Check the min. thickness h of slab Check the depth for shear:
α1(L2/L1) = 6.53(5/5)
Ln = 5000- 300 α1(L2/L1) = 6.53 > 1
Ln = 4700mm
x = 2.5 – 0.30/2 – 0.93
x = 1.42 m
h= Ln( 800 + 0.73fy)_____________
36,000 + 5,000β[αm- 0.12(1+1/β) Taking b = 1m
c = Wu x Ashaded
h= 4700( 800 + 0.73x 300)________
Vu = 17.72 ( 1.42)(1)
36,000 + 5,000β[αm- 0.12(1+1/1.0)
Vu = 25.16 kN
L1 = 5m
Middle Strip = 85.63 – 64.22
Middle Strip = 21.41 kN-m
Mo = ( WuL2)Ln2
8
Ln = 5m
Ln = 5 – 0.30
Ln = 4.7m 4. 82 4.82 21.41 4.82 4.82
2
Mo = (17.72 x 5)(4.7)
8
Mo = 244.65 kN-m
Mo = (WUL2) LN2
8
L2 = 5m
Ln = 5 – 0.30
Ln = 4.7 m
Mo = (17.72 x 5)(4.7)
8
Mo = 244.65 kN-m
Column Strip
From Section 5.13.6.3
4. 82
-8.95
-8.95
Negative Factored Moment = -0.65(244.65)
Negative Factored Moment = -159.02 kN-m
4. 82
-8.95
-8.95
Positive Factored Moment = 85.63 kN-m
L2/L1 = 5/5
-39.75
-39.75
21.41
L2/L1 = 1.0
4. 82
-8.95
-8.95
Percentage = 75% from Table 10.4
4. 82
-8.95
-8.95
Column Strip = 75%( -159.02)
Column Strip = -119.27 kN-m
For the edge beam with 2.5m slab width Service Load 4.80 kPa
6 Impact Load 4.80( 35%) or 1.68kPa
α1 = 4375 x 10 TOTAL LIVELOAD 6.48 kPa
2500(125)3/12
α1 = 10.752
Taking b = 1m
L2 = 5m
Positive Moment
Mo = ( WuL2)Ln2
EXTERIOR SLAB PANEL ALONG D
8
Ln = 5m
Ln = 5 – 0.30
MOMENT ALONG THE LONG SPAN (Along Edge Beam)
Ln = 4.7m
L2 = 2.65m
Mo = (17.72 x 5)(4.7)2
8
Mo = 244.65 kN-m
L1 = 5m
Negative Factored Moment = -0.65(129.66) eExterior Column Strip Interior Column Strip
Negative Factored Moment = -84.28 kN-m
Positive Factored Moment = 0.35 (129.66) -9.48 -21.07 -19.88 -8.95 -8.95
Positive Factored Moment = 45.38 kN-m
βt = EcbC
5.11 11.34 10.71 4.82 4.82
2EcsIs
C = Σ [ 1 – 0.63(x/y)]( x3y/3)
βt = 2991.87 x106
2(406 x 106)
βt = 3.68
L1 = 5m
Percentage = 75% from Table 10.5
Positive Moment
Mo = (WUL2) LN2
Column Strip = 75% (45.38)
8
Column Strip = 34.04 kN-m
L2 = 5m
Ln = 5 – 0.30
Beam = 85% (34.04)
Ln = 4.7 m
Beam = 28.93 kN-m
Mo = (17.72 x 5)(4.7)
Slab = 15% (34.04)
8
Slab = 5.11 kN-m
Mo = 244.65 kN-m
Column Strip
Distributing These Moments to Beam
4. 82
-8.95
-8.95
and Column Strips:
L2/L1 = 5/5
L2/L1 = 1.0
4. 82
-8.95
-8.95
α1 = αb = 6.53 ( in the direction of L1)
α1(L2/L1) = 6.53
-39.75
-39.75
21.41
Interior Negative Moment
4. 82
-8.95
-8.95
-8.95
-8.95
Positive Moment
ρmax = 0.02492
