Anda di halaman 1dari 59

TABULATION NO.

1 WATER STORAGE TANK SIZING COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS ITEM LEVEL DESCRIPTIONS ESTIMATED FLOOR AREA m2 DESIGN WATER DEMAND CRITERIA 1 DAY STORAGE 1.5 DAYS STORAGE m3 m3 519 778.5 AS PER SYABAS REQ. 119 69 707 178.5 103.5 1,061

1 2 3

HOTEL FEC RETAIL TOTAL

WATER TANK HOTEL Suction Tank (1/3 of total storage) FRP Roof Tank (2/3 of total storage) FEC & RETAIL Suction Tank (1/3 of total storage) FEC FRP Roof Tank (2/3 of total storage) RETAIL

CAPACITY m3 (eff) m3 (nom) 173 346 63 260 390 105

DIMENSION L (m) 130 m2 15 75 m2 10 W (m) Heff (m) 1.60 2.3 1.00 Hnom (m) 2 2.6 1.4

79

93.6

2.3

2.6

FRP Roof Tank (2/3 of total storage)

46

62.4

2.3

2.6

TABULATION NO. 2 TRANSFER PUMPSET SIZING (TP-B-RETAIL) COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: R.C. suction tank (basement) to FRP storage tank (roof) A 1 2 3 4 5 B Design Data 66.7% Water storage of 1.0 days water storage, Q1 Number of hours per day required to replenish the tank, T Pressure required at outlet Coefficient of friction (C) for ductile iron pipe Length of straight pipe, L Pipe Sizing Based on Hazen-Williams formula of delta P = (10.666 x Q1.85)/(D4.87 x C1.85) where delta P = frictional loss due to fluid flow in the pipe per unit length (m WG/m) Q = flow rate (m3/s) D = internal diameter of pipe considered (m) C = coefficient of friction 1 2 3 4 5 C 1 2 3 Volumetric flow rate, Q (=Q1/T) Maximum flow velocity allowed by JBA, vmax Proposed pipe size, D Actual flow velocity, v Friction loss using 65mm diameter pipe, delta P Static Losses Highest water level (storage tank) Lowest water level (Suction tank) Static Head (Note: All levels indicated is based on FFL as datum) Pipe and Fitting Losses Refer to MWA (Table 16.6; Page 16/7) & *Attachment A (Carrier Handbook; Table 10 & 11) Equivalent pipe length Fittings Equivalent Length (m) Quantities Elbows 20 1.83 Tees 5 3.66 0.85 Gate Valve 4 Y-strainer 2 8.53 Check valve 1 7.62 45 Y-valve 1 8.84

1 2 3 4 5 6

Total = Total Length of Pipe 1 2 Total length of straight pipe Total equivalent length of pipe Total Friction Loss 1 2 Total length of pipe Friction loss per meter run 10% Safety Factor, say

+ =

x = =

E 1

Other Losses (None) =

F 1 2 3 4

Total Pressure Losses Pressure required at outlet Static Head Pipe and fitting losses Other losses

+ + + =

Transfer Pumpset Selection Transfer pump specified at 2.5 L/s @ 40m head (1 duty & 1 standby)

65 8 1.0 100 60.0

m3 hrs m WG m

x1.15

65 H 16.8 V 81.8 94

13.2+3.6

0.002257 m3/s 2.5 65 0.68 0.0163 m/s mm m/s m WG/m

37.5 m 2.4 m 35.2 m

=25.5+3.6 =12.3

IL IL

Total Equivalent Length 36.6 18.3 3.4 17.1 7.6 8.8

m m m m m m

Pipe size

Equivalent length (mm)

mm in 90 bend T gate valve Y Strainer

25 1 0.79 1.52 0.30 1.52

Equivalent length (mm) 91.8 m check valve 3.05 45 Y valve 3.66

70.0 m 91.8 m 161.8 m

161.8 0.0163 2.6431 3.0

m m WG/m m WG m WG

0.0 m WG 0.0 m WG

1.0 35.2 3.0 0 39.2

m WG m WG m WG m WG m WG

13.2+3.6

32 1.25 1.01 2.13 0.46 2.74

38 1.5 1.22 2.44 0.55 3.05

50 2 1.52 3.05 0.70 8.23

65 2.5 1.83 3.66 0.85 8.53

77 3 2.29 4.57 0.98 12.80

89 3.5 2.74 5.49 1.22 14.63

100 4 3.05 6.40 1.37 18.29

125 5 3.96 7.62 1.83 24.38

150 6 4.88 9.14 2.13 33.53

200 8 6.10 12.19 2.74 45.72

250 10 7.62 15.24 3.66 57.91

300 12 9.14 18.29 3.96 76.20

4.27 4.88 6.10 7.62 9.14 10.67 12.19 15.24 18.29 24.38 30.48 36.57 4.57 5.49 7.31 8.84 10.67 12.50 14.32 17.68 21.33 25.91 32.00 39.62

