Anda di halaman 1dari 1

Action Plan for Target Achievement under PAT Cycle-I

1 Name of the Unit Complete Postal address of Plant Chief Executives Name, designation, mobile, telephone, fax nos. & e-mail Registered Office address with telephone, fax nos. & e-mail Name, designation, address, mobile, telephone, fax nos. & email of Certified Energy Manager appointed or designated by Designated Consumer under EC Act 2

Base Line Data (2007-10) 5 kCal/kWh (Net Heat Rate)

Notified Target Data (2014-15) kCal/kWh (Net Heat Rate) 2010-11 % Reduction GTG SEC, Kcal/(production unit) Capacity utilization

Status 2011-12 GTG SEC, Kcal/(production unit) Capacity utilization

Identified Energy Saving Measures [Year wise]- 2012-13 Electricity Million Units (MUs)# Expected Annual energy savings Fuels* Coal (tonnes) F.Oil (kL) Gas (lakh Nm3) Total (fuel) in (MTOE) Total Estimated Expected Cost for savings in implementati (Rs. Lakhs)# on Implementation plan (i.e., through action point implementation or purchase of Energy Certificates (ESCerts))

Sr No

Action Point for Identified Energy Saving measures

Area

Remarks

1 2 3 4 5 7

Identified Energy Saving Measures [Year wise]- 2013-14 Electricity Million Units (MUs)# Expected Annual energy savings Fuels* Coal (tonnes) F.Oil (kL) Gas (lakh Nm3) Total (fuel) in (MTOE) Total Estimated Expected Cost for savings in implementati (Rs. Lakhs)# on Implementation plan (i.e., through action point implementation or purchase of Energy Certificates (ESCerts))

Sr No

Action Point for Identified Energy Saving measures

Area

Remarks

1 2 3 4 5 8 Sr No

Identified Energy Saving Measures [Year wise]- 2014-15 Electricity Million Units (MUs)# Expected Annual energy savings Fuels* Coal (tonnes) F.Oil (kL) Gas (lakh Nm3) Total (fuel) in (MTOE) Total Estimated Expected Cost for savings in implementati (Rs. Lakhs)# on

Action Point for Identified Energy Saving measures

Area

Implementation plan (i.e., through action point implementation or purchase of Energy Certificates (ESCerts))

Remarks

1 2 3 4 5 * Delete or add fuels as the case may be

(Signature of the Energy Manager) Date: Place: Name & designation of the Energy Manager: EM/EA No: Mobile No: Organisation Seal:

Anda mungkin juga menyukai