DESIGN OF INTERIOR SLAB PANEL (S-1)
h = 106.42mm > 71.05mm (OK)
Assume h = Ln (800 + 0.73fy
36,000 + 9,000β
Mo = ( WuL2)Ln2
8
Ln = 5m
Ln = 5 – 0.30
Ln = 4.7m 7.61 7.61 33.79 7.61 7.61
2
Mo = (27.97 x 5)(4.7)
8
Mo = 386.16 kN-m
Mo = (WUL2) LN2
8
L2 = 5m
Ln = 5 – 0.30
Ln = 4.7 m
Mo = (27.97 x 5)(4.7)
8
Mo = 386.16 kN-m
Column Strip
From Section 5.13.6.3
-14.10
-14.10
-7.61
Negative Factored Moment = -0.65(386.16)
Negative Factored Moment = -251.00 kN-m
-14.10
-14.10
-7.61
Positive Factored Moment = 0.35 (386.16)
Positive Factored Moment = 135.16 kN-m
-62.75
-62.75
L2/L1 = 5/5
3.79
L2/L1 = 1.0
-14.10
-14.10
-7.61
-7.61
Ln = 5000- 300
Ln = 4700mm
h = 65.85 mm
α1 = 5312 x 106
5000(125)3/12 LIVELOAD:
α1 = 6.53
From Table 1.3-A of RECOMMENDED MINIMUM DESIGN LIVE
LOADS IN BUILDINGS
For the edge beam with 2.5m slab width
Service Load 7.18 kPa
α1 = 4375 x 106
for storehouse (heavy)
2500(125)3/12
Impact Load 7.18( 35%) or 2,51kPa
α1 = 10.752
TOTAL LIVELOAD 9.69 kPa
Average, αm = 3 α1 + α2
Negative Factored Moment = -0.65(386.16)
TOTAL DESIGN LOAD, WU Negative Factored Moment = -251.00 kN-m
Taking b = 1m
Percentage = 75% from Table 10.4
c = Wu x Ashaded (By Linear Interpolation)
Vu = 17.72 ( 1.42)(1)
Vu = 25.16 kN Interior Negative Moment
L2 = 5m Positive Moment
Mo = (27.97 x 5)(4.7)2
8
Mo = 386.16 kN-m
L1 = 5m
Middle Strip = -(133.09 – 99.82)
Middle Strip = -33.27 kN-m
Positive Moment
Negative Factored Moment = -0.65(204.66) eExterior Column Strip Interior Column Strip
Negative Factored Moment = -133.09kN-m
βt = EcbC
2EcsIs 8.06 17.91 16.90 7.61 7.61
C = Σ [ 1 – 0.63(x/y)]( x3y/3)
βt = 2991.87 x106
2(406 x 106)
βt = 3.68
Mo = (27.97 x 5)(4.7)
8
Mo = 386.16 kN-m
Column Strip
Distributing These Moments to Beam
-14.1
-7.61
-14.1
L2/L1 = 5/5
L2/L1 = 1.0
-14.1
-7.61
-14.1
3.79
DF12 = 1.0
ρmax = 0.75 x 0.85(20.7)(0.85)(600)
DF21 = __ k12 ___ = 0.5
300 (600 + 300)
k12 + k23
DF23 = __ k23 ___ = 0.5
ρmax = 0.02492 K23 + k21
DF32 = __ k32 ___ = 0.5
K32 + k34
DF34 = __ k34 ___ = 0.5
k34 + k32
DF43 = __ k43 ___ = 0.5
k43 + k45
DF45 = __ k45 ___ = 0.5
k45 + k43
DF54 = __ k54 ___ = 0.5
k54 + k56
DF56 = __ k56 ___ = 0.5
k54 + k56
DF65 = __ k65 ___ = 1.0
k65 + k66’
DF21 = 0
BEAM ALONG A’
LOAD COMPUTATION
SPAN 1-6
WT = WS + WB = 17.72(1/2) + 5.04
= 13.9 kN/m
SPAN 6-6’
WS = WB = 5.04 kN/m
= 17.72(1/2) + 18.31(5/3) +
5.04
= 44.42 kN/m