TABULATION NO. 2 TRANSFER PUMPSET SIZING (TP-B-FEC) COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: R.C. suction tank (basement) to FRP storage tank (roof) A 1 2 3 4 5 B Design Data 66.7% Water storage of 1.0 days water storage, Q1 Number of hours per day required to replenish the tank, T Pressure required at outlet Coefficient of friction (C) for ductile iron pipe Length of straight pipe, L Pipe Sizing Based on Hazen-Williams formula of delta P = (10.666 x Q1.85)/(D4.87 x C1.85) where delta P = frictional loss due to fluid flow in the pipe per unit length (m WG/m) Q = flow rate (m3/s) D = internal diameter of pipe considered (m) C = coefficient of friction 1 2 3 4 5 C 1 2 3 Volumetric flow rate, Q (=Q1/T) Maximum flow velocity allowed by JBA, vmax Proposed pipe size, D Actual flow velocity, v Friction loss using 80mm diameter pipe, delta P Static Losses Highest water level (storage tank) Lowest water level (Suction tank) Static Head (Note: All levels indicated is based on FFL as datum) Pipe and Fitting Losses Refer to MWA (Table 16.6; Page 16/7) & *Attachment A (Carrier Handbook; Table 10 & 11) Equivalent pipe length Fittings Equivalent Length (m) Quantities Elbows 20 2.29 Tees 5 4.57 0.98 Gate Valve 4 Y-strainer 2 12.80 Check valve 1 9.14 45 Y-valve 1 10.67

1 2 3 4 5 6

Total = Total Length of Pipe 1 2 Total length of straight pipe Total equivalent length of pipe Total Friction Loss 1 2 Total length of pipe Friction loss per meter run 10% Safety Factor, say

+ =

x = =

E 1

Other Losses (None) =

F 1 2 3 4

Total Pressure Losses Pressure required at outlet Static Head Pipe and fitting losses Other losses

+ + + =

Transfer Pumpset Selection Transfer pump specified at 3.5 L/s @ 40m head (1 duty & 1 standby)

95 8 1.0 100 60.0

m3 hrs m WG m

x1.15

65 H 16.8 V 81.8 94

13.2+3.6

0.003299 m3/s 2.5 80 0.66 0.0120 m/s mm m/s m WG/m

37.5 m 2.4 m 35.2 m

=25.5+3.6 =12.3

IL IL

Total Equivalent Length 45.7 22.9 3.9 25.6 9.1 10.7

m m m m m m

Pipe size

Equivalent length (mm)

mm in 90 bend T gate valve Y Strainer

25 1 0.79 1.52 0.30 1.52

Equivalent length (mm) 117.9 m check valve 3.05 45 Y valve 3.66

70.0 m 117.9 m 187.9 m

187.9 0.0120 2.2531 2.5

m m WG/m m WG m WG

0.0 m WG 0.0 m WG

1.0 35.2 2.5 0 38.7

m WG m WG m WG m WG m WG

13.2+3.6

32 1.25 1.01 2.13 0.46 2.74

38 1.5 1.22 2.44 0.55 3.05

50 2 1.52 3.05 0.70 8.23

65 2.5 1.83 3.66 0.85 8.53

77 3 2.29 4.57 0.98 12.80

89 3.5 2.74 5.49 1.22 14.63

100 4 3.05 6.40 1.37 18.29

125 5 3.96 7.62 1.83 24.38

150 6 4.88 9.14 2.13 33.53

200 8 6.10 12.19 2.74 45.72

250 10 7.62 15.24 3.66 57.91

300 12 9.14 18.29 3.96 76.20

4.27 4.88 6.10 7.62 9.14 10.67 12.19 15.24 18.29 24.38 30.48 36.57 4.57 5.49 7.31 8.84 10.67 12.50 14.32 17.68 21.33 25.91 32.00 39.62

TABULATION NO. 2 TRANSFER PUMPSET SIZING (TP-B-HOTEL) COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: R.C. suction tank (basement) to FRP storage tank (roof) A 1 2 3 4 5 B Design Data 66.7% Water storage of 1.0 days water storage, Q1 Number of hours per day required to replenish the tank, T Pressure required at outlet Coefficient of friction (C) for ductile iron pipe Length of straight pipe, L Pipe Sizing Based on Hazen-Williams formula of delta P = (10.666 x Q )/(D xC ) where delta P = frictional loss due to fluid flow in the pipe per unit length (m WG/m) Q = flow rate (m3/s) D = internal diameter of pipe considered (m) C = coefficient of friction 1 2 3 4 5 C 1 2 3 Volumetric flow rate, Q (=Q1/T) Maximum flow velocity allowed by JBA, vmax Proposed pipe size, D Actual flow velocity, v Friction loss using 100mm diameter pipe, delta P Static Losses Highest water level (storage tank) Lowest water level (Suction tank) Static Head (Note: All levels indicated is based on FFL as datum) 31.6 m 0.9 m 30.8 m 0.013542 m3/s 2.5 100 1.72 0.0552 m/s mm m/s m WG/m
1.85 4.87 1.85

