Anda di halaman 1dari 37

DAFTAR HARGA BAHAN DAN UPAH

PROYEK

PEKERJAAN

LOKASI
TAHUN ANGGARAN

:
:

A. U P A H
1.
2.
3.
4.

Kepala Tukang
Mandor
Tukang
Pekerja

Org-Hr
Org-Hr
Org-Hr
Org-Hr

B. B A H A N
Bahan Galian
1
M3
2
M3

PEMBANGUNAN KANTOR BADAN PENGELOLAAN KEUANGAN DAERAH


PEMKO DUMAI (1 UNIT)
PERENCANAAN KANTOR BADAN PENGELOLAAN KEUANGAN DAERAH
PEMKO DUMAI
KOTA DUMAI
2006

Harga (Rp)
Tanah Urug
Pasir Urug

Bahan Pengecoran dan Dinding


1
M3
Pasir Cor
2
M3
Pasir Pasang
3
M3
Kerikil
4
Zak
Semen PC
5
Bh
Batu Bata
Bahan Kayu
1
2
3
4
5

M3
M3
M3
M3
Btg

Harga (Rp)
59,500.00
59,500.00
52,500.00
38,500.00

Kayu
Kayu
Kayu
Kayu
Kayu

Kulim Klas I (setara)


Meranti Klas II (setara)
Bowplank Klas III
Bekisting
Cerucuk Mahang dia.15cm, L=5m

40,000.00
88,000.00

219,000.00
69,000.00
233,000.00
42,500.00
400.00

2,100,000.00
1,100,000.00
690,000.00
800,000.00
15,000.00

Bahan Besi dan Paku


1
Kg
Besi Baja
2
Kg
Kawat Beton
3
Kg
Besi Setrip
4
Kg
Paku 1/2" s/d 3/4"
5
Kg
Paku 1"
6
Kg
Paku 2" s/d 5"
7
Kg
Paku Sekrup
8
Kg
Paku Atap Genteng Metal

8,500.00
10,500.00
12,500.00
14,400.00
13,800.00
9,200.00
15,500.00
14,400.00

Bahan Atap
1
2
3
4
5
6
7
8

Atap Genteng Metal Multi Roof (setara)


Perabung Atap Genteng Metal 30 cm
Nok Genteng Metal 1 M'
Bola-bola Atap Genteng Metal
Atap Seng Gelombang BJLS
Seng Plat BJLS
Skor Penahan
Residu

64,800.00
26,000.00
46,000.00
33,125.00
45,000.00
50,400.00
5,750.00
5,750.00

Triplek 4 mm
Triplek 3 mm
Plywood
Gypsumboard 9 mm
Gypsum List 1-2 M'
Tepung Gypsum
List Profil Kayu K4

56,000.00
42,000.00
96,000.00
90,000.00
20,700.00
2,800.00
10,350.00

Lbr
M'
M'
M'
Lbr
Lbr
Bh
Kg

Bahan Plafond
1
Lbr
2
Lbr
3
Lbr
4
Lbr
5
Btg
6
Kg
7
Btg

Bahan Pengecatan
1
Kg
2
Kg
3
Ltr
4
Kg
5
Kg
6
Ltr
7
Ltr
8
Kg
9
Bh
10
Bh
11
Lbr

Cat Minyak Platon (setara)


Cat Air Maritex (setara)
Minyak Cat
Menie
Tinner
Minyak Bekisting
Dempul Kayu
Dempul Plamir
Kuas 4"
Kuas Gulung
Amplas

30,000.00
7,400.00
8,050.00
13,800.00
34,500.00
15,000.00
10,500.00
34,500.00
5,500.00
15,000.00
3,500.00

Bahan Lantai dan Kaca


1
Kotak Keramik Masterina (setara) uk. 20/20 cm
1
Kotak Keramik Masterina (setara) uk. 20/25 cm
2
Kotak Keramik Masterina (setara) uk. 30/30 cm
3
Bh
Plint Keramik 10x30
4
Kg
Tepung Keramik
5
M2
Kaca Bening 5 mm
6
M2
Kaca Bening 3 mm

44,400.00
56,200.00
60,950.00
2,705.00
10,350.00
66,000.00
60,000.00

Bahan Pintu, Pengunci dan Penggantung


1
Bh
Kunci Pintu 2 slaag Merk Azzuro (setara)
2
Bh
Engsel Pintu merk Alexch (setara)
3
Bh
Engsel Jendela merk Alexch (setara)
4
Bh
Gerendel Pintu 2" merk Fit (setara)
5
Bh
Gerendel Jendela 3"
6
Bh
Hak Angin
7
Bh
Tangan-tangan jendela

115,000.00
8,600.00
5,750.00
10,100.00
10,000.00
11,500.00
5,000.00

Bahan Listrik
1
2
3
4
5
6

125,000.00
22,500.00
13,000.00
37,500.00
38,000.00
52,500.00

Bh
Bh
Bh
Bh
Bh
Bh

Bahan Sanitair
1
M'
2
M'
3
M'
4
M'
5
M'
6
M'
7
Bh
8
Bh
9
Bh
10
Bh
11
Bh
12
Bh
13
Kg

Lampu Box TL 2x20 watt


Lampu Pijar 25 watt
Lampu TL 10 watt
Stop Kontak Nasional (setara)
Saklar Tunggal Nasional (setara)
Saklar Ganda Nasional (setara)

Pipa PVC 3/4"


Pipa PVC 1"
Pipa PVC 2"
Pipa PVC 4"
Pipa PVC 6"
Pipa Galvanis 1"
Bak Air Fiber
Washtafel
Kran Air 3/4" merk RRT (setara)
Kloset Duduk merk KIA pakai tangki (setara)
Kloset Jongkok merk KIA (setara)
Floor Drain
Ijuk

6,600.00
8,600.00
31,875.00
63,250.00
123,750.00
26,250.00
250,000.00
265,000.00
10,500.00
1,552,500.00
162,000.00
24,000.00
12,000.00

ANALISA HARGA SATUAN


PROYEK

PEKERJAAN

LOKASI
TAHUN ANGGARAN

:
:

PEMBANGUNAN KANTOR BADAN PENGELOLAAN KEUANGAN DAERAH


PEMKO DUMAI (1 UNIT)
PERENCANAAN KANTOR BADAN PENGELOLAAN KEUANGAN DAERAH
PEMKO DUMAI
KOTA DUMAI
2006

1 M2 Pembersihan Lahan
Tenaga
0.0500 Oh Pekerja
0.0050 Oh Mandor

Rp
Rp

38,500.00
59,500.00
Jumlah (1)

=
=
=

1 M' Pemasangan bouwplank


Bahan
0.0038 M3 Kayu Kasau 3/4
0.0150 Kg Paku
0.0040 M3 Kayu papan Klas III

Rp
Rp
Rp

690,000.00
9,200.00
690,000.00
Jumlah (1)

=
=
=
=

52,500.00
38,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

1 M3 Galian tanah biasa sedalam 1 meter


Tenaga
0.7500 Oh Pekerja
0.0200 Oh Mandor

Rp
Rp

38,500.00
59,500.00
Jumlah

=
=
=

1 M3 Urugan kembali
Tenaga
0.1875 Oh Pekerja
0.0050 Oh Mandor

Rp
Rp

38,500.00
59,500.00
Jumlah

=
=
=

1 M3 Urugan pasir
Bahan
1.2000 M3 Pasir urug

Rp

88,000.00
Jumlah (1)

=
=

38,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp

40,000.00
Jumlah (1)

=
=

38,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp
Rp

8,500.00
10,500.00
Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)x3/4

=
=
=
=
=

Tenaga
0.0500 Oh Tukang Kayu
0.0280 Oh Pekerja
0.0050 Oh Kepala Tukang

Tenaga
0.3000 Oh Pekerja
0.0100 Oh Mandor

1 M3 Urugan tanah
Bahan
1.2000 M3 Tanah Urug
Tenaga
0.1875 Oh Pekerja
0.0050 Oh Mandor

1 Kg Pembesian dengan besi polos atau besi ulir


Bahan
1.0000 Kg Besi beton (polos/ulir)
0.0200 Kg Kawat beton
Tenaga
0.0900 Oh Pekerja
0.0900 Oh Tukang besi
0.0300 Oh Kepala Tukang

Rp
Rp
Rp

Rp
Rp

Rp
Rp

Rp
Rp
Rp

1 M3 Membuat beton tumbuk, 1 Pc : 2 Ps : 3 Kr


Bahan
6.8000 Zak Semen Portland
0.5400 M3 Pasir beton
0.8200 M3 Kerikil
Tenaga
2.0000
1.0000
0.1000
0.1500

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

1 M3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr


Bahan
5.0000 Zak Semen Portland
0.5000 M3 Pasir beton
1.0000 M3 Kerikil
Tenaga
2.0000
0.5000
0.0500
0.1500

