Evaluation of External Loads on Tank Shell Openings Nozzle : Feed Inlet (N1A-H) Size : 24" -12.7t D ts d tn L tr = = = = = = = Sd = 39000 mm 8 mm 610 mm 12.7 mm 9440 mm 12 mm A 516 Gr.60N 147 Mpa Design Data Tank diameter Tank Shell Thickness Nozzle outside diameter Nozzle neck thickness Nozzle location from bottom Reinforcing pad thickness Material Design stress Loadings Radial Thrust Circular Moment Longitudinal Moment Torsional Moment Transverse Shear force Longitudinal Shear Force Thickness of tank shell at nozzle location Distance of nozzle removed from any other gross structural stress continuity Height factor From Fig. P-11 Stress reduction factor Stress Factors Geometric parameter Ratio For d / tn = Load FR FR MC MC ML ML 30 u t / tn = = = For d / tn = Load FR FR MC MC ML ML (d / D) * (D/t)0.5 0.69 1.575 50 Z = 1 B h = = = = L/B 5.34 2 (Dt)0.5 1766
Rev.01
FR MC ML MT VC VL t
= = = = = = = =
Stress Factor Fiqure r = 1.4848 P-8B & P-8C = r = = r = = 0.8857 P-8F & P-8G 1.6441 P-9B & P-9C 0.9002 P-9F & P-9G 1.4239 P-10B & P-10C 0.806 P-10F & P-10G
By: BTE
Page 1 of 12
Rev.01
By: BTE
Page 2 of 12
Rev.01
40.43
37.57 Mpa
146.00
98.15 Mpa
The Maximum stress is a combination of the radial thrust and longitudinal moment S max = = 0.5 z * [ (r + ) + {r - )2 + 42}0.5 ] 171.90 Mpa
= =
1.0 x Sd
( Mechanical Load )
147 Mpa
By: BTE
Page 3 of 12
Rev.01
FR MC ML MT VC VL t
= = = = = = = =
Stress Factor Fiqure r = 1.3188 P-8C & P-8D = r = = r = = 0.8929 P-8G & P-8H 1.571 P-9C & P-9D 0.9262 P-9G & P-9H 1.3313 P-10C & P-10D 0.8454 P-10G & P-10H
By: BTE
Page 4 of 12
Rev.01
By: BTE
Page 5 of 12
Rev.01
62.96
85.64 Mpa
52.54
81.14 Mpa
The Maximum stress is a combination of the radial thrust and longitudinal moment S max = = 0.5 z * [ (r + ) + {r - )2 + 42}0.5 ] 117.11 Mpa
= =
1.0 x Sd
( Mechanical Load )
147 Mpa
By: BTE
Page 6 of 12
Rev.01
Nozzle : Water Outlet (N3) Size : 48" -14t D ts d tn L tr = = = = = = = Sd = 39000 mm 18 mm 1219.2 mm 14 mm 1230 mm 18 mm A 516 Gr.60N 147 Mpa Design Data Tank diameter Tank Shell Thickness Nozzle outside diameter Nozzle neck thickness Nozzle location from bottom Reinforcing pad thickness Material Design stress Loadings Radial Thrust Circular Moment Longitudinal Moment Torsional Moment Transverse Shear force Longitudinal Shear Force Thickness of tank shell at nozzle location Distance of nozzle removed from any other gross structural stress continuity Height factor From Fig. P-11 Stress reduction factor Stress Factors Geometric parameter Ratio For d / tn = Load FR FR MC MC ML ML 50 u t / tn = = = For d / tn = Load FR FR MC MC ML ML (d / D) * (D/t)0.5 1.03 2.571 100 Z = 1 B h = = = = L/B 0.52 2 (Dt)0.5 2370
FR MC ML MT VC VL t
= = = = = = = =
Stress Factor Fiqure r = 0.9274 P-8C & P-8D = r = = r = = 0.8565 P-8G & P-8H 1.3228 P-9C & P-9D 1.1277 P-9G & P-9H 1.0579 P-10C & P-10D 0.9936 P-10G & P-10H
By: BTE
Page 7 of 12
Rev.01
By: BTE
Page 8 of 12
Rev.01
48.99
83.42 Mpa
7.88
48.61 Mpa
The Maximum stress is a combination of the radial thrust and longitudinal moment S max = = 0.5 z * [ (r + ) + {r - )2 + 42}0.5 ] 51.90 Mpa
= =
1.0 x Sd
( Mechanical Load )
147 Mpa
By: BTE
Page 9 of 12
Rev.01
FR MC ML MT VC VL t
= = = = = = = = ts + tr
28 mm
Stress Factor Fiqure r = 2.0447 P-8A & P-8B = r = = r = = 1.7891 P-8E & P-8F 1.4148 P-9A & P-9B 1.3389 P-9E & P-9F 1.4415 P-10A & P-10B 1.2939 P-10E & P-10F
By: BTE
Page 10 of 12
Rev.01
By: BTE
Page 11 of 12
Rev.01
86.88
96.83 Mpa
87.96
93.90 Mpa
The Maximum stress is a combination of the radial thrust and longitudinal moment S max = = 0.5 z * [ (r + ) + {r - )2 + 42}0.5 ] 108.16 Mpa
= =
1.0 x Sd
( Mechanical Load )
147 Mpa
By: BTE
Page 12 of 12