DETALLE

Item

01.00.00
02.00.00
03.00.00
04.00.00
05.00.00
09.00.00
10.00.00
12.00.00
13.00.00
14.00.00
17.00.00
18.00.00
19.00.00
20.00.00
21.00.00
22.00..00
23.00.00
24.00.00
25.00.00
26.00.00
29.00.00
34.00.00
36.00.00

PROVINCIA : TACNA

MODULO 02 AULAS Y 02 SS. HH. - NIVEL INICIAL


OBRAS PROVISIONALES
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
MUROS Y TABIQUES DE ALBAILERIA
REVOQUES, ENLUCIDOS Y MOLDURAS
PISOS Y PAVIMENTOS
CONTRAZOCALOS
ZOCALOS
CUBIERTAS
CARPINTERIA DE MADERA
CARPINTERIA METALICA
CERRAJERIA
VIDRIOS, CRISTALES Y SIMILARES
PINTURA
VARIOS
APARATOS Y ACCESORIOS SANITARIOS
INSTALACIONES SANITARIAS
REDES DE DISTRIBUCION DE AGUA
INSTALACIONES ELECTRICAS
CONEXION A RED EXTERNA
ARTEFACTOS
COSTO DIRECTO

02.00.00
03.00.00
04.00.00
05.00.00
09.00.00
10.00.00
12.00.00
13.00.00
14.00.00
17.00.00
18.00.00
19.00.00
20.00.00
21.00.00
22.00..00
23.00.00
24.00.00
25.00.00
26.00.00
29.00.00
36.00.00

MODULO AULA LAB Y SS.HH.- NIVEL INICIAL


TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
MUROS Y TABIQUES DE ALBAILERIA
REVOQUES, ENLUCIDOS Y MOLDURAS
PISOS Y PAVIMENTOS
CONTRAZOCALOS
ZOCALOS
CUBIERTAS
CARPINTERIA DE MADERA
CARPINTERIA METALICA
CERRAJERIA
VIDRIOS, CRISTALES Y SIMILARES
PINTURA
VARIOS
APARATOS Y ACCESORIOS SANITARIOS
INSTALACIONES SANITARIAS
REDES DE DISTRIBUCION DE AGUA
INSTALACIONES ELECTRICAS
ARTEFACTOS
COSTO DIRECTO

02.00.00
03.00.00
04.00.00
23.00.00

PATIO BLANDO, AREA DE JUEGOS Y AREAS VERDES


TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
VARIOS

COSTO DIRECTO

02.00.00
03.00.00
04.00.00
05.00.00
09.00.00
10.00.00
12.00.00
13.00.00
13.00.00
18.00.00
20.00.00

MODULO 06 AULAS - NIVEL PRIMARIO Y SECUNDARIO


TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
MUROS Y TABIQUES DE ALBAILERIA
REVOQUES, ENLUCIDOS Y MOLDURAS
PISOS Y PAVIMENTOS
CONTRAZOCALOS
CUBIERTAS
CARPINTERIA DE MADERA
CERRAJERIA

MONTO

REGION : TACNA

MES 1

2,991.90
859.97
5,115.66
8,835.34
46,470.24
6,645.06
6,717.61
6,794.24
587.68
1,662.84
5,139.69
17,223.28
1,361.11
1,639.16
1,147.10
4,859.38
1,025.99
3,516.80
2,756.74
1,308.26
2,623.41
2,292.92
3,695.91

2,991.90
859.97
5,115.66
8,835.34
23,235.12

135,270.29

41,037.99

468.16
1,972.52
6,399.97
25,270.79
4,267.27
3,257.18
3,397.12
352.28
815.13
2,624.44
8,470.73
680.55
881.96
566.06
2,553.25
630.21
1,758.40
1,334.25
778.58
1,941.65
833.32

468.16
1,972.52
6,399.97
25,270.79

69,253.82

34,111.44

MES 2

MES 3

23,235.12
6,645.06
6,717.61
6,794.24
587.68
1,662.84
5,139.69
17,223.28
1,361.11
1,639.16
1,147.10
4,859.38
1,025.99
3,516.80
2,756.74
1,308.26
2,623.41
2,292.92
3,695.91
78,038.26

