Anda di halaman 1dari 75

Pedoman Pengelolaan Rantai Suplai

Lampiran no : FL-002
Formulir No : SC.02

FORMULIR
PERHITUNGAN TINGKAT KOMPONEN LOKAL DALAM NEGERI
( DOMESTIC CONTENT CALCULATION )
Formulir N0. : SC-02
Jumlah Nilai Penawaran :

Rp

17,577,102,880.00

( Total Quoted Price )


Item
URAIAN
(DESCRIPTION)

% Komponen

KDN Penawaran

Dalam

( Quoted DC )

Negeri/KDN

Nilai

( % Domestic

(Value)

d=axc

Nilai Per Item


(Item Value)

Content/DC )

a
A.

BARANG ( GOODS )
I. Material Terpakai

2,522,008,680.00

14.35

100%

2,522,008,680.00

14.35

169,848,000.00

0.97

100%

169,848,000.00

0.97

(Material Used )
II. Peralatan
( Equipment )

Sub Jumlah ( Sub Total ) A


B.

2,691,856,680.00

15.31

2,691,856,680.00

15.31

JASA ( SERVICES )
III. Personil / Konsultan

3,695,802,000.00

21.03

100%

3,695,802,000.00

21.03

876,506,400.00

4.99

100%

876,506,400.00

4.99

10,312,937,800.00

58.67

100%

10,312,937,800.00

58.67

( Personel )
IV. Alat Kerja/Peralatan
(Equipment)
V.Konstruksi/Fabrikasi
(Construction/Fabrication)
V. Jasa Umum,dll
(Other Services )
Sub Jumlah ( Sub Total ) B

C. JUMLAH ( TOTAL )
= Sub Jumlah ( Sub Total ) A + B

14,885,246,200.00

84.69

14,885,246,200.00

17,577,102,880.00

100.00

17,577,102,880.00

Nilai Per Item / jumlah nilai Penawaran * 100%

Nilai KDN Penawaran / jumlah nilai Penawaran * 100%

Catatan ( Note )
1 Personil / Konsultan Kerja dll
(Personnel )
2 Alat Kerja / Peralatan
(Equipment)
3 Kontruksi / Fabrikasi
(Contruction/Fabrication)

: Rekayasa,Survey Perencanaan,Pengawasan, Management, Tenaga dll


: Engineering, Design Survey ,Suvervisory, Management, Labour,etc
: Sewa rig, sewa kendaraan, sewa kapal , sewa Pompa dll.
: Rig rental , vehicle Rental, Vessel Rental , Pump Rental ,etc
: Kontruksi Sipil , Mesin, Listrik dll.
: Civil contruction, Machines,electricity, etc.

4 Jasa Umum, dll

: Pengurusan Asuransi sewa rumah dll.

( Other service )

: Handling Insurance House Leasing dll.

5 Material terpakai

: Pipa cement, chemical, dll.

(Material Used )

: Pipe cement, chemical, dll.

6 Peralatan
(Equipment)

: Pompa , kompressor, generator, dll.


: Pump, compressor, generator, etc.

84.69
100.00

EXHIBIT C
COMPENSATION
CIVIL MAINTENANCE SERVICES
BQ

NO

DESCRIPTION

Unit

PROJECT MANAGEMENT

COST (Rupah)

UNIT PRICE
Price (Rp)

Monhtly

28 Months

Cost (Rupiah)
c

c=axb

d = c x 28

Qty

Unit

1.2

Supervisor Manpower Supply

Ps

Month

12,442,500.00

24,885,000.00

1.3

HSE Inspector Manpower Supply

Ps

Month

12,442,000.00

24,884,000.00

696,752,000.00

49,769,000.00

1,393,532,000.00

Sub Total 1
2
2.6

CIVIL MAINTENANCE - MAN POWER SUPPLY


Call Out personel

Ps

a
24,108

b
Daily

d=axb

133,500.00

3,218,418,000.00

Sub Total 2
4

TRANSPORTATION

4.1

Double cabin 4 x 4

4.3

BBM, Solar

696,780,000.00

Ea

Month

Ltr/day

25

Ltr

Sub Total 4
TOTAL ESTIMATE CONTRACT VALUE - 28 Months
Total rata - rata pembiayaan per bulan

3,218,418,000.00

c=axb

d = c x 28

1,694,500.00

1,694,500.00

47,446,000.00

5,500.00

16,500,000.00

462,000,000.00

18,194,500.00

509,446,000.00
IDR

5,121,396,000.00

IDR

182,907,000.00

Note :
1 Formula For 4.3 BBM, Solar "Transfortation", in column Monthly or column C should be filled : c = a x b x 30 days x 4 unit
2 5.1 Capex Maintenance & Opec should be filled with Total estimated price of Unit Price (Supply & Instal)
3 5.2 Supply Material should be filled with Total estimated price of Material Suply Only
4 5.3 Painting should be filled with Total estimated price of Painting works

17,220

FIX Cost/ bulan

Gaji

Over Time

Total

Thr

Pesangon

Cuti

Cto

Svp 4 orang

9,500,000

791,667

791,666.67

791,666.67

2,000,000

HSE 4

9,150,000

762,500

762,500.00

762,500.00

2,500,000

18,650,000

1,554,167

1,554,166.67

1,554,166.67

4,500,000

Call out

6,000,000

2,861,272

8,861,272

500,000.00

500,000.00

500,000.00

6,000,000

2,861,272

8,861,272

500,000.00

500,000.00

500,000.00

24,108
28

##########

22.64

Total fix cost/ bulan

Invoice/ bulan

27,812,500.00

49,769,000.00

10,361,271.68

total

selisih

21,956,500.00

(10,361,271.68)
#REF!

EXHIBIT C
COMPENSATION
CIVIL MAINTENANCE SERVICES
BQ

NO

DESCRIPTION

Unit

PROJECT MANAGEMENT

COST (Rupah)

UNIT PRICE
Price (Rp)

Monhtly

36 Months

Cost (Rupiah)
c

c=axb

d = c x 36

Qty

Unit

1.1

Field Manager

Ps

Month

1,891,500.00

3,783,000.00

136,188,000.00

1.2

Supervisor

Ps

Month

1,891,500.00

7,566,000.00

272,376,000.00

1.3

HSE Inspector

Ps

Month

1,891,500.00

7,566,000.00

272,376,000.00

Sub Total 1
2

680,940,000.00

CIVIL MAINTENANCE - MAN POWER SUPPLY

d=axb

2.1

Foremen (2 Person every day)

Ps

1900

Daily

126,100.00

239,590,000.00

2.2

Mansory (3 Person every day)

Ps

2700

Daily

126,100.00

340,470,000.00

2.3

Carpenter (3 Person every day)

Ps

2400

Daily

126,100.00

302,640,000.00

2.4

Plumber (2 Person every day)

Ps

1520

Daily

126,100.00

191,672,000.00

2.5

Skill Labour (8 Person every day)

Ps

4320

Daily

126,100.00

544,752,000.00

2.6

Call Out personel

Ps

270

Daily

125,400.00

33,858,000.00

Sub Total 2
3
3.1

1,652,982,000.00

SCAFFOLDING :

c=axb

d = c x 36

Material

3.1.1

Tubes (6m)

Jts

1,500 Month

1,500.00

2,250,000.00

81,000,000.00

3.1.2

Couplers & Fitting

Ea

2,800 Month

300.00

840,000.00

30,240,000.00

3.1.3

Wodden Plank (50 mm thick, 250 mm widh, Sheet


3 M Length)
400 Month

3,900.00

1,560,000.00

56,160,000.00

3.1.4

Alluminium Ladder

6,800.00

68,000.00

Ea

10

Month

2,448,000.00

Sub Total 3.1


3.2

169,848,000.00

Manpower

c=axb

d = c x 36

3.2.1

Foremen (1 person every day)

Ps

Month

1,891,500.00

3,783,000.00

136,188,000.00

3.2.2

Scaffolder (4 person every day)

Ps

Month

1,891,500.00

15,132,000.00

544,752,000.00

3.2.3

Skill labour (5 person every day)

Ps

10

Month

1,891,500.00

18,915,000.00

680,940,000.00

Sub Total 3.2


4

1,361,880,000.00

TRANSPORTATION

c=axb

d = c x 36

4.1

Double cabin 4 x 4

Ea

Month

1,694,500.00

5,083,500.00

4.2

PS truck

Ea

Month

2,763,900.00

2,763,900.00

183,006,000.00
99,500,400.00

4.3

BBM, Solar

Ltr/day

25

Ltr

5,500.00

16,500,000.00

594,000,000.00

Sub Total 4
5

876,506,400.00

WORK PACKAGE

5.1

Capex Maintenance & Opec

Lot

9,286,127,800.00

5.2

Suplly Material

Lot

2,522,008,680.00

5.3

Painting

Lot

1,026,810,000.00

Sub Total 5
TOTAL ESTIMATE CONTRACT VALUE - 36 Months
Total rata - rata pembiayaan per bulan

12,834,946,480.00
IDR 17,577,102,880.00
IDR

Note :
1 Formula For 4.3 BBM, Solar "Transfortation", in column Monthly or column C should be filled : c = a x b x 30 days x 4 unit
2 5.1 Capex Maintenance & Opec should be filled with Total estimated price of Unit Price (Supply & Instal)
3 5.2 Supply Material should be filled with Total estimated price of Material Suply Only
4 5.3 Painting should be filled with Total estimated price of Painting works

488,252,857.78

22,618,691,459

77.71

CS-136478484 Civil Maintenance Services

SUMATERA CIVIL MAINTENANCE CONTRACT


BILL OF QUANTITIES
PAINTING WORKS
NO.

