D C B A 0 Rev.
H.KH.
Check
Date
Appr.
Date
MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY
IPDC
PROJECT: TITLE: 6x159 MW SHIRVAN GAS TURBINE POWER PLANT INSPECTION & TEST PLAN FOR ELECTRICAL EQUIPMENT OF NATURAL GAS SYSTEM
MP-SVG-19EE-31-FG0-001
A4 File No.
DEQWE3R3R
MAPNA CO.
H.A. Design
Oct.06
H.KH.
Oct.06
H.R.D.
Oct.06
Date
Check
Date
Appr.
Date
REVISION 0 A B C D E REMARK
FOMAT:A4
SCALE:
SHEET: 2 OF 3 REV. 0
KHERAD WATER
D C B A 0 Rev. FOR APPROVAL Description H.KH. CHK. Oct.06 DATE H.R.D. APP. Oct.06 DATE
DES.
DRAW.
SHIRVAN 6x159 M.W GAS SE CODE: MF CODE: TURBINE POWER PLANT 9007 TITEL: INSPECTION & TEST PLAN FOR ELECTRICAL EQUIPMENT OF NATURAL GAS SYSTEM
MP-SVG-19EE-31-FG0-001
MAPNA CO. (PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT CO.
MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY
IPDC
6x159 MW SHIRVAN GAS TURBINE POWER PLANT NATURAL GAS SYSTEM CATHODIC PROTECTION MATERIAL KHERAD WATER TREATMENT CO. UNITS,COMPONENETS & PARTS TO BE INSPECTED
Type, material, Anode Cable same as ID 2 Type, material, Insulation, Core, Sheath, Voltage, Size Type, Size, voltage(Input & output), Paining, Wiring, Meters, Terminals, Gland, Thightness, Busbar, Earth Lug, Opening/Closeing of Breakers, Labels, Nameplate, Phase Identity, Megger Test Output Voltage, Voltage Adjustement, No-Load Test, Short Circuit Test Type, Cable Gland, Terminals, Shunt, Copper Link, Variable Resistor Material
EXT.OF INSP.
RI RI
INVOLVED PARTES 1
WP WP
2
WP WP
3
RD RD
TI
WP
WP
RD
Vendor Document
MS
4 5 6
TI TI TI
WP WP WP
WP WP WP
RD RD RD
R R R
MS MS MS
abbreviation: HP=Hold Point WP=Withness Point RI=Random Inspection RD=Review Documents TI=Total Inspection PLACE OF INSPECTION MS : Vendor shop SS : Subvendor's shop F : Field