16,194.04

4,267.27
3,257.18
3,397.12
352.28
815.13
2,624.44
8,470.73
680.55
881.96
566.06
2,553.25
630.21
1,758.40
1,334.25
778.58
1,941.65
833.32
28,496.18

4,556.16
820.28
3,462.85
2,022.23

4,556.16
820.28
3,462.85
2,022.23

10,861.52

10,861.52

801.74
10,262.27
10,526.36
119,817.03
15,910.72
18,943.79
14,757.91
1,682.77
5,934.04
26,832.56
3,568.62

801.74
10,262.27
10,526.36

6,646.20

119,817.03
15,910.72
18,943.79
14,757.91
1,682.77
5,934.04
26,832.56
3,568.62

MES 4

GOBIERNO REGIONAL TACNA


GERENCIA DE INFRAESTRUCTURA

CRONOGRAMA VALORIZADO DE OBRA


PROYECTO : RECONSTRUCCION Y AMPLIACION DE INFRAESTRUCTURA DE LA I.E. HENRY MARCIAL RONDINEL CORNEJO VIAI II ETAPA
UBICACIN:

DISTRITO : GREGORIO ALBARRACIN

DETALLE

Item
21.00.00
22.00..00
23.00.00
29.00.00
34.00.00
36.00.00

VIDRIOS, CRISTALES Y SIMILARES


PINTURA
VARIOS
INSTALACIONES ELECTRICAS
CONEXION A RED EXTERNA
ARTEFACTOS
COSTO DIRECTO

02.00.00
03.00.00
04.00.00
05.00.00
09.00.00
10.00.00
12.00.00
13.00.00
14.00.00
17.00.00
18.00.00
20.00.00
21.00.00
22.00..00
24.00.00
25.00.00
26.00.00
29.00.00
36.00.00

BATERIA DE SS.HH.
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
MUROS Y TABIQUES DE ALBAILERIA
REVOQUES, ENLUCIDOS Y MOLDURAS
PISOS Y PAVIMENTOS
CONTRAZOCALOS
ZOCALOS
CUBIERTAS
CARPINTERIA DE MADERA
CERRAJERIA
VIDRIOS, CRISTALES Y SIMILARES
PINTURA
APARATOS Y ACCESORIOS SANITARIOS
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA Y CONTRAINCENDIOS
INSTALACIONES ELECTRICAS
ARTEFACTOS
COSTO DIRECTO

02.00.00
03.00.00
04.00.00
05.00.00
09.00.00
10.00.00
12.00.00
13.00.00
18.00.00
18.00.00
20.00.00
21.00.00
22.00..00
29.00.00
36.00.00

CONSTRUCCION ESCALERA - NIVEL PRIMARIO


TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
MUROS Y TABIQUES DE ALBAILERIA
REVOQUES, ENLUCIDOS Y MOLDURAS
PISOS Y PAVIMENTOS
CONTRAZOCALOS
CARPINTERIA DE MADERA
CARPINTERIA METALICA
CERRAJERIA
VIDRIOS, CRISTALES Y SIMILARES
PINTURA
INSTALACIONES ELECTRICAS
ARTEFACTOS
COSTO DIRECTO

02.00.00
03.00.00
04.00.00
05.00.00
09.00.00
10.00.00
12.00.00
13.00.00
14.00.00
17.00.00
18.00.00
20.00.00
21.00.00
22.00..00
24.00.00
25.00.00
26.00.00
29.00.00
36.00.00

MODULO ADMINISTRATIVO
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
ALBAILERIA Y TABIQUES
REVOQUES, ENLUCIDOS Y MOLDURAS
PISOS Y PAVIMENTOS
CONTRAZOCALOS
ZOCALOS
CUBIERTAS
CARPINTERIA DE MADERA
CERRAJERIA
VIDRIOS, CRISTALES Y SIMILARES
PINTURA
APARATOS Y ACCESORIOS SANITARIOS
INSTALACIONES SANITARIAS
REDES DE DISTRIBUCION DE AGUA
INSTALACIONES ELECTRICAS
ARTEFACTOS (O APARATOS ELECTRICOS)