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

1 M2 Pekerjaan Bekisting/Cetakan Beton


Bahan
0.0400 M3 Kayu Bekisting
0.0400 Kg Paku
Tenaga
0.0200
0.0600
0.0120
0.0100

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

1 M' Pekerjaan Tiang Pancang dia. 30 cm


Bahan
0.016 M3 Pasir Urug
0.080 M3 Pasir Beton
0.125 M3 Kerikil
49.000 Kg Semen PC
12.000 Kg Besi beton
0.700 Kg Kawat Beton
0.027 M3 Kayu 5/7
0.120 Kg Paku
0.090 Ltr Minyak Bekisting
0.200 Kg Plamur Tembok
Tenaga
0.500
0.800
0.0500
0.040

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp

42,500.00
219,000.00
233,000.00
Jumlah (1)

=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

Rp
Rp
Rp

42,500.00
219,000.00
233,000.00
Jumlah (1)

=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

Rp
Rp

800,000.00
9,200.00
Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

88,000
219,000
233,000
850
8,500
10,500
690,000
9,200
15,000
34,500
Jumlah (1)

=
=
=
=
=
=
=
=
=
=
=

38,500
52,500
59,500
59,500
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

Rp
Rp
Rp
Rp

1 M3 Pekerjaan Poer Pondasi 80x80 cm


1.0000 M3 Pek. Beton 1:2:3
180.0000 Kg Pek. Pembesian
5.0000 M2 Pek. Bekisting

Rp
Rp
Rp

742,695.00
16,191.25
37,597.00
Jumlah (1)

=
=
=
=

1 M3 Pekerjaan Balok Sloof 25/40


1.0000 M3 Pek. Beton 1:2:3
108.0000 Kg Pek. Pembesian
13.0000 M2 Pek. Bekisting

Rp
Rp
Rp

742,695.00
16,191.25
37,597.00
Jumlah (1)

=
=
=
=

1 M3 Pekerjaan Balok
1.0000 M3
136.0000 Kg
12.0000 M2

25/45
Pek. Beton 1:2:3
Pek. Pembesian
Pek. Bekisting

Rp
Rp
Rp

1 M3 Pekerjaan Kolom 30/30


1.0000 M3 Pek. Beton 1:2:3
170.0000 Kg Pek. Pembesian
13.0000 M2 Pek. Bekisting

Rp
Rp
Rp

742,695.00
16,191.25
37,597.00
Jumlah (1)

=
=
=
=

742,695.00
16,191.25
37,597.00
Jumlah (1)
Untuk Lantai 2; x 1.05

=
=
=
=
=

1 M3 Pekerjaan Kolom 40/40


1.0000 M3 Pek. Beton 1:2:3
90.0000 Kg Pek. Pembesian
10.0000 M2 Pek. Bekisting

Rp
Rp
Rp

1 M3 Pekerjaan Kolom 20/20


1.0000 M3 Pek. Beton 1:2:3
217.0000 Kg Pek. Pembesian
20.0000 M2 Pek. Bekisting

1 M3 Pekerjaan Kolom Praktis 13/13


1.0000 M3 Pek. Beton 1:2:3
250.0000 Kg Pek. Pembesian
30.0000 M2 Pek. Bekisting

742,695.00
16,191.25
37,597.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp

742,695.00
16,191.25
37,597.00
Jumlah (1)
Untuk Lantai 2; x 1.05

=
=
=
=
=

Rp
Rp
Rp

=
=
=
=
=

742,695.00
16,191.25
37,597.00
Jumlah (1)
Untuk Lantai 2; x 1.05

1 M3 Pekerjaan Reng Balok 20/25


1.0000 M3 Pek. Beton 1:2:3
128.0000 Kg Pek. Pembesian
15.0000 M2 Pek. Bekisting

Rp
Rp
Rp

742,695.00
16,191.25
37,597.00
Jumlah (1)

=
=
=
=

1 M3 Pekerjaan Reng Balok 15/20


1.0000 M3 Pek. Beton 1:2:3
195.0000 Kg Pek. Pembesian
18.0000 M2 Pek. Bekisting

Rp
Rp
Rp

742,695.00
16,191.25
37,597.00
Jumlah (1)

=
=
=
=

1 M3 Pekerjaan Balok
1.0000 M3
80.0000 Kg
16.0000 M2

Rp
Rp
Rp

742,695.00
16,191.25
37,597.00
Jumlah (1)

=
=
=
=

1 M3 Plat Lantai Beton Bertulang t=14 cm


1.0000 M3 Pek. Beton 1:2:3
60.0000 Kg Pek. Pembesian
8.0000 M2 Pek. Bekisting

Rp
Rp
Rp

742,695.00
16,191.25
37,597.00
Jumlah (1)

=
=
=
=

1 M3 Plat Tangga Beton Bertulang


1.0000 M3 Pek. Beton 1:2:3
80.0000 Kg Pek. Pembesian
22.0000 M2 Pek. Bekisting

Rp
Rp
Rp

742,695.00
16,191.25
37,597.00
Jumlah (1)

=
=
=
=

1 M3 List Profil Beton


1.0000 M3 Pek. Beton 1:2:3
120.0000 Kg Pek. Pembesian
20.0000 M2 Pek. Bekisting

Rp
Rp
Rp

742,695.00
16,191.25
37,597.00
Jumlah (1)
Untuk Lantai 2; x 1.05

=
=
=
=
=

Latei
Pek. Beton 1:2:3
Pek. Pembesian
Pek. Bekisting

1 M2 Pasang bata merah tebal 1/2 bata, 1 Pc : 2 Ps


Bahan
75.0000 Bh Batu Bata
0.4122 Zak Semen Portland
0.0330 M3 Pasir pasang
Tenaga
0.0480
0.1600
0.0160
0.0480

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

1 M2 Pasang bata merah tebal 1/2 bata, 1 Pc : 4 Ps


Bahan
75.0000 Bh Batu Bata
0.4000 Zak Semen Portland
0.0165 M3 Pasir pasang
Tenaga
0.0480
0.1600
0.0160
0.0480

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

1 M2 Pasang bata merah tebal 1 bata, 1 Pc : 4 Ps


Bahan
150.0000 Bh Batu Bata
0.8130 Zak Semen Portland
0.1040 M3 Pasir pasang
Tenaga
0.9600
0.3200
0.0320
0.0960

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

1 M2 Plesteran 1 Pc : 2 Ps, tebal 15 mm


Bahan
0.2130 Zak Semen Portland
0.0170 M3 Pasir pasang
Tenaga
0.0400
0.0200
0.0020
0.0040

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

1 M2 Plesteran 1 Pc : 4 Ps, tebal 15 mm


Bahan
0.1360 Zak Semen Portland
0.0200 M3 Pasir pasang
Tenaga
0.0400
0.0200
0.0020
0.0040

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp

400.00
42,500.00
69,000.00
Jumlah (1)

=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=

Rp
Rp
Rp
Rp

Rp
Rp
Rp

400.00
42,500.00
69,000.00
Jumlah (1)

=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=

Rp
Rp
Rp
Rp

Rp
Rp
Rp

400.00
42,500.00
69,000.00
Jumlah (1)

=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

Rp
Rp

42,500.00
69,000.00
Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Rp
Rp

42,500.00
69,000.00
Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=

Rp
Rp
Rp
Rp

1 M2 Berapen 1 Pc : 3 Ps, tebal 20 mm


Bahan
0.2700 Zak Semen Portland
0.0260 M3 Pasir pasang
Tenaga
0.1200
0.0200
0.0020
0.0120

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

1 M3 Pasang kusen pintu dan jendela kayu


Bahan
1.1000 M3 Kayu Klas I
4.0000 Kg Paku
Tenaga
6.0000
3.0000
2.0000
0.3333

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

1 M2 Pasang kaca, tebal 5 mm


Bahan
1.1000 M2 Kaca
Tenaga
0.0150
0.1500
0.0150
0.0008

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

1 M' Pasang lisplank ukuran 3 x 20 cm,


Bahan
0.0070 M3 Kayu Klas II
0.0500 Kg Paku biasa 2" - 5"
Tenaga
0.0050
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

1 M2 Pasang rangka langit-langit ( 60 x 120 ) m,


Bahan
0.0270 M3 Kayu Klas II
0.1800 Kg Paku biasa 2" - 5"
Tenaga
0.1100
0.3500
0.0350
0.0110

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Rp
Rp

42,500.00
69,000.00
Jumlah (1)

=
=
=

Rp
Rp
Rp
Rp

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp 2,100,000.00
Rp
9,200.00
Jumlah (1)

=
=
=

Rp
Rp
Rp
Rp

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

Rp

66,000.00
Jumlah (1)

=
=

Rp
Rp
Rp
Rp

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

Rp 1,100,000.00
Rp
9,200.00
Jumlah (1)

=
=
=

Rp
Rp
Rp
Rp

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp 1,100,000.00
Rp
9,200.00
Jumlah (1)

=
=
=

Rp
Rp
Rp
Rp

=
=
=
=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

1 M' Pasang list plafond - kayu profil


Bahan
1.1000 M' Kayu profil K4
0.0100 Kg Paku biasa 2" - 5"
Tenaga
0.0160
0.0500
0.0050
0.0080

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

1 M2 Langit-langit gypsum board, tebal 9 mm


Bahan
0.7500 Lbr Gypsum Board
0.1000 Kg Paku gypsum
0.4000 Kg Tepung Gypsum
Tenaga
0.9800
0.1400
0.0140
0.0490