DESCRIPTION

UNIT

VOLUME

PRICE
(Rp.)

Painting Camp (oil Paint)

M2

3,200

26,000

Painting Camp (emulsion Paint Paint)

M2

11,500

33,200

General oil Paint for support/ post and stopper

M2

2,100

39,000

Painting for piping

M2

3,100

39,000

Hot resistence painting for piping and skid

M2

1,100

94,200

Acid Resistence for piping and skid

M2

1,200

54,700

Chainlink fence painting

M2

7,500

25,300

TOTAL ESTIMATED PRICE

TOTAL ESTIMATED
(Rp)

Rp.

( Say In Word : Nine Hundred And Fourty- Two Million Rupiahs)

Bill Of Quantity

Page 7 of 75

CS-136478484 Civil Maintenance Services

ACT

TOTAL ESTIMATED
(Rp)
83,200,000
381,800,000
81,900,000
120,900,000
103,620,000
65,640,000
189,750,000

1,026,810,000

Bill Of Quantity

Page 8 of 75

CS-136478484 Civil Maintenance Services

SUMATERA CIVIL MAINTENANCE CONTRACT


BILL OF QUANTITIES CIVIL WORK

NO.

DESCRIPTION

PRICE

UNIT

TOTAL ESTIMATED
PRICE

UNIT PRICE (Supply & Install)


1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
1
2
3
4
5
6
7
8
1
2
3
4
5

Excavation < 1.5 m, commond soil


Excavation > 1.5 m, comomond soil
Disposal < 15 m, used manual
Disposal; 15 < Disposal < 100 m, used manual
Disposal; 100 < Disposal < 1000 m, used light vehicle
Sand Bedding 100 THK
Backfill & Compaction (used tamping rammer)
Sand Bedding 250 THK
Concrete Work
Plastic Sheet 1,2 x 50 m
Lean Concrete K-125 ( Type I Cement )
Formwork by Plywood minimum 12 mm thk
Reinforcement (rebar) U 39
Anchor Bolt min dia 16 mm
Concrete K-175 ( Type I Cement )
Concrete K-210 ( Type I Cement )
Concrete K-225 ( Type I Cement )
Grouting minimum K400
Wall Instalation Work
Brick Wall, commond brick 10 x10 x20 cm
Plastering & Rendering 1 pc : 3 sand & Rendering
Install'n Gypsum 12 mm include hollo frame
Install'n Gypsum 12 mm exclude hollo frame
Acustic Board (inc. Alumunium Frame + Hanger)
Plaster Board
Plaster Board (incl. Wood Frame + Hanger )
Stell Structural Works & Roofing Work
Stell Structural Works (carbon Steel)
Bolt & Nut Dia 9 - 19 mm (carbon Steel)
Corrugated metal roofing (klip lock)
Ridge Chapping (Galvanize)
Flashing ( Galvanize)
Zink Gutter BJLS 30 (Galvanize)
Corrugated roof zinc 0,35 thk
Ceiling Work
Plaffond plywood 6 mm, good quality
Plaffond plywood 9 mm, good quality
Calciboard 5 mm (Not Include Frame)
Sanitary Work
Western Closet ( inc acessories ), good Quality
Squatsing Closet ( inc acessories ), good Quality
Urinoir ( inc acessories ), good Quality
Wash Basin, good quality
Shower Head, good quality
Hand Shower, good quality
Toilet Shower, good quality
Valve for Shower, good quality
Plumbing Work
Down Sport PVC Pipe Dia. 4" minimum AW
Install pipe PVC size <=3" minimum AW
Install pipe PVC size >=3" minimum AW
Instal pipe galvanize size <=3" minimum sch 40
Instal pipe galvanize size >=3" minimum sch 40

Bill Of Quantity

M3
M3
M3
M3
M3
M3
M3
M3

1,250
950
600
240
240
120
960
130

89,600.00
98,100.00
29,600.00
53,500.00
124,200.00
245,000.00
34,600.00
245,000.00

roll
M3
M2
Kg
Kg
M3
M3
M3
M3

240
460
8,940
50,000
50
1,100
800
900
250

51,000.00
805,000.00
78,400.00
18,400.00
45,500.00
869,500.00
923,500.00
977,500.00
45,100.00

M2
M2
M2
M2
M2
M2
M2

2,400
2,400
300
320
48
144
48

129,100.00
57,500.00
234,300.00
72,400.00
252,700.00
40,100.00
72,400.00

Kg
Kg
M2
M'
M'
M'
M2

2,400
60
144
48
96
230
750

32,700.00
28,700.00
85,000.00
63,800.00
54,200.00
101,800.00
69,600.00

M2
M2
M2

840
650
201

73,900.00
110,400.00
96,400.00

Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea

15
15
12
12
25
35
35
54

2,130,000.00
2,646,000.00
1,628,700.00
2,066,400.00
922,000.00
275,200.00
154,000.00
112,600.00

M'
M'
M'
M'
M'

48
720
720
720
720

159,500.00
80,300.00
80,300.00
75,400.00
137,900.00

112,000,000.00
93,195,000.00
17,760,000.00
12,840,000.00
29,808,000.00
29,400,000.00
33,216,000.00
31,850,000.00
12,240,000.00
370,300,000.00
700,896,000.00
920,000,000.00
2,275,000.00
956,450,000.00
738,800,000.00
879,750,000.00
11,275,000.00
309,840,000.00
138,000,000.00
70,290,000.00
23,168,000.00
12,129,600.00
5,774,400.00
3,475,200.00
78,480,000.00
1,722,000.00
12,240,000.00
3,062,400.00
5,203,200.00
23,414,000.00
52,200,000.00
62,076,000.00
71,760,000.00
19,376,400.00
31,950,000.00
39,690,000.00
19,544,400.00
24,796,800.00
23,050,000.00
9,632,000.00
5,390,000.00
6,080,400.00
7,656,000.00
57,816,000.00
57,816,000.00
54,288,000.00
99,288,000.00

9 of 75

CS-136478484 Civil Maintenance Services

NO.

DESCRIPTION

PRICE

UNIT

TOTAL ESTIMATED
PRICE

UNIT PRICE (Supply & Install)

1
2
3
4
1
2
3
4
5
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Tile Instalation Work


Ceramik Tile (inc. Mortar) for Floor 0,3 x 0,3 M KW 1
M2
Ceramik Tile (inc. Mortar) for Wall 0,2 x 0,2 M KW 1
M2
Granit Tile, good quality
M2
Vinil Tile, minimum 3mm thk, good quality
M2
Door Installation work
Allumunium door Frame 2.1 m x 0.9m, clear, good quality
Unit
Allumunium door Frame 2.1 m x 180 m & acc'ries, clear, good quality
Unit
Alluminium Sliding window 1.2 m x 60m & acc'ries, clear, good quality
Set
Door leaf type Panel 0.82 m x 2.2m
Ea
Bug/ Bird Screen Galvanice Door inc. Frame, Hanger & acc'ries 2.1Eax 1 m
Key etc Instalation Work
Handle Lock door 1 set or equivalent, good quality
Ea
Cylinder lock, good quality
Ea
Door Closer, good quality
Ea
Hinge Door size 4", good quality
Ea
Hinge furniture, good quality
Ea
Drawer lock, good quality
Ea
"Gerendel" good quality
Ea
Other Work
M'
Galvanize Steel Chain Dia. 8 mm
Insulation (chainlink, aluminium single sided, glasswool)
M2
Formica
M2
Polyprint
M2
Teak Wood
M2
Soft Board
M2
Industrial Chain Link Pole 2m' & Concrete L 70.70.7
Ea
Unit
Vehicle Gates & Foundation
Personal Gate
Unit
Polycarbonate 5 mm
M2
Supply & Install Barbed Wire Fencing 5 Layer, galvanize
M1
Supply & Install Concrete Ditch 60x40, K 225
M1
Supply & Install Chain Link Fencing, galvanize
M2
Cutting Grass flowline/ pipeline, max grass height 30 cm
Ha