PROVINCIA : TACNA

MONTO

REGION : TACNA

MES 1

MES 2

3,180.45
11,852.74
2,669.68
3,791.83
1,083.35
3,703.30

MES 4

3,180.45
11,852.74
2,669.68
3,791.83
1,083.35
3,703.30

255,319.16

21,590.37

241.80
2,642.23
5,221.82
14,535.84
9,413.48
6,156.29
4,400.77
152.77
5,940.96
1,745.47
6,568.31
677.19
372.69
2,575.80
5,856.52
2,693.37
2,964.49
1,536.19
1,239.21

241.80
2,642.23
5,221.82
14,535.84

74,935.20

22,641.69

118.25
2,347.13
3,912.88
17,051.76
3,400.63
2,239.99
549.92
162.30
370.99
3,205.16
190.64
104.95
889.28
507.84
351.55

118.25
2,347.13
3,912.88
17,051.76

35,403.27

23,430.02

48.40
797.79
2,019.87
13,811.72
3,965.31
2,926.62
1,520.34
642.88
414.59
1,514.92
4,369.11
999.45
453.86
2,113.58
686.60
812.16
828.60
3,291.17
677.35

MES 3

228,942.14

4,786.65

9,413.48
6,156.29
4,400.77
152.77
5,940.96
1,745.47
6,568.31
677.19
372.69
2,575.80
5,856.52
2,693.37
2,964.49
1,536.19
1,239.21
38,003.73

14,289.78

3,400.63
2,239.99
549.92
162.30
370.99
3,205.16
190.64
104.95
889.28
507.84
351.55
11,113.86

859.39

48.40
797.79
2,019.87

13,811.72
3,965.31
2,926.62
1,520.34
642.88
414.59
1,514.92
4,369.11
999.45
453.86
2,113.58
686.60
812.16
828.60
3,291.17
677.35

GOBIERNO REGIONAL TACNA


GERENCIA DE INFRAESTRUCTURA

CRONOGRAMA VALORIZADO DE OBRA


PROYECTO : RECONSTRUCCION Y AMPLIACION DE INFRAESTRUCTURA DE LA I.E. HENRY MARCIAL RONDINEL CORNEJO VIAI II ETAPA
UBICACIN:

DISTRITO : GREGORIO ALBARRACIN

DETALLE

Item

COSTO DIRECTO

02.00.00
03.00.00
04.00.00
17.00.00
18.00.00
20.00.00
21.00.00
22.00..00
23.00.00
24.00.00
25.00.00
26.00.00
29.00.00
36.00.00

MOD. COCINA
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
CUBIERTAS
CARPINTERIA DE MADERA
CERRAJERIA
VIDRIOS, CRISTALES Y SIMILARES
PINTURA
VARIOS
APARATOS Y ACCESORIOS SANITARIOS
INSTALACIONES SANITARIAS
REDES DE DISTRIBUCION DE AGUA
INSTALACIONES ELECTRICAS
ARTEFACTOS

COSTO DIRECTO

02.00.00
03.00.00
05.00.00
09.00.00
10.00.00
12.00.00
18.00.00
20.00.00
22.00..00
26.00.00
29.00.00
36.00.00

TANQUE CISTERNA Y TANQUE ELEVADO


TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO ARMADO
MUROS Y TABIQUES DE ALBAILERIA
REVOQUES, ENLUCIDOS Y MOLDURAS
PISOS Y PAVIMENTOS
CARPINTERIA METALICA
CERRAJERIA
PINTURA
REDES DE DISTRIBUCION DE AGUA
INSTALACIONES ELECTRICAS
ARTEFACTOS

COSTO DIRECTO

02.00.00
03.00.00
05.00.00
09.00.00
10.00.00

POZO SEPTICO
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO ARMADO
MUROS Y TABIQUES DE ALBAILERIA
VARIOS

COSTO DIRECTO

PROVINCIA : TACNA

MONTO

41,894.32

REGION : TACNA

MES 1

MES 2

2,866.06

MES 3

38,350.91

27.81
15.80
409.89
592.94
2,161.57
92.85
276.55
181.83
1,247.03
207.23
543.56
310.97
260.17
89.76

27.81
15.80
409.89
592.94
2,161.57
92.85
276.55
181.83
1,247.03
207.23
543.56
310.97
260.17
89.76