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

1 M2 Plafond Piri-piri
Bahan
0.0220 M3 Kayu Klas II
0.1500 Kg Paku
Tenaga
0.2300
0.5000
0.0500
0.0120

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

1 M2 Pasang atap genteng metal


Bahan
1.0000 Lbr Genteng metal
0.2000 Kg Paku Atap
Tenaga
0.0800
0.1200
0.0120
0.0040

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

1 M' Pasang bubung genteng metal


Bahan
3.0000 Bh Rabung Metal
0.0500 Kg Paku Atap
Tenaga
0.0600
0.1000
0.0010
0.0030

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Rp
Rp

10,350.00
9,200.00
Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp

Rp
Rp
Rp

90,000.00
14,400.00
2,800.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=
=
=

Rp 1,100,000.00
Rp
9,200.00
Jumlah (1)

=
=
=

Rp
Rp
Rp
Rp

=
=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

Rp
Rp

64,800.00
14,400.00
Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp

26,000.00
14,400.00
Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

1 M' Pasang Talang Atap dari seng BJLS


Bahan
0.3500 Lbr Seng BJLS
1.0000 Bh Skor Penahan
0.0150 Kg Paku Atap
Tenaga
0.1250
0.2000
0.0200
0.0625

Oh
Oh
Oh
Oh

Rp
Rp
Rp

45,000.00
5,750.00
14,400.00
Jumlah (1)

=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp

50,400.00
14,400.00
Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp

44,400.00
42,500.00
69,000.00
10,350.00
Jumlah (1)

=
=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=
=
=

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

1 M2 Pasang seng plat


Bahan
0.7000 Lbr Seng plat BJLS
0.2000 Kg Paku biasa 1/2" - 1"
Tenaga
0.1200
0.0600
0.0060
0.0060

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

1 M2 Pasang lantai keramik 20 x 20 cm


Bahan
1.0000 M2 Keramik 20x20 cm Masterina (setara)
0.1000 Zak Semen Portland
0.0500 M3 Pasir pasang
0.1500 Kg Tepung Keramik
Tenaga
0.2000
0.1500
0.0250
0.0250

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

1 M2 Pasang lantai keramik 30 x 30 cm


Bahan
1.0000 M2 Keramik 30x30 cm Masterina (setara)
0.1000 Zak Semen Portland
0.0500 M3 Pasir pasang
0.1500 Kg Tepung Keramik
Tenaga
0.2000
0.1500
0.0250
0.0250

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

60,950.00
42,500.00
69,000.00
10,350.00
Jumlah (1)

=
=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp

1 M2 Pasang dinding keramik 20 x 20 cm,


Bahan
1.0000 M2 Keramik 20 x 20 cm Masterina (setara)
0.1860 Kg Semen Portland
0.0180 M3 Pasir pasang
1.5000 Kg Semen warna
Tenaga
0.2000
0.1500
0.0250
0.0250

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

44,400.00
42,500.00
69,000.00
10,350.00
Jumlah (1)

=
=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp

1 M2 Pengecatan bidang kayu baru


Bahan
0.1250 Kg Cat meni
0.0800 Ltr Plamir
0.4250 Kg Cat Minyak
0.0750 Ltr Minyak Cat
0.2000 Lbr Amplas
Tenaga
0.2000
0.3400
0.0034
0.0100

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

1 M2 Pengecatan tembok baru


Bahan
0.1500 Kg Plamir
0.2500 Kg Cat Tembok Maritek (setara)
0.2000 Lbr Amplas
Tenaga
0.1500
0.2000
0.0200
0.0075

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

Memasang 1 buah kloset jongkok porselen


Bahan
1.0000 Bh Kloset jongkok porselen Kia (setara)
6.0000 Kg Semen portland
0.0100 M3 Pasir pasang
Tenaga
1.0000
1.5000
1.5000
0.1600

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Memasang 1 buah kloset duduk


Bahan
1.000 Bh Kloset duduk Kia (setara)
1.000 Bh Plat Asber t=6mm
6% HargaKloset Perlengkapan
Tenaga
3.300
1.100
0.011
0.160

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp
Rp

13,800.00
34,500.00
30,000.00
8,050.00
3,500.00
Jumlah (1)

=
=
=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=

Rp
Rp
Rp
Rp

Rp
Rp
Rp

34,500.00
7,400.00
3,500.00
Jumlah (1)

=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=

Rp
Rp
Rp
Rp

Rp
Rp
Rp

162,000.00
42,500.00
69,000.00
Jumlah (1)

=
=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=

Rp
Rp
Rp
Rp

Rp
Rp

1,552,500 =
50,000 =
=
Jumlah (1) =

Rp
Rp
Rp
Rp

=
=
=
=
=

38,500
52,500
59,500
59,500
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

Memasang 1 bh washtafel
Bahan
1.000 Bh Washtafel
12% harga washtafel
Perlengkapan
6.000 Kg Semen PC
0.010 M3 Pasir Pasang
Tenaga
1.800
2.700
0.540
0.110

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Memasang 1 buah fibreglass volume 1 M3 air


Bahan
1.0000 Bh Bak fibreglass
12% Harga Bak Perlengkapan

Rp
Rp
Rp

265,000 =
=
850 =
69,000 =
Jumlah (1) =

Rp
Rp
Rp
Rp

38,500
52,500
59,500
59,500
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

Rp

250,000.00
Jumlah (1)

Tenaga
2.0000
0.4500
0.0450
0.2000

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Memasang 1 m' pipa PVC tipe AW diameter 3/4"


Bahan
1.2000 M' Pipa PVC
35% harga pipa Perlengkapan
Tenaga
0.0360
0.0600
0.0060
0.0018

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Memasang 1 m' pipa PVC tipe AW diameter 1"


Bahan
1.2000 M' Pipa PVC
35% harga pipa Perlengkapan
Tenaga
0.0360
0.0600
0.0060
0.0018

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Memasang 1 m' pipa PVC tipe AW diameter 2"


Bahan
1.2000 M' Pipa PVC
35% harga pipa Perlengkapan
Tenaga
0.0540
0.0800
0.0090
0.0027

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

Rp

6,600.00

=
=
=
=
=
=
=

=
=
=
=
=
=
=
=
=

Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp

Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp

Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp

8,600.00

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

31,875.00

Memasang 1 bh kran diameter 3/4" atau 1/2"


Bahan
1.0000 Bh Kran air
0.0250 Bh Seal tape
Tenaga
0.0100
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Memasang 1 bh floor drain


Bahan
1.0000 Bh Floor drain
Tenaga
0.0100
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

1 M3 Pasang bata merah tebal 1/2 bata, 1 Pc : 4 Ps


Bahan
750.0000 Bh Batu Bata
4.0000 Zak Semen Portland
0.5100 M3 Pasir pasang
Tenaga
1.3500
0.6750
0.0675
0.0225

Oh
Oh
Oh
Oh

1 M' Saluran Keliling


0.0750 M3
0.0200 M3
0.0750 M3
0.0200 M3
1.2000 M2
0.0100 M'

Rp
Rp

10,500.00
2,000.00
Jumlah (1)

=
=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp

Rp

24,000.00
Jumlah (1)

=
=

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)
Untuk Lantai 2; x 1.05

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp

Rp
Rp
Rp

400.00
42,500.00
69,000.00
Jumlah (1)

=
=
=
=

Pekerja
Tukang batu
Kepala Tukang
Mandor

38,500.00
52,500.00
59,500.00
59,500.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

Pek.Galian Tanah
Pasir Urug
Pek. Pas. Bata 1:4
Pek. Cor 1:3:5
Pek. Plesteran 1:4
Pas. Bowplank

Rp
Rp
Rp
Rp
Rp
Rp

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp

30,065.00
117,745.00
597,957.50
670,150.00
10,107.00
9,520.50
Jumlah

UAN

AAN KEUANGAN DAERAH

AAN KEUANGAN DAERAH

Rp
Rp
Rp

1,925.00
297.50
2,222.50

Rp
Rp
Rp
Rp

2,622.00
138.00
2,760.00
5,520.00

Rp
Rp
Rp
Rp
Rp

2,625.00
1,078.00
297.50
4,000.50
9,520.50

Rp
Rp
Rp

28,875.00
1,190.00
30,065.00

Rp
Rp
Rp

7,218.75
297.50
7,516.25

Rp
Rp

105,600.00
105,600.00

Rp
Rp
Rp
Rp

11,550.00
595.00
12,145.00
117,745.00

Rp
Rp

48,000.00
48,000.00

Rp
Rp
Rp
Rp

7,218.75
297.50
7,516.25
55,516.25

Rp
Rp
Rp

8,500.00
210.00
8,710.00

Rp
Rp
Rp
Rp
Rp

3,465.00
4,725.00
1,785.00
9,975.00
16,191.25

Rp
Rp
Rp
Rp

289,000.00
118,260.00
191,060.00
598,320.00

Rp
Rp
Rp
Rp
Rp
Rp

77,000.00
52,500.00
5,950.00
8,925.00
144,375.00
742,695.00

Rp
Rp
Rp
Rp

212,500.00
109,500.00
233,000.00
555,000.00

Rp
Rp
Rp
Rp
Rp
Rp

77,000.00
26,250.00
2,975.00
8,925.00
115,150.00
670,150.00

Rp
Rp
Rp

32,000.00
368.00
32,368.00

Rp
Rp
Rp
Rp
Rp
Rp

770.00
3,150.00
714.00
595.00
5,229.00
37,597.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,408
17,520
29,125
41,650
102,000
7,350
18,630
1,104
1,350
6,900
227,037