TOTAL ESTIMATED PRICE

700
700
710
360

110,500.00
100,900.00
309,500.00
156,400.00

17
23
12
25
48

458,200.00
526,200.00
318,500.00
1,482,400.00
151,100.00

60
60
60
60
60
60
60

345,400.00
356,200.00
297,400.00
32,000.00
32,000.00
41,500.00
40,600.00

77,350,000.00
70,630,000.00
219,745,000.00
56,304,000.00
7,789,400.00
12,102,600.00
3,822,000.00
37,060,000.00
7,252,800.00
20,724,000.00
21,372,000.00
17,844,000.00
1,920,000.00
1,920,000.00
2,490,000.00
2,436,000.00

120
96
408
60
60
60
690
15
14
50
1,970
375
1,950
450

381,100.00
52,700.00
115,400.00
94,400.00
78,600.00
88,100.00
1,983,100.00
7,393,600.00
3,244,200.00
112,700.00
36,000.00
298,600.00
40,900.00
1,194,700.00

45,732,000.00
5,059,200.00
47,083,200.00
5,664,000.00
4,716,000.00
5,286,000.00
1,368,339,000.00
110,904,000.00
45,418,800.00
5,635,000.00
70,920,000.00
111,975,000.00
79,755,000.00
537,615,000.00

Rp.

9,286,127,800

( Say In Word : Nine Billion Ninety Five Million Eight Hundred And Fifty Four Thousand thirty Hundred Rupiahs)

Bill Of Quantity

10 of 75

CS-13647884 Civil Maintenance Services

SUMATERA CIVIL MAINTENANCE CONTRACT


BILL OF QUANTITIES CIVIL WORK
NO.

DESCRIPTION

UNIT

VOLUME

PRICE
(Rp.)

TOTAL ESTIMATED
(Rp)

MATERIAL SUPPLY ONLY


Concrete Material
1
2
3
4
5
6
7
8

Gravel 2 - 3
Gravel 3 - 5
Sand for Sand Blasting
Sand Building
Portland Cement ( 50 kg )
Chicken Mess, galvanize
Wire Mesh M6. 150
Wire, Tie, 1mm, Mild Steel

1
2
3
4

Timber minimum class 2


Plywood 6 mm, good quality
Plywood 12 mm, good quality
Plywood 18 mm, good quality

1
2
3
4
5
6
7
8
9
10

PVC Pipe dia. 4 inch minimum AW


PVC Pipe dia. 3 inch minimum AW
PVC Pipe dia. 2 inch minimum AW
PVC Pipe dia. 1,5 inch minimum AW
PVC Pipe dia. 1 1/4 inch minimum AW
PVC Pipe dia. 1 inch minimum AW
PVC Pipe dia. 3/4 inch minimum AW
Adhesive, Synthetic, 601, Rubber 1/2 Kg/ Can
Pipe, 1/2 In, Min AW, Lg 13 Ft, Conn Socket, PVC
Adafter, Pipe, 1/2 IN MNPT x Socket,
minimum AW, PVC
Adapter, Pipe, Hex Head, 2 IN FNPT X 2 IN
Socket, minimum AW, PVC
Coupling, Pipe, Size, 1 IN Thereaded Femele
x 1 IN Socket, PVC minimum AW
Copling, Pipe, Size 1 IN, Socket, PVC, minimum AW
Coupling, Pipe, Size, 1/2 IN Thereaded Femele
x 1/2 IN Socket, PVC minimum AW
Coupling, Pipe, Socket, 1-1/4 IN, minimum AW, PVC
Coupling , Pipe, Threaded, 1 IN MNPT, PVC; minimum AW
Coupling, Pipe, Threaded, 1 - 1/2 IN FNPT, PVC; minimum AW
Coupling , Pipe, Threaded, 1 - 1/2 IN MNPT, PVC; minimum AW
Elbow, Pipe, Socket, 1 - 1/2 IN, minimum AW, mat'l PVC
Elbow, Socket, Size 2 IN, PVC, RAD 90 DEG
Elbow, Pipe, Size 3/4 IN, Socket, PVC, minimum AW,
RAD 90 DEG
Elbow, Pipe, Socket, 1 IN, minimum AW, RAD 45 DEG, PVC
Elbow, Pipe, Socket, 1 IN, minimum AW, RAD 90 DEG, PVC
Elbow, Pipe, Socket, 1/2 IN, minimum AW, RAD 45 DEG, PVC
Elbow, Pipe, Socket, 1/2 IN, minimum AW, RAD 90 DEG, PVC
Elbow, Pipe, Socket, 1 - 1/4 IN, minimum AW, RAD 90 DEG, PVC
Elbow, Pipe, Socket, 3/4 IN, minimum AW, RAD 45 DEG, PVC
Reducer, Pipe, Concentric, Socket, 1 - 1/2 x 1 IN, min AW PVC
Reducer, Pipe, Concentric, Socket, 1 - 1/2 x 1/2 IN, min AW PVC
Reducer, Pipe, Concentric, Socket, 2 x1-1/2 IN, min AW PVC
Reducer, Pipe, Concentric, Socket, 3/4 x1/2 IN, min AW PVC
Reducer, Pipe; Dia 1 x 1/2 IN, minimum AW
Reducer, Conn Socket, Mat'l PVC; minimum AW
Socket, Pipe, 1 IN Lg 4 M, Plastic, PVC, minimum AW
Socket, Pipe, 1/2 IN, Lg 4 M, Plastic, PVC, minimum AW
Tee, 1/2 IN, Mat'l PVC, minimum AW, Socket ;
Tropical Glue, Basmatl Solvent Cement,
Appl PVC Pipe and Fitting ;

M3
M3
M3
M3
bag
M2
M2
Kg

750
950
225
2,700
2,800
3,300
850
300

450,000.00
450,000.00
138,000.00
138,000.00
54,000.00
27,000.00
31,746.00
7,300.00

M3
Sheet
Sheet
Sheet

45
500
500
500

1,620,000.00
78,000.00
174,000.00
240,000.00

Ea
Ea
Ea
Ea
Ea
Ea
Ea
Can
Ea
Ea

90
90
90
90
90
90
90
450
40
40

371,400.00
223,920.00
111,000.00
85,800.00
76,200.00
51,000.00
37,200.00
20,400.00
26,880.00
1,200.00

Ea

30

9,180.00

Ea

30

2,460.00

Ea

30

1,920.00

Ea
Ea
Ea
Ea
Ea
Ea

87
90
30
30
30
30

5,880.00
4,500.00
9,840.00
9,840.00
5,820.00
9,180.00

Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Can

30
30
60
60
60
60
60
50
50
50
50
30
30
30
30
30
70

1,920.00
2,520.00
2,520.00
1,200.00
1,320.00
4,080.00
1,620.00
4,680.00
3,540.00
8,040.00
1,650.00
4,680.00
3,540.00
2,400.00
1,200.00
1,920.00
20,400.00

Fomwork Materials

Plumbing Material

11
12
13

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Bill Of Quantity

Page 11 of 75

CS-13647884 Civil Maintenance Services


NO.

DESCRIPTION

UNIT

VOLUME

PRICE
(Rp.)

