12 1/4
AVGE O.H:
#DIV/0!
in
BHA No. 3
DATE: 29 / 09 /2008
DAY: 11
DRILLING PARAMETERS
SPP (psi) PREDOMINANT SHAPE ACTIVITY
0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 CUTTINGS + CAVING REAL DAILY CUM VOLUME THEORIC CUM VOLUME AVERAGE CAVING DAILY (DRILLING) THEORIC AVERAGE (CUTTINGS) 5.5 5.3 0.1 2.6 6.8 3.60 3.032 -0.57 5447.2 5450.0 2.80 3.6 57 192 571 1938 NO CAVINGS DRILLING - ROTATING 8.4 1.67 2.455 0.79 5346.3 5347.9 1.60 3.9 63 169 591 2103 BLOCKY DRILLING - ROTATING
DRILLING DAILY PROM VOLUME (Bbls/hr) REAMING DAILY CUM VOLUME (Bbls) CIRCULATING DAILY CUM VOLUME (Bbls)
2.7
NOTA: SE DEBE TENER EN CUENTA QUE ESTE MTODO DE CLCULO SUPONE QUE TODO EL MATERIAL QUE LLEGA A LA BANDEJA SON CORTES PROVENIENTES DE LA FORMACIN SIN CONSIDERAR EL PORCENTAJE DE AGUA ASOCIADO A LOS MISMOS, POR TANTO EL VOLUMEN DE CORTES ES SOBRE-ESTIMADO
CARACARA SUR C4
DATE: 29 / 09 /2008 DAY: 11
SIZE
I: II: III: IV: Hrs Time min
1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 8.4 6.8
SHAPE
1 - 5 mm 5 - 10 mm 10 -15 mm >15 mm
LAG DEPTH
1: 2: 3: 4:
BIT DEPTH
FORMATION
5346 5447
5348 5450
C7 C7
30
DRILLING - ROTATING
DRILLING - ROTATING
5.5 0.2
1.8 0.11
OBSERVACIONES:
REALIZO PRUEBA DE CAVINGS Y LIMPIEZA DEL HUECO, OBSERV LIMPIEZA NORMAL. BOMBE PLDORA PARA LIMPIAR HUECO, SALIENDO CORTES RETRABAJADOS DE TAMAO MXIMO 15 mm.