BEAM ALONG A
LOAD COMPUTATION
BEAM ALONG B
LOAD COMPUTATION
BEAM ALONG C
LOAD COMPUTATION
DISTRIBUTION FACTOR, DF
FIXED – END MOMENT
BEAM ALONG D
LOAD COMPUTATION
BEAM ALONG E
LOAD COMPUTATION
SPAN 1 - 6 WA = WS + WST + WB
DF3C = ___k3C ____ = 0.590 SPAN 1-6
k3C + k32 + k34 WT = WS + WB = 17.72(1/2) + 5.04
DF34 = ___k34 ____ = 0.205 = 13.9 kN/m
k34 + k32 + k3C
DF43 = ___k43 ____ = 0.205 SPAN 6-6’
k43 + k4D + k45 WS = WB = 5.04 kN/m
DF4D = ___k4D ____ = 0.590
k4D + k43 + k45 IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
DF45 = ___k45 ____ = 0.205 12 12
k45 + k4D + k43
DF54 = ___k54 ____ = 0.205 RELATIVE STIFFNESS FACTOR, k = I/L
k54 + k5E + k56
DF5E = ___k5E ____ = 0.590 k66’ = 0.0031 = 3.1 x 10-3
k5E + k54 + k56
DF56 = ___k56 ____ = 0.205 k12 = k23 = k34 = k45 = k56 = 0.0031 = 0.62 x 10
K56 + k54+ k5E 5
DF65 = ___k65 ____ = 0.260
k65 + k6F + k66’ DISTRIBUTION FACTOR, DF
DF6F’ = ___k6F____ = 0.740
k6F + k65 + k66’ DF12 = 1.0
DF66’ = ___k66’ ____ = 0 DF21 = __ k12 ___ = 0.5
K66’ + k65 + k6F k12 + k23
DF23 = __ k23 ___ = 0.5
K23 + k21
FIXED – END MOMENT
DF32 = __ k32 ___ = 0.5
2 K32 + k34
FEM12 = FEM21 = 43.43(5) = 90.48 kN-m
DF34 = __ k34 ___ = 0.5
12
k34 + k32
FEM23 = FEM32 = 43.43 (5)2 = 90.48 kN-m
DF43 = __ k43 ___ = 0.5
12
k43 + k45
FEM34 = FEM43 = 43.43 (5)2 = 90.48 kN-m
DF45 = __ k45 ___ = 0.5
12
k45 + k43
FEM45 = FEM54 = 43.43 (5)2 = 90.48 kN-m
DF54 = __ k54 ___ = 0.5
12
k54 + k56
FEM56 = FEM65 = 43.43 (5)2 = 90.48 kN-m
DF56 = __ k56 ___ = 0.5
12
k54 + k56
FEM66’ = 5.04 (0.5) + 41.02(1) = 43.54 kN-m
DF65 = __ k65 ___ = 1.0
k65 + k66’
DF66’ = 0
BEAM ALONG E’
LOAD COMPUTATION
SPAN A - C & D - E Wb = WS + WB
= 17.72(5/3) + 5.04
= 35.57 kN/m
SPAN C - D Wc = WST + WB
= 17.72(5/3) + 5.04
= 35.57 kN/m
DFAA’ = 0
FEM66’ = 5.04(1)(0.5) + 4.05(1) = 6.57 kN-m
DFA1 = __ kA1 ___ = 0.740
kA1 + kAB
DFAB = __ kAB ___ = 0.260
kAB + kA1
DFBA = ___kBA ____ = 0.205
kBA + kB2 + kBC
DFB2 = ___kB2 ____ = 0.590
kBA + kB2 + kBC
BEAM ALONG 1
LOAD COMPUTATION
BEAM ALONG 2
LOAD COMPUTATION
LOAD COMPUTATION
DFBC = ___kBC ____ = 0.205
SPAN A - A’ & E - E’ Wa = WB = 5.04 kN/m
kBA + kB2 + kBC
DFCB = ___kCB ____ = 0.205
kCB + kC3 + kCD SPAN A - E Wb = WS + WB
DFC3 = ___kC3 ____ = 0.590 = 17.72(2)(5/3) + 5.04
kCB + kC3 + kCD = 64.11 kN/m
DFCD = ___kCD ____ = 0.205
kCB + kC3 + kCD