TOTAL ESTIMATED
(Rp)

MATERIAL SUPPLY ONLY


Concrete Material
Door Lock Material
1
2
3
4
5
6
7
8

Lock - Set, door, Double Cylinder,


1 x 7 IN, Steel, good quality
Lock - Set, door, 1/2 x 2-1/2 x 9 -1/2,
IN, Steel, good quality
Lock - Set, door, Type 36 - L, 3/4 x
1 -3/4 x 11 -1/2, Steel; good quality
Lock - Set, door, Type 49 - L, 1/2 x 3 - 1/2
x 9 - 1/2 IN, Steel ; good quality
Lock - Set, door, Type Extra - A, 40 mm,
Steel ; good quality
Lock - Set, door, Standart, Type Spain,
Steel, Plated ; good quality
Lock - Set, door, Type 693 LD
Standart, Steel, Plated ; good quality
Lock - Set, door, Type England,
1/2 x 2 - 1/2 x 6 IN, Steel ; good quality

Ea

30

93,000.00

Ea

25

890,400.00

Ea

25

774,000.00

Ea

25

956,400.00

Ea

25

174,000.00

Ea

25

144,000.00

Ea

30

48,000.00

Ea

30

79,200.00

Ea
Can

45
45

19,200.00
43,056.00

Can
Ea

25
25

90,000.00
6,000.00

Can
Ea

50
40

22,800.00
5,400.00

M2

70

134,400.00

Can
Ea

45
68

20,400.00
4,320,000.00

Box
Zak

300
200

270,000.00
81,000.00

35
60
70
443
325
12,000

3,600,000.00
102,000.00
84,000.00
36,000.00
42,000.00
600.00

Painting Material
1
2
3
4
5
6

Brush, Paint, 4 In ; good quality


Thinner, Liquid, Cap 1 Kg/ Can, Appl for
Mixing Paints ; good quality
Varnish, Oil, Wood Protection, Package 1 ltr/Can, good quality
Brush, Wire, Scrate, 1 x 10 IN
Carbon Steel, Handle Wood ;
Putty, Wood Filler, Impra SH 113, Teak ;
Mattock

Other Material
1

2
3

4
5
6
7
8
9
10
11

Panel, Ceiling, Suspended, Acoustic


thk 15 mm, Lg 1210 mm, W.603 mm,
Colour White
Adhesive, Synthetic, Glue, White, Cap 1 Kg/ Can
Grating, Metal, Matl Galvanish, Length 6100 mm,
Width 900 mm, Load Bea 30 x 5 mm, Load Bar
30 mm, Cross RO 100 mm
Acoustic Tile
( 15 mm x 59 mm X 119 cm );
Cement, Concrete, Color White, VOL 40,
Cap Kg/Zak ;
Terpaulin Sheet 20m x 20 m
Glass 40% 5 mm
Glass Clear 5mm
Concrete Nail
Insulation (chainlink, aluminium single sided, glasswool)
Brick wall, commond brick 10 x 10 20 cm

TOTAL ESTIMATED PRICE

Sheet
M1
M1
Kg
M1
Ea

Rp.

( Say In Word : Two Billion Five Hundred And Tweenty Two Million And Eight Thousand Six Hundred And Eighty Rupiahs)

Bill Of Quantity

Page 12 of 75

CS-13647884 Civil Maintenance Services

RACT

TOTAL ESTIMATED
(Rp)

337,500,000
427,500,000
31,050,000
372,600,000
151,200,000
89,100,000
26,984,100
2,190,000
72,900,000
39,000,000
87,000,000
120,000,000
33,426,000
20,152,800
9,990,000
7,722,000
6,858,000
4,590,000
3,348,000
9,180,000
1,075,200
48,000
275,400
73,800
57,600

511,560
405,000
295,200
295,200
174,600
275,400
57,600
75,600
151,200
72,000
79,200
244,800
97,200
234,000
177,000
402,000
82,500
140,400
106,200
72,000
36,000
57,600
1,428,000

Bill Of Quantity

Page 13 of 75

CS-13647884 Civil Maintenance Services


TOTAL ESTIMATED
(Rp)

2,790,000
22,260,000
19,350,000
23,910,000
4,350,000
3,600,000
1,440,000

2,376,000
864,000
1,937,520
2,250,000
150,000
1,140,000
216,000
9,408,000

918,000
293,760,000

81,000,000
16,200,000
126,000,000
6,120,000
5,880,000
15,948,000
13,650,000
7,200,000

2,522,008,680

x Hundred And Eighty Rupiahs)

Bill Of Quantity

Page 14 of 75

Analisa

15 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
1 Month Personnel
2.000 Person
4.000 Person
4.000 Person

Field Manager
Supervisor
Safety Inspector

@ Rp.
@ Rp.
@ Rp.

1,891,500
1,891,500
1,891,500

TOTAL

Rp.
Rp.
Rp.
Rp.

1 Month Day To Day Personnel


1 M3

2.000 Person
EXCAVATION < 1.5 M
0.909 Person
0.030 Person

Forement

@ Rp.

126,100

Rp.

Helper
Foreman

@ Rp.
@ Rp.

94,300
126,100

Rp.
Rp.

TOTAL
1 M3

Rp.

EXCAVATION > 1.5 M


1.000 Person
0.030 Person

Helper
Foreman

@ Rp.
@ Rp.

94,300
126,100

TOTAL
1 M3

Rp.

DISPOSAL < 15 M
0.300 Person
0.010 Person

Helper
Foreman

@ Rp.
@ Rp.

94,300
126,100

TOTAL
1 M3

Rp.

Helper
Foreman

@ Rp.
@ Rp.

94,300
126,100

TOTAL

Rp.

Helper
Foreman

@ Rp.
@ Rp.

94,300
126,100

TOTAL

Rp.
Rp.
Rp.

BACKFIIL & COMPACTION


0.125 Unit

Hand Compactor

@ Rp.

80,000

Rp.

0.260 Person

Helper

@ Rp.

94,300

Rp.

TOTAL
1 ROLL PLASTIC SHEET 1,2 x 50 M
1 M2 PLASTIC SHEET 1,2 x 50 M
1.000 M2
Plastic Sheet
0.400 Person
Labour

@ Rp.
@ Rp.

Rp.

13,200
94,300

TOTAL
1 M3

Rp.
Rp.

DISPOSAL > 100 DISPOSAL < 1000 M


1.250 Person
0.050 Person

1 M2

Rp.
Rp.

DISPOSAL > 15 DISPOSAL < 100 M


0.500 Person
0.050 Person

1 M3

Rp.
Rp.

LEAN CONCRETE K-125


0.820 M3
0.500 M3
4.000 Zak
0.250 Unit
0.100 Person
0.250 Person
1.000 Person

Gravel
Sand
Cement Type I
Concrete Mixer
Foreman
Masonary
Helper

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

TOTAL

Rp.
Rp.
Rp.

450,000
138,000
54,000
50,000
126,100
126,100
94,300

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Analisa

16 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT

10 M2 FORMWORK
0.400
4.000
0.100
0.260
0.500

M3
Kg
Person
Person
Person

Timber
Nail
Foreman
Carpenter
Helper

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1,620,000
10,800
126,100
126,100
94,300

TOTAL
for 1 M2 Rp. 2,052.000
783,746
: 10 : 10
1 M2

Rp.
Rp.

Instal Wiremesh M-8


1.000 M2
0.001 Person
0.010 Person

Wire
Foreman
Skill

@ Rp.
@ Rp.
@ Rp.

54,000
126,100
126,100

TOTAL
1 KG

Rp.

Kg
Kg
Person
Person

Reinforcement
Wire
Foreman
Skill

@
@
@
@

Rp.
Rp.
Rp.
Rp.

14,904
13,800
126,100
126,100

TOTAL

Rp.

M3
M3
Zak
Unit
Unit
Person
Person
Person

Gravel
Sand
Cement Type I
Concrete Mixer
Vibrator
Foreman
Masonary
Helper

@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

450,000
138,000
54,000
50,000
50,000
126,100
126,100
94,300

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

CONCRETE K-210
0.820
0.540
6.000
0.250
0.150
0.080
0.250
1.000

M3
M3
Zak
Unit
Unit
Person
Person
Person

Gravel
Sand
Cement Type I
Concrete Mixer
Vibrator
Foreman
Masonary
Helper

@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

450,000
138,000
54,000
50,000
50,000
126,100
126,100
94,300

TOTAL
1 M3

Rp.
Rp.
Rp.
Rp.

CONCRETE K-175
0.820
0.540
5.000
0.250
0.150
0.080
0.250
1.000

1 M3

Rp.
Rp.
Rp.

REINFORCEMENT
1.100
0.040
0.001
0.010

1 M3

Rp.
Rp.
Rp.
Rp.
Rp.

CONCRETE K-225
0.820 M3
0.540 M3
7.000 Zak
0.250 Unit
0.150 Unit
0.080 Person
0.250 Person
1.000 Person

Gravel
Sand
Cement Type I
Concrete Mixer
Vibrator
Foreman
Masonary
Helper

@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

450,000
138,000
54,000
50,000
50,000
126,100
126,100
94,300

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Analisa

17 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
TOTAL
1 M3

Rp.