Rp
Rp
Rp
Rp
Rp
Rp

19,250
42,000
2,975
2,380
66,605
293,642

Rp
Rp
Rp
Rp

742,695.00
2,914,425.00
187,985.00
3,845,105.00

Rp
Rp
Rp
Rp

742,695.00
1,748,655.00
488,761.00
2,980,111.00

Rp
Rp
Rp
Rp

742,695.00
2,202,010.00
451,164.00
3,395,869.00

Rp
Rp
Rp
Rp
Rp

742,695.00
2,752,512.50
488,761.00
3,983,968.50
4,183,166.93

Rp
Rp
Rp
Rp

742,695.00
1,457,212.50
375,970.00
2,575,877.50

Rp
Rp
Rp
Rp
Rp

742,695.00
3,513,501.25
751,940.00
5,008,136.25
5,258,543.06

Rp
Rp
Rp
Rp
Rp

742,695.00
4,047,812.50
1,127,910.00
5,918,417.50
6,214,338.38

Rp
Rp
Rp
Rp

742,695.00
2,072,480.00
563,955.00
3,379,130.00

Rp
Rp
Rp
Rp

742,695.00
3,157,293.75
676,746.00
4,576,734.75

Rp
Rp
Rp
Rp

742,695.00
1,295,300.00
601,552.00
2,639,547.00

Rp
Rp
Rp
Rp

742,695.00
971,475.00
300,776.00
2,014,946.00

Rp
Rp
Rp
Rp

742,695.00
1,295,300.00
827,134.00
2,865,129.00

Rp
Rp
Rp
Rp
Rp

742,695.00
1,942,950.00
751,940.00
3,437,585.00
3,609,464.25

Rp
Rp
Rp
Rp

30,000.00
17,518.50
2,277.00
49,795.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,848.00
8,400.00
952.00
2,856.00
14,056.00
63,851.50
67,044.08

Rp
Rp
Rp
Rp

30,000.00
17,000.00
1,138.50
48,138.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,848.00
8,400.00
952.00
2,856.00
14,056.00
62,194.50
65,304.23

Rp
Rp
Rp
Rp

60,000.00
34,552.50
7,176.00
101,728.50

Rp
Rp
Rp
Rp
Rp
Rp

36,960.00
16,800.00
1,904.00
5,712.00
61,376.00
163,104.50

Rp
Rp
Rp

9,052.50
1,173.00
10,225.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,540.00
1,050.00
119.00
238.00
2,947.00
13,172.50
13,831.13

Rp
Rp
Rp

5,780.00
1,380.00
7,160.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,540.00
1,050.00
119.00
238.00
2,947.00
10,107.00
10,612.35

Rp
Rp
Rp

11,475.00
1,794.00
13,269.00

Rp
Rp
Rp
Rp
Rp
Rp

4,620.00
1,050.00
119.00
714.00
6,503.00
19,772.00

Rp
Rp
Rp

2,310,000.00
36,800.00
2,346,800.00

Rp
Rp
Rp
Rp
Rp
Rp

231,000.00
157,500.00
119,000.00
19,831.35
527,331.35
2,874,131.35

Rp
Rp

72,600.00
72,600.00

Rp
Rp
Rp
Rp
Rp
Rp

577.50
7,875.00
892.50
44.63
9,389.63
81,989.63

Rp
Rp
Rp

7,700.00
460.00
8,160.00

Rp
Rp
Rp
Rp
Rp
Rp

192.50
5,250.00
595.00
297.50
6,335.00
14,495.00

Rp
Rp
Rp

29,700.00
1,656.00
31,356.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,235.00
18,375.00
2,082.50
654.50
25,347.00
56,703.00
59,538.15

Rp
Rp
Rp

11,385.00
92.00
11,477.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

616.00
2,625.00
297.50
476.00
4,014.50
15,491.50
16,266.08

Rp
Rp
Rp
Rp

67,500.00
1,440.00
1,120.00
70,060.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

37,730.00
7,350.00
833.00
2,915.50
48,828.50
118,888.50
124,832.93

Rp
Rp
Rp

24,200.00
1,380.00
25,580.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,855.00
26,250.00
2,975.00
714.00
38,794.00
64,374.00
67,592.70

Rp
Rp
Rp

64,800.00
2,880.00
67,680.00

Rp
Rp
Rp
Rp
Rp
Rp

3,080.00
6,300.00
714.00
238.00
10,332.00
78,012.00

Rp
Rp
Rp

78,000.00
720.00
78,720.00

Rp
Rp
Rp
Rp
Rp
Rp

2,310.00
5,250.00
59.50
178.50
7,798.00
86,518.00

Rp
Rp
Rp
Rp

15,750.00
5,750.00
216.00
21,716.00

Rp
Rp
Rp
Rp
Rp
Rp

4,812.50
10,500.00
1,190.00
3,718.75
20,221.25
41,937.25

Rp
Rp
Rp

35,280.00
2,880.00
38,160.00

Rp
Rp
Rp
Rp
Rp
Rp

4,620.00
3,150.00
357.00
357.00
8,484.00
46,644.00

Rp
Rp
Rp
Rp
Rp

44,400.00
4,250.00
3,450.00
1,552.50
53,652.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,700.00
7,875.00
1,487.50
1,487.50
18,550.00
72,202.50
75,812.63

Rp
Rp
Rp
Rp
Rp

60,950.00
4,250.00
3,450.00
1,552.50
70,202.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,700.00
7,875.00
1,487.50
1,487.50
18,550.00
88,752.50
93,190.13

Rp
Rp
Rp
Rp
Rp

44,400.00
7,905.00
1,242.00
15,525.00
69,072.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,700.00
7,875.00
1,487.50
1,487.50
18,550.00
87,622.00
92,003.10

Rp
Rp
Rp
Rp
Rp
Rp

1,725.00
2,760.00
12,750.00
603.75
700.00
18,538.75

Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,700.00
17,850.00
202.30
595.00
26,347.30
44,886.05
47,130.35

Rp
Rp
Rp
Rp

5,175.00
1,850.00
700.00
7,725.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,775.00
10,500.00
1,190.00
446.25
17,911.25
25,636.25
26,918.06

Rp
Rp
Rp
Rp

162,000.00
255,000.00
690.00
417,690.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

38,500.00
78,750.00
89,250.00
9,520.00
216,020.00
633,710.00
665,395.50

Rp
Rp
Rp
Rp

1,552,500
50,000
93,150
1,695,650

Rp
Rp
Rp
Rp
Rp
Rp
Rp

127,050
57,750
655
9,520
194,975
1,890,625
1,985,155.73

Rp
Rp
Rp
Rp
Rp

265,000
31,800
5,100
690
302,590

Rp
Rp
Rp
Rp
Rp
Rp
Rp

69,300
141,750
32,130
6,545
249,725
552,315
579,930.75

Rp
Rp
Rp

250,000.00
30,000.00
280,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

77,000.00
23,625.00
2,677.50
11,900.00
115,202.50
395,202.50
414,962.63

Rp
Rp
Rp

7,920.00
2,772.00
10,692.00

Rp
Rp
Rp
Rp
Rp
Rp

1,386.00
3,150.00
357.00
107.10
5,000.10
15,692.10

Rp
Rp
Rp

10,320.00
3,612.00
13,932.00

Rp
Rp
Rp
Rp
Rp
Rp

1,386.00
3,150.00
357.00
107.10
5,000.10
18,932.10

Rp
Rp
Rp

38,250.00
13,387.50
51,637.50

Rp
Rp
Rp
Rp
Rp
Rp

2,079.00
4,200.00
535.50
160.65
6,975.15
58,612.65

Rp
Rp
Rp

10,500.00
50.00
10,550.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

385.00
5,250.00
595.00
297.50
6,527.50
17,077.50
17,931.38

Rp
Rp

24,000.00
24,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

385.00
5,250.00
595.00
297.50
6,527.50
30,527.50
32,053.88

Rp
Rp
Rp
Rp

300,000.00
170,000.00
35,190.00
505,190.00

Rp
Rp
Rp
Rp
Rp
Rp

51,975.00
35,437.50
4,016.25
1,338.75
92,767.50
597,957.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,254.88
2,354.90
44,846.81
13,403.00
12,128.40
95.21
75,083.19

ENGINEER ESTIMATE (EE)


PROYEK
PEKERJAAN
LOKASI
TAHUN ANGGARAN
N0

: PEMBANGUNAN KANTOR BADAN PENGELOLAAN KEUANGAN DAERAH


PEMKO DUMAI (1 UNIT)
: PERENCANAAN KANTOR BADAN PENGELOLAAN KEUANGAN DAERAH
PEMKO DUMAI
: KOTA DUMAI
: 2006
URAIAN PEKERJAAN