DFDC = ___kDC ____ = 0.205 IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
kDC + kD4 + kDE 12 12
DFD4 = ___kD4 ____ = 0.590 IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
kDC + kD4 + kDE 13 12
DFDE = ___kDE ____ = 0.205
kDC + kD4 + kDE RELATIVE STIFFNESS FACTOR, k = I/L
DFED = ___kED ____ = 0.260
kED + kE5 + kEE’ kB = 0.0031
DFE5 = ___kE5 ____ = 0.740 5
kED + kE5 + kEE’ = 0.62 x 10-3
DFEE’ = ___kEE’ ____ = 0
kED + kE5 + kEE’ kC = 0.0052
3.5
= 1.49 x 10-3
FIXED – END MOMENT DISTRIBUTION FACTOR, DF
BEAM ALONG 3
SPAN A - A’ & E - E’ Wa = WB = 5.04 kN/m
DISTRIBUTION FACTOR, DF
FIXED – END MOMENT
BEAM ALONG 4
LOAD COMPUTATION
SPAN A - A’ & E - E’ Wa = WB = 5.04 kN/m
DFBC = ___kBC ____ = 0.205
kBA + kB2 + kBC
DFCB = ___kCB ____ = 0.205 SPAN A – D Wb = WS + WB
kCB + kC3 + kCD = 17.72(2)(5/3) + 5.04
DFC3 = ___kC3 ____ = 0.590 = 64.11 kN/m
kCB + kC3 + kCD
DFCD = ___kCD ____ = 0.205 SPAN D –E Wc = WST + WB + WS
kCB + kC3 + kCD = 17.72(5/3) + 5.04 +
DFDC = ___kDC ____ = 0.205 18.31(5/3)
kDC + kD4 + kDE = 65.09 kN/m
DFD4 = ___kD4 ____ = 0.590
kDC + kD4 + kDE
DFDE = ___kDE ____ = 0.205 IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
kDC + kD4 + kDE 12 12
DFED = ___kED ____ = 0.260 IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
kED + kE5 + kEE’ 12 12
DFE5 = ___kE5 ____ = 0.740
kED + kE5 + kEE’ RELATIVE STIFFNESS FACTOR, k = I/L
DFEE’ = ___kEE’ ____ = 0
kED + kE5 + kEE’ kB = 0.0031
5
= 0.62 x 10-3
FIXED – END MOMENT
kC = 0.0052
FEMAA’ = 5.04 (0.5) + 68.18(1) = 70.07 kN-m 3.5
FEMAB = FEMBA = 64.11 (5)2 = 133.56 kN-m = 1.49 x 10-3
12 DISTRIBUTION FACTOR, DF
FEMBC = FEMCB = 64.11 (5)2 = 133.56 kN-m
12 DFAA’ = 0
FEMCD = FEMDC = 64.11 (5)2 = 133.56 kN-m DFA1 = __ kA1 ___ = 0.740
12 kA1 + kAB
FEMDE = FEMED = 64.11 (5)2 = 133.56 kN-m DFAB = __ kAB ___ = 0.260
12 kAB + kA1
FEMEE’ = 5.04 (0.5) + 68.18(1) = 70.07 kN-m DFBA = ___kBA ____ = 0.205
kBA + kB2 + kBC
DFB2 = ___kB2 ____ = 0.590
kBA + kB2 + kBC
BEAM ALONG 5
LOAD COMPUTATION
LOAD COMPUTATION
SPAN A - A’ & E - E’ Wa = W B + W S
DFBC = ___kBC ____ = 0.205 = 5.04 + 17.72(1/2)
kBA + kB2 + kBC = 13.9 kN/m
DFCB = ___kCB ____ = 0.205
kCB + kC3 + kCD
SPAN A – D Wc = WS+ WS1 + WS0
DFC3 = ___kC3 ____ = 0.590
= 17.72(1/2) + 5.04 +
kCB + kC3 + kCD
17.72(5/3)
DFCD = ___kCD ____ = 0.205
= 43.43 kN/m
kCB + kC3 + kCD
DFDC = ___kDC ____ = 0.205
