO N.
Grout

280

DIAMETRO

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Mortero grout, p.u.o.t. para nivelacin de apoyos

MATERIAL: CONCRETO
CLAVE:
- SUBESTRUCTURA
APOYO N.
Grout

281

APOYO N.
Grout

282

DIAMETRO

R2

dm3

EJES
CANTIDAD

AREA
(dm2)

L2

VOL/ELEM
(dm3)

NUM
(ELEM)

VOL(dm)
TOTAL

15

7.5

176.71

0.87

147.92

0.00

15

7.5

176.71

0.87

147.92

0.00

13,312.80

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD
EJES
CANTIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: Losas entre trabes
MATERIAL
CLAVE:

UNIDAD

ANCHO
PROM

LONGITUD/ELEMENTO

m3

AREA
(m2)

ALTURA
PROM

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

2.73
0.98

0.62

76.33
4.31
80.6

74
1

5,648.5
4.3
5,652.8

TRAMO VI
APOYO 1 a 75

- SUPERESTRUCTURA
CONCRETO DE FC = 350 KG/CM2

Tramo 1-2 a 74-75


LOSA
MENSULA

__________________________
TRADECO INFRAESTRUCTURA

m3
m3

4.40
4.40

27.96

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD
EJES
CANTIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: Losas entre trabes
MATERIAL
CLAVE:

UNIDAD

ANCHO
PROM

LONGITUD/ELEMENTO

m3

AREA
(m2)

ALTURA
PROM

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

2.73

0.62

76.30

90

6,867.0

TRAMO VII
APOYO 75 a 166

- SUPERESTRUCTURA
CONCRETO DE FC = 350 KG/CM2

Tramo 75-76 a 165-166


LOSA

__________________________
TRADECO INFRAESTRUCTURA

m3

4.40

27.96

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD
EJES
CANTIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: Losas entre trabes
MATERIAL
CLAVE:

UNIDAD

ANCHO
PROM

LONGITUD/ELEMENTO

m3

AREA
(m2)

ALTURA
PROM

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

2.73

0.62

76.33

11

839.6

TRAMO VIII
APOYO 166 a 177

- SUPERESTRUCTURA
CONCRETO DE FC = 350 KG/CM2

Tramo 166-167 a 176-177


LOSA

__________________________
TRADECO INFRAESTRUCTURA

m3

4.40

27.96

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD
EJES
CANTIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: Losas entre trabes
MATERIAL
CLAVE:

UNIDAD

ANCHO
PROM

LONGITUD/ELEMENTO

m3

AREA
(m2)

ALTURA
PROM

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

2.73

0.62

76.33

42

3,205.9

TRAMO IX
APOYO 177 a 221

- SUPERESTRUCTURA
CONCRETO DE FC = 350 KG/CM2

Tramo 177-178 a 220-221


LOSA

__________________________
TRADECO INFRAESTRUCTURA

m3

4.40

27.96

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD
EJES
CANTIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: Losas entre trabes
MATERIAL
CLAVE:

UNIDAD

ANCHO
PROM

LONGITUD/ELEMENTO

AREA
(m2)

ALTURA
PROM

m3

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

TRAMO X
APOYO 221 a 282

- SUPERESTRUCTURA
CONCRETO DE FC = 350 KG/CM2
Tramo 221-222 a 248-249
Tramo 252-253 a 260-262
Tramo 265-266 a 281-282
LOSA
MENSULA

4.4
4.4

27.96

2.73
0.98

0.62

76.33
4.31
80.64

16

1,221.3
0.0
1,221.3

m3

4.58

27.96

2.84

0.62

79.40

0.0

m3

6.16

27.96

3.82

0.62

106.78

0.0

m3

10.34

27.96

6.41

0.62

179.25

0.0

m3

12.4

27.96

7.69

0.62

214.96

0.0

m3

27.96

4.34

0.62

121.35

0.0

m3

4.74

27.96

2.94

0.62

82.17

0.0

Tramo 249-250
LOSA
Tramo 250-251
LOSA
Tramo 251-252
LOSA
Tramo 262-263
LOSA
Tramo 263-264
LOSA
Tramo 264-265
LOSA

__________________________
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD
L1

PESO
UNIT

UD

FECHA
UNIDAD
EJES
CANTIDAD

Kg

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

113
57
24
24
48

770.6
991.9
2,656.5
4,163.6
80.6
8,663.2

74.0
74.0
74.0
74.0
74.0
74.0

57,026.0
73,400.5
196,581.5
308,108.0
5,960.9
641,076.9

153.4
65.6
166.9
52.9
95.9
28.4
31.8
594.9

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

153.4
65.6
166.9
52.9
95.9
28.4
31.8
594.9

TRAMO VI
APOYO 1 a 75

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
Tramo 1-2 a 74-75
LOSA
VARS A
VARS B
VARS C
VARS D
VARS E

MENSULA
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G

f
f
f
f
f

f
f
f
f
f
f
f

= 5c (5/8")
= 8c (1")
= 8c (1")
= 10c (5/4")
= 4c (1/2")

= 6c (3/4")
= 8c (1")
= 8c (1")
= 5c (5/8")
= 4c (1/2")
= 6c (3/4")
= 6c (3/4")

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

4.38
4.38
27.86
27.86
1.69

3.45
1.50
2.10
1.70
1.61
4.26
4.77

1.557
3.973
3.973
6.227
0.993

2.223
3.973
3.973
1.557
0.993
2.223
2.223

kg/m
kg/m
kg/m
kg/m
kg/m

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

__________________________
SUPERVISION EJECUTIVA

20
11
20
20
60
3
3

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD
L1

PESO
UNIT

UD

FECHA
UNIDAD
EJES
CANTIDAD

Kg

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

113
57
24
24
48

770.6
991.9
2,656.5
4,163.6
80.6
8,663.2

90.0
90.0
90.0
90.0
90.0

69,355.9
89,270.9
239,085.6
374,725.9
7,249.7
779,688.1

TRAMO VII
APOYO 75 a 166

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
Tramo 75-76 a 165-166

LOSA
VARS A
VARS B
VARS C
VARS D
VARS E

f
f
f
f
f

= 5c (5/8")
= 8c (1")
= 8c (1")
= 10c (5/4")
= 4c (1/2")

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

4.38
4.38
27.86
27.86
1.69

1.557
3.973
3.973
6.227
0.993

kg/m
kg/m
kg/m
kg/m
kg/m

__________________________
SUPERVISION EJECUTIVA

91.0

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD
L1

PESO
UNIT

UD

FECHA
UNIDAD
EJES
CANTIDAD

Kg

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

113
57
24
24
48

770.6
991.9
2,656.5
4,163.6
80.6
8,663.2

11.0
11.0
11.0
11.0
11.0

8,476.8
10,910.9
29,221.6
45,799.8
886.1
95,295.2

TRAMO VIII
APOYO 166 a 177

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
Tramo 166-167 a 176-177

LOSA
VARS A
VARS B
VARS C
VARS D
VARS E

f
f
f
f
f

= 5c (5/8")
= 8c (1")
= 8c (1")
= 10c (5/4")
= 4c (1/2")

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

4.38
4.38
27.86
27.86
1.69

1.557
3.973
3.973
6.227
0.993

kg/m
kg/m
kg/m
kg/m
kg/m

__________________________
SUPERVISION EJECUTIVA

11.0

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD
L1

PESO
UNIT

UD

FECHA
UNIDAD
EJES
CANTIDAD

Kg

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

113
57
24
24
48

770.6
991.9
2,656.5
4,163.6
80.6
8,663.2

42.0
42.0
42.0
42.0
42.0

32,366.1
41,659.8
111,573.3
174,872.1
3,383.2
363,854.4

TRAMO IX
APOYO 177 a 221

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
Tramo 177-178 a 220-221

LOSA
VARS A
VARS B
VARS C
VARS D
VARS E

f
f
f
f
f

= 5c (5/8")
= 8c (1")
= 8c (1")
= 10c (5/4")
= 4c (1/2")

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

4.38
4.38
27.86
27.86
1.69

1.557
3.973
3.973
6.227
0.993

kg/m
kg/m
kg/m
kg/m
kg/m

__________________________
SUPERVISION EJECUTIVA

2.0

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD
L1

PESO
UNIT

UD

FECHA
UNIDAD
EJES
CANTIDAD

Kg

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

113
57
24
24
48

770.6
991.9
2,656.5
4,163.6
80.6
8,663.2

16.0
16.0
16.0
16.0
16.0
55.0

12,329.9
15,870.4
42,504.1
66,617.9
1,288.8
138,611.2

1.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

TRAMO X
APOYO 221 a 282

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
Tramo 221-222 a 248-249
Tramo 252-253 a 260-262
Tramo 265-266 a 281-282

LOSA
VARS A
VARS B
VARS C
VARS D
VARS E

MENSULA
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G

f
f
f
f
f

f
f
f
f
f
f
f

= 5c (5/8")
= 8c (1")
= 8c (1")
= 10c (5/4")
= 4c (1/2")

= 6c (3/4")
= 8c (1")
= 8c (1")
= 5c (5/8")
= 4c (1/2")
= 6c (3/4")
= 6c (3/4")

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

4.38
4.38
27.86
27.86
1.69

3.45
1.50
2.10
1.70
1.61
4.26
4.77

1.557
3.973
3.973
6.227
0.993

2.223
3.973
3.973
1.557
0.993
2.223
2.223

kg/m
kg/m
kg/m
kg/m
kg/m

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

__________________________
SUPERVISION EJECUTIVA

20
11
20
20
60
3
3

153.4
65.6
166.9
52.9
95.9
28.4
31.8
594.9

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD
L1

PESO
UNIT

UD

FECHA
UNIDAD
EJES
CANTIDAD

NUM
PZAS/ELEM.

PESO/VAR
KG

113
57
57
24
2
24
2
50

800.5
1,030.4
380.1
2,656.5
116.0
4,118.8
181.8
84.9
9,369.1

Kg

N. DE ELEM.

PESO
TOTAL

TRAMO X
APOYO 221 a 282

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
Tramo 249-250

LOSA
VARS A
VARS B
VARS B1
VARS C
VARS C1
VARS D
VARS D1
VARS E

f
f
f
f
f
f
f
f

= 5c (5/8")
= 8c (1")
= 6c (3/4")
= 8c (1")
= 8c (1")
= 10c (5/4")
= 10c (5/4")
= 4c (1/2")

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

4.55
4.55
3.00
27.86
14.60
27.56
14.60
1.71

1.557
3.973
2.223
3.973
3.973
6.227
6.227
0.993

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

__________________________
SUPERVISION EJECUTIVA

1.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD
L1

PESO
UNIT

UD

FECHA
UNIDAD
EJES
CANTIDAD

NUM
PZAS/ELEM.