VOLUME

I
1
2
2

PEK. PENDAHULUAN
Pek. Pembersihan Lokasi
Pek. Pas. Papan Bouwplank
Pek. Pas. Papan Nama Kegiatan

II
1
2
3
4
5
6

PEK. GALIAN, URUGAN DAN LANTAI KERJA


Pek. Galian Tanah Pondasi
Pek. Urugan Pasir Bawah Pondasi
Pek. Urugan Tanah Bawah Lantai
Pek. Urugan Pasir Bawah Lantai
Pek. Urugan Tanah Kembali
Pek. Lantai Kerja 1 : 3 : 5

115.00
8.87
338.09
49.31
84.52
8.87

III
1
2
3

PEK. PONDASI
Pek. Pas. Tiang Pancang dia. 30 cm
Pek. Pondasi Bata
Pek. Raben Pondasi Bata

402.00 M'
31.77 M2
63.55 M2

IV PEK. STRUKTUR BETON


Lantai 1
1 Pek. Poer Pondasi 0.8x0.8 M
2 Pek. Balok Sloof 25/40
3 Pek. Kolom 30/30
4 Pek. Kolom Teras 40/40
5 Pek. Kolom Praktis 13/13
6 Pek. Konsol Profil Beton
7 Pek. Cor Balok Latei
Lantai 2
1 Pek. Balok Lantai 25/45
2 Pek. Reng Balok 20/25
3 Pek. Reng Balok 15/20
4 Pek. Cor Plat Lantai 2, t=14cm
5 Pek. Kolom 30/30
6 Pek. Kolom 20/20
7 Pek. Kolom Praktis 13/13
8 Pek. Konsol Profil Beton
V
1
2
3
4
5
6
7
8
9
10

PEK. DINDING & PLESTERAN


Pek. Pas. Dinding 1/2 Bata 1 : 4 Lt. 1
Pek. Plesteran Dinding 1 : 4 Lt. 1
Pek. Pas. Dinding 1/2 Bata 1 : 2 Lt. 1
Pek. Plesteran Dinding 1 : 2 Lt. 1
Pek. Profil Dinding Lt. 1
Pek. Pas. Dinding 1/2 Bata 1 : 4 Lt. 2
Pek. Plesteran Dinding 1 : 4 Lt. 2
Pek. Pas. Dinding 1/2 Bata 1 : 2 Lt. 2
Pek. Plesteran Dinding 1 : 2 Lt. 2
Pek. Profil Dinding Lt. 2

VI
1
2
3
4
5
6
7

PEK. KERAMIK LANTAI & DINDING


Pek. Cor Lantai Dasar 1:3:5
Pek. Pas. Lantai Keramik 30 x 30 Lt. 1
Pek. Pas. Lantai Keramik 20 x 20 KM/WC Lt. 1
Pek. Pas. Keramik Dinding KM/WC 20/20 Lt. 1
Pek. Pas. Lantai Keramik 30 x 30 Lt. 2
Pek. Pas. Lantai Keramik 20 x 20 KM/WC Lt. 2
Pek. Pas. Keramik Dinding KM/WC 20/20 Lt. 2

1,148.05 M2
155.29 M'
1.00 Ls

M3
M3
M3
M3
M3
M3

HARGA
SATUAN
(Rp)
2,222.50
9,520.50
280,000.00

Sub Jumlah

30,065.00
117,745.00
55,516.25
117,745.00
7,516.25
670,150.00

Sub Jumlah

293,642.00
163,104.50
19,772.00

Sub Jumlah

9.60
39.10
20.95
1.87
1.67
4.09
5.82

M3
M3
M3
M3
M3
M3
M3

3,845,105.00
2,980,111.00
3,983,968.50
2,575,877.50
5,918,417.50
3,437,585.00
2,639,547.00

74.85
2.84
1.86
57.32
14.36
1.87
1.18
12.25

M3
M3
M3
M3
M3
M3
M3
M3

3,395,869.00
3,379,130.00
4,576,734.75
2,014,946.00
4,183,166.93
5,258,543.06
6,214,338.38
3,609,464.25

773.22
1,546.43
129.88
259.76
129.64
642.60
1,285.21
49.50
99.00
58.00

M2
M2
M2
M2
M'
M2
M2
M2
M2
M'

64.72
564.72
25.37
39.60
410.26
24.62
49.50

M3
M2
M2
M2
M2
M2
M2

Sub Jumlah

62,194.50
10,107.00
63,851.50
13,172.50
25,000.00
65,304.23
10,612.35
67,044.08
13,831.13
26,250.00

Sub Jumlah

670,150.00
88,752.50
72,202.50
87,622.00
93,190.13
75,812.63
92,003.10

Sub Jumlah

N0

URAIAN PEKERJAAN

VII
1
2
3
4
5
6
7
8
9
10

PEK. STRUKTUR ATAP


Rangka Atap Baja Ringan
Pek. Pas. Atap Genteng Metal
Pek. Pas. Perabung Atap
Pek. Pas. Bola-bola Atap
Pek. Pas. Jurai Dalam Atap
Pek. Pas. Talang Air
Pek. Pas. Singap Ukir
Pek. Pas. Seng Plat pelapis singap
Pek. Pas. Selembayung
Pek. Pas. Lisplank Kayu 2x3/30

VIII
1
2
3
4
5
6

PEK. TANGGA
Pek. Cor Tangga
Pek. Pas. Keramik Tangga 30 x 30
Pek. Railing Tangga
Pek. Railing Void
Pek. Cor Tangga Teras
Pek. Pas. Keramik Tangga Teras 30 x 30

IX
1
2
3
4
5
6
7
8
9
10
11
12

PEK. PLAFOND
Pek. Pas. Plafond Gypsum Lt. 1
Pek. Rangka Plafond Lt. 1
Pek. Pas. List Plafond Gypsum Lt. 1
Pek. Pas. Plafond Piri-piri Lt. 1
Pek. Rangka Plafond Piri-piri Lt. 1
Pek. Pas. List Plafond Piri-piri Lt. 1
Pek. Pas. Plafond Gypsum Lt. 2
Pek. Rangka Plafond Lt. 2
Pek. Pas. List Plafond Gypsum Lt. 2
Pek. Pas. Plafond Piri-piri Lt. 2
Pek. Rangka Plafond Piri-piri Lt. 2
Pek. Pas. List Plafond Piri-piri Lt. 2

X
1
2
3
4
5
6
7
8
9

PEK. PENGECATAN
Pek. Cat Minyak Listplank Kayu
Pek. Cat Dinding + Kolom Lt.1
Pek. Cat Plafond Gypsum Lt. 1
Pek. Cat Profil Beton Lt. 1
Pek. Cat Minyak Plafond Piri-piri Lt. 1
Pek. Cat Dinding + Kolom Lt.2
Pek. Cat Plafond Gypsum Lt. 2
Pek. Cat Profil Beton Lt. 2
Pek. Cat Minyak Plafond Piri-piri Lt. 2

XI PEK. KUSEN, PINTU DAN JENDELA


Terpasang komplit dengan aksesorisnya
1 Pek. Pas. Pintu P1
2 Pek. Pas. Pintu P2
3 Pek. Pas. Pintu P3
4 Pek. Pas. Pintu Fiber
5 Pek. Pas. Jendela J1
6 Pek. Pas. Jendela J2
7 Pek. Pas. Jendela J3
8 Pek. Pas. Jendela J4
9 Pek. Pas. Jendela J5
10 Pek. Pas. Jendela J6
11 Pek. Pas. Jendela J7
12 Pek. Pas. Ventilasi

VOLUME

1,120.72
1,120.72
141.25
81.42
143.34
194.61
81.71
81.71
7.00
81.42

M2
M2
M'
M'
M'
M'
M2
M2
Psg
M'

3.99
16.25
8.22
18.99
2.81
56.16

M3
M2
M'
M'
M3
M2

605.75
605.75
601.88
76.03
76.03
78.02
546.86
546.86
471.92
170.73
170.73
185.58

M2
M2
M'
M2
M2
M'
M2
M2
M'
M2
M2
M'

81.42
1,546.43
605.75
210.46
76.03
1,285.21
546.86
120.63
170.73

M2
M2
M2
M2
M2
M2
M2
M2
M2

2.00
14.00
10.00
10.00
27.00
4.00
16.00
6.00
3.00
2.00
22.00
8.00

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

HARGA
SATUAN
(Rp)
192,762.15
78,012.00
86,518.00
23,322.00
41,937.25
41,937.25
360,000.00
46,644.00
300,000.00
14,495.00

Sub Jumlah

2,865,129.00
88,752.50
400,000.00
400,000.00
670,150.00
88,752.50

Sub Jumlah

118,888.50
56,703.00
20,700.00
64,374.00
56,703.00
15,491.50
124,832.93
59,538.15
21,735.00
67,592.70
59,538.15
16,266.08

Sub Jumlah

47,130.35
25,636.25
25,636.25
25,636.25
47,130.35
26,918.06
26,918.06
26,918.06
47,130.35