SPAN D – E Wc = WST + WB + WS
kDC + kD4 + kDE
= 17.72(1/2) + 5.04 +
DFD4 = ___kD4 ____ = 0.590
18.31(5/3)
kDC + kD4 + kDE
= 44.42 kN/m
DFDE = ___kDE ____ = 0.205
kDC + kD4 + kDE
DFED = ___kED ____ = 0.260
IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
kED + kE5 + kEE’
12 12
DFE5 = ___kE5 ____ = 0.740
IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
kED + kE5 + kEE’
14 12
DFEE’ = ___kEE’ ____ = 0
kED + kE5 + kEE’
RELATIVE STIFFNESS FACTOR, k = I/L
kB = 0.0031
FIXED – END MOMENT
5
= 0.62 x 10-3
FEMAA’ = 5.04 (0.5) + 76.51(1) = 79.02 kN-m
FEMAB = FEMBA = 64.11 (5)2 = 133.56 kN-m
kC = 0.0052
12
3.5
FEMBC = FEMCB = 64.11 (5)2 = 133.56 kN-m
= 1.49 x 10-3
12
FEMCD = FEMDC = 64.11 (5)2 = 133.56 kN-m
DISTRIBUTION FACTOR, DF
12
FEMDE = FEMED = 65.09 (5)2 = 135.60 kN-m
12 DFAA’ = 0
FEMEE’ = 5.04 (0.5) + 76.51(1) = 79.02 kN-m DFA1 = __ kA1 ___ = 0.740
kA1 + kAB
DFAB = __ kAB ___ = 0.260
kAB + kA1
DFBA = ___kBA ____ = 0.205
kBA + kB2 + kBC
DFB2 = ___kB2 ____ = 0.590
kBA + kB2 + kBC
BEAM ALONG 6
LOAD COMPUTATION
SPAN E’ – A’
DFBC = ___kBC ____ = 0.205 WT = WS + WB = 17.72(1/2) + 5.04
kBA + kB2 + kBC = 13.9 kN/m
DFCB = ___kCB ____ = 0.205
kCB + kC3 + kCD
DFC3 = ___kC3 ____ = 0.590 IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
kCB + kC3 + kCD 13 12
DFCD = ___kCD ____ = 0.205
kCB + kC3 + kCD RELATIVE STIFFNESS FACTOR, k = I/L
DFDC = ___kDC ____ = 0.205
kDC + kD4 + kDE kE’6’ = kAA’ = 0.0031 = 3.1 x 10-3
DFD4 = ___kD4 ____ = 0.590 1
kDC + kD4 + kDE kED = kDC = kCB = kBA = 0.0031 = 0.62 x 10-3
DFDE = ___kDE ____ = 0.205 5
kDC + kD4 + kDE
DFED = ___kED ____ = 0.260 DISTRIBUTION FACTOR, DF
kED + kE5 + kEE’
DFE5 = ___kE5 ____ = 0.740 DFE’E = 1.0
kED + kE5 + kEE’ DFEE’ = __ kEE’ ___ = 0.5
DFEE’ = ___kEE’ ____ = 0 kEE’ + kED
kED + kE5 + kEE’ DFED = __ kED ___ = 0.5
kEE’ + kED
DFDE = __ kDE ___ = 0.5
FIXED – END MOMENT kDE + kDC
DFDC = __ kDC ___ = 0.5
FEMAA’ = 13.09(0.5) + 45.54(1) = 52.08 kN-m kDE + kDC
FEMAB = FEMBA = 43.43 (5)2 = 90.48 kN-m DFCD = __ kCD ___ = 0.5
12 kCD + kCB
FEMBC = FEMCB = 43.43 (5)2 = 90.48 kN-m DFCB = __ kCB ___ = 0.5
12 kCD + kCB
FEMCD = FEMDC = 43.43 (5)2 = 90.48 kN-m DFBC = __ kBC ___ = 0.5
12 kBC + kBA
FEMDE = FEMED = 44.42 (5)2 = 92.54 kN-m DFBA = __ kBA ___ = 0.5
12 kBA + kBC
FEMEE’ = 13.09(0.5) + 45.54(1) = 52.08 kN-m DFAB = __ kAB ___ = 0.5
kAB + kAA’
