Anda di halaman 1dari 1

Junction

Retrofit
Retrofit Strategies for a Typical Junction Neighbourhood Home

[Date]

Prepared By:

Adam Di Placido Bianca Portoraro Samantha Lane

A retrofit for every budget.


The retrofit was designed with the goal of participation. Acknowledging that homeowners will have different commitment levels is the first step in designing a widely implementable retrofit for a broad range of clients.

A Variety of Retrofit Components

Before:
1300 sq. ft. home built in 1920s West Toronto Double brick and lathe Very little insulation and 10.35 air changes per hour

Enclosing the balcony reduces heat lost through the front windows and the floor of the top dormer, increasing performance and client comfort. Exterior cladding increases thermal performance and renews the building appearance with minimal disturbance to the homeowner Demand reduction solutions to reduce electricity and natural gas consumption encourage client participation High efficiency appliances including a furnace and heat recovery vehicle modernize the interior
Water Heating 27 279 MJ/year 16 367 MJ / year Space Heating 218 068 MJ/year 45 309 MJ/year GHG Reduction 22.74 tonnes/year 12.16 tonnes/year

Total Energy Consumption 68 MWh/year

Before After

Total Electricity 68.2 MWh/year 15.7 MWh/year

Savings

77%

40%

79%

47%

Anda mungkin juga menyukai