SAND BENDDING 100 THK


1.000 M3
0.100 Person
1.000 Person

Sand
Foreman
Helper

@ Rp.
@ Rp.
@ Rp.

138,000
126,100
94,300

TOTAL
1 M3

Rp.

SAND BENDDING 250 THK


1.000 M3
0.100 Person
1.000 Person

Sand
Foreman
Helper

@ Rp.
@ Rp.
@ Rp.

138,000
126,100
94,300

TOTAL
1 M2

Rp.

Each
Zak
M3
Person
Person
Person

Brick
Cement Type I
Sand
Foreman
Masonary
Helper

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

600
54,000
138,000
126,100
126,100
94,300

TOTAL

Rp.

M3
Zak
Person
Person
Person

Sand
Cement Type I
Foreman
Masonary
Helper

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

138,000
54,000
126,100
126,100
94,300

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

CORRUGATED METAL ROOFING


1.000
2.000
0.010
0.120
0.120

M2
Each
Person
Person
Person

Klip lock
Fixing Strap
Foreman
Masonary
Helper

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

54,840
1,200
126,100
126,100
94,300

TOTAL
1 M2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PLASTERING & RENDERING


0.014
0.130
0.010
0.150
0.300

1 M2

Rp.
Rp.
Rp.

BRICK WALL
50.000
0.420
0.070
0.030
0.200
0.400

1 M2

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Zink Gutter BJLS 30


1.000
4.000
0.020
0.010
0.120
0.120

M2
Each
Each
Person
Person
Person

Zink Gutter BJLS30


Revet Nail
Silicon Sealent
Foreman
Masonary
Helper

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,000
282
48,000
126,100
126,100
94,300

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Analisa

18 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
TOTAL

1 M1

RIDGE CHAPPING
1.000 M1
0.080 Kg
0.010 Person
0.050 Person
0.050 Person

Ridge Capping
Nail
Foreman
Masonary
Helper

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

50,603
10,800
126,100
126,100
94,300

TOTAL
1 M1

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

FLASHING
1.000
0.080
0.010
0.050
0.050

M1
Kg
Person
Person
Person

Flashing
Nail
Foreman
Masonary
Helper

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

41,040
10,800
126,100
126,100
94,300

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1 Each BUG / BIRD SCREEN DOOR


0.04
0.08
2.50
3.00
2.00
0.050
0.050

M3
Kg
M'
Each
Each
Person
Person

Timber
Nail
Kawat Nyamuk
Engsel 4"
Grendle
Masonary
Helper

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,620,000
10,800
2,400
16,800
9,000
126,100
94,300

TOTAL
1 M2

Rp.

ACOUSTIC BOARD
0.550
1.400
1.200
6.300
2.000
0.050
0.200

Each
Each
M
Each
Each
Person
Person

Aluminum T (1x1)
Acoustic Panel
Wire
Rivet Nail
Concrete Nail
Foreman
Masonary

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

37,800
54,000
102,000
282
300
126,100
126,100

TOTAL
1 M1

INSTALL PIPE PVC <= 4"


0.010 Person
0.050 Person
0.250 PVC 4"
1.000 Soc/T
0.050 Lem

Foreman
Skill
Ea
Ea
Kg

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

INSTALL PIPE PVC > 3"


0.010 Person
0.100 Person
0.250 PVC 3"
0.500 Soc/T

Foreman
Skill
Ea
Ea

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

126,100
126,100
371,400
21,840
20,400

TOTAL
1 M1

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

126,100
126,100
223,920
18,000

Rp.
Rp.
Rp.
Rp.

Analisa

19 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
0.070 Lem

Kg

@ Rp.

20,400

TOTAL
1 M1

Rp.

INSTALL PIPE PVC > 2"


0.010
0.100
0.250
0.500
0.070

Person
Person
PVC 2"
Soc/T
Lem

Foreman
Skill
Ea
Ea
Kg

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

126,100
126,100
111,000
7,200
20,400

TOTAL
1 M1

Rp.

Person
Person
PVC1.5"
Soc/T
Lem

Foreman
Skill
Ea
Ea
Kg

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

126,100
126,100
85,800
7,200
20,400

TOTAL

Rp.

Person
Person
PVC1.1/4"
Soc/T
Lem

Foreman
Skill
Ea
Ea
Kg

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

126,100
126,100
76,200
6,000
20,400

TOTAL

Rp.

Person
Person
PVC 1"
Soc/T
Lem

Foreman
Skill
Ea
Ea
Kg

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

126,100
126,100
51,000
2,400
20,400

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

INSTALL PIPE GALVANIZE <= 2"


0.010
0.100
0.167
0.050

Person
Person
Galvanis
Soc/T

Foreman
Skill
Ea
Ea

@
@
@
@

Rp.
Rp.
Rp.
Rp.

TOTAL

1 M1

Rp.
Rp.
Rp.
Rp.
Rp.

INSTALL PIPE PVC > 1"


0.010
0.100
0.250
0.500
0.070

1 M1

Rp.
Rp.
Rp.
Rp.
Rp.

INSTALL PIPE PVC > 1.1/4"


0.010
0.100
0.250
0.500
0.070

1 M1

Rp.
Rp.
Rp.
Rp.
Rp.

INSTALL PIPE PVC > 1.5"


0.010
0.100
0.250
0.500
0.070

1 M1

Rp.

INSTALL PIPE GALVANIZE > 3"

126,100
126,100
366,000
9,600

Rp.
Rp.
Rp.
Rp.
Rp.

Analisa

20 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
0.050
0.167
0.050
0.250

Person
Galvanis
Soc/T
Person

Foreman
Ea
Ea
Skill

@
@
@
@

Rp.
Rp.
Rp.
Rp.

126,100
595,200
15,600
126,100

TOTAL
1 M1

Rp.

INSTALL PIPE GALVANIZE > 4"


0.050
0.167
0.050
0.250

Person
Galvanis
Soc/T
Person

Foreman
Ea
Ea
Skill

@
@
@
@

Rp.
Rp.
Rp.
Rp.

126,100
534,000
32,400
126,100

TOTAL
1 M1

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

INSTALL PIPE GALVANIZE > 6"


0.050
0.167
0.050
0.250

Person
Galvanis
Soc/T
Person

Foreman
Ea
Ea
Skill

@
@
@
@

Rp.
Rp.
Rp.
Rp.

126,100
1,461,600
37,200
126,100

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

SURFACE PREPARATION
a. Labor Cost, 18,52 M2/Day
1.000 Person
3.000 Person

Foreman
Grinder

@ Rp.
@ Rp.

126,100
126,100

TOTAL
for 1 M2 Rp. 1.021.000
504,400
: 18,52
: 18,52

Rp.
Rp.
Rp.
Rp.

b. Equipment Cost, 18,52 M2/Day


3.000 Ea
3.000 Ea
1.000 Lot

Granding
Wire Brush Cup
Others

@ Rp.
@ Rp.
@ Rp.

5,000
19,200
500

TOTAL
for 1 M2 Rp. 84 ,50073,100
: 18,52 : 18,52 m
1 M2

Rp.
Rp.

PAINTING PLANT (Hot)


0.125
0.120
0.100
1.000
1.000

Liter
Liter
Liter
M2
M2

High Heat Silicone


Heat Resisting Silicone Alum
Tinner
Paint Manpower
Paint Equipment

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

239,237
239,237
43,056
27,235
3,947

TOTAL
1 M2

Rp.
Rp.
Rp.

PAINTING CAMP
0.200 Liter

Emulsion

@ Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,000

Rp.

Analisa

21 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
0.140
0.120
1.000
0.100
0.010

Kg
Each
Lot
Person
Person

Wallfiller
Emery Clotch
Consumable
Painter
Foreman

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

26,160
2,160
1,000
126,100
126,100

TOTAL
1 M2

Rp.

CUTTING GRASS
0.00120 Person
0.00005 Person

Helper
Foreman

@ Rp.
@ Rp.

94,300
126,100

TOTAL

Untuk 1 Ha 10000 x
1 Ea

Rp.

Anchor Bolt 3/4" - 30 cm


@ Rp.
@ Rp.

36,000
94,300

TOTAL

Rp.

Skill

@ Rp.
@ Rp.

32,400
126,100

TOTAL

Ceramic Tile ( Incl.Mortar ) for Floor


0,3 x 0,3 M
1.000 Box
Ceramic Tile
0.030 M3
Concrete
0.020 Person
Skill
0.200 Person
Helper

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Ceramic Tile ( Incl.Mortar ) for wall


0,2 x 0,2 M
1.000 Box
Ceramic Tile
0.030 M3
Concrete
0.020 Person
Skill
0.200 Person
Helper

@
@
@
@

Rp.
Rp.
Rp.
Rp.