390 8 1.0 100 60.0

m3 hrs m WG m

1 2 3 4 5 6

Pipe and Fitting Losses Refer to MWA (Table 16.6; Page 16/7) & *Attachment A (Carrier Handbook; Table 10 & 11) Equivalent pipe length Fittings Equivalent Length (m) Quantities Elbows 20 3.05 Tees 5 6.40 1.37 Gate Valve 4 Y-strainer 2 18.29 Check valve 1 12.19 45 Y-valve 1 14.32 Total = Total Length of Pipe Total length of straight pipe Total equivalent length of pipe Total Friction Loss

Total Equivalent Length 61.0 32.0 5.5 36.6 12.2 14.3 161.5

m m m m m m m

1 2

+ =

60.0 m 161.5 m 221.5 m

1 2

Total length of pipe Friction loss per meter run 10% Safety Factor, say

x = =

221.5 0.0552 12.2191 13.5

m m WG/m m WG m WG

TABULATION NO. 2 TRANSFER PUMPSET SIZING (TP-B-HOTEL) COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: R.C. suction tank (basement) to FRP storage tank (roof) E 1 Other Losses (None) = F 1 2 3 4 Total Pressure Losses Pressure required at outlet Static Head Pipe and fitting losses Other losses 1.0 30.8 13.5 0 45.3 m WG m WG m WG m WG m WG 0.0 m WG 0.0 m WG

+ + + =

Transfer Pumpset Selection Transfer pump specified at 13.5 L/s @ 45m head (1 duty & 1 standby)

TABULATION NO. 3 BOOSTER PUMPSET SIZING (BP-ROOF-FV-FEC) COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 TYPE : FLUSH VALVE SYSTEM SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: FRP storage tank (roof level - blk D) to the furthest point at nearest level (level 4 - blk B.) A 1 2 3 B Design Data Pressure required at outlet Coefficient of friction (C) for polysteel pipes Length of straight pipe, L (Furthest point at toilet located at level 4; GL 1-D ) Determination of Flow Rate Based on Hazen-Williams formula of delta P = (10.666 x L x Q1.85)/(D4.87 x C1.85) where delta P = frictional loss due to fluid flow in the pipe (m WG) Q = flow rate (m3/s) D = internal diameter of pipe considered (m) C = coefficient of friction L = pipe length (m) Total volumetric flow rate, Q (Refer to Tabulation No. 5 for flow rate calculation) Or Total volumetric flow rate, Q Maximum flow velocity allowed by JBA, vmax Proposed pipe size, D Actual flow velocity, v Friction loss using 80mm diameter pipe, delta P Static Losses Lowest water level (FRP Storage tank) Furthest point at toilet located at level 4; GL 1-D ) Positive static head (Pressure available) (Note: All levels indicated is based on FFL as datum) 37.5 30.0 7.6 7.50 0.00750 2.5 80 1.49 0.0547 15.0 100 100.0

2 3 4 5 6 C 1 2 3

Pipe and Fitting Losses Refer to MWA (Table 16.6; Page 16/7) Equivalent pipe length Fittings Elbows

Eq Length (m) 2.29

Quantities 10

Total Eq Length 22.9

2 3 4 5 6

Tees Gate Valve Strainer Check Valve 45 Y-valve Total Length of Pipe Total length of straight pipe Total equivalent length of pipe Total Friction Loss

4.57 0.98 12.80 9.14 10.67 Total =

20 2 1 1 1

91.4 2.0 12.8 9.1 10.7 148.9 100.0 148.9 248.9

1 2

+ =

1 2

Total length of pipe Friction loss per meter run 10% Safety Factor, say Other Losses (None)

x = =

248.9 0.0547 13.6 15.0

F 1

= G 1 2 3 4 5 H Total Pressure Losses Pressure required at outlet Positive static head (Pressure available) Pipe and Fitting Losses Other Losses Total pressure losses Booster Pumpset Selection Variable speed pumpsets specified at 7.5 L/S @ 2.5 bar head (duty & standby)