PESO/VAR
KG

113
112
113
27
15
27
15
69

2,761.0
2,789.7
2,761.0
2,988.6
793.8
4,684.1
1,244.2
117.2
18,139.5

Kg

N. DE ELEM.

PESO
TOTAL

TRAMO X
APOYO 221 a 282

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
Tramo 250-251

LOSA
VARS A
VARS A1
VARS B
VARS C
VARS C1
VARS D
VARS D1
VARS E

f
f
f
f
f
f
f
f

= 8c (1")
= 10c (5/4")
= 8c (1")
= 8c (1")
= 8c (1")
= 10c (5/4")
= 10c (5/4")
= 4c (1/2")

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

6.15
4.00
6.15
27.86
13.32
27.86
13.32
1.71

3.973
6.227
3.973
3.973
3.973
6.227
6.227
0.993

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

__________________________
SUPERVISION EJECUTIVA

1.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

PESO
UNIT

UD

FECHA
UNIDAD
EJES
CANTIDAD

NUM
PZAS/ELEM.

PESO/VAR
KG

105
109
7
46
11
4
38
31
5
38
31
5
171

6,754.1
4,072.5
436.3
1,811.1
553.3
111.2
4,206.1
1,716.9
552.4
6,592.4
2,690.9
865.9
29,036.3
59,399.5

Kg

N. DE ELEM.

PESO
TOTAL

TRAMO X
APOYO 221 a 282

Tramo 251-252

LOSA
VARS A
VARS A1
VARS A2
VARS B
VARS B1
VARS B2
VARS C
VARS C1
VARS C2
VARS D
VARS D1
VARS D2
VARS E

f
f
f
f
f
f
f
f
f
f
f
f
f

= 10c (5/4")
= 10c (5/4")
= 10c (5/4")
= 8c (1")
= 8c (1")
= 8c (1")
= 8c (1")
= 8c (1")
= 8c (1")
= 10c (5/4")
= 10c (5/4")
= 10c (5/4")
= 4c (1/2")

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

10.33
6.00
10.01
9.91
12.66
7.00
27.86
13.94
27.81
27.86
13.94
27.81
171.00

6.227
6.227
6.227
3.973
3.973
3.973
3.973
3.973
3.973
6.227
6.227
6.227
0.993

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

__________________________
SUPERVISION EJECUTIVA

1.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

PESO
UNIT

UD

FECHA
UNIDAD
EJES
CANTIDAD

NUM
PZAS/ELEM.

PESO/VAR
KG

102
108
11
42
16
5
47
39
2
47
39
2
171

7,869.6
4,035.1
812.4
1,955.7
978.3
146.0
5,202.3
2,177.0
220.9
8,153.8
3,412.1
346.2
29,036.3
64,345.6

Kg

N. DE ELEM.

PESO
TOTAL

TRAMO X
APOYO 221 a 271

Tramo 262-263

LOSA
VARS A
VARS A1
VARS A2
VARS B
VARS B1
VARS B2
VARS C
VARS C1
VARS C2
VARS D
VARS D1
VARS D2
VARS E

f
f
f
f
f
f
f
f
f
f
f
f
f

= 10c (5/4")
= 10c (5/4")
= 10c (5/4")
= 8c (1")
= 8c (1")
= 8c (1")
= 8c (1")
= 8c (1")
= 8c (1")
= 10c (5/4")
= 10c (5/4")
= 10c (5/4")
= 4c (1/2")

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

12.39
6.00
11.86
11.72
15.39
7.35
27.86
14.05
27.80
27.86
14.05
27.80
171.00

6.227
6.227
6.227
3.973
3.973
3.973
3.973
3.973
3.973
6.227
6.227
6.227
0.993

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

__________________________
SUPERVISION EJECUTIVA

1.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD
L1

PESO
UNIT

UD

FECHA
UNIDAD
EJES
CANTIDAD

NUM
PZAS/ELEM.

PESO/VAR
KG

113
112
113
29
20
29
20
77

4,918.5
2,789.7
3,138.2
3,209.9
1,090.2
5,031.0
1,708.7
130.7
22,017.0

Kg

N. DE ELEM.

PESO
TOTAL

TRAMO X
APOYO 221 a 282

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
Tramo 263-264

LOSA
VARS A
VARS A1
VARS B
VARS C
VARS C1
VARS D
VARS D1
VARS E

f
f
f
f
f
f
f
f

= 10c (5/4")
= 10c (5/4")
= 8c (1")
= 8c (1")
= 8c (1")
= 8c (1")
= 10c (5/4")
= 4c (1/2")

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

6.99
4.00
6.99
27.86
13.72
27.86
13.72
1.71

6.227
6.227
3.973
3.973
3.973
6.227
6.227
0.993

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

__________________________
SUPERVISION EJECUTIVA

1.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en: Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD
L1

PESO
UNIT

UD

FECHA
UNIDAD
EJES
CANTIDAD

NUM
PZAS/ELEM.

PESO/VAR
KG

113
57
57
24
4
24
4
52

830.4
1,068.9
679.4
2,656.5
221.7
4,163.6
347.5
88.3
10,056.3

Kg

N. DE ELEM.

PESO
TOTAL

TRAMO X
APOYO 221 a 282

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
Tramo 264-265

LOSA
VARS A
VARS B
VARS B1
VARS C
VARS C1
VARS D
VARS D1
VARS E

f
f
f
f
f
f
f
f

= 5c (5/8")
= 8c (1")
= 8c (1")
= 8c (1")
= 8c (1")
= 10c (5/4")
= 10c (5/4")
= 4c (1/2")

4.72
4.72
3.00
27.86
13.95
27.86
13.95
1.71

1.557
3.973
3.973
3.973
3.973
6.227
6.227
0.993

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

1.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

138,611.2

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: trabes
presforzadas (incluye montaje de trabes con gruas)
ALTURA
AREA
UNIDAD
PROM
LONGITUD/ELEMENTO
(m2)

MATERIAL
CLAVE:

- SUPERESTRUCTURA

FECHA
UNIDAD
EJES
CANTIDAD

m3

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

TRAMO VI
APOYO 1 a 75

CONCRETO DE FC = 350 KG/CM2

Tramo 1-2 a 18-19


TRABES B INTRADOS
TRABES C EXTRADOS

27.80
28.12

2.73
2.73

75.89
76.77

18
18

1,366.1
1,381.8

27.80
28.12

2.73
2.73

75.89
76.77

5
5

379.5
383.8

27.89
28.03

2.73
2.73

76.14
76.52

1
1

76.1
76.5

27.96

2.73

76.33

80

6,106.5

27.95
27.97

2.73
2.73

76.30
76.36

1
1

76.3
76.4

Tramo 19-20 a 23-24


TRABES B INTRADOS
TRABES C EXTRADOS
Tramo 24-25
TRABES D INTRADOS
TRABES E EXTRADOS
Tramo 25-26 a 64-65
TRABES A
Tramo 65-66
TRABES D INTRADOS
TRABES E EXTRADOS

Tramo 66-67 a 73-74

__________________________
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

MATERIAL
CLAVE:

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: trabes
presforzadas (incluye montaje de trabes con gruas)
ALTURA
AREA
UNIDAD
PROM
LONGITUD/ELEMENTO
(m2)

TRABES B INTRADOS
TRABES C EXTRADOS

FECHA
UNIDAD
EJES
CANTIDAD

m3

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

27.88
28.04

2.73
2.73

76.11
76.55

8
8

608.9
612.4

27.91
28.01

2.73
2.73

76.19
76.47

1
1

76.2
76.5

Tramo 74-75
TRABES D INTRADOS
TRABES E EXTRADOS

__________________________
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

MATERIAL
CLAVE:

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: trabes
presforzadas (incluye montaje de trabes con gruas)
ALTURA
AREA
UNIDAD
PROM
LONGITUD/ELEMENTO
(m2)

- SUPERESTRUCTURA

FECHA
UNIDAD
EJES
CANTIDAD

m3

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

182

13,892.2

TRAMO VII
APOYO 76 a 166

CONCRETO DE FC = 350 KG/CM2

Tramo 75-76 a 145-146


TRABES A

27.96

2.73

76.33

27.89
28.03

2.73
2.73

76.14
76.52

0.0
0.0

27.82
28.10

2.73
2.73

75.95
76.71

0.0
0.0

27.72
28.19

2.73
2.73

75.68
76.96

0.0
0.0

27.80
28.12

2.73
2.73

75.89
76.77

0.0
0.0

Tramo146-147
TRABES D INTRADOS
TRABES E EXTRADOS
Tramo 147-148
TRABES F INTRADOS
TRABES G EXTRADOS
Tramo 148-149
TRABES H INTRADOS
TRABES I EXTRADOS
Tramo 149-150 a 159-160
TRABES B INTRADOS
TRABES C EXTRADOS

__________________________
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: trabes
presforzadas (incluye montaje de trabes con gruas)
ALTURA
MATERIAL
AREA
UNIDAD
PROM
CLAVE:
LONGITUD/ELEMENTO
(m2)
Tramo 160-161
TRABES J INTRADOS
TRABES K EXTRADOS

FECHA
UNIDAD
EJES
CANTIDAD

m3

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

27.74
28.17

2.73
2.73

75.73
76.90

0.0
0.0

27.85
28.07

2.73
2.73

76.03
76.63

0.0
0.0

27.95
27.97

2.73
2.73

76.30
76.36

0.0
0.0

27.96

2.73

76.33

0.0

Tramo 161-162
TRABES L INTRADOS
TRABES M EXTRADOS
Tramo 162-163
TRABES N INTRADOS
TRABES O EXTRADOS
Tramo 163-164 a 165-166
TRABES A

__________________________
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

MATERIAL
CLAVE:

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: trabes
presforzadas (incluye montaje de trabes con gruas)
ALTURA
AREA
UNIDAD
PROM
LONGITUD/ELEMENTO
(m2)

- SUPERESTRUCTURA

FECHA
UNIDAD
EJES
CANTIDAD

m3

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

22

1,679.3

TRAMO VIII
APOYO 167 a 177

CONCRETO DE FC = 350 KG/CM2

Tramo 166-167 a 167-168


TRABES A

27.96

2.73

76.33

27.89
28.03

2.73
2.73

76.14
76.52

0.0
0.0

27.82
28.10

2.73
2.73

75.95
76.71

0.0
0.0

27.80
28.12

2.73
2.73

75.89
76.77

0.0
0.0

27.72
28.19

2.73
2.73

75.68
76.96

0.0
0.0

Tramo 168-169
TRABES D INTRADOS
TRABES E EXTRADOS
Tramo 169-170
TRABES F INTRADOS
TRABES G EXTRADOS
Tramo 170-171 a 171-172
TRABES B INTRADOS
TRABES C EXTRADOS
Tramo 172-173
TRABES H INTRADOS
TRABES I EXTRADOS

__________________________
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: trabes
presforzadas (incluye montaje de trabes con gruas)
ALTURA
MATERIAL
AREA
UNIDAD
PROM
CLAVE:
LONGITUD/ELEMENTO
(m2)
Tramo 173-174
TRABES J INTRADOS
TRABES K EXTRADOS

FECHA
UNIDAD
EJES
CANTIDAD

m3

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

27.74
28.17

2.73
2.73

75.73
76.90

0.0
0.0

27.96

2.73

76.33

0.0

2.73

76.33

Tramo 174-175 a 176-177


TRABES A

- SUPERESTRUCTURA

TRAMO IX
APOYO 178 a 1

CONCRETO DE FC = 350 KG/CM2


Tramo 177-178 a 220-221
TRABES A

27.96

88

6,717.1

TRMO 221-222
TRABES D
TRABES E

- SUPERESTRUCTURA

__________________________
TRADECO INFRAESTRUCTURA

TRAMO X
APOYO 222 a 282
__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

MATERIAL
CLAVE:

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 350 Kg/cm2 en: trabes
presforzadas (incluye montaje de trabes con gruas)
ALTURA
AREA
UNIDAD
PROM
LONGITUD/ELEMENTO
(m2)

FECHA
UNIDAD
EJES
CANTIDAD

m3

VOL/ELEM.

TOTAL PIEZAS

VOL./TOTAL

(m3)

(pzas)

(m3)

118

9,007.0

Tramo 177-178 a 220-221


TRABES A

27.96

2.73

76.33

TRABES B INTRADOS
TRABES C EXTRADOS

27.80
28.12

2.73
2.73

75.89
76.77

__________________________
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

0.0
0.0

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

TRAMO VI
APOYO 1 a 75

Tramo 1-2 a 18-19


TRABES B
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.44
27.70
27.70
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
678.0
733.2
129.4
355.0
445.0
95.4
216.0
756.3
87.2
7,224.8

18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0

12,166.5
10,941.4
44,023.2
12,203.1
13,197.4
2,329.0
6,389.9
8,009.6
1,716.3
3,888.7
13,612.8
1,569.3
130,047.3

TRABES C
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.75
28.02
28.02
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
127.0
240.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

681.6
607.9
2,466.3
685.3
741.7
130.9
355.0
445.0
95.4
216.0
756.3
87.2
7,268.4

18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0

12,268.7
10,941.4
44,393.2
12,336.2
13,349.9
2,355.9
6,389.9
8,009.6
1,716.3
3,888.7
13,612.8
1,569.3
130,831.8

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

TRAMO VI
APOYO 1 a 75

Tramo 19-20 a 23-24


TRABES B
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.44
27.70
27.70
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
678.0
733.2
129.4
355.0
445.0
95.4
216.0
756.3
87.2
7,224.8

5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0

3,379.6
3,039.3
12,228.7
3,389.8
3,666.0
646.9
1,775.0
2,224.9
476.8
1,080.2
3,781.3
435.9
36,124.2

TRABES C
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.75
28.02
28.02
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
127.0
240.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

681.6
607.9
2,466.3
685.3
741.7
130.9
355.0
445.0
95.4
216.0
756.3
87.2
7,268.4

5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0

3,408.0
3,039.3
12,331.4
3,426.7
3,708.3
654.4
1,775.0
2,224.9
476.8
1,080.2
3,781.3
435.9
36,342.2

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

TRAMO VI
APOYO 1 a 75

Tramo 24-25
TRABES D
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.53
27.81
27.81
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
680.1
736.1
129.9
355.0
445.0
95.4
216.0
756.3
87.2
7,230.4

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

675.9
607.9
2,445.7
680.1
736.1
129.9
355.0
445.0
95.4
216.0
756.3
87.2
7,230.4

TRABES E
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.68
27.93
27.93
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
128.0
238.0
6.0
17.0
3.0
111.0
56.0
6.0
74.0
448.0
224.0

675.9
612.6
2,445.7
683.7
739.3
130.5
345.7
445.0
95.4
216.0
756.3
87.2
7,233.2

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

675.9
612.6
2,445.7
683.7
739.3
130.5
345.7
445.0
95.4
216.0
756.3
87.2
7,233.2

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0

54,073.2
48,628.4
195,658.8
54,541.3
58,994.1
10,410.7
27,901.4
35,598.1
7,628.2
17,283.0
60,501.5
6,974.5
578,193.3

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.5
737.2
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,226.9

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

675.9
607.9
2,445.7
681.5
737.2
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,226.9

TRAMO VI
APOYO 1 a 75

Tramo 25-26 a 64-65


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VI
APOYO 1 a 75

Tramo 65-66
TRABES D
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.59
27.85
27.85
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:
TRABES E
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

DIAMETRO

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

CLARO:
TRABE TIPO:
PESO:

LONGITUD
L1

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

2.86
4.82
6.60
28.61
27.87
27.87
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
128.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
612.6
2,445.7
682.0
737.7
130.2
348.8
445.0
95.4
216.0
756.3
87.2
7,232.8

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

675.9
612.6
2,445.7
682.0
737.7
130.2
348.8
445.0
95.4
216.0
756.3
87.2
7,232.8

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
680.0
735.3
129.8
355.0
445.0
95.4
216.0
756.3
87.2
7,229.4

8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0

5,407.3
4,862.8
19,565.9
5,439.8
5,882.5
1,038.1
2,840.0
3,559.8
762.8
1,728.3
6,050.2
697.4
57,834.9

TRAMO VI
APOYO 1 a 75

Tramo 66-67 a 73-74


TRABES B
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.53
27.78
27.78
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:
TRABES C
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

DIAMETRO

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

CLARO:
TRABE TIPO:
PESO:

LONGITUD
L1

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

2.86
4.82
6.60
28.68
27.96
27.96
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
127.0
240.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

681.6
607.9
2,466.3
683.6
740.1
130.6
355.0
445.0
95.4
216.0
756.3
87.2
7,264.8

8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0

5,452.8
4,862.8
19,730.3
5,468.4
5,920.6
1,044.8
2,840.0
3,559.8
762.8
1,728.3
6,050.2
697.4
58,118.2

TRAMO VI
APOYO 1 a 75

Tramo 74-75
TRABES D
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.55
27.81
27.81
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
680.5
736.1
129.9
355.0
445.0
95.4
216.0
756.3
87.2
7,230.8

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

675.9
607.9
2,445.7
680.5
736.1
129.9
355.0
445.0
95.4
216.0
756.3
87.2
7,230.8

TRABES E
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.655
27.91
27.91
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
127.0
240.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

681.6
607.9
2,466.3
683.1
738.8
130.4
355.0
445.0
95.4
216.0
756.3
87.2
7,262.8

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

681.6
607.9
2,466.3
683.1
738.8
130.4
355.0
445.0
95.4
216.0
756.3
87.2
7,262.8

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

182.0
182.0
182.0
182.0
182.0
182.0
182.0
182.0
182.0
182.0
182.0
182.0

123,017.44
110,630.52
445,124.68
124,082.14
134,212.26
23,683.66
63,476.14
80,986.36
17,353.70
39,319.28
137,641.14
15,866.76
1,315,394.1

TRAMO VII
APOYO 75 a 166

Tramo 75-91 (LONG DE TRABE=27.96 m)


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VII
APOYO 75 a 166

Tramo 91-109 (LONG DE TRABE=27.96 m)


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VII
APOYO 75 a 166

Tramo 109-127 (LONG DE TRABE=27.96 m)


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VII
APOYO 76 a 166

Tramo 127-145 (LONG DE TRABE=27.96 m)


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VII
APOYO 76 a 166

Tramo 145-146 (LONG DE TRABE=27.96 m)


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.3
738.8
130.4
355.0
445.0
95.4
216.0
756.3
87.2
7,234.8

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
682.5
738.8
130.4
355.0
445.0
95.4
216.0
756.3
87.2
7,235.9

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VII
APOYO 76 a 166

Tramo 146-147 (LONG DE TRABE=27.93 INTRADOS m)


TRABES D
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.58
27.91
27.91
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VII
APOYO 76 a 166

Tramo 146-147 (LONG DE TRABE=27.99 EXTRADOS m)


TRABES E
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.63
27.91
27.91
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
678.4
733.7
129.5
355.0
445.0
95.4
216.0
756.3
87.2
7,226.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
127.0
240.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

681.6
607.9
2,466.3
685.1
741.1
130.8
355.0
445.0
95.4
216.0
756.3
87.2
7,267.6

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VII
APOYO 76 a 166

Tramo 147-148 (LONG DE TRABE=27.82m INTRADOS)


TRABES F
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.46
27.72
27.72
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VII
APOYO 76 a 166

Tramo 147-148 (LONG DE TRABE=28.10 m EXTRADOS)


TRABES G
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.74
28.00
28.00
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
676.3
731.1
129.0
348.8
445.0
95.4
216.0
756.3
87.2
7,214.5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
127.0
240.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

681.6
607.9
2,466.3
687.0
743.3
131.2
348.8
445.0
95.4
216.0
756.3
87.2
7,265.8

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VII
APOYO 76 a 166

Tramo 148-149 (LONG DE TRABE=27.72 m INTRADOS)