63,000
869,433
126,100
94,300

53,400
869,433
126,100
94,300

Rp.
Rp.
Rp.
Rp.
Rp.

Steel Structure Work


0.030 Person Skill
0.100 Person Helper
1.000 Steel

@ Rp.
@ Rp.
@ Rp.
TOTAL

1 Kg

Rp.
Rp.
Rp.
Rp.
Rp.

TOTAL
1 Kg

Rp.
Rp.
Rp.

TOTAL
1 M2

Rp.
Rp.

Grouting
1.000 Grouting
0.100 Person

1 M2

Rp.
Rp.

119

1.000 Anchor Bolt Ea


0.100 Person
Helper

1 Ltr

Rp.
Rp.
Rp.
Rp.
Rp.

Bolt & Nut Dia. 9 - 19 mm

126,100
94,300
19,440

Rp.
Rp.
Rp.
Rp.

Analisa

22 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
0.010 Person Skill
0.100 Person
Helper
1.000 Steel

@ Rp.
@ Rp.
@ Rp.

126,100
94,300
18,000

TOTAL

1 M2

Rp.

Insulation (chainlink, aluminum single sided, Glasswool )


1.000 Glaswool
0.010 Person
0.100 Person

Skill
Helper

@ Rp.
@ Rp.
@ Rp.

42,000
126,100
94,300

TOTAL
1 M2

Rp.

@ Rp.
@ Rp.
@ Rp.

27,000
126,100
126,100

TOTAL
Downspot PVC 4"
0.250 Each
0.500 Each
1.000 Each
4.000 Each

Pipe PVC dia 4"


Elbow PVC dia 4"
Plate 1" x 2 mmm
Fisher S -8 + Screw

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Galvanized Steel Chain Dia. 8 mm


0.010 Person
Foremen
0.100 Each
Skill
1.000 M
Galvanize Steel Chain

@ Rp.
@ Rp.
@ Rp.

371,400
21,840
45,360
2,592

126,100
126,100
367,200

Rp.

M2
Kg
Person
Person

Gypsum Plaster Board


Nail
Skill
Helper

@
@
@
@

Rp.
Rp.
Rp.
Rp.

51,000
10,800
126,100
94,300

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

Plafond Triplek 6 mm
0.350
0.080
0.020
0.200
0.015

M2
Kg
Person
Person
M3

Triplek 6 mm
Nail
Skill
Helper
Timber

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

78,000
10,800
126,100
94,300
1,620,000

TOTAL
1 M2

Rp.
Rp.
Rp.

Plaster Board
0.350
0.080
0.020
0.200

1 M2

Rp.
Rp.
Rp.
Rp.
Rp.

TOTAL
1 M2

Rp.
Rp.
Rp.
Rp.

TOTAL
1 M'

Rp.
Rp.
Rp.

Instal chainlink Galvanize


1.000 Chainklink Galvanize
0.010 Person
Skill
0.100 Person
Helper

1 M'

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Plafond Triplek 9 mm
0.350 M2

Triplek 9 mm

@ Rp.

182,400

Rp.

Analisa

23 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
0.080
0.020
0.200
0.015

Kg
Person
Person
M3

Nail
Skill
Helper
Timber

@
@
@
@

Rp.
Rp.
Rp.
Rp.

10,800
126,100
94,300
1,620,000

TOTAL

1 M2

Rp.

INSTAL CALCI BOARD (NOT INCLUDE FRAME )


1.000 M2
0.020 Person
0.200 Person

Calci Board
Skill
Helper

@ Rp.
@ Rp.
@ Rp.

75,000
126,100
94,300

TOTAL
1 M2

Rp.

Gypsum
Skill
Helper

@ Rp.
@ Rp.
@ Rp.

51,000
126,100
94,300

TOTAL

Rp.

M2
EA
M1
Ea
M1
Person
Person

Gypsum
Nail Concrete
Wire
Rivet Nail
Hollo Frame
Skill
Helper

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

51,000
300
102,000
282
36,000
126,100
94,300

TOTAL

Rp.

Formica
Glue
Skill

@ Rp.
@ Rp.
@ Rp.

240,000
20,400
126,100

TOTAL

Rp.
Rp.
Rp.
Rp.

Poliprint
0.350 Ea
0.300 Kg
0.200 Person

Poliprint
Glue
Skill

@ Rp.
@ Rp.
@ Rp.

180,000
20,400
126,100

TOTAL
1 M2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Formica
0.350 Ea
0.300 Kg
0.200 Person

1 M2

Rp.
Rp.
Rp.

GYPSUM ( inc Wood Frame + Hanger )


1.000
6.000
1.200
6.000
1.000
0.020
0.200

1 M2

Rp.
Rp.
Rp.

GYPSUM
1.000 M2
0.020 Person
0.200 Person

1 M2

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Teak Wood
0.350 Ea
0.300 Kg

Teak Wood
Glue

@ Rp.
@ Rp.

135,000
20,400

Rp.
Rp.

Analisa

24 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
0.200 Person

Skill

@ Rp.

126,100

TOTAL
1 M2

Rp.

Soft Board
0.350 Ea
0.300 Kg
0.200 Person

Soft Board 1/2 "


Glue
Carpenter

@ Rp.
@ Rp.
@ Rp.

162,000
20,400
126,100

TOTAL
1 Ea

Kunci SES

Rp.

Kunci SES
Skill
Cosumable

@ Rp.
@ Rp.
@ Rp.

210,000
126,100
7,500

TOTAL

Rp.

Handle
Skill
Cosumable

@ Rp.
@ Rp.
@ Rp.

300,000
126,100
7,500

TOTAL

Rp.

Cylinder Lock
Skill
Cosumable

@ Rp.
@ Rp.
@ Rp.

291,600
126,100
7,500

TOTAL

Rp.

Hinge Door
Skill
Cosumable

@ Rp.
@ Rp.
@ Rp.

36,000
126,100
7,500

TOTAL

Rp.

Hinge Furniture
Skill
Cosumable

@ Rp.
@ Rp.
@ Rp.

14,400
126,100
7,500

TOTAL

Rp.
Rp.
Rp.
Rp.

Kunci Alfa Kens


1.000 Ea
0.300 Person
1.000 Lot

Alfa Kens
Skill
Cosumable

@ Rp.
@ Rp.
@ Rp.
TOTAL

1 Ea

Rp.
Rp.
Rp.

Hinge Furniture
1.000 Ea
0.080 Person
1.000 Lot

1 Ea

Rp.
Rp.
Rp.

Hinge Door 4"


1.000 Ea
0.080 Person
1.000 Lot

1 Ea

Rp.
Rp.
Rp.

Cylinder Lock 1 set


1.000 Ea
0.300 Person
1.000 Lot

1 Ea

Rp.
Rp.
Rp.

Handle 1 set
1.000 Ea
0.300 Person
1.000 Lot

1 Ea

Rp.
Rp.
Rp.

1 set
1.000 Ea
0.300 Person
1.000 Lot

1 Ea

Rp.

Door Closer

135,000
126,100
7,500

Rp.
Rp.
Rp.
Rp.

Analisa

25 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT

1.000 Ea
0.300 Person
1.000 Lot

Door Closer
Skill
Cosumable

@ Rp.
@ Rp.
@ Rp.

252,000
126,100
7,500

TOTAL
1 Ea

Rp.

Engsel for Door


1.000 Ea
0.300 Person

Engsel
Skill

@ Rp.
@ Rp.

14,400
126,100

TOTAL
1 Ea

Rp.

Engsel
Skill

@ Rp.
@ Rp.

10,800
126,100

TOTAL

Rp.
Rp.
Rp.

Drawer Lock
1.000 Ea
0.200 Person

Drawer Lock
Skill

@ Rp.
@ Rp.

16,200
126,100

TOTAL

1 Ea

Rp.
Rp.

Engsel for Furniture


1.000 Ea
0.300 Person

1 Ea

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Grandel
1.000 Ea
0.250 Person

Grandel
Skill

@ Rp.
@ Rp.

9,000
126,100

TOTAL

Rp.
Rp.
Rp.