6,417.96

6,417.96

54.24
869.25
13,142.78
395.94
1,050.87
165.00
1,248.53
403.29
350.21
5,076.48
1,294.57
1,253.69

54.24
869.25
13,142.78

395.94
1,050.87
165.00
1,248.53
403.29
350.21

25,304.85

3,613.84

5,076.48
1,294.57
1,253.69

7.92
2,292.09
2,079.14
1,882.82
342.69

1,882.82
342.69

6,604.66

2,225.51

21,691.01

7.92
2,292.09
2,079.14

4,379.15

MES 4

677.35

GOBIERNO REGIONAL TACNA


GERENCIA DE INFRAESTRUCTURA

CRONOGRAMA VALORIZADO DE OBRA


PROYECTO : RECONSTRUCCION Y AMPLIACION DE INFRAESTRUCTURA DE LA I.E. HENRY MARCIAL RONDINEL CORNEJO VIAI II ETAPA
UBICACIN:

DISTRITO : GREGORIO ALBARRACIN

PROVINCIA : TACNA

DETALLE

Item

MONTO

LOSA DE USO MULTIPLE


TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
VARIOS

02.00.00
03.00.00
04.00.00
23.00.00

47,070.12

47,070.12

4,933.97
19,336.28
69,948.72
9,023.50

4,933.97
19,336.28
69,948.72
9,023.50

COSTO DIRECTO

103,242.47

103,242.47

CERCO PERIMETRICO
OBRAS PROVISIONALES
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
ALBAILERIA Y TABIQUES
REVOQUES, ENLUCIDOS Y MOLDURAS
CONTRAZOCALOS
CARPINTERIA METALICA
PINTURA
VARIOS
INSTALACIONES ELECTRICAS
CONCEXION A RED EXTERNA
ARTEFACTOS (O APARATOS ELECTRICOS)
COSTO DIRECTO

7,925.28
4,091.68
22,205.53
71,986.03
70,368.18
78,360.06
25,246.23
9,367.24
2,000.00
26,557.09
2,415.21
71.42
488.00
82.57
321,164.52

7,925.28
4,091.68
22,205.53
71,986.03

106,208.52

8,086.09
9,177.34
15,449.14

8,086.09
9,177.34
15,449.14

32,712.57

32,712.57

REDES EXTERIORES
RED EXTERIOR DE AGUA FRIA
RED EXTERIOR DE DESAGUE
RED EXTERIOR DE ENERGIA ELECTRICA

27.00.00
03.00.00
04.00.00

MES 2

2,278.08
8,927.76
32,716.92
3,147.36

PATIO DE HONOR
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
VARIOS

01.00.00
02.00.00
03.00.00
04.00.00
05.00.00
09.00.00
10.00.00
13.00.00
19.00.00
22.00..00
23.00..00
29.00.00
34.00.00
36.00.00

MES 1

2,278.08
8,927.76
32,716.92
3,147.36

COSTO DIRECTO

02.00.00
03.00.00
04.00.00
23.00.00

REGION : TACNA

COSTO DIRECTO

MES 3

MES 4

70,368.18
78,360.06
25,246.23
9,367.24
2,000.00
26,557.09
2,415.21
71.42
488.00
214,873.43

82.57
82.57

COSTO DIRECTO

1
2
3
4

COSTO DIRECTO TOTAL


GASTOS GENERALES
GASTOS DE SUPERVISION Y LIQUIDACION
UTILIDAD

5 SUB TOTAL
6 IGV
7 EQUIPAMIENTO
8 TOTAL PRESUPUESTO
% AVANCE
% AVANCE ACUMULADO

10 %
3%
10%

19%

1,165,454.73
116,545.47
30,000.00
116,545.47

121,221.14
12,122.11
3,636.63
12,122.11

486,043.01
48,604.30
14,581.29
48,604.30

552,644.01
55,264.40
16,579.32
55,264.40

5,546.57
554.66
166.40
554.66

1,428,545.67
271,423.68
81,577.12

149,102.00
28,329.38

597,832.90
113,588.25

679,752.13
129,152.91

6,822.28
1,296.23
81,577.12

1,781,546.47

177,431.38

711,421.15

808,905.04

89,695.63

9.96%

39.93%

45.40%

5.03%

9.96%

49.89%

95.30%

100.33%