Sub Jumlah

2,100,000.00
1,900,000.00
1,000,000.00
300,000.00
420,000.00
400,000.00
470,000.00
520,000.00
920,000.00
2,300,000.00
520,000.00
55,000.00

Sub Jumlah

N0

URAIAN PEKERJAAN

VOLUME

XII
1
2
3
4
5
6
7
8
9
10
11
12
13

PEK. PERLENGKAPAN ALAT SANITASI


Pek. Pas. Kloset Jongkok Lt. 1
Pek. Pas. Kloset Duduk Lt. 1
Pek. Pas. Bak Air Fiber Lt. 1
Pek. Pas.Washtafel Lt. 1
Pek. Pas. Kran Air Lt. 1
Pek. Pas. Floor Drain Lt. 1
Pek. Pas. Kloset Jongkok Lt. 2
Pek. Pas. Bak Air Fiber Lt. 2
Pek. Pas.Washtafel Lt. 2
Pek. Pas. Kran Air Lt. 2
Pek. Pas. Floor Drain Lt. 2
Pek. Pas. Septictank
Pek. Pas. Bak Peresapan

XIII
1
2
3

PEK. PLUMBING
Pek. Pas. Instalasi Pipa PVC Super dia. 3/4"
Pek. Pas. Instalasi Pipa PVC Super dia. 2"
Pek. Pas. Assesories Pipa PVC Super

65.00 M'
50.00 M'
1.00 Ls

XIV
1
2
3
4
5
6
7
8
9
10
11
12
13
14

PEK. ELEKTRIKAL
Pek. Pas. Sub Box Panel Lt. 1
Pek. Pas. Titik Api Lt. 1
Pek. Pas. Stop Kontak Lt.1
Pek. Pas. Saklar Ganda Lt.1
Pek. Pas. Saklar Tunggal Lt. 1
Pek. Pas. Lampu Pijar 25 watt Lt. 1
Pek. Pas. Lampu Box TL 2x20 watt Lt. 1
Pek. Pas. Sub Box Panel Lt. 2
Pek. Pas. Titik Api Lt. 2
Pek. Pas. Stop Kontak Lt.2
Pek. Pas. Saklar Ganda Lt.2
Pek. Pas. Saklar Tunggal Lt. 2
Pek. Pas. Lampu Pijar 25 watt Lt. 2
Pek. Pas. Lampu Box TL 2x20 watt Lt. 2

1.00
75.00
15.00
7.00
13.00
19.00
41.00
1.00
60.00
11.00
7.00
9.00
12.00
37.00

XV
1
2
3

PEK. LAIN-LAIN
Pek. Saluran Keliling
Pek. Pas. Box Control
Pek. Pembersihan Akhir

4.00
1.00
5.00
3.00
5.00
5.00
4.00
4.00
2.00
8.00
6.00
2.00
2.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit

Bh
Ttk
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
Bh
Bh
Bh
Bh
Bh

132.58 M'
18.00 Bh
1.00 Ls

HARGA
SATUAN
(Rp)
633,710.00
1,890,624.50
395,202.50
552,315.00
17,077.50
30,527.50
665,395.50
414,962.63
579,930.75
17,931.38
32,053.88
1,500,000.00
800,000.00

Sub Jumlah

15,692.10
58,612.65
200,000.00

Sub Jumlah

405,000.00
105,000.00
37,500.00
52,500.00
38,000.00
22,500.00
125,000.00
405,000.00
110,250.00
37,500.00
52,500.00
38,000.00
22,500.00
125,000.00

Sub Jumlah

75,083.19
75,000.00
1,500,000.00

Sub Jumlah

GAN DAERAH

GAN DAERAH

JUMLAH
HARGA
(Rp)
2,551,550.02
1,478,438.45
280,000.00
4,309,988.46
3,457,475.00
1,044,103.79
18,769,644.41
5,805,440.77
635,235.87
5,942,555.13
35,654,454.96
118,044,084.00
5,182,319.28
1,256,431.51
124,482,834.79

36,913,008.00
116,522,340.10
83,472,108.01
4,822,042.68
9,902,104.32
14,071,135.43
15,366,122.86
254,190,982.26
9,596,729.20
8,501,742.47
115,488,644.94
60,049,361.21
9,843,992.61
7,351,562.30
44,209,728.78
790,301,605.17
48,089,770.07
15,629,784.18
8,293,160.52
3,421,741.29
3,241,000.00
41,964,722.53
13,639,066.17
3,318,681.71
1,369,281.38
1,522,500.00
140,489,707.86
43,373,126.63
50,120,223.05
1,832,066.24
3,469,831.20
38,232,450.93
1,866,681.20
4,554,153.45
143,448,532.69

JUMLAH
HARGA
(Rp)
216,032,400.00
87,429,608.64
12,220,667.50
1,898,877.24
6,011,285.42
8,161,559.20
29,416,320.00
3,811,374.53
2,100,000.00
1,180,182.90
368,262,275.42
11,438,741.02
1,442,228.13
3,288,000.00
7,596,000.00
1,881,781.20
4,984,340.40
30,631,090.74
72,016,138.21
34,347,570.08
12,458,916.00
4,894,252.22
4,311,038.37
1,208,646.83
68,265,908.67
32,558,925.54
10,257,181.20
11,540,345.00
10,165,162.69
3,018,658.20
265,042,743.00
3,837,353.30
39,644,707.11
15,529,035.38
5,395,405.18
3,583,245.29
34,595,281.51
14,720,363.21
3,247,045.13
8,046,734.75
128,599,170.85

4,200,000.00
26,600,000.00
10,000,000.00
3,000,000.00
11,340,000.00
1,600,000.00
7,520,000.00
3,120,000.00
2,760,000.00
4,600,000.00
11,440,000.00
440,000.00
86,620,000.00

JUMLAH
HARGA
(Rp)
2,534,840.00
1,890,624.50
1,976,012.50
1,656,945.00
85,387.50
152,637.50
2,661,582.00
1,659,850.50
1,159,861.50
143,451.00
192,323.25
3,000,000.00
1,600,000.00
18,713,515.25
1,019,986.50
2,930,632.50
200,000.00
4,150,619.00
405,000.00
7,875,000.00
562,500.00
367,500.00
494,000.00
427,500.00
5,125,000.00
405,000.00
6,615,000.00
412,500.00
367,500.00
342,000.00
270,000.00
4,625,000.00
28,293,500.00
9,954,529.66
1,350,000.00
1,500,000.00
12,804,529.66

PERHITUNGAN VOLUME RUANG ICU

PEMBERSIHAN LOKASI
No

KETERANGAN
Ruang ICU
Teras Depan
Teras Belakang

B1

Dimensi (M')
B2
H

15.000
4.500
4.500

18.000
1.500
1.500

Luas (M2)
270.000
6.750
6.750

Jumlah Luas Total (M2)


1
1
1

Grand Total (M2)

270.000
6.750
6.750
283.500

PASANG PAPAN BOWPLANK


No

KETERANGAN
Ruang ICU
Teras Depan
Teras Belakang

B1
5.250
1.500
1.500

Dimensi (M')
B2
H
5.250
1.500
1.500

18.000
4.500
4.500

Kllng (M')
28.500
7.500
7.500

Jumlah Kllng Total (M')


2
1
1

Grand Total (M')

57.000
7.500
7.500
72.000

GALIAN TANAH PONDASI


No

KETERANGAN
Poer Pondasi
Sloof

B1
0.900
0.350

Dimensi (M')
B2
H
0.900
0.500

1.150
391.000

Vol (M3)
0.932
68.425

Jumlah
50
1

Grand Total (M3)

Vol Total (M3)


46.575
68.425
115.000

URUGAN PASIR BAWAH PONDASI


No

KETERANGAN
Poer Pondasi
Sloof

B1
0.900
0.350

Dimensi (M')
B2
H
0.900
0.050

0.050
391.000

Vol (M3)
0.041
6.843

Jumlah
50
1

Grand Total (M3)

Vol Total (M3)


2.025
6.843
8.868

URUGAN TANAH BAWAH LANTAI


No

KETERANGAN
Kantor

B1
704.360

Dimensi (M')
B2
H

0.480

Vol (M3)
338.093

Jumlah
1

Grand Total (M3)

Vol Total (M3)


338.093
338.093

URUGAN PASIR BAWAH LANTAI


No

KETERANGAN
Kantor

Grand Total (M3)

B1
704.360

Dimensi (M')
B2
H
0.070

Vol (M3)
49.305

Jumlah
1

Vol Total (M3)


49.305
49.305

PONDASI TAPAK 60X60 CM


No

KETERANGAN
Poer Pondasi

B1
0.800

Dimensi (M')
B2
H
0.800

0.300

Vol (M3)
0.192

Jumlah
50

Grand Total (M3)

Vol Total (M3)


9.600
9.600

PONDASI BATA
No

KETERANGAN

B1

Pondasi Pas. 1 bata

Dimensi (M')
B2
H
0.350

L
90.780

Luas (M2)
31.773

Jumlah Luas Total(M2)


1

Grand Total (M2)