TRABES H
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.37
27.62
27.62
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VII
APOYO 76 a 166

Tramo 148-149 (LONG DE TRABE= 28.184 m EXTRADOS)


TRABES I
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.82
28.08
28.08
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
675.1
731.1
129.0
348.8
445.0
95.4
216.0
756.3
87.2
7,213.3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
127.0
240.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

681.6
607.9
2,466.3
687.3
743.5
131.2
355.0
445.0
95.4
216.0
756.3
87.2
7,272.5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VII
APOYO 76 a 166

Tramo 149-160 (LONG DE TRABE=27.72 m INTRADOS)


TRABES B
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.32
27.62
27.62
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VII
APOYO 76 a 166

Tramo 149-160 (LONG DE TRABE=28.192 m EXTRADOS)


TRABES C
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.83
28.09
28.09
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
677.2
731.1
129.0
348.8
445.0
95.4
216.0
756.3
87.2
7,215.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
676.1
731.1
129.0
348.8
445.0
95.4
216.0
756.3
87.2
7,214.2

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VII
APOYO 76 a 166

Tramo 160-161 (LONG DE TRABE= 27.74 m INTRADOS)


TRABES J
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.41
27.62
27.62
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VII
APOYO 76 a 166

Tramo 160-161 (LONG DE TRABE= 28.17 m EXTRADOS)


TRABES K
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.36
27.62
27.62
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
128.0
238.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

675.9
612.6
2,445.7
679.4
734.5
129.6
355.0
445.0
95.4
216.0
756.3
87.2
7,232.6

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
128.0
240.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

681.6
612.6
2,466.3
684.4
740.3
130.7
355.0
445.0
95.4
216.0
756.3
87.2
7,270.7

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VII
APOYO 76 a 166

Tramo 161-162 (LONG DE TRABE= 27.85 m INTRADOS)


TRABES L
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.50
27.75
27.75
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VII
APOYO 76 a 166

Tramo 161-162 (LONG DE TRABE= 28.07 m EXTRADOS)


TRABES M
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.71
27.97
27.97
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
680.8
737.2
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,226.2

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
682.2
737.7
130.2
355.0
445.0
95.4
216.0
756.3
87.2
7,234.5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VII
APOYO 76 a 166

Tramo 162-163 (LONG DE TRABE= 27.95 m INTRADOS)


TRABES N
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.56
27.85
27.85
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VII
APOYO 76 a 166

Tramo 162-163 (LONG DE TRABE= 27.971 m EXTRADOS)


TRABES O
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.62
27.87
27.87
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

CLARO:
TRABE TIPO:
PESO:

PESO
UNIT

UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VII
APOYO 76 a 166

Tramo 163-166 (LONG DE TRABE= 27.96 m )


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VIII
APOYO 166 a 177

Tramo 166-168 (LONG DE TRABE= 27.96 m )


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

PESO
UNIT

CLARO:
TRABE TIPO:
PESO:
UD

NUM
PZAS/ELEM.

PESO/VAR
KG

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.3
736.9
130.0
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

N. DE ELEM.

PESO
TOTAL

TRAMO VIII
APOYO 166 a 177

Tramo 168-169 (LONG DE TRABE= 27.94 m INTRADOS )


TRABES D
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.58
27.84
27.84
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

22.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VIII
APOYO 166 a 177

Tramo 168-169 (LONG DE TRABE= 27.98 m EXTRADOS )


TRABES E
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.63
27.88
27.88
2.00
2.00
4.00
2.94
1.70
0.70

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

__________________________
SUPERVISION EJECUTIVA

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
682.5
738.0
130.2
348.8
445.0
95.4
216.0
756.3
87.2
7,228.8

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

PESO
UNIT

CLARO:
TRABE TIPO:
PESO:
UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
678.9
734.0
129.5
348.8
445.0
95.4
216.0
756.3
87.2
7,220.5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
127.0
240.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

681.6
607.9
2,466.3
684.9
740.6
130.7
348.8
445.0
95.4
216.0
756.3
87.2
7,260.5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VIII
APOYO 166 a 177

Tramo 169-170 (LONG DE TRABE= 27.83 m INTRADOS )


TRABES F
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.48
27.73
27.73
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VIII
APOYO 166 a 177

Tramo 169-170 (LONG DE TRABE= 28.08 m EXTRADOS )


TRABES G
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.73
27.98
27.98
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

PESO
UNIT

CLARO:
TRABE TIPO:
PESO:
UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
128.0
238.0
6.0
17.0
3.0
114.0
56.0
6.0
74.0
448.0
224.0

675.9
612.6
2,445.7
678.0
733.2
129.4
355.0
445.0
95.4
216.0
756.3
87.2
7,229.7

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
127.0
240.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

681.6
607.9
2,466.3
685.3
741.7
130.9
348.8
445.0
95.4
216.0
756.3
87.2
7,262.2

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VIII
APOYO 166 a 177

Tramo 170-172 (LONG DE TRABE= 27.80 m INTRADOS )


TRABES B
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.44
27.70
27.70
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VIII
APOYO 166 a 177

Tramo 170-172 (LONG DE TRABE= 28.12 m EXTRADOS )


TRABES C
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.75
28.02
28.02
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

PESO
UNIT

CLARO:
TRABE TIPO:
PESO:
UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
127.0
240.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

681.6
607.9
2,466.3
678.2
733.7
129.5
348.8
445.0
95.4
216.0
756.3
87.2
7,245.7

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

240.0
128.0
240.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

681.6
612.6
2,466.3
684.4
731.1
129.0
348.8
445.0
95.4
216.0
756.3
87.2
7,253.6

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VIII
APOYO 166 a 177

Tramo 172-173 (LONG DE TRABE= 27.82 m INTRADOS )


TRABES H
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.45
27.72
27.72
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VIII
APOYO 166 a 177

Tramo 172-173 (LONG DE TRABE= 28.09 m EXTRADOS )


TRABES I
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.71
27.62
27.62
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

PESO
UNIT

CLARO:
TRABE TIPO:
PESO:
UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
128.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
612.6
2,445.7
681.1
736.4
130.0
348.8
445.0
95.4
216.0
756.3
87.2
7,230.3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
682.7
738.5
130.3
348.8
445.0
95.4
216.0
756.3
87.2
7,229.6

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VIII
APOYO 166 a 177

Tramo 173-174 (LONG DE TRABE= 27.92 m INTRADOS )


TRABES J
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.57
27.82
27.82
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO VIII
APOYO 166 a 177

Tramo 173-174 (LONG DE TRABE= 28.00 m EXTRADOS )


TRABES K
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.64
27.90
27.90
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

PESO
UNIT

CLARO:
TRABE TIPO:
PESO:
UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO VIII
APOYO 166 a 177

Tramo 174-177 (LONG DE TRABE= 27.96 m )


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO IX
APOYO 177 a 221

Tramo 177-181 (LONG DE TRABE= 27.96 m )


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

88.0

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

PESO
UNIT

CLARO:
TRABE TIPO:
PESO:
UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO IX
APOYO 177 a 221

Tramo 181-199 (LONG DE TRABE= 27.96 m )


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO IX
APOYO 177 a 221

Tramo 199-217 (LONG DE TRABE= 27.96 m )


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

LONGITUD
L1

PESO
UNIT

CLARO:
TRABE TIPO:
PESO:
UD

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

0.993
0.993
1.557
3.973
1.557
1.557
1.557
3.973
3.973
0.993
0.993
0.556

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

238.0
127.0
238.0
6.0
17.0
3.0
112.0
56.0
6.0
74.0
448.0
224.0

675.9
607.9
2,445.7
681.8
737.4
130.1
348.8
445.0
95.4
216.0
756.3
87.2
7,227.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0

TRAMO IX
APOYO 177 a 221

Tramo 217-221 (LONG DE TRABE= 27.96 m )


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

TRAMO X
APOYO 222 a 261

Tramo 217-221 (LONG DE TRABE= 27.96 m )


TRABES A
VARS A
VARS B
VARS C
VARS D
VARS E
VARS F
VARS G
VARS H
VARS M
VARS I
VARS K
VARS L

f
f
f
f
f
f
f
f
f
f
f
f

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

= 4c (1/2")
= 4c (1/2")
= 5c (5/8")
= 8c (1")
= 5c (5/8")
= 5c (5/8")
= 5c (5/8")
= 8c (1")
= 8c (1")
= 4c (1/2")
= 4c (1/2")
= 3c (3/8")

2.86
4.82
6.60
28.60
27.86
27.86
2.00
2.00
4.00
2.94
1.70
0.70

__________________________
SUPERVISION EJECUTIVA

118.0

__________________________
DIRECCION EJECUTIVA DE OBRA

- SUPERESTRUCTURA
CONCEPTO ACERO DE REFUERZO TRABES
OBRA Construccion de Desvo Ferroviario en el Vaso II de
la Laguna Cuyutln
MATERIAL
CLAVE:

______________________________
CONSTRUCTORA TRADECO INFRAESTRUCTURA

DIAMETRO

LONGITUD
L1

PESO
UNIT

CLARO:
TRABE TIPO:
PESO:
UD

__________________________
SUPERVISION EJECUTIVA

NUM
PZAS/ELEM.