1 Unit Install Allumunium Door Frame 2.1 m x 0.9 m


5.100
5.100
1.000
1.000
0.010

M1
M1
Lot
Person
Person

Allumunium Frame
Moher + stopper list
rivet + acc
Skill
Foreman

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

37,800
27,000
282
126,100
126,100

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1 Unit Install Allumunium Door Frame 2.1 m x 1.80 m


6.000
6.000
1.000
1.000
0.010

M1
M1
Lot
Person
Person

Allumunium Frame
Moher
Consumable
Skill
Foreman

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

37,800
27,000
10,000
126,100
126,100

TOTAL
1 Set

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Install Allumunium Sliding Window 1.2 m x 0.6 m


3.600
1.000
1.000
1.000

M1
Lot
Lot
Person

Allumunium Frame
Accessories
Consumable
Skill

@
@
@
@

Rp.
Rp.
Rp.
Rp.

37,800
45,000
10,000
126,100

Rp.
Rp.
Rp.
Rp.

Analisa

26 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
0.010 Person

Foreman

@ Rp.

126,100

TOTAL
1 Ea

Rp.

Door Leaf type panel 0.82 m x 2.2 m


1.000
1.000
1.000
1.000
0.010

Ea
Lot
Lot
Person
Person

Door type Panel


Accessories
Consumable
Skill
Foreman

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1,320,000
25,000
10,000
126,100
126,100

TOTAL
1 M2

Rp.

Liter
Kg
Lot
Person
Person

Platone
Wallfiller
Consumable
Painter
Foreman

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

40,000
21,800
1,000
126,100
126,100

TOTAL
Western Closet
1.000
0.200
1.000
0.500
0.500

TOTO ( inc assossories )


Ea
Kg
Ea
Person
Person

Squatsing Closet
1.000
0.200
1.000
0.500
0.500

Westeren Closet
Cement
Cosumabel
Skill
Helper

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

2,004,000
54,000
5,000
126,100
94,300

- TOTO ( inc accessories )

Ea
Kg
Ea
Person
Person

S. Closet
Cement
Cosumabel
Skill
Helper

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

2,520,000
54,000
5,000
126,100
94,300

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Urinoir - TOTO ( inc assosories )


1.000
0.250
1.000
0.500
0.500

Ea
Kg
Ea
Person
Person

Urinoir
Cement
Cosumabel
Skill
Helper

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1,500,000
54,000
5,000
126,100
94,300

TOTAL
1 Ea

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

TOTAL
1 Ea

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

TOTAL
1 Ea

Rp.
Rp.
Rp.
Rp.
Rp.

PAINTING CAMP ( Oil Paint )


0.200
0.140
1.000
0.100
0.010

1 Ea

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Wash Basin
1.000
0.200
1.000
0.500
0.500

Ea
Kg
Ea
Person
Person

Wash Basin
Cement
Cosumabel
Skill
Helper

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1,940,400
54,000
5,000
126,100
94,300

Rp.
Rp.
Rp.
Rp.
Rp.

Analisa

27 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT

TOTAL
1 Ea

Rp.

Shower Head - San EI


1.000 Ea
0.250 Person

Shower Head
Skill

@ Rp.
@ Rp.

890,400
126,100

TOTAL
1 Ea

Hand Shower

Rp.

San EI

1.000 Ea
0.250 Person

Hand Shower
Skill

@ Rp.
@ Rp.

243,600
126,100

TOTAL
1 Ea

Rp.

Toilet Shower
Skill

@ Rp.
@ Rp.

122,400
126,100

TOTAL

Rp.

Valve
Skill

@ Rp.
@ Rp.

81,000
126,100

TOTAL

Rp.

Box
Zak
M3
Ea
Person
Person

Ganito Tile
Cement
Pasir
Cosumabel
Skill
Helper

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

240,000
54,000
138,000
5,000
126,100
94,300

TOTAL

Rp.

M2
Ea
Ea
Person
Person

Polycarbonate
Nail
Cosumabel
Skill
Helper

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

84,746
250
5,000
126,100
94,300

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Corrugated zinc 4' x 8' thick=0,3 mm


0.357
6.000
1.000
0.020
0.200

Ea
Ea
Ea
Person
Person

Corrugated zinc
Nail
Cosumabel
Skill
Helper

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

TOTAL
1 M'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Polycarbonate
1.000
6.000
1.000
0.020
0.200

1 M2

Rp.
Rp.

Granito Tile
1.000
0.300
0.030
1.000
0.200
0.200

1 M2

Rp.
Rp.

Valve for Shower San EI


1.000 Ea
0.250 Person

1 M2

Rp.
Rp.

Toilet Shower San EI


1.000 Ea
0.250 Person

1 Ea

Rp.
Rp.

Barbed Wire

116,640
250
5,000
126,100
94,300

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Analisa

28 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT

0.100 Roll
0.020 Person
0.100 Person

Barbed wire fencing


Skill
Helper

@ Rp.
@ Rp.
@ Rp.

240,000
126,100
94,300

TOTAL
1 M2

Rp.
Rp.
Rp.
Rp.

Vinil Tile
1.000
0.300
0.015
0.300

M2
Can
Person
Person

Vinil Tile
Lem Fox
Skill
Helper

@
@
@
@

Rp.
Rp.
Rp.
Rp.

120,000
20,400
126,100
94,300

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

BBM/ Bulan
1.000 Mobil

@ Rp.

5,500

TOTAL

1 M2

Rp.

Rp.

PAINTING FOR PIPING


0.150
0.100
1.000
0.150
0.020
1.000

Liter
Liter
Lot
Person
Person
Lot

Platone
Thinner
Consumable
Painter
Foreman
Surface preparation

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

48,000
43,056
1,000
126,100
126,100
5,000

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

1 M2 PAINTING ACID RESISTANCE FOR PIPING AND SKID


0.150
0.120
0.100
0.050
0.010
1.000

Ltr
Ltr
Ltr
Person
Person
Lot

Epoxy Phenolic
Shop Epoxy Primer
Thinner
Painter
Foreman
Paint Equitment

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

140,098
140,098
43,056
126,100
126,100
5,000

TOTAL
1 M2

Rp.

PAINTING FOR PIPING CHAINLINK FENCE


0.100
0.100
1.000
0.100
0.020

Liter
Liter
Lot
Person
Person

Platone
Thinner
Consumable
Painter
Foreman

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

TOTAL
1 M2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Instal Wiremesh M-8

48,000
43,056
1,000
126,100
126,100

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Analisa

29 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
1.000 M2
0.001 Person
0.010 Person

Wire
Foreman
Skill

@ Rp.
@ Rp.
@ Rp.

54,000
126,100
126,100

TOTAL
1 M1

Rp.
Rp.
Rp.

Rp.

Instal Dick 60 x 40
0.240
0.060
1.200
1.400
0.140

M3
M3
M2
M2
M3

Excavation
Disposal
Formwork
Wiremash M6
Concrete K225

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

89,510
29,551
78,375
31,746
977,433

TOTAL
Industrial Chain Pole & Pondation jarak 3 m
5.820 M2
Chain Link Fence
11.000 M1
Angle Steel L75x75x6
0.072 M3
Concrete K175
9.000 M1
Barbed Wire
10.000 M'
Round bar 8 mm
50.000 Ea
Welding rod
1.000 Lot
Consumable

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,871
40,000
869,433
35,952
9,900.00
16,200.00
10,000

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1 Unit Personal Gates


4.000
6.000
2.000
6.000
0.063
4.000
50.000
1.000

M1
M1
M2
M1
M3
M1
Ea
Lot

Pipa Galv 6"


Pipa Galv 4"
Chain Link Fence
Angle Steel L75x75x6
Concrete K175
Barbed Wiremesh
Welding Rod
Consumable

@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

283,290
128,450
40,871
40,000
869,433
35,952
16,200
10,000

TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1 Unit Vehicle Gates & Foundation


4.000
20.000
12.000
0.352
24.000
27.000
50.000
6.000
1.000

M1
M1
M2
M3
M1
M1
Ea
M1
Lot

Pipa Galv 6"


Pipa Galv 4"
Chain Link Fence
Concrete K175
Barbed Wiremesh
Angle Steel L75x75x6
Welding Rod
Wire sling
Consumable

@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

283,290
128,450
40,871
869,433
35,952
40,000
16,200
22,000
10,000

TOTAL

1 Bln

Mobil Double Cabin


1.000 Ea
1.000 Lot

Double Cabin
Maintenance

@ Rp.
@ Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

60,000,000
1,000,000

TOTAL

1 Bln = Total/36

Rp.
Rp.
Rp.
Rp.

Analisa

30 of 75

ANALISA HARGA SATUAN


SUMATERA CIVIL MAINTENANCE CONTRACT
1 Bln

Mobil Ps Truck (8 Ton)


1.000 Ea
PS Truck
1.000 Ea
Maintenance

@ Rp.
@ Rp.