0.0 0.0

+ + =

15.0 7.6 15.0 0.0 22.5

m WG m

L/s m3/s m/s mm m/s m WG/m

m m m

* Assume fitting at 1.5m high from FFL

Total Eq Length m

Pipe size

mm in

25 1

32 1.25

38 1.5

50 2

65 2.5

77 3

89 3.5

m m m m m m m m m

90 bend T Equivalent gate valve length (mm) Y Strainer check valve 45 Y valve

0.79 1.52 0.30 1.52 3.05 3.66

1.01 2.13 0.46 2.74 4.27 4.57

1.22 2.44 0.55 3.05 4.88 5.49

1.52 3.05 0.70 8.23 6.10 7.31

1.83 3.66 0.85 8.53 7.62 8.84

2.29 4.57 0.98 12.80 9.14 10.67

2.74 5.49 1.22 14.63 10.67 12.50

m m WG/m m WG m WG

m WG m WG

m WG m WG m WG m WG m WG

100 4

125 5

150 6

200 8

250 10

300 12

3.05 6.40 1.37 18.29 12.19 14.32

3.96 7.62 1.83 24.38 15.24 17.68

4.88 9.14 2.13 33.53 18.29 21.33

6.10 12.19 2.74 45.72 24.38 25.91

7.62 15.24 3.66 57.91 30.48 32.00

9.14 18.29 3.96 76.20 36.57 39.62

TABULATION NO. 3 BOOSTER PUMPSET SIZING (BP-ROOF-FV-HOTEL-BLK D) COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 TYPE : FLUSH VALVE SYSTEM SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: FRP storage tank (roof level - blk D) to the furthest point at nearest level (level 4 - blk B.) A 1 2 3 B Design Data Pressure required at outlet Coefficient of friction (C) for polysteel pipes Length of straight pipe, L (Furthest point at toilet located at level 4; GL 19-G ) Determination of Flow Rate Based on Hazen-Williams formula of delta P = (10.666 x L x Q1.85)/(D4.87 x C1.85) where delta P = frictional loss due to fluid flow in the pipe (m WG) Q = flow rate (m3/s) D = internal diameter of pipe considered (m) C = coefficient of friction L = pipe length (m) Total volumetric flow rate, Q (Refer to Tabulation No. 5 for flow rate calculation) Or Total volumetric flow rate, Q Maximum flow velocity allowed by JBA, vmax Proposed pipe size, D Actual flow velocity, v Friction loss using 100mm diameter pipe, delta P Static Losses Lowest water level (FRP Storage tank) Furthest point at toilet located at level 4; GL 19-G ) Positive static head (Pressure available) (Note: All levels indicated is based on FFL as datum) 31.6 28.5 3.2 13.00 0.01300 2.5 100 1.65 0.0510 20.0 100 120.0

2 3 4 5 6 C 1 2 3

Pipe and Fitting Losses Refer to MWA (Table 16.6; Page 16/7) Equivalent pipe length Fittings Elbows

Eq Length (m) 3.05

Quantities 10

Total Eq Length 30.5

2 3 4 5 6

Tees Gate Valve Strainer Check Valve 45 Y-valve Total Length of Pipe Total length of straight pipe Total equivalent length of pipe Total Friction Loss

6.40 1.37 18.29 12.19 14.32 Total =

20 2 1 1 1

128.0 2.7 18.3 12.2 14.3 206.0 120.0 206.0 326.0

1 2

+ =

1 2

Total length of pipe Friction loss per meter run 10% Safety Factor, say Other Losses (None)

x = =

326.0 0.0510 16.6 19.0

F 1

= G 1 2 3 4 5 H Total Pressure Losses Pressure required at outlet Positive static head (Pressure available) Pipe and Fitting Losses Other Losses Total pressure losses Booster Pumpset Selection Variable speed pumpsets specified at 13 L/S @ 3.6 bar head (duty & standby)