PESO/VAR
KG

N. DE ELEM.

PESO
TOTAL

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 2" cm en trabes

MATERIAL
CLAVE:

DIAMETRO

L PROM

N. DE DUC
TRABE

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f =2"

2.70

NUM
TRABES

LONG
TOTAL

150.0

1,620.00

TRAMO VI
APOYO 1 a 75

- SUPERESTRUCTURA
DUCTOS DE PVC PARA PASO DE BARRAS EN MONTAJE
DE TRABES DE 2" DE DIAMETRO

DUCTOS

LONG/TRAB

FECHA
UNIDAD
EJES
CANTIDAD

4.00

__________________________
SUPERVISION EJECUTIVA

10.80

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 2" cm en trabes

MATERIAL
CLAVE:

DIAMETRO

L PROM

N. DE DUC
TRABE

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f =2"

2.70

NUM
TRABES

LONG
TOTAL

182.0

1,965.60

TRAMO VII
APOYO 75 a 166

- SUPERESTRUCTURA
DUCTOS DE PVC PARA PASO DE BARRAS EN MONTAJE
DE TRABES DE 2" DE DIAMETRO

DUCTOS

LONG/TRAB

FECHA
UNIDAD
EJES
CANTIDAD

4.00

__________________________
SUPERVISION EJECUTIVA

10.80

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJES
CANTIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 2" cm en trabes

MATERIAL
CLAVE:

DIAMETRO

L PROM

N. DE DUC
TRABE

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f =2"

2.70

NUM
TRABES

LONG
TOTAL

TRAMO VIII
APOYO 167 a 177

- SUPERESTRUCTURA
DUCTOS DE PVC PARA PASO DE BARRAS EN MONTAJE
DE TRABES DE 2" DE DIAMETRO

DUCTOS

LONG/TRAB

4.00

__________________________
SUPERVISION EJECUTIVA

10.80

22.0

237.60

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJES
CANTIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 2" cm en trabes

MATERIAL
CLAVE:

DIAMETRO

L PROM

N. DE DUC
TRABE

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f =2"

2.70

NUM
TRABES

LONG
TOTAL

TRAMO IX
APOYO 177 a 221

- SUPERESTRUCTURA
DUCTOS DE PVC PARA PASO DE BARRAS EN MONTAJE
DE TRABES DE 2" DE DIAMETRO

DUCTOS

LONG/TRAB

4.00

__________________________
SUPERVISION EJECUTIVA

10.80

88.0

950.40

__________________________
DIRECCION EJECUTIVA DE OBRA

FECHA
UNIDAD
EJES
CANTIDAD

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Ducto de PVC para paso de barras en montaje de trabes, p.u.o.t. de = 2" cm en trabes

MATERIAL
CLAVE:

DIAMETRO

L PROM

N. DE DUC
TRABE

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f =2"

2.70

NUM
TRABES

LONG
TOTAL

TRAMO X
APOYO 221 a 282

- SUPERESTRUCTURA
DUCTOS DE PVC PARA PASO DE BARRAS EN MONTAJE
DE TRABES DE 2" DE DIAMETRO

DUCTOS

LONG/TRAB

4.00

__________________________
SUPERVISION EJECUTIVA

10.80

118.0

1,274.40

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T15 en trabes
MATERIAL
CLAVE:

DIAMETRO

LONGITUD

PESO
UNIT

Kg

EJES

UD

CANTIDAD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE
KG

N. ELEMEN.

PESO
TOTAL

TRAMO VI
APOYO 1 a 75

- SUPERESTRUCTURA
ACERO DE PRESFUERZO DE L.R.=19000 Kg/cm2
Tramo 1-2 a 18-19
TRABE B INTRADO
TRABE C EXTRADO

f =15mm
f =15mm

27.80
28.12

1.108
1.108

kg/m
kg/m

12.00
12.00

369.63
373.88

5.00
5.00

1,848.14
1,869.42

18.0
18.0

33,266.59
33,649.52

Tramo 19-20 a 23-24


TRABE B INTRADO
TRABE C EXTRADO

f =15mm
f =15mm

27.80
28.12

1.108
1.108

kg/m
kg/m

12.00
12.00

369.63
373.88

5.00
5.00

1,848.14
1,869.42

5.0
5.0

9,240.72
9,347.09

Tramo 24-25
TRABES D INTDRO
TRABES E EXTRADO

f =15mm
f =15mm

27.89
28.03

1.108
1.108

kg/m
kg/m

12.00
12.00

370.83
372.69

5.00
5.00

1,854.13
1,863.43

1.0
1.0

1,854.13
1,863.43

Tramo 25-26 a 64-65


TRABES A

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

80.0

148,702.46

Tramo 65-66
TRABES D INTDRO
TRABES E EXTRADO

f =15mm
f =15mm

27.95
27.97

1.108
1.108

kg/m
kg/m

12.00
12.00

371.62
371.89

5.00
5.00

1,858.12
1,859.45

1.0
1.0

1,858.12
1,859.45

Tramo 66-67 a 73-74


TRABES BI NTRADO
TRABES C EXTRADO

f =15mm
f =15mm

27.88
28.04

1.108
1.108

kg/m
kg/m

12.00
12.00

370.69
372.82

5.00
5.00

1,853.46
1,864.10

8.0
8.0

14,827.70
14,912.79

Tramo 74-75
TRABES D INTRADO
TRABES E EXTRADO

f =15mm
f =15mm

27.91
28.01

1.108
1.108

kg/m
kg/m

12.00
12.00

371.09
372.42

5.00
5.00

1,855.46
1,862.10

1.0
1.0

1,855.46
1,862.10

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T15 en trabes
MATERIAL
CLAVE:

DIAMETRO

LONGITUD

PESO
UNIT

Kg

EJES

UD

CANTIDAD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE
KG

N. ELEMEN.

PESO
TOTAL

182.0

338,297.96

TRAMO VII
APOYO 76 a 166

- SUPERESTRUCTURA
ACERO DE PRESFUERZO DE L.R.=19000 Kg/cm2
Tramo 75-76 a 115-116
TRABES A

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

Tramo 116-117
TRABES A EXTRADOS

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

Tramo 117-118
TRABES A EXTRADOS

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

Tramo 118-119
TRABES A EXTRADOS

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

Tramo 119-120 a 135-136


TRABES A

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

Tramo 136-137
TRABES A EXTRADOS

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

Tramo 137-138
TRABES A EXTRADOS

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

Tramo 138-139
TRABES A EXTRADOS

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

Tramo 139-140 a 145-146


TRABES A

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

Tramo 146-147
TRABES D INTDRO
TRABES E EXTRADO

f =15mm
f =15mm

27.89
28.03

1.108
1.108

kg/m
kg/m

12.00
12.00

370.83
372.69

5.00
5.00

1,854.13
1,863.43

0.00
0.00

Tramo 147-148
TRABES F INTRADOS
TRABES G EXTRADOS

f =15mm
f =15mm

27.82
28.10

1.108
1.108

kg/m
kg/m

12.00
12.00

369.89
373.62

5.00
5.00

1,849.47
1,868.09

0.00
0.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T15 en trabes
MATERIAL
CLAVE:

DIAMETRO

LONGITUD

PESO
UNIT

Kg

EJES

UD

CANTIDAD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE
KG

N. ELEMEN.

PESO
TOTAL

TRAMO VII
APOYO 76 a 166

- SUPERESTRUCTURA
ACERO DE PRESFUERZO DE L.R.=19000 Kg/cm2
Tramo 148-149
TRABES H INTRADOS
TRABES I EXTRADOS

f =15mm
f =15mm

27.72
28.19

1.108
1.108

kg/m
kg/m

12.00
12.00

368.57
374.81

5.00
5.00

1,842.83
1,874.07

0.00
0.00

Tramo 149-150 a 159-160


TRABE B INTRADO
TRABE C EXTRADO

f =15mm
f =15mm

27.80
28.12

1.108
1.108

kg/m
kg/m

12.00
12.00

369.63
373.88

5.00
5.00

1,848.14
1,869.42

0.00
0.00

Tramo 160-161
TRABES J INTRADO
TRABES K EXTRADO

f =15mm
f =15mm

27.74
28.17

1.108
1.108

kg/m
kg/m

12.00
12.00

368.83
374.55

5.00
5.00

1,844.16
1,872.74

0.00
0.00

Tramo 161-162
TRABES L INTRADO
TRABES M EXTRADO

f =15mm
f =15mm

27.85
28.07

1.108
1.108

kg/m
kg/m

12.00
12.00

370.29
373.22

5.00
5.00

1,851.47
1,866.09

0.00
0.00

Tramo 162-163
TRABES N INTRADOS
TRABES 0 EXTRADOS

f =15mm
f =15mm

27.95
27.97

1.108
1.108

kg/m
kg/m

12.00
12.00

371.62
371.89

5.00
5.00

1,858.12
1,859.45

0.00
0.00

Tramo 163-164 a 165-166


TRABES A

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T15 en trabes
MATERIAL
CLAVE:

DIAMETRO

LONGITUD

PESO
UNIT

Kg

EJES

UD

CANTIDAD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE
KG

N. ELEMEN.

PESO
TOTAL

22.0

40,893.18

TRAMO VIII
APOYO 167 a 177

- SUPERESTRUCTURA
ACERO DE PRESFUERZO DE L.R.=19000 Kg/cm2
Tramo 166-167 a 167-168
TRABES A

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

Tramo 168-169
TRABES D INTRADOS
TRABES E EXTRADOS

f =15mm
f =15mm

27.89
28.03

1.108
1.108

kg/m
kg/m

12.00
12.00

370.83
372.69

5.00
5.00

1,854.13
1,863.43

0.00
0.00

Tramo 169-170
TRABES F INTRADOS
TRABES G EXTRADOS

f =15mm
f =15mm

27.82
28.10

1.108
1.108

kg/m
kg/m

12.00
12.00

369.89
373.62

5.00
5.00

1,849.47
1,868.09

0.00
0.00

Tramo 170-171 a 171-172


TRABE B INTRADO
TRABE C EXTRADO

f =15mm
f =15mm

27.80
28.12

1.108
1.108

kg/m
kg/m

12.00
12.00

369.63
373.88

5.00
5.00

1,848.14
1,869.42

0.00
0.00

Tramo 172-173
TRABES H INTRADOS
TRABES I EXTRADOS

f =15mm
f =15mm

27.72
28.19

1.108
1.108

kg/m
kg/m

12.00
12.00

368.57
374.81

5.00
5.00

1,842.83
1,874.07

0.00
0.00

Tramo 173-174
TRABES J INTRADO
TRABES K EXTRADO

f =15mm
f =15mm

27.74
28.17

1.108
1.108

kg/m
kg/m

12.00
12.00

368.83
374.55

5.00
5.00

1,844.16
1,872.74

0.00
0.00

Tramo 174-175 a 176-177


TRABES A

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T15 en trabes
MATERIAL
CLAVE:

DIAMETRO

LONGITUD

ACERO DE PRESFUERZO DE L.R.=19000 Kg/cm2

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f =15mm

UD

CANTIDAD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE
KG

N. ELEMEN.

PESO
TOTAL

1,858.78

86.0

159,855.15

TRAMO IX
APOYO 178 a 221

- SUPERESTRUCTURA

Tramo 177-178 a 220-221


TRABES A

PESO
UNIT

Kg

EJES

27.96

1.108

kg/m

12.00

__________________________
SUPERVISION EJECUTIVA

371.76

5.00

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T15 en trabes
MATERIAL
CLAVE:

DIAMETRO

LONGITUD

PESO
UNIT

Kg

EJES

UD

CANTIDAD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE
KG

N. ELEMEN.

PESO
TOTAL

TRAMO X
APOYO 222 a 271

- SUPERESTRUCTURA
ACERO DE PRESFUERZO DE L.R.=19000 Kg/cm2
Tramo 221-222
TRABES D INTRADOS
TRABES E EXTRADOS

f =15mm
f =15mm

27.89
28.03

1.108
1.108

kg/m
kg/m

12.00
12.00

370.83
372.69

5.00
5.00

1,854.13
1,863.43

0.00
0.00

Tramo 222-223 a 231-232


TRABE B INTRADO
TRABE C EXTRADO

f =15mm
f =15mm

27.80
28.12

1.108
1.108

kg/m
kg/m

12.00
12.00

369.63
373.88

5.00
5.00

1,848.14
1,869.42

0.00
0.00

Tramo 232-233
TRABES F INTRADOS
TRABES G EXTRADOS

f =15mm
f =15mm

27.82
28.10

1.108
1.108

kg/m
kg/m

12.00
12.00

369.89
373.62

5.00
5.00

1,849.47
1,868.09

0.00
0.00

Tramo 233-234 a 248-249


TRABES A

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

Tramo 249-250
TRABE A EXTRADOS
TRABE B INTRADOS

f =15mm
f =15mm

27.96
27.97

1.108
1.108

kg/m
kg/m

12.00
12.00

371.76
371.89

5.00
5.00

1,858.78
1,859.45

0.00
0.00

Tramo 250-251
TRABES A EXTRADOS
TRABES C INTRADOS
TRABES Y

f =15mm
f =15mm
f =15mm

27.96
27.99
27.99

1.108
1.108
1.108

kg/m
kg/m
kg/m

12.00
12.00
12.00

371.76
372.16
372.16

5.00
5.00
5.00

1,858.78
1,860.78
1,860.78

0.00
0.00
0.00

Tramo 251-252
TRABES A EXTRADOS
TRABES D INTRADOS
TRABES Z

f =15mm
f =15mm
f =15mm

27.96
26.38
28.04

1.108
1.108
1.108

kg/m
kg/m
kg/m

12.00
12.00
12.00

371.76
350.75
372.82

5.00
5.00
5.00

1,858.78
1,753.74
1,864.10

0.00
0.00
0.00

Tramo 252-253 a 261-262


TRABES A

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T15 en trabes
MATERIAL
CLAVE:
Tramo 262-263
TRABES A EXTRADOS
TRABES D INTRADOS
TRABES Z

DIAMETRO

LONGITUD

Kg

EJES

PESO
UNIT

UD

CANTIDAD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE
KG

N. ELEMEN.

PESO
TOTAL

f =15mm
f =15mm
f =15mm

27.96
25.89
28.02

1.108
1.108
1.108

kg/m
kg/m
kg/m

12.00
12.00
12.00

371.76
344.23
372.55

5.00
5.00
5.00

1,858.78
1,721.17
1,862.77

0.00
0.00
0.00

Tramo 263-264
TRABES A EXTRADOS
TRABES C INTRADOS
TRABES Y

f =15mm
f =15mm
f =15mm

27.96
28.21
28.02

1.108
1.108
1.108

kg/m
kg/m
kg/m

12.00
12.00
12.00

371.76
375.08
372.55

5.00
5.00
5.00

1,858.78
1,875.40
1,862.77

0.00
0.00
0.00

Tramo 264-265
TRABES A EXTRADOS
TRABES B INTRADOS

f =15mm
f =15mm

27.96
27.97

1.108
1.108

kg/m
kg/m

12.00
12.00

371.76
371.89

5.00
5.00

1,858.78
1,859.45

0.00
0.00

Tramo 265-266 a 277-278


TRABE A

f =15mm

27.96

1.108

kg/m

12.00

371.76

5.00

1,858.78

0.00

Tramo 278-279
TRABES D EXTRADOS
TRABES E EXTRADOS

f =15mm
f =15mm

27.82
28.10

1.108
1.108

kg/m
kg/m

12.00
12.00

369.89
373.62

5.00
5.00

1,849.47
1,868.09

0.00
0.00

Tramo 279-280 a 281-282


TRABES B EXTRADOS
TRABES C EXTRADOS

f =15mm
f =15mm

27.54
28.36

1.108
1.108

kg/m
kg/m

12.00
12.00

366.17
377.07

5.00
5.00

1,830.86
1,885.37

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

118.0

0.00
222,473.99

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD
EJES
CANTIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T13 en losa
MATERIAL
CLAVE:

DIAMETRO

LONGITUD

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

f =13mm

UD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE

N. ELEM.

PESO
TOTAL

4,032.0

74

298,368.0

TRAMO VI
APOYO 1 a 75

- SUPERESTRUCTURA
ACERO DE PRESFUERZO DE L.R.=19000 Kg/cm2

Tramo 1-2 a 74-75


LOSA
TORONES

PESO
UNIT

Kg

8.00

0.75

kg/m

12.00

__________________________
SUPERVISION EJECUTIVA

72.00

56.00

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD
EJES
CANTIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T13 en losa
MATERIAL
CLAVE:

DIAMETRO

LONGITUD

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

=13mm

UD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE

N. ELEM.

PESO
TOTAL

4,193.3

25

104,832.5

TRAMO VII
APOYO 75 a 166

- SUPERESTRUCTURA
ACERO DE PRESFUERZO DE L.R.=19000 Kg/cm2

Tramo 75-76 a 165-166


LOSA
TORONES

PESO
UNIT

Kg

8.00

0.75

kg/m

12.00

__________________________
SUPERVISION EJECUTIVA

72.00

56.00

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD
EJES
CANTIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T13 en losa
MATERIAL
CLAVE:

DIAMETRO

LONGITUD

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

=13mm

UD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE

N. ELEM.

PESO
TOTAL

TRAMO VIII
APOYO 166 a 177

- SUPERESTRUCTURA
ACERO DE PRESFUERZO DE L.R.=19000 Kg/cm2

Tramo 166-167 a 176-177


LOSA
TORONES

PESO
UNIT

Kg

8.00

0.75

kg/m

12.00

__________________________
SUPERVISION EJECUTIVA

72.00

56.00

4,032.0

0.0

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD
EJES
CANTIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T13 en losa
MATERIAL
CLAVE:

DIAMETRO

LONGITUD

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

=13mm

UD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE

N. ELEM.

PESO
TOTAL

TRAMO IX
APOYO 177 a 221

- SUPERESTRUCTURA
ACERO DE PRESFUERZO DE L.R.=19000 Kg/cm2

Tramo 177-178 a 220-221


LOSA
TORONES

PESO
UNIT

Kg

8.00

0.75

kg/m

12.00

__________________________
SUPERVISION EJECUTIVA

72.00

56.00

4,032.0

0.0

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.

FECHA
UNIDAD
EJES
CANTIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de presfuerzo, p.u.o.t. L.R. 19,000 Kg/cm2, cables 12T13 en losa
MATERIAL
CLAVE:

DIAMETRO

LONGITUD

PESO
UNIT

UD

NUM
PESO
NUM
(TOR)/DUC. (TOR)/DUC. DUC./ELEM

PESO/ELE

Kg

N. ELEM.

PESO
TOTAL

TRAMO X
APOYO 221 a 282

- SUPERESTRUCTURA
ACERO DE PRESFUERZO DE L.R.=19000 Kg/cm2

Tramo 221-222 a 248-249


Tramo 252-253 a 260-262
Tramo 265-266 a 281-282
LOSA
TORONES

=13mm

8.00

0.75

kg/m

12.00

72.00

56.00

4,032.0

0.0

Tramo 221-222
LOSA
TORONES

=13mm

8.18

0.75

kg/m

12.00

73.62

56.00

4,122.7

0.0

Tramo 221-222
LOSA
TORONES

=13mm

9.76

0.75

kg/m

12.00

87.84

56.00

4,919.0

0.0

Tramo 221-222
LOSA
TORONES

=13mm

13.94

0.75

kg/m

12.00

125.46

56.00

7,025.8

0.0

Tramo 221-222
LOSA
TORONES

=13mm

16.00

0.75

kg/m

12.00

144.00

56.00

8,064.0

0.0

Tramo 221-222
LOSA
TORONES

=13mm

10.60

0.79

kg/m

12.00

99.85

56.00

5,591.7

0.0

Tramo 221-222
LOSA
TORONES

=13mm

8.34

0.79

kg/m

12.00

78.56

56.00

4,399.5

0.0

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de


cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Malla galvanizada, p.u.o.t. calibre 10 en: zona de drenes

MATERIAL
CLAVE:
SUPER-ESTRUCTURA

CANTIDAD

ANCHO
A1

m2

EJES

A2

AREA
(m2)

NUM
TRAMOS

0.81

74

TRAMO VI
APOYO 1 a 75

MALLA GALVANIZADA p.u.o.t. CALIBRE 10

0.30

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

0.30

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de


cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Malla galvanizada, p.u.o.t. calibre 10 en: zona de drenes

MATERIAL
CLAVE:
SUPER-ESTRUCTURA

CANTIDAD

ANCHO
A1

m2

EJES

A2

AREA
(m2)

NUM
TRAMOS

0.81

90

TRAMO VII
APOYO 75 a 166

MALLA GALVANIZADA p.u.o.t. CALIBRE 10

0.30

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

0.30

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de


cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Malla galvanizada, p.u.o.t. calibre 10 en: zona de drenes

MATERIAL
CLAVE:
SUPER-ESTRUCTURA

CANTIDAD

ANCHO
A1

m2

EJES

A2

AREA
(m2)

NUM
TRAMOS

0.81

11

TRAMO VIII
APOYO 166-177

MALLA GALVANIZADA p.u.o.t. CALIBRE 10

0.30

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

0.30

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de


cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Malla galvanizada, p.u.o.t. calibre 10 en: zona de drenes

MATERIAL
CLAVE:
SUPER-ESTRUCTURA

CANTIDAD

ANCHO
A1

m2

EJES

A2

AREA
(m2)

NUM
TRAMOS

0.81

42

TRAMO IX
APOYO 177-221

MALLA GALVANIZADA p.u.o.t. CALIBRE 10

0.30

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

0.30

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de


cuyutln en Manzanillo, Col.