31.773
31.773

RABEN PONDASI BATA


No

KETERANGAN
Pondasi Pas. 1 bata

Grand Total (M2)

B1

Dimensi (M')
B2
H
0.350

L
90.780

Luas (M2)
31.773

Jumlah Luas Total(M2)


2

63.546
63.546

BALOK SLOOF 25/40


No

KETERANGAN
Sloof 25/40

B1
0.250

Dimensi (M')
B2
H
0.400

L
391.000

Vol (M3)
39.100

Jumlah
1

Grand Total (Btg)

Vol Total (M3)


39.100
39.100

URUGAN KEMBALI
No

KETERANGAN
Galian Tanah Pondasi
Urugan Pasir Bawah Pondasi Tapak
Lantai Kerja Pondasi Tapak
Pondasi Tapak
Tiang pondasi Tapak

B1

0.300

Dimensi (M')
B2
H

0.300

0.700

Vol (M3)
115.000
8.868
8.868
9.600
0.063

Jumlah
1
-1
-1
-1
-50

Grand Total (M3)

Vol Total (M3)


115.000
-8.868
-8.868
-9.600
-3.150
84.515

KOLOM 30/30
No

KETERANGAN
Lantai
Lantai
Lantai
Lantai

1
2 elev. 8.50
2 elev. 9
2 elev. 10.2

B1
0.300
0.300
0.300
0.300

Dimensi (M')
B2
H
0.300
0.300
0.300
0.300

L
4.850
4.050
4.650
5.500

Vol (M3)
0.437
0.365
0.419
0.495

Jumlah
48
16
18
2

Grand Total (M3)

Vol Total (M3)


20.952
5.832
7.533
0.990
35.307

BALOK 25/45
No

KETERANGAN
Balok 25/45

B1
0.250

Dimensi (M')
B2
H
0.450

L
665.360

Vol (M3)
74.853

Jumlah
1

Grand Total (M3)

Vol Total (M3)


74.853
74.853

RENG BALOK 20/25


No

KETERANGAN
Reng Balok 20/25

B1
0.200

Dimensi (M')
B2
H
0.250

L
56.800

Vol (M3)
2.840

Jumlah
1

Grand Total (M3)

Vol Total (M3)


2.840
2.840

LISPLANK BETON
No

KETERANGAN
Listplank Beton
Listplank Beton Lt.1
Listplank Beton Lt.2

Grand Total (M3)

B1
0.120
0.120
0.120

Dimensi (M')
B2
H
0.550
0.550
0.550

L
247.600
62.020
185.580

Vol (M3)
16.342
4.093
12.248

Jumlah
1
1
1

Vol Total (M3)


16.342
4.093
12.248
16.342

PEK. KUSEN
No

KETERANGAN

B1

Dimensi (M')
B2
H

Vol (M3)

Jumlah

Vol Total (M3)

Space Kusen+daun jendela&pintu P1


Space daun jendela&pintu P1

2.000
1.900
0.825

2.700
2.200
0.400

0.130
0.130
0.130

0.702
0.543
0.043

2
-2
-4

1.404
-1.087
-0.172

Space Kusen+daun jendela&pintu P2


Space daun jendela&pintu P2

1.700
1.600
0.775

2.700
2.200
0.400

0.130
0.130
0.130

0.597
0.458
0.040

14
-14
-28

8.354
-6.406
-1.128

Space Kusen+daun jendela&pintu P3


Space daun jendela&pintu P3

0.900
0.800
0.800

2.700
2.200
0.400

0.130
0.130
0.130

0.316
0.229
0.042

10
-10
-10

3.159
-2.288
-0.416

Space Kusen Pintu Fiber


Space daun jendelapintu fiber

0.800
0.700

2.200
2.150

0.130
0.130

0.229
0.196

10
-10

2.288
-1.957

Space Kusen+daun jendela J1


Space daun jendela J1

0.800
0.700
0.700

2.150
1.500
0.500

0.130
0.130
0.130

0.224
0.137
0.046

27
-27
-27

6.037
-3.686
-1.229

Space Kusen+daun jendela J2


Space daun jendela J2

0.800

1.950

0.130
0.130
0.130

0.203
0.000
0.000

4
-8
-8

0.811
0.000
0.000

Space Kusen+daun jendela J3


Space daun jendela J3

0.800

3.250

0.130
0.130
0.130

0.338
0.000
0.000

16
-8
-8

5.408
0.000
0.000

Space Kusen+daun jendela J4


Space daun jendela J4

1.550

2.150

0.130
0.130
0.130

0.433
0.000
0.000

6
-8
-8

2.599
0.000
0.000

Space Kusen+daun jendela J5

1.750
0.875

2.450
0.301

0.130
0.130
0.130

0.557
0.039
0.000

3
3
-8

1.672
0.117
0.000

1.750
0.875

5.550
0.301

0.130
0.130
0.130

1.263
0.039
0.000

2
2
-8

2.525
0.078
0.000

Space Kusen+daun jendela J7


Space daun jendela J7

1.550

2.150

0.130
0.130
0.130

0.433
0.000
0.000

22
-8
-8

9.531
0.000
0.000

Space Kusen+kaca V1
Space kaca V1

0.800
0.700

0.600
0.500

0.130
0.130

0.062
0.046

8
-8

0.499
-0.364

Space daun jendela J5


Space Kusen+daun jendela J6
Space daun jendela J6

Grand Total (M3)

25.752

PAS. DINDING BATA 1:2


No

KETERANGAN

B1

Dinding bata 1:2


Dinding WC lt1
Dinding WC lt2

Dimensi (M')
B2
H
0.300
1.200
1.500

L
300.940
33.000
33.000

Luas (M2)
90.282
39.600
49.500

Jumlah Luas Total (M2)


1
1
1

Grand Total (M2)

90.282
39.600
49.500
129.882

PAS. DINDING BATA 1:4


No

KETERANGAN

B1

Dinding bata keseluruhan (lt. 1)


Dinding ekspos
Dinding bata keseluruhan (lt. 2)

Dimensi (M')
B2
H

3.550

300.940

4.050
4.550
0.950

104.000
87.000
44.960

Dinding bata 1:2


Space Kusen Lt. 1
Space Kusen Lt. 2

Luas (M2)
1068.337
110.591
421.200
395.850
42.712
129.882
275.830
167.659

Jumlah Luas Total (M2)


1
1
1
1
1
-1
-1
-1

Grand Total (M2)

1068.337
110.591
421.200
395.850
42.712
-129.882
-275.830
-167.659
1465.319

PEK. KUDA-KUDA KAYU


No

KETERANGAN

B1

Dimensi (M')
B2
H

Volume (M3) Jumlah

Vol Total (M3)

Kuda-Kuda K1
Kayu 6/12
Kayu 5/10

0.060
0.050

0.120
0.100

28.340
4.840

0.204
0.024

4
4

0.816
0.097

Kuda-Kuda K2
Kayu 6/12
Kayu 5/10

0.060
0.050

0.120
0.100

17.060
1.720

0.123
0.009

1
1

0.123
0.009

Kuda-kuda K3
Kayu 6/12
Kayu 5/10

0.060
0.050

0.120
0.100

17.040
2.720

0.123
0.014

1
1

0.123
0.014

Stengah kuda2
Kayu 6/12
Kayu 5/10

0.060
0.050

0.120
0.100

3.420
2.196

0.025
0.011

4
4

0.098
0.044

Skor Angin
Gording 5/10

0.050
0.050

0.100
0.100

29.780
204.000

0.149
1.020

1
1

0.149
1.020

Grand Total (M3)

2.492

PAS. ATAP
No

KETERANGAN
Atap depan dan belakang
Atap teras depan dan belakang
Atap Samping bagian atas

B1
13.270
8.430
16.500
2.030
5.930
2.680
7.020
5.740
16.800
13.160
4.430
5.930

Dimensi (M')
B2
H
8.430
4.410
7.400
4.210
2.030
7.020
2.040
4.410
7.400
4.810
4.190
3.390

7.020

Luas (M2)
76.167
37.176
52.700
8.546
17.313
18.814
11.099
25.313
59.532
43.667
18.562
12.163

4.410
4.350
2.450
4.920
4.860
2.610

Jumlah Luas Total (M2)


4
4
2
4
4
4
4
4
2
2
2
2

Grand Total (M2)

304.668
148.705
105.399
34.185
69.252
75.254
44.394
101.254
119.064
87.334
37.123
24.325
1150.958

SINGAP UKIR
No

KETERANGAN
Singap atap utama
Singap atap teras

B1
4.540
1.420

Dimensi (M')
B2
H

2.840
0.890

Luas (M2)
6.447
0.632

Jumlah Luas Total (M2)


2
2

Grand Total (M2)

12.894
1.264
14.157

LISTPLANK
No

KETERANGAN
Listplank
Listplank
Listplank
Listplank
Listplank
Listplank
Listplank

B1

depan dan belakang


konsol depan dan belakang
teras depan dan belakang
samping
konsol samping
teras samping
atap pelana