98,500,000
1,000,000

TOTAL

1 Bln = Total/36

Rp.
Rp.
Rp.
Rp.

Analisa

31 of 75

3,783,000
7,566,000
7,566,000
18,915,000
7,566,000
85,727
3,783
89,510

94,300
3,783
98,083

28,290
1,261
29,551

47,150
6,305
53,455

117,875
6,305
124,180

10,000
24,518
34,518

13,200
37,720
50,920

369,000
69,000
216,000
12,500
12,610
31,525
94,300
804,935

Analisa

32 of 75

648,000
43,200
12,610
32,786
47,150
783,746
78,375

54,000
126
1,261

55,387
16,394
552
126
1,261

18,334

369,000
74,520
270,000
12,500
7,500
10,088
31,525
94,300
869,433

369,000
74,520
324,000
12,500
7,500
10,088
31,525
94,300
923,433
369,000
74,520
378,000
12,500
7,500
10,088
31,525
94,300

Analisa

33 of 75

T
977,433

138,000
12,610
94,300
244,910

138,000
12,610
94,300
244,910

30,000
22,680
9,660
3,783
25,220
37,720
129,063

1,932
7,020
1,261
18,915
28,290
57,418

54,840
2,400
1,261
15,132
11,316
84,949

72,000
1,128
960
1,261
15,132
11,316

Analisa

34 of 75

T
101,797

50,603
864
1,261
6,305
4,715
63,748

41,040
864
1,261
6,305
4,715
54,185

64,800
864
6,000
50,400
18,000
6,305
4,715
151,084

20,790
75,600
122,400
1,777
600
6,305
25,220
252,692

1,261
6,305
92,850
21,840
1,020
123,276
1,261
12,610
55,980
9,000

Analisa

35 of 75

T
1,428

80,279
80,279

1,261
12,610
27,750
3,600
1,428
46,649

1,261
12,610
21,450
3,600
1,428
40,349

1,261
12,610
19,050
3,000
1,428
37,349

1,261
12,610
12,750
1,200
1,428
29,249

1,261
12,610
61,000
480
75,351
75,351

Analisa

36 of 75

T
6,305
99,200
780
31,525
137,810

6,305
89,000
1,620
31,525
128,450

6,305
243,600
1,860
31,525
283,290

126,100
378,300
504,400
27,235

15,000
57,600
500
73,100
3,947

29,905
28,708
4,306
27,235
3,947
94,101

14,400

Analisa

37 of 75

T
3,662
259
1,000
12,610
1,261
33,193

113
6
119

1,194,650.00

36,000
9,430
45,430

32,400
12,610
45,010

63,000
26,083
2,522
18,860
110,464.99
110,465

53,400
26,083
2,522
18,860
100,865
100,865

3,783
9,430
19,440
32,653

Analisa

38 of 75

T
1,261
9,430
18,000
28,691

42,000
1,261
9,430
52,691

27,000
1,261
12,610
40,871

92,850
10,920
45,360
10,368
159,498

1,261
12,610
367,200
381,071
17,850
864
2,522
18,860
40,096

27,300
864
2,522
18,860
24,300
73,846

63,840

Analisa

39 of 75

T
864
2,522
18,860
24,300
110,386

75,000
2,522
18,860
96,382

51,000
2,522
18,860
72,382

51,000
1,800
122,400
1,692
36,000
2,522
18,860
234,274

84,000
6,120
25,220
115,340

63,000
6,120
25,220
94,340

47,250
6,120

Analisa

40 of 75

T
25,220
78,590

56,700
6,120
25,220
88,040

210,000
37,830
7,500
255,330

300,000
37,830
7,500
345,330

291,600
37,830
7,500
356,200

36,000
10,088
7,500
53,588

14,400
10,088
7,500
31,988

135,000
37,830
7,500
180,330

Analisa

41 of 75

252,000
37,830
7,500
297,330

14,400
37,830
52,230

10,800
37,830
48,630

16,200
25,220
41,420

9,000
31,525
40,525

192,780
137,700
282
126,100
1,261
458,123

226,800
162,000
10,000
126,100
1,261
526,161

136,080
45,000
10,000
126,100

Analisa

42 of 75

T
1,261
318,441

1,320,000
25,000
10,000
126,100
1,261
1,482,361

8,000
3,052
1,000
12,610
1,261
25,923

2,004,000
10,800
5,000
63,050
47,150
2,130,000

2,520,000
10,800
5,000
63,050
47,150
2,646,000

1,500,000
13,500
5,000
63,050
47,150
1,628,700

1,940,400
10,800
5,000
63,050
47,150

Analisa

43 of 75

2,066,400

890,400
31,525
921,925

243,600
31,525
275,125

122,400
31,525
153,925

81,000
31,525
112,525

240,000
16,200
4,140
5,000
25,220
18,860
309,420

84,746
1,500
5,000
2,522
18,860
112,628

41,657
1,500
5,000
2,522
18,860
69,539

Analisa

44 of 75

24,000
2,522
9,430
35,952

120,000
6,120
1,892
28,290
156,302

165,000

165,000

7,200
4,306
1,000
18,915
2,522
5,000

38,943

21,015
16,812
4,306
6,305
1,261
5,000

54,698

4,800
4,306
1,000
12,610
2,522
25,238

Analisa

45 of 75

T
54,000
126
1,261

55,387

21,482
1,773
94,050
44,444
136,841
298,590

237,869
440,000
62,599
323,568
99,000
810,000
10,000
1,983,036

1,133,160
770,700
81,742
240,000
54,774
143,808
810,000
10,000
3,244,184

1,133,160
2,569,000
490,452
306,040
862,848
1,080,000
810,000
132,000
10,000
7,393,500

60,000,000
1,000,000
61,000,000

1,694,444.44

Analisa

46 of 75

98,500,000
1,000,000
99,500,000

2,763,888.89

PERHITUNGAN BIAYA KARYAWAN


CIVIL MAINTENANCE SERVICES

NO.

Contractor
Owner

U R A I A N

DASAR PERHITUNGAN

BIAYA / HARI
WASTE SEGREGATION

A.

B.

WWTP

KETERANGAN
NURSERY

MINOR RIPAIR

FORMEN MINOR RIPAIR

HELPER

Standart / Bulan

A.2 Jumlah Tenaga Kerja

Sesuai Beban Kerja

A.3 Upah Karyawan Per Hari

Sesuai Beban Kerja

Rp.

60,000.00

Rp.

60,000.00

Rp.

60,000.00

Rp.

60,000.00

Rp.

60,000.00

Rp.

60,000.00

Rp.

80,000.00 Rp.

30,000.00

10

10

10

10

10

10

10.00

10

5.00

4.00

3.000

8.00

3.00

15.00

2.00

3.00

Rata-rata Upah / Hari x A.2 x A.3

Rp.

300,000.00

Rp.

240,000.00

Rp.

180,000.00

Rp.

480,000.00

Rp.

180,000.00

Rp.

900,000.00

90,000.00

Jam/Bulan
Orang
Orang/Hari

Kesejahteraan & Tunjangan Karyawan


6.24%

x Jumlah (B.1)

Rp.

160,000.00 Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

B.3 Tunjangan Hari Raya

Jumlah (B.1) : 12

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

0.00 Rp.

B.4 Tunjangan Cuti

Jumlah (B.1) : 12

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

0.00 Rp.

B.5 Pesangon

Jumlah (B.1) : 12

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

0.00 Rp.

B.6 Askes

E.

BIO REMEDIATION

A.1 Jam Kerja Normal Per Hari

B.2 Jamsostek

D.

GARDENER

Estimasi Jam Kerja (Manhour)

B.1 Biaya Upah Karyawan Per Hari

C.

PT. Kesayangan Prakarsa


ConocoPhillips

7,000 x Jumlah (A.2)

Rp.

Jumlah ( B )

Rp.

300,000.00

Rp.

240,000.00

Rp.

180,000.00

Rp.

480,000.00

Rp.

180,000.00

Rp.

900,000.00

Rp.

160,000.00 Rp.

90,000.00

Jumlah Biaya Kesejahterann & Tunjangan Per Hari / Orang ( B : A.2 )

Rp.

60,000.00

Rp.

60,000.00

Rp.

60,000.00

Rp.

60,000.00

Rp.

60,000.00

Rp.

60,000.00

Rp.

80,000.00 Rp.

30,000.00

Perlengkapan Karyawan
C.