DFAA’ = __ kAA’ ___ = 1.0
kAA’ + kAB
BEAM ALONG 6’
LOAD COMPUTATION
SPAN 1-5
W15 = WS0 + WS + WB
= 27.97(1/2) + 27.97(5/3) + 5.04
= 65.64 kN/m
SPAN 5-6
W15 = WS + WST + WB
= 27.97(1/2) + 18.31(5/3) + 5.04
= 49.54 kN/m
FIXED – END MOMENT
BEAM ALONG A
LOAD COMPUTATION
DF2C = DF2D = __ kC ___ = 0.370
2kC + 2kB
SPAN 2-5
DF23 = DF32 = __ kB ___ = 0.130
Wa = 2WS + WB
2kB + 2kC
= (2)(27.97)(5/3) + 5.04
DF3E = DF3F = __ kC ___ = 0.370
= 98.27 kN/m
2kC + 2kB
DF34 = DF43 = __ kB ___ = 0.130
SPAN 1-2 & 5-6
2kB + 2kC
Wb = WS + WST + WB
DF4G = DF4H = __ kC ___ = 0.370
= 27.97(5/3) + 18.31(5/3) + 5.04
2kC + 2kB
= 82.17 kN/m
DF45 = DF54 = __ kB ___ = 0.130
2kB + 2kC
DF5I = DF5J = __ kC ___ = 0.370
SPAN 6-6’
2kC + 2kB
W66’ = WB = 5.04 kN/m
DF56 = DF65 = __ kB ___ = 0.130
2kB + 2kC
DF6K = DF6L = __ kC ___ = 0.425
IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
2kC + 2kB
12 12
DF45 = 0
IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
12 12
BEAM ALONG B
DF2C = DF2D = __ kC ___ = 0.370 LOAD COMPUTATION
2kC + 2kB
DF23 = DF32 = __ kB ___ = 0.130 SPAN 2-6
2kB + 2kC Wa = 2WS + WB
DF3E = DF3F = __ kC ___ = 0.370 = (2)(27.97)(5/3) + 5.04
2kC + 2kB = 98.27 kN/m
DF34 = DF43 = __ kB ___ = 0.130
2kB + 2kC SPAN 1-2
DF4G = DF4H = __ kC ___ = 0.370 Wb = WS + WST + WB
2kC + 2kB = 27.97(5/3) + 18.31(5/3) + 5.04
DF45 = DF54 = __ kB ___ = 0.130 = 82.17 kN/m
2kB + 2kC
DF5I = DF5J = __ kC ___ = 0.370
2kC + 2kB SPAN 6-6’
DF56 = DF65 = __ kB ___ = 0.130 W66’ = WB = 5.04 kN/m
2kB + 2kC
DF6K = DF6L = __ kC ___ = 0.425
2kC + 2kB IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
DF45 = 0 12 12
IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
12 12
BEAM ALONG C
LOAD COMPUTATION
DF2C = DF2D = __ kC ___ = 0.370
2kC + 2kB SPAN 2-6
DF23 = DF32 = __ kB ___ = 0.130 Wa = 2WS + WB
2kB + 2kC = (2)(27.97)(5/3) + 5.04
DF3E = DF3F = __ kC ___ = 0.370 = 98.27 kN/m
2kC + 2kB
DF34 = DF43 = __ kB ___ = 0.130 SPAN 6-6’
2kB + 2kC W66’ = WB = 5.04 kN/m
DF4G = DF4H = __ kC ___ = 0.370
2kC + 2kB
DF45 = DF54 = __ kB ___ = 0.130 IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
2kB + 2kC 12 12
DF5I = DF5J = __ kC ___ = 0.370 IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
2kC + 2kB 12 12
DF56 = DF65 = __ kB ___ = 0.130
2kB + 2kC
DF6K = DF6L = __ kC ___ = 0.425 RELATIVE STIFFNESS FACTOR, k = I/L
2kC + 2kB
DF45 = 0 kB = 0.0031 = 0.62 x 10-3