0.0 0.0

+ + =

20.0 3.2 19.0 0.0 35.9

m WG m

L/s m3/s m/s mm m/s m WG/m

m m m

* Assume fitting at 1.5m high from FFL

Total Eq Length m

Pipe size

mm in

25 1

32 1.25

38 1.5

50 2

65 2.5

77 3

89 3.5

m m m m m m m m m

90 bend T Equivalent gate valve length (mm) Y Strainer check valve 45 Y valve

0.79 1.52 0.30 1.52 3.05 3.66

1.01 2.13 0.46 2.74 4.27 4.57

1.22 2.44 0.55 3.05 4.88 5.49

1.52 3.05 0.70 8.23 6.10 7.31

1.83 3.66 0.85 8.53 7.62 8.84

2.29 4.57 0.98 12.80 9.14 10.67

2.74 5.49 1.22 14.63 10.67 12.50

m m WG/m m WG m WG

m WG m WG

m WG m WG m WG m WG m WG

100 4

125 5

150 6

200 8

250 10

300 12

3.05 6.40 1.37 18.29 12.19 14.32

3.96 7.62 1.83 24.38 15.24 17.68

4.88 9.14 2.13 33.53 18.29 21.33

6.10 12.19 2.74 45.72 24.38 25.91

7.62 15.24 3.66 57.91 30.48 32.00

9.14 18.29 3.96 76.20 36.57 39.62

TABULATION NO. 3 BOOSTER PUMPSET SIZING (BP-ROOF-FV-HOTEL-BLK C) COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 TYPE : FLUSH VALVE SYSTEM SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: FRP storage tank (roof level - blk D) to the furthest point at nearest level (level 4 - blk B.) A 1 2 3 B Design Data Pressure required at outlet Coefficient of friction (C) for polysteel pipes Length of straight pipe, L (Furthest point at toilet located at level 4; GL 19-D ) Determination of Flow Rate Based on Hazen-Williams formula of delta P = (10.666 x L x Q1.85)/(D4.87 x C1.85) where delta P = frictional loss due to fluid flow in the pipe (m WG) Q = flow rate (m3/s) D = internal diameter of pipe considered (m) C = coefficient of friction L = pipe length (m) Total volumetric flow rate, Q (Refer to Tabulation No. 5 for flow rate calculation) Or Total volumetric flow rate, Q Maximum flow velocity allowed by JBA, vmax Proposed pipe size, D Actual flow velocity, v Friction loss using 100mm diameter pipe, delta P Static Losses Lowest water level (FRP Storage tank) Furthest point at toilet located at level 4; GL 19-D ) Positive static head (Pressure available) (Note: All levels indicated is based on FFL as datum) 31.6 28.5 3.2 11.00 0.01100 2.5 100 1.40 0.0375 20.0 100 60.0

2 3 4 5 6 C 1 2 3

Pipe and Fitting Losses Refer to MWA (Table 16.6; Page 16/7) Equivalent pipe length Fittings Elbows

Eq Length (m) 3.05

Quantities 10

Total Eq Length 30.5

2 3 4 5 6

Tees Gate Valve Strainer Check Valve 45 Y-valve Total Length of Pipe Total length of straight pipe Total equivalent length of pipe Total Friction Loss

6.40 1.37 18.29 12.19 14.32 Total =

20 2 1 1 1

128.0 2.7 18.3 12.2 14.3 206.0 60.0 206.0 266.0

1 2

+ =

1 2

Total length of pipe Friction loss per meter run 10% Safety Factor, say Other Losses (None)

x = =

266.0 0.0375 10.0 11.0

F 1

= G 1 2 3 4 5 H Total Pressure Losses Pressure required at outlet Positive static head (Pressure available) Pipe and Fitting Losses Other Losses Total pressure losses Booster Pumpset Selection Variable speed pumpsets specified at 8 L/S @ 3.0 bar head (duty & standby)

0.0 0.0

+ + =

20.0 3.2 11.0 0.0 27.9

m WG m

L/s m3/s m/s mm m/s m WG/m

m m m

* Assume fitting at 1.5m high from FFL

Total Eq Length m

Pipe size

mm in

25 1

32 1.25

38 1.5

50 2

65 2.5

77 3

89 3.5

m m m m m m m m m

90 bend T Equivalent gate valve length (mm) Y Strainer check valve 45 Y valve

0.79 1.52 0.30 1.52 3.05 3.66

1.01 2.13 0.46 2.74 4.27 4.57

1.22 2.44 0.55 3.05 4.88 5.49

1.52 3.05 0.70 8.23 6.10 7.31

1.83 3.66 0.85 8.53 7.62 8.84

2.29 4.57 0.98 12.80 9.14 10.67

2.74 5.49 1.22 14.63 10.67 12.50

m m WG/m m WG m WG

m WG m WG

m WG m WG m WG m WG m WG

100 4

125 5

150 6

200 8

250 10

300 12

3.05 6.40 1.37 18.29 12.19 14.32

3.96 7.62 1.83 24.38 15.24 17.68

4.88 9.14 2.13 33.53 18.29 21.33

6.10 12.19 2.74 45.72 24.38 25.91

7.62 15.24 3.66 57.91 30.48 32.00

9.14 18.29 3.96 76.20 36.57 39.62

TABULATION NO. 3 BOOSTER PUMPSET SIZING (BP-ROOF-FV-HOTEL-BLK B) COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 TYPE : FLUSH VALVE SYSTEM SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: FRP storage tank (roof level - blk D) to the furthest point at nearest level (level 4 - blk B.) A 1 2 3 B Design Data Pressure required at outlet Coefficient of friction (C) for polysteel pipes Length of straight pipe, L (Furthest point at toilet located at level 4; GL 3-H ) Determination of Flow Rate Based on Hazen-Williams formula of delta P = (10.666 x L x Q 1.85)/(D4.87 x C1.85) where delta P = frictional loss due to fluid flow in the pipe (m WG) Q = flow rate (m3/s) D = internal diameter of pipe considered (m) C = coefficient of friction L = pipe length (m) Total volumetric flow rate, Q (Refer to Tabulation No. 5 for flow rate calculation) Or Total volumetric flow rate, Q Maximum flow velocity allowed by JBA, vmax Proposed pipe size, D Actual flow velocity, v Friction loss using 100mm diameter pipe, delta P Static Losses Lowest water level (FRP Storage tank) Furthest point at toilet located at level 4; GL 3-H ) Positive static head (Pressure available) (Note: All levels indicated is based on FFL as datum) 31.6 m 28.5 m 3.2 m 8.00 L/s 0.00800 2.5 100 1.02 0.0208 m3/s m/s mm m/s m WG/m 20.0 m WG 100 275.0 m

2 3 4 5 6 C 1 2 3

TABULATION NO. 3 BOOSTER PUMPSET SIZING (BP-ROOF-FV-HOTEL-BLK B) COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 TYPE : FLUSH VALVE SYSTEM SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: FRP storage tank (roof level - blk D) to the furthest point at nearest level (level 4 - blk B.)