Dimensi (M')
B2
H
0.300
0.300
0.300
0.300
0.300
0.300
0.300

L
13.440
13.440
4.300
16.440
16.440
3.500
81.420

Luas (M2)
4.032
4.032
1.290
4.932
4.932
1.050
24.426

Jumlah Luas Total (M2)


2
2
2
2
2
4
1

Grand Total (M2)

8.064
8.064
2.580
9.864
9.864
4.200
24.426
67.062

PLAFOND GYPSUM
No

KETERANGAN

B1

Dimensi (M')
B2
H

Lt 1
Lt 2
Teras

Luas (M2)
567.435
546.858
38.310

Jumlah Luas Total (M2)


1
1
1

Grand Total (M2)

567.435
546.858
38.310
1152.603

PLAFOND PIRI-PIRI
No

KETERANGAN
Piri-piri depan dan belakang
Piri-piri samping
Piri-piri teras
Piri-piri pelana

Grand Total (M2)

B1
13.100
14.130
4.600
2.500
1.000

Dimensi (M')
B2
H

0.980
0.980
0.980
0.980
81.420

Luas (M2)
12.838
13.847
4.508
2.450
81.420

Jumlah Luas Total (M2)


4
4
2
2
1

51.352
55.390
9.016
4.900
81.420
202.078

COR LANTAI ICU


No

KETERANGAN
Lantai Ruang ICU

B1

Dimensi (M')
B2
H

13.870

10.870

0.100

Volume (M3) Jumlah


15.077

Grand Total (M3)

Vol Total (M3)


15.077
15.077

COR LANTAI TERAS


No

KETERANGAN
Lantai Teras

B1
2.500

Dimensi (M')
B2
H
2.450

0.100

Volume (M3) Jumlah


0.613

Grand Total (M3)

Vol Total (M3)


1.225
1.225

COR RABAT KELILING


No

KETERANGAN
Rabat tebal 7 cm

B1

Dimensi (M')
B2
H

13.100
14.130
2.500

0.850
0.850
0.850

L
0.070
0.070
0.070

Vol (M3)
0.779
0.841
0.149

Jumlah
2
2
2

Grand Total (M2)

Vol Total (M3)


1.559
1.681
0.298
3.538

LANTAI KERAMIK WC
No

KETERANGAN
Lantai Keramik WC 20X20

B1
1.370
1.370

Dimensi (M')
B2
H

1.870
2.000

Luas (M2)
2.562
2.740

Jumlah Luas Total (M2)


2
2

Grand Total (M2)

5.124
5.480
10.604

LANTAI KERAMIK RG ICU


No

KETERANGAN
Luas Ruang ICU
Luas teras
Lantai WC

B1

Dimensi (M')
B2
H

10.870
2.500

13.870
2.450

Luas (M2)
150.767
6.125
10.604

Jumlah Luas Total (M2)


1
2
-1

Grand Total (M2)

150.767
12.250
-10.604
152.413

PINTU PANIL
No

KETERANGAN
Pintu P3
Pintu P4
Kaca Mati P3

B1
0.800
0.800
0.550

Dimensi (M')
B2
H

2.050
2.050
0.350

Luas (M2)
1.640
1.640
0.193

Jumlah Luas Total (M2)


6
3
-6

Grand Total (M2)

9.840
4.920
-1.155
13.605

PAS. KACA MATI


No

KETERANGAN
Pintu P1
Pintu P2
Pintu P3
Pintu P4
Jendela J1
Jendela J2
Ventilasi V1

Grand Total (M2)

B1
0.580
0.560
0.560
0.600
0.550
0.600
0.600
0.600
0.600
0.600
0.500

Dimensi (M')
B2
H
0.200
1.860
1.860
0.200
0.350
0.200
0.200
0.850
0.200
0.850
0.440

Luas (M2)
0.116
1.042
1.042
0.120
0.193
0.120
0.120
0.510
0.120
0.510
0.220

Jumlah Luas Total (M2)


4
4
2
6
6
3
10
10
3
3
3

0.464
4.166
2.083
0.720
1.155
0.360
1.200
5.100
0.360
1.530
0.660

17.799

PAS. DAUN JENDELA


No

KETERANGAN

B1

Dimensi (M')
B2
H

Vol (M3)

Jumlah

Vol Total (M3)

Pintu P1

1.550
1.600
0.580
0.560

0.400
2.100
0.200
1.860

0.025
0.025
0.025
0.025

0.016
0.084
0.003
0.026

2
2
-4
-4

0.031
0.168
-0.012
-0.104

Pintu P2

1.600
0.560

2.100
1.860

0.025
0.025

0.084
0.026

1
-2

0.084
-0.052

Pintu P3

0.800
0.600

0.400
0.200

0.025
0.025

0.008
0.003

6
-6

0.048
-0.018

Pintu P4

0.800
0.600

0.400
0.200

0.025
0.025

0.008
0.003

3
-3

0.024
-0.009

Jendela J1

1.600
1.600
0.600
0.600

0.400
1.050
0.200
0.850

0.025
0.025
0.025
0.025

0.016
0.042
0.003
0.013

5
5
-10
-10

0.080
0.210
-0.030
-0.128

Jendela J2

0.800
0.800
0.600
0.600

0.400
1.050
0.200
0.850

0.025
0.025
0.025
0.025

0.008
0.021
0.003
0.013

3
3
-3
-3

0.024
0.063
-0.009
-0.038

Grand Total (M3)

0.332

CAT DINDING DAN KOLOM


No

KETERANGAN
Dinding 1:4
Dinding 1:2
Kolom
Kolom teras

B1

0.140
0.800

Dimensi (M')
B2
H

Luas (M2)
773.216
129.882
0.532
3.040

3.800
3.800

Jumlah Luas Total (M2)


2
1.0
18
4

Grand Total (M2)

1546.432
129.882
9.576
12.160
1698.050

CAT DAUN JENDELA


No

KETERANGAN

B1

Dimensi (M')
B2
H

Luas (M2)

Jumlah Luas Total (M2)

Pintu P1

0.800

2.050

1.640

14.760

Jendela J1

0.700
0.600

1.500
1.400

1.050
0.840

6
-6

6.300
-5.040

Jendela J2

0.700
0.600

1.000
0.900

0.700
0.540

8
-8

5.600
-4.320

1.311

1.311

Pinggir daun jendela


Grand Total (M2)

0.025

52.450

18.611

PEK. CAT KUSEN


No

KETERANGAN

B1

Luas Kusen
Bagian dalam kusen

Dimensi (M')
B2
H
0.130

L
52.450

Luas (M2)
396.180
6.819

Jumlah Luas Total (M2)


1
1

Grand Total (M2)

396.180
6.819
402.999

TERALIS
No

KETERANGAN

B1

Dimensi (M')
B2
H

Luas (M2)

Jumlah Luas Total (M2)

Pintu P1

1.550

0.400

0.620

1.240

Pintu P3

0.800

0.400

0.320

1.920

Pintu P4

0.800

0.400

0.320

0.960

Jendela J1

1.600
1.600

0.400
1.050

0.640
1.680

5
5

3.200
8.400

Jendela J2

0.800
0.800

0.400
1.050

0.320
0.840

3
3

0.960
2.520

Grand Total (M2)

19.200

REKAPITULASI
PROYEK

: PEMBANGUNAN KANTOR BADAN PENGELOLAAN KEUANGAN DAERAH


PEMKO DUMAI (1 UNIT)

PEKERJAAN

: PERENCANAAN KANTOR BADAN PENGELOLAAN KEUANGAN DAERAH

LOKASI

: KOTA DUMAI

TAHUN ANGGARAN

: 2006

PEMKO DUMAI

NO

JUMLAH HARGA

URAIAN PEKERJAAN

( Rp. )

PEK. PENDAHULUAN

4,309,988.46

PEK. GALIAN, URUGAN DAN LANTAI KERJA

PEK. PONDASI

124,482,834.79

PEK. STRUKTUR BETON

790,301,605.17

PEK. DINDING & PLESTERAN

140,489,707.86

PEK. KERAMIK LANTAI & DINDING

143,448,532.69

PEK. STRUKTUR ATAP

368,262,275.42

PEK. TANGGA

30,631,090.74

PEK. PLAFOND

265,042,743.00

10

PEK. PENGECATAN

128,599,170.85

11

PEK. KUSEN, PINTU DAN JENDELA

86,620,000.00

12

PEK. PERLENGKAPAN ALAT SANITASI

18,713,515.25

13

PEK. PLUMBING

14

PEK. ELEKTRIKAL

28,293,500.00

15

PEK. LAIN-LAIN

12,804,529.66

35,654,454.96

4,150,619.00

JUMLAH

2,181,804,567.86

PPN 10%

218,180,456.79

TOTAL

2,399,985,024.65

DIBULATKAN

2,399,985,000.00

Terbilang : Dua milyar tiga ratus sembilan puluh sembilan juta sembilan ratus delapan puluh lima
ribu rupiah
Pekanbaru,

Juli 2006

Dibuat Oleh,
KONSULTAN PERENCANA
CV. BINA RIAU JAYA KONSULTAN
hjhjhjhj
k

HAZNI SYAFRINA, ST
Direktur

Anda mungkin juga menyukai