5
kC = 0.0052 = 1.49 x 10-3
3.5
FIXED – END MOMENT
BEAM ALONG D
LOAD COMPUTATION
DF2C = DF2D = __ kC ___ = 0.370
2kC + 2kB SPAN 1-6
DF23 = DF32 = __ kB ___ = 0.130 W15 = WS0 +WS + WB
2kB + 2kC = (27.97)(1/2) + (27.97)(5/3) + 5.04
DF3E = DF3F = __ kC ___ = 0.370 = 65.64 kN/m
2kC + 2kB
DF34 = DF43 = __ kB ___ = 0.130 SPAN 6-6’
2kB + 2kC W66’ = WB = 5.04 kN/m
DF4G = DF4H = __ kC ___ = 0.370
2kC + 2kB
DF45 = DF54 = __ kB ___ = 0.130 IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
2kB + 2kC 12 12
DF5I = DF5J = __ kC ___ = 0.370 IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
2kC + 2kB 12 12
DF56 = DF65 = __ kB ___ = 0.130
2kB + 2kC
DF6K = DF6L = __ kC ___ = 0.425 RELATIVE STIFFNESS FACTOR, k = I/L
2kC + 2kB
DF45 = 0 kB = 0.0031 = 0.62 x 10-3
5
kC = 0.0052 = 1.49 x 10-3
FIXED – END MOMENT 3.5
BEAM ALONG E
LOAD COMPUTATION
DF2C = DF2D = __ kC ___ = 0.370
2kC + 2kB
SPAN A - A’ & E - E’ Wa = WB = 5.04 kN/m
DF23 = DF32 = __ kB ___ = 0.130
2kB + 2kC
DF3E = DF3F = __ kC ___ = 0.370 SPAN A - C & D - E Wb = WS + WB
2kC + 2kB = 27.97(5/3) + 5.04
DF34 = DF43 = __ kB ___ = 0.130 = 51.65 kN/m
2kB + 2kC
DF4G = DF4H = __ kC ___ = 0.370 SPAN C - D Wc = WST + WB
2kC + 2kB = 18.31(5/3) + 5.04
DF45 = DF54 = __ kB ___ = 0.130 = 35.56 kN/m
2kB + 2kC
DF5I = DF5J = __ kC ___ = 0.370
2kC + 2kB IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
DF56 = DF65 = __ kB ___ = 0.130 12 12
2kB + 2kC IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
DF6K = DF6L = __ kC ___ = 0.425 12 12
2kC + 2kB
DF45 = 0
RELATIVE STIFFNESS FACTOR, k = I/L
BEAM ALONG 1
LOAD COMPUTATION
DFB3 = DFB4 = __ kC ___ = 0.370
2kC + 2kB SPAN A - A’ & E - E’ Wa = WB = 5.04 kN/m
DFBC = DFCB = __ kB ___ = 0.130
2kB + 2kC
SPAN A - C & D - E Wb = 2WS + WB
DFC5 = DFC6 = __ kC ___ = 0.370
= 27.97(2)(5/3) + 5.04
2kC + 2kB
= 98.27 kN/m
DFCD = DFDC = __ kB ___ = 0.130
2kB + 2kC
SPAN C - D Wc = WS + WST + WB
DFD7 = DFD8 = __ kC ___ = 0.370
= 27.97(5/3) +18.31(5/3) +
2kC + 2kB
5.04
DFDE = __ k12 ___= 0.130
= 82.17 kN/m
kB + 2kC
DFED = __ kB ___ = 0.150
2kB + 2kC
IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
DFE9 = DFE10 = __ kc ___ = 0.425
12 12
2kC + 2kB
IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
DFEE’ = 0
12 12
BEAM ALONG 2
LOAD COMPUTATION
BEAM ALONG 3
LOAD COMPUTATION
DFB3 = DFB4 = __ kC ___ = 0.370