FECHA
UNIDAD

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Malla galvanizada, p.u.o.t. calibre 10 en: zona de drenes

MATERIAL
CLAVE:
SUPER-ESTRUCTURA

CANTIDAD

ANCHO
A1

m2

EJES

A2

AREA
(m2)

NUM
TRAMOS

0.81

16

TRAMO X
APOYO 221-282

MALLA GALVANIZADA p.u.o.t. CALIBRE 10

0.30

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

0.30

__________________________
DIRECCION EJECUTIVA DE OBRA

AREA
TOTAL

59.9

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

AREA
TOTAL

72.9

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

AREA
TOTAL

8.9

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

AREA
TOTAL

34.0

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

AREA
TOTAL

13.0

__________________________
CONSTRUCTURA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de


cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Dren de PVC de 3" de dimetro L= 70cm, p.u.o.t. en Losas
MATERIAL
CLAVE:

DIAMETRO

- SUPERESTRUCTURA
DRENE DE PVC DE 3" DE DIAMETRO L=70cm EN
LOSAS
TRAMOS DE 1-2 A 74-75
DRENES

f =3"

LONGITUD (m)
L1
L PROM

FECHA
UNIDAD
EJES
CANTIDAD

Pza

N. DE DUC
LOSA

LONG/LOSA

NUM
LOSAS

PIEZAS
TOTAL

9.00

6.30

74.0

666.00

TRAMO VI
APOYO 1 a 75
0.70

666.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA.

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de


cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Dren de PVC de 3" de dimetro L= 70cm, p.u.o.t. en Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD (m)
L1
L PROM

FECHA
UNIDAD
EJES
CANTIDAD

Pza

N. DE DUC
LOSA

LONG/LOSA

NUM
LOSAS

PIEZAS
TOTAL

9.00

6.30

90.0

810.00

TRAMO VII
DRENE DE PVC DE 3" DE DIAMETRO L=70cm EN LOSAS
APOYO 76 a 166
- SUPERESTRUCTURA

TRAMOS DE 75-76 A 165-166


DRENES

f =3"

0.70

810.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA.

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de


cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Dren de PVC de 3" de dimetro L= 70cm, p.u.o.t. en Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD (m)
L1
L PROM

FECHA
UNIDAD
EJES
CANTIDAD

Pza

N. DE DUC
LOSA

LONG/LOSA

NUM
LOSAS

PIEZAS
TOTAL

9.00

6.30

11.0

99.00

TRAMO VIII
DRENE DE PVC DE 3" DE DIAMETRO L=70cm ENAPOYO
LOSAS
167 a 177
- SUPERESTRUCTURA

TRAMOS DE 166-167 A 176-177

DRENES

f =3"

0.70

99.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA.

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de


cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Dren de PVC de 3" de dimetro L= 70cm, p.u.o.t. en Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD (m)
L1
L PROM

FECHA
UNIDAD
EJES
CANTIDAD

Pza

N. DE DUC
LOSA

LONG/LOSA

NUM
LOSAS

PIEZAS
TOTAL

9.00

6.30

42.0

378.00

TRAMO IX
DRENE DE PVC DE 3" DE DIAMETRO L=70cm ENAPOYO
LOSAS
178 a 221
- SUPERESTRUCTURA

TRAMOS DE 177-178 A 220-221

DRENES

f =3"

0.70

378.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA.

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de


cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Dren de PVC de 3" de dimetro L= 70cm, p.u.o.t. en Losas
MATERIAL
CLAVE:

DIAMETRO

LONGITUD (m)
L1
L PROM

FECHA
UNIDAD
EJES
CANTIDAD

Pza

N. DE DUC
LOSA

LONG/LOSA

NUM
LOSAS

PIEZAS
TOTAL

9.00

6.30

16.0

144.00

TRAMO X
DRENE DE PVC DE 3" DE DIAMETRO L=70cm ENAPOYO
LOSAS
222 a 282
- SUPERESTRUCTURA

TRAMOS DE 221-222 a 270-271

DRENES

f =3"

0.70

144.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA.

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col. FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
EJES
CANTIDAD
CONCEPTO: Apoyo tipo TETRON o similar p.u.o.t., fijo con capacidad vertical =350
Ton, capacidad horizontal 100 Ton
CANTIDAD
CONCEPTO: Apoyo tipo TETRON o similar p.u.o.t., movil con capacidad vertical =350
Ton, capacidad horizontal 100 Ton, rotacin long. 016 rad y desplazamiento longitudinal
40 mm
MATERIAL
N. DE PZAS
N. DE PZAS
NUM
CLAVE:
PILOTE
APOYO
APOYOS

Pza

PZAS.
TOTALES

TRAMO VI
DEL APOYO 1 AL 75

- SUBESTRUCTURA
APOYO TIPO TETRON FIJO
APOYO N.1
APOYOS

1.00

2.00

1.00

2.00

APOYO N.2 A APOYO N.75


APOYOS

1.00

2.00

74.00

148.00

SUMA=

150.00

74.00

148.00

SUMA=

148.00

APOYO TIPO TETRON MOVIL


APOYO N.2 A APOYO N.75
APOYOS
1.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

2.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col. FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
EJES
CANTIDAD
CONCEPTO: Apoyo tipo TETRON o similar p.u.o.t., fijo con capacidad vertical =350
Ton, capacidad horizontal 100 Ton
CANTIDAD
CONCEPTO: Apoyo tipo TETRON o similar p.u.o.t., movil con capacidad vertical =350
Ton, capacidad horizontal 100 Ton, rotacin long. 016 rad y desplazamiento longitudinal
40 mm
MATERIAL
N. DE PZAS
N. DE PZAS
NUM
CLAVE:
PILOTE
APOYO
APOYOS
- SUBESTRUCTURA
APOYO TIPO TETRON FIJO

APOYO N.76 A APOYO N.166


APOYOS

Pza

PZAS.
TOTALES

TRAMO VII
DEL APOYO 76 AL 166

1.00

2.00

91.00

182.00

SUMA=

182.00

90.25

180.50

SUMA=

180.50

APOYO TIPO TETRON MOVIL


APOYO N.76 A APOYO N.166
APOYOS
1.00

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

2.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col. FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
EJES
CANTIDAD
CONCEPTO: Apoyo tipo TETRON o similar p.u.o.t., fijo con capacidad vertical =350
Ton, capacidad horizontal 100 Ton
CANTIDAD
CONCEPTO: Apoyo tipo TETRON o similar p.u.o.t., movil con capacidad vertical =350
Ton, capacidad horizontal 100 Ton, rotacin long. 016 rad y desplazamiento longitudinal
40 mm
MATERIAL
N. DE PZAS
N. DE PZAS
NUM
CLAVE:
PILOTE
APOYO
APOYOS
- SUBESTRUCTURA
APOYO TIPO TETRON FIJO

APOYO N.167 A APOYO N.177


APOYOS

Pza

PZAS.
TOTALES

TRAMO VIII
DEL APOYO 167 AL 177

1.00

2.00

11.00

22.00

SUMA=

22.00

11.00

22.00

SUMA=

22.00

APOYO TIPO TETRON MOVIL


APOYO N.167 A APOYO N.177
APOYOS

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

1.00

2.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col. FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
EJES
CANTIDAD
CONCEPTO: Apoyo tipo TETRON o similar p.u.o.t., fijo con capacidad vertical =350
Ton, capacidad horizontal 100 Ton
CANTIDAD
CONCEPTO: Apoyo tipo TETRON o similar p.u.o.t., movil con capacidad vertical =350
Ton, capacidad horizontal 100 Ton, rotacin long. 016 rad y desplazamiento longitudinal
40 mm
MATERIAL
N. DE PZAS
N. DE PZAS
NUM
CLAVE:
PILOTE
APOYO
APOYOS
- SUBESTRUCTURA
APOYO TIPO TETRON FIJO

APOYO N.178 A APOYO N.221


APOYOS

Pza

PZAS.
TOTALES

TRAMO IX
DEL APOYO 178 AL 221

1.00

2.00

43.50

87.00

SUMA=

87.00

43.50

87.00

SUMA=

87.00

APOYO TIPO TETRON MOVIL


APOYO N.178 A APOYO N.221
APOYOS

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

1.00

2.00

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col. FECHA
UNIDAD
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
EJES
CANTIDAD
CONCEPTO: Apoyo tipo TETRON o similar p.u.o.t., fijo con capacidad vertical =350
Ton, capacidad horizontal 100 Ton
CANTIDAD
CONCEPTO: Apoyo tipo TETRON o similar p.u.o.t., movil con capacidad vertical =350
Ton, capacidad horizontal 100 Ton, rotacin long. 016 rad y desplazamiento longitudinal
40 mm
MATERIAL
N. DE PZAS
N. DE PZAS
NUM
CLAVE:
PILOTE
APOYO
APOYOS
- SUBESTRUCTURA
APOYO TIPO TETRON FIJO

APOYO N.222 A APOYO N.270


APOYOS

Pza

PZAS.
TOTALES
TRAMO X

DEL APOYO 222 AL 271

1.00

2.00

46.25

92.50

SUMA=

92.50

APOYO TIPO TETRON MOVIL


APOYO N.221 A APOYO N.281
APOYOS

1.00

2.00

0.00

1.00

2.00

0.00

APOYO N.271
APOYOS

SUMA=

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

0.00

__________________________
DIRECCION EJECUTIVA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Neopreno dureza Shore 60, ASTM-D2240 P.U.O.T. en topes laterales
MATERIAL
CLAVE:

LONGITUD

ANCHO

ESPESOR

FECHA
UNIDAD
EJES
CANTIDAD
VOL(dm3)

TOPE

Pza

NUM.
TOPES

VOL(dm3)

TOTAL

TRAMO VI
DEL APOYO 1 AL 75

- SUBESTRUCTURA

APOYO N.1 A APOYO N.74


NEOPRENOS

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

6.00

2.00

0.20

__________________________
SUPERVISION EJECUTIVA

2.40

294.0

705.60

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Neopreno dureza Shore 60, ASTM-D2240 P.U.O.T. en topes laterales
MATERIAL
CLAVE:

LONGITUD

ANCHO

ESPESOR

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

VOL(dm3)

TOPE

Pza

NUM.
TOPES

VOL(dm3)

TOTAL

TRAMO VII
DEL APOYO 75 AL 166

- SUBESTRUCTURA

APOYO N.75 A APOYO N.166


NEOPRENOS

FECHA
UNIDAD
EJES
CANTIDAD

6.00

4.00

0.20

__________________________
SUPERVISION EJECUTIVA

4.80

0.0

0.00

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Neopreno dureza Shore 60, ASTM-D2240 P.U.O.T. en topes laterales
MATERIAL
CLAVE:

LONGITUD

ANCHO

ESPESOR

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

VOL(dm3)

TOPE

Pza

NUM.
TOPES

VOL(dm3)

TOTAL

TRAMO VIII
DEL APOYO 166 AL 177

- SUBESTRUCTURA

APOYO N.166 A APOYO N.177


NEOPRENOS

FECHA
UNIDAD
EJES
CANTIDAD

6.00

4.00

0.20

__________________________
SUPERVISION EJECUTIVA

4.80

0.0

0.00

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Neopreno dureza Shore 60, ASTM-D2240 P.U.O.T. en topes laterales
MATERIAL
CLAVE:

LONGITUD

ANCHO

ESPESOR

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

VOL(dm3)

TOPE

Pza

NUM.
TOPES

VOL(dm3)

TOTAL

TRAMO IX
DEL APOYO 177 AL 221

- SUBESTRUCTURA

APOYO N.177 Al APOYO N.221


NEOPRENOS

FECHA
UNIDAD
EJES
CANTIDAD

6.00

4.00

0.20

__________________________
SUPERVISION EJECUTIVA

4.80

0.0

0.00

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en


Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Neopreno dureza Shore 60, ASTM-D2240 P.U.O.T. en topes laterales
MATERIAL
CLAVE:

LONGITUD

ANCHO

ESPESOR

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

VOL(dm3)

TOPE

Pza

NUM.
TOPES

VOL(dm3)

TOTAL

TRAMO X
DEL APOYO 221 AL 282

- SUBESTRUCTURA

APOYO N.221 A APOYO N.282


NEOPRENOS

FECHA
UNIDAD
EJES
CANTIDAD

6.00

4.00

0.20

__________________________
SUPERVISION EJECUTIVA

4.80

0.0

0.00

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Tapa junta de acero estructural A-36 galvanizado, p.u.o.t. a base de PL de 4" x 3/8" y angulos de 3"
x3" x 3/8"
MATERIAL
N. DE JUNTAS
LONGITUD
CLAVE:

FECHA
UNIDAD
EJES
CANTIDAD

LONG TOT.

TRAMO VI
APOYO 1 a 75

- SUPERESTRUCTURA
TAPA JUNTA DE ACERO ESTRUCTURAL A-36 GALVANIZADO A BASE DE PL DE 4" x 3/8"
Y ANGULOS DE 3" x 3" x 3/8"

TRAMOS DE 1-2 A 74-75


TAPA JUNTA

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

6.20

75.00

465

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Tapa junta de acero estructural A-36 galvanizado, p.u.o.t. a base de PL de 4" x 3/8" y angulos de 3"
x3" x 3/8"
MATERIAL
N. DE JUNTAS
LONGITUD
CLAVE:

FECHA
UNIDAD
EJES
CANTIDAD

LONG TOT.

TRAMO VII
APOYO 75 a 166

- SUPERESTRUCTURA
TAPA JUNTA DE ACERO ESTRUCTURAL A-36 GALVANIZADO A BASE DE PL DE 4" x 3/8"
Y ANGULOS DE 3" x 3" x 3/8"

TRAMOS DE 75-76 A 165-166


TAPA JUNTA

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

6.20

91.00

564.2

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Tapa junta de acero estructural A-36 galvanizado, p.u.o.t. a base de PL de 4" x 3/8" y angulos de 3"
x3" x 3/8"
MATERIAL
N. DE JUNTAS
LONGITUD
CLAVE:

FECHA
UNIDAD
EJES
CANTIDAD

LONG TOT.

TRAMO VIII
APOYO 166 a 177

- SUPERESTRUCTURA
TAPA JUNTA DE ACERO ESTRUCTURAL A-36 GALVANIZADO A BASE DE PL DE 4" x 3/8"
Y ANGULOS DE 3" x 3" x 3/8"

TRAMOS DE 166-167 A 176-177


TAPA JUNTA

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

6.20

11.00

68.2

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Tapa junta de acero estructural A-36 galvanizado, p.u.o.t. a base de PL de 4" x 3/8" y angulos de 3"
x3" x 3/8"
MATERIAL
N. DE JUNTAS
LONGITUD
CLAVE:

FECHA
UNIDAD
EJES
CANTIDAD

LONG TOT.

TRAMO IX
APOYO 177 a 221

- SUPERESTRUCTURA
TAPA JUNTA DE ACERO ESTRUCTURAL A-36 GALVANIZADO A BASE DE PL DE 4" x 3/8"
Y ANGULOS DE 3" x 3" x 3/8"

TRAMOS DE 177-178 A 220-221


TAPA JUNTA

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

6.20

44.00

272.8

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Tapa junta de acero estructural A-36 galvanizado, p.u.o.t. a base de PL de 4" x 3/8" y angulos de 3"
x3" x 3/8"
MATERIAL
N. DE JUNTAS
LONGITUD
CLAVE:

FECHA
UNIDAD
EJES
CANTIDAD

LONG TOT.

TRAMO X
APOYO 221 a 282

- SUPERESTRUCTURA
TAPA JUNTA DE ACERO ESTRUCTURAL A-36 GALVANIZADO A BASE DE PL DE 4" x 3/8"
Y ANGULOS DE 3" x 3" x 3/8"

TRAMOS DE 1-2 A 74-75


TAPA JUNTA

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

6.20

47.00

291.4

__________________________
DIRECCION EJECUTIVA DE OBRA

MATERIAL
CLAVE:

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna de cuyutln


en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 300 Kg/cm2 en: Losa de
transicin
AREA
ANCHO
LONGITUD
ALTURA
(m2)

FECHA
UNIDAD
EJES
CANTIDAD

m3

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

25.34
0.04

1
4

25.3
0.2

TRAMO VI

- SUPERESTRUCTURA
CONCRETO DE FC = 300 KG/CM2 EN LOSAS DE TRANSICION
CABALLETE 1
LOSA
REMATES

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

6.60
0.30

8.00
0.30

52.80
0.09

__________________________
SUPERVISION EJECUTIVA

0.48
0.45

__________________________
DIRECCION EJECUTIVA DE OBRA

MATERIAL
CLAVE:

OBRA: Construccin del desvo Ferroviario en el vaso II de la


laguna de cuyutln en Manzanillo, Col.
Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.
CONCEPTO: Concreto hidrulico simple p.u.o.t. de f'c= 300 Kg/cm2
en: Losa de transicin
AREA
ANCHO
LONGITUD
ALTURA
(m2)

FECHA
UNIDAD
EJES
CANTIDAD

m3

VOL
(m3)

NUM
(pzas)

VOL
TOTAL

25.34
0.04

1
4

25.3
0.2

TRAMO X

- SUPERESTRUCTURA

CONCRETO DE FC = 300 KG/CM2 EN LOSAS DE TRANSICION


CABALLETE 282
LOSA
REMATES

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

6.60
0.30

8.00
0.30

52.80
0.09

0.48
0.45

__________________________
SUPERVISION EJECUTIVA

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna deFECHA


cuyutln en Manzanillo, Col.
UNIDAD

MATERIAL
CLAVE:

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en:
Losa de transicin
DIAMETRO DE LONGITUD PESO VAR.
VAR.
DE VAR.
(ml)

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
LOSAS DE TRANSICION EN CABALLETE 1
LOSA
VARS A
VARS B
VARS C
VARS D
VARS E
VARS E1
VARS F

f
f
f
f
f
f
f

=12c (3/2")
= 6c (3/4")
= 6c (3/4")
= 6c (3/4")
= 6c (3/4")
= 4c (1/2")
= 6c (3/4")

Kg

EJES
CANTIDAD
UD.

NUM
(pzas)

PESO
TOTAL(Kg)

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

43
53
22
27
6
113
12

3,136.17
980.25
406.90
415.35
88.30
254.71
213.94

TRAMO VI

8.16
8.32
8.32
6.92
6.62
2.27
8.02

8.938
2.223
2.223
2.223
2.223
0.993
2.223

SUMA POR LOSA=

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

5,495.6

__________________________
DIRECCION EJECUTIVA DE OBRA

OBRA: Construccin del desvo Ferroviario en el vaso II de la laguna deFECHA


cuyutln en Manzanillo, Col.
UNIDAD

MATERIAL
CLAVE:

Contratista: TRADECO INFRAESTRUCTURA Y ASOCIADOS.


CONCEPTO: Acero de refuerzo p.u.o.t. fy 4200 Kg/cm2 en:
Losa de transicin
DIAMETRO DE LONGITUD PESO VAR.
VAR.
DE VAR.
(ml)

- SUPERESTRUCTURA
ACERO DE REFUERZO DE f`y=4200 Kg/cm2
LOSAS DE TRANSICION EN CABALLETE 282
LOSA
VARS A
VARS B
VARS C
VARS D
VARS E
VARS E1
VARS F

f
f
f
f
f
f
f

=12c (3/2")
= 6c (3/4")
= 6c (3/4")
= 6c (3/4")
= 6c (3/4")
= 4c (1/2")
= 6c (3/4")

Kg

EJES
CANTIDAD
UD.

NUM
(pzas)

PESO
TOTAL(Kg)

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

43
53
22
27
6
113
12

3,136.17
980.25
406.90
415.35
88.30
254.71
213.94

TRAMO X

8.16
8.32
8.32
6.92
6.62
2.27
8.02

8.938
2.223
2.223
2.223
2.223
0.993
2.223

SUMA POR LOSA=

__________________________
CONSTRUCTORA
TRADECO INFRAESTRUCTURA

__________________________
SUPERVISION EJECUTIVA

5,495.6

__________________________
DIRECCION EJECUTIVA DE OBRA

Anda mungkin juga menyukai