Pipe and Fitting Losses Refer to MWA (Table 16.6; Page 16/7) Equivalent pipe length Fittings Elbows Tees Gate Valve Strainer Check Valve 45 Y-valve Total Length of Pipe Total length of straight pipe Total equivalent length of pipe Total Friction Loss

1 2 3 4 5 6

Eq Length (m) 3.05 6.40 1.37 18.29 12.19 14.32

Quantities 10 20 2 1 1 1 Total =

Total Eq Length 30.5 m 128.0 m 2.7 m 18.3 m 12.2 m 14.3 m 206.0 m 275.0 m 206.0 m 481.0 m

1 2

+ =

1 2

Total length of pipe Friction loss per meter run 10% Safety Factor, say Other Losses (None)

x = =

481.0 0.0208 10.0 11.0

m m WG/m m WG m WG

F 1

= G 1 2 3 4 5 H Total Pressure Losses Pressure required at outlet Positive static head (Pressure available) Pipe and Fitting Losses Other Losses Total pressure losses Booster Pumpset Selection Variable speed pumpsets specified at 8 L/S @ 3.0 bar head (duty & standby)

0.0 m WG 0.0 m WG

+ + =

20.0 3.2 11.0 0.0 27.9

m WG m WG m WG m WG m WG

* Assume fitting at 1.5m high from FFL

mm in 90 bend T Equivalent gate valve length (mm) Y Strainer check valve 45 Y valve Pipe size

25 1 0.79 1.52 0.30 1.52 3.05 3.66

32 1.25 1.01 2.13 0.46 2.74 4.27 4.57

38 1.5 1.22 2.44 0.55 3.05 4.88 5.49

50 2 1.52 3.05 0.70 8.23 6.10 7.31

65 2.5 1.83 3.66 0.85 8.53 7.62 8.84

77 3 2.29 4.57 0.98 12.80 9.14 10.67

89 3.5 2.74 5.49 1.22 14.63 10.67 12.50

100 4 3.05 6.40 1.37 18.29 12.19 14.32

125 5 3.96 7.62 1.83 24.38 15.24 17.68

150 6 4.88 9.14 2.13 33.53 18.29 21.33

200 8 6.10 12.19 2.74 45.72 24.38 25.91

250 10 7.62 15.24 3.66 57.91 30.48 32.00

300 12 9.14 18.29 3.96 76.20 36.57 39.62

TABULATION NO. 4 DROPPER SIZING - HOTEL COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 TYPE : NON-FLUSH VALVE SYSTEM SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: FRP storage tank (roof level) to the furthest point at nearest level (level 4) A 1 2 3 B Design Data Pressure required at outlet Coefficient of friction (C) for polysteel pipes Length of straight pipe, L (Furthest point at area located at level G; GL 25-C ) Determination of Flow Rate Based on Hazen-Williams formula of delta P = (10.666 x L x Q1.85)/(D4.87 x C1.85) where delta P = frictional loss due to fluid flow in the pipe (m WG) Q = flow rate (m3/s) D = internal diameter of pipe considered (m) C = coefficient of friction L = pipe length (m) Total volumetric flow rate, Q (Refer to Tabulation No. 5 for flow rate calculation) Or Total volumetric flow rate, Q Maximum flow velocity allowed by JBA, vmax Proposed pipe size, D Actual flow velocity, v Friction loss using 80mm diameter pipe, delta P Static Losses Lowest water level (Storage tank) Furthest point at area located at level G; GL 29-C ) Positive static head (Pressure available) (Note: All levels indicated is based on FFL as datum) 31.6 18.0 13.7 3.00 0.00300 2.5 80 0.60 0.0100 10.0 100 50.0

2 3 4 5 6 C 1 2 3

Pipe and Fitting Losses Refer to MWA (Table 16.6; Page 16/7) Equivalent pipe length Fittings Elbows

Eq Length (m) 2.29

Quantities 10

Total Eq Length 22.9

2 3 4 5 6

Tees Gate Valve Strainer Check Valve 45 Y-valve Total Length of Pipe Total length of straight pipe Total equivalent length of pipe Total Friction Loss

4.57 0.98 12.80 9.14 10.67 Total =

20 2 1 1 1

91.4 2.0 12.8 9.1 10.7 148.9 50.0 148.9 198.9

1 2

+ =

1 2

Total length of pipe Friction loss per meter run 10% Safety Factor, say Other Losses (None)

x = =

198.9 0.0100 2.0 3.0

F 1

= G 1 2 3 4 5 H Total Pressure Losses Pressure required at outlet Positive static head (Pressure available) Pipe and Fitting Losses Other Losses Total pressure losses Booster Pumpset Selection

0.0 0.0

+ + =

10.0 13.7 3.0 0.0 -0.7

Rough Calculation Length(mm) m WG m + x1.15 65 H 3.1 V 68.1 78

L/s m3/s m/s mm m/s m WG/m

m m m

* Assume fitting at 1.5m high from FFL

Total Eq Length m

Pipe size

mm in

25 1

32 1.25

38 1.5

50 2

65 2.5

77 3

89 3.5

m m m m m m m m m

90 bend T Equivalent gate valve length (mm) Y Strainer check valve 45 Y valve

0.79 1.52 0.30 1.52 3.05 3.66

1.01 2.13 0.46 2.74 4.27 4.57

1.22 2.44 0.55 3.05 4.88 5.49

1.52 3.05 0.70 8.23 6.10 7.31

1.83 3.66 0.85 8.53 7.62 8.84

2.29 4.57 0.98 12.80 9.14 10.67

2.74 5.49 1.22 14.63 10.67 12.50

m m WG/m m WG m WG

m WG m WG

m WG m WG m WG m WG m WG

100 4

125 5

150 6

200 8

250 10

300 12

3.05 6.40 1.37 18.29 12.19 14.32

3.96 7.62 1.83 24.38 15.24 17.68

4.88 9.14 2.13 33.53 18.29 21.33

6.10 12.19 2.74 45.72 24.38 25.91

7.62 15.24 3.66 57.91 30.48 32.00

9.14 18.29 3.96 76.20 36.57 39.62

TABULATION NO. 4 DROPPER SIZING - RETAIL COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 TYPE : NON-FLUSH VALVE SYSTEM SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: FRP storage tank (roof level) to the furthest point at nearest level (level 4) A 1 2 3 B Design Data Pressure required at outlet Coefficient of friction (C) for polysteel pipes Length of straight pipe, L (Furthest point at area located at level G; GL 29-H ) Determination of Flow Rate Based on Hazen-Williams formula of delta P = (10.666 x L x Q1.85)/(D4.87 x C1.85) where delta P = frictional loss due to fluid flow in the pipe (m WG) Q = flow rate (m3/s) D = internal diameter of pipe considered (m) C = coefficient of friction L = pipe length (m) Total volumetric flow rate, Q (Refer to Tabulation No. 5 for flow rate calculation) Or Total volumetric flow rate, Q Maximum flow velocity allowed by JBA, vmax Proposed pipe size, D Actual flow velocity, v Friction loss using 100mm diameter pipe, delta P Static Losses Lowest water level (Storage tank) Furthest point at area located at level G; GL 29-H ) Positive static head (Pressure available) (Note: All levels indicated is based on FFL as datum) 37.5 m 11.8 m 25.8 m 5.50 L/s 0.00550 2.5 100 0.70 0.0104 m3/s m/s mm m/s m WG/m 10.0 m WG 100 350.0 m

2 3 4 5 6 C 1 2 3

TABULATION NO. 4 DROPPER SIZING - RETAIL COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 TYPE : NON-FLUSH VALVE SYSTEM SOURCE: 1. MWA DESIGN GUIDELINES FOR WATER SUPPLY SYSTEMS Section: FRP storage tank (roof level) to the furthest point at nearest level (level 4)

Pipe and Fitting Losses Refer to MWA (Table 16.6; Page 16/7) Equivalent pipe length Fittings Elbows Tees Gate Valve Strainer Check Valve 45 Y-valve Total Length of Pipe Total length of straight pipe Total equivalent length of pipe Total Friction Loss

1 2 3 4 5 6

Eq Length (m) 3.05 6.40 1.37 18.29 12.19 14.32

Quantities 10 20 2 1 1 1 Total =

Total Eq Length 30.5 m 128.0 m 2.7 m 18.3 m 12.2 m 14.3 m 206.0 m 350.0 m 206.0 m 556.0 m

1 2

+ =

1 2

Total length of pipe Friction loss per meter run 10% Safety Factor, say Other Losses (None)

x = =

556.0 0.0104 5.8 7.0

m m WG/m m WG m WG

F 1

= G 1 2 3 4 5 H Total Pressure Losses Pressure required at outlet Positive static head (Pressure available) Pipe and Fitting Losses Other Losses Total pressure losses Booster Pumpset Selection

0.0 m WG 0.0 m WG

+ + =

10.0 25.8 7.0 0.0 -8.8

m WG m WG m WG m WG m WG

Rough Calculation Length(mm)

+ x1.15

65 H 3.1 V 68.1 78

* Assume fitting at 1.5m high from FFL

Rough Calculation

mm in 90 bend T Equivalent gate valve length (mm) Y Strainer check valve 45 Y valve Pipe size

25 1 0.79 1.52 0.30 1.52 3.05 3.66

32 1.25 1.01 2.13 0.46 2.74 4.27 4.57

38 1.5 1.22 2.44 0.55 3.05 4.88 5.49

50 2 1.52 3.05 0.70 8.23 6.10 7.31

65 2.5 1.83 3.66 0.85 8.53 7.62 8.84

77 3 2.29 4.57 0.98 12.80 9.14 10.67

89 3.5 2.74 5.49 1.22 14.63 10.67 12.50

100 4 3.05 6.40 1.37 18.29 12.19 14.32

125 5 3.96 7.62 1.83 24.38 15.24 17.68

150 6 4.88 9.14 2.13 33.53 18.29 21.33

200 8 6.10 12.19 2.74 45.72 24.38 25.91

250 10 7.62 15.24 3.66 57.91 30.48 32.00

300 12 9.14 18.29 3.96 76.20 36.57 39.62

FIXTURE UNIT CALCULATION COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 SOURCE: 1. 2001 ASHRAE FUNDAMENTALS HANDBOOK, PIPE SIZING

Flush Valve : WC, U & SH Item 1 Level hotel (Blk B) hotel (Blk C) hotel (Blk D) FEC Retail Total WC (6 F.U) - flush valve (private) Qty F.U 54 324 74 444 129 774 0 0 0 0 257 1542 rain SH (2 F.U) - (private) Qty 54 74 129 0 0 257

2 3

Non-Flush Valve : S Item 1 2 3 Level hotel FEC Retail Total S (4 F.U) (public) Qty F.U 20 80 60 240 36 144 0 464 F.U 80 240 144 464

fixture units and flow rate F.U (FV)= F.U (FV)= F.U (FV)= F.U (NFV)= TOTAL F.U = (Pressurised) Flow rate, Xnfv (LS-1) = (Pressurised) Flow rate, Xnfv (LS ) = (Pressurised) Flow rate, Xnfv (LS-1) = F.U (gravity)=
-1

432 592 1032 80 n/a 8 11 13 80

HOTEL blk B (pressurised) blk C (pressurised) blk D (pressurised) (gravity) blk B (L/S) blk C (L/S) blk D (L/S)

Flow rate, Xnfvg (LS-1) =

L/S

ain SH (2 F.U) - (private) F.U 108 148 258 0 0 514

U (5 F.U) - (public) Qty F.U 0 0 0 0 0 0 30 150 3 15 33 165

WC (10 F.U) - flush valve (public) Qty F.U 0 0 0 0 0 0 60 600 14 140 74 740

FEC 150 (pressurised) 15

RETAIL (gravity)

240 390 7.5

(pressurised) L/S

144 n/a 0

(gravity) L/S

159

L/S

5.5

L/S

F.U 432 592 1032 150 15 2221

block b rain shower: 15 lpm @ 5 bar nos. rain shower at one time 32 diversity (for checking):

block c 44

block d 52

0.59259 0.59459 0.4031

TABULATION NO. 5 LOADING UNIT CALCULATION COLD WATER PLUMBING SERVICES PROJECT: MIXED DEVELOPMENT FOR PUTERI HARBOUR LOCATION: PUTERI HARBOUR, JOHOR DATE: JUNE 2010 SOURCE: 1. 2001 ASHRAE FUNDAMENTALS HANDBOOK, PIPE SIZING

Flush Valve : WC, U & SH Item 1 Level hotel (Blk B) hotel (Blk C) hotel (Blk D) FEC Retail Total WC (8 F.U) - flush valve (private) Qty F.U 54 324 74 444 129 774 0 0 0 0 257 1542 rain SH (2 F.U) - (private) Qty F.U 54 108 74 148 129 258 0 0 0 0 257 514 U (5 F.U) - (public) Qty F.U 0 0 0 0 0 0 30 150 3 15 33 165 WC (10 F.U) - flush valve (public) Qty F.U 0 0 0 0 0 0 60 600 14 140 74 740 F.U 432 592 1032 150 15 2221

2 3

Non-Flush Valve : S Item 1 2 3 Level hotel FEC Retail Total S (4 F.U) (public) Qty F.U 20 80 60 240 36 144 0 464 F.U 80 240 144 464 2056

fixture units and flow rate F.U (FV)= F.U (NFV)= TOTAL F.U = -1 (Pressurised) Flow rate, Xnfv (LS ) = F.U (gravity)= Flow rate, Xnfvg (LS-1) =

HOTEL 2056 80 n/a 23 80 3 pressurised (gravity) L/S 150 240 390 8 0 0

FEC (pressurised) (pressurised) L/S 15 144 15 2 144 4.5

RETAIL (pressurised) (gravity) L/S