SPAN A - A’ & E - E’ Wa = WB = 5.04 kN/m
2kC + 2kB
DFBC = DFCB = __ kB ___ = 0.130
2kB + 2kC SPAN A – E Wb = 2WS + WB
DFC5 = DFC6 = __ kC ___ = 0.370 = 27.97(2)(5/3) + 5.04
2kC + 2kB = 98.27 kN/m
DFCD = DFDC = __ kB ___ = 0.130
2kB + 2kC
DFD7 = DFD8 = __ kC ___ = 0.370 IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
2kC + 2kB 12 12
DFDE = __ k12 ___= 0.130 IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
kB + 2kC 12 12
DFED = __ kB ___ = 0.150
2kB + 2kC
DFE9 = DFE10 = __ kc ___ = 0.425 RELATIVE STIFFNESS FACTOR, k = I/L
2kC + 2kB
DFEE’ = 0 kB = 0.0031 = 0.62 x 10-3
5
kC = 0.0052 = 1.49 x 10-3
3.5
FIXED – END MOMENT
BEAM ALONG 4
LOAD COMPUTATION
DFB3 = DFB4 = __ kC ___ = 0.370
2kC + 2kB SPAN A - A’ & E - E’ Wa = WB = 5.04 kN/m
DFBC = DFCB = __ kB ___ = 0.130
2kB + 2kC SPAN A – D Wb = 2WS + WB
DFC5 = DFC6 = __ kC ___ = 0.370 = 27.97(2)(5/3) + 5.04
2kC + 2kB = 98.27 kN/m
DFCD = DFDC = __ kB ___ = 0.130
2kB + 2kC SPAN D - E Wc = WS + WST + WB
DFD7 = DFD8 = __ kC ___ = 0.370 = 27.97(5/3) +18.31(5/3) +
2kC + 2kB 5.04
DFDE = __ k12 ___= 0.130 = 82.17 kN/m
kB + 2kC
DFED = __ kB ___ = 0.150
2kB + 2kC IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
DFE9 = DFE10 = __ kc ___ = 0.425 12 12
2kC + 2kB IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
DFEE’ = 0 12 12
BEAM ALONG 5
LOAD COMPUTATION
DFB3 = DFB4 = __ kC ___ = 0.370
2kC + 2kB SPAN A-A’ & E-E’ Wb = WS + WB
DFBC = DFCB = __ kB ___ = 0.130 = 27.97(1/2) + 5.04
2kB + 2kC = 19.02 kN/m
DFC5 = DFC6 = __ kC ___ = 0.370
2kC + 2kB SPAN A–D Wc = WST + WB + WS
DFCD = DFDC = __ kB ___ = 0.130 = 27.97(1/2) + 5.04 +
2kB + 2kC 27.97(5/3)
DFD7 = DFD8 = __ kC ___ = 0.370 = 65.64 kN/m
2kC + 2kB
DFDE = __ k12 ___= 0.130 SPAN D - E Wc = WS + WST + WB
kB + 2kC = 27.97(1/2) +18.31(5/3) +
DFED = __ kB ___ = 0.150 5.04
2kB + 2kC = 49.54 kN/m
DFE9 = DFE10 = __ kc ___ = 0.425
2kC + 2kB
DFEE’ = 0 IB = bd3 = (0.3)(0.5)3 = 0.0031 mm4
12 12
IC = bd3 = (0.5)(0.5)3 = 0.0052 mm4
FIXED – END MOMENT 12 12
BEAM ALONG 6
DFB3 = DFB4 = __ kC ___ = 0.370
2kC + 2kB
DFBC = DFCB = __ kB ___ = 0.130
2kB + 2kC
DFC5 = DFC6 = __ kC ___ = 0.370
2kC + 2kB
DFCD = DFDC = __ kB ___ = 0.130
2kB + 2kC
DFD7 = DFD8 = __ kC ___ = 0.370
2kC + 2kB
DFDE = __ k12 ___= 0.130
kB + 2kC
DFED = __ kB ___ = 0.150
2kB + 2kC
DFE9 = DFE10 = __ kc ___ = 0.425
2kC + 2kB
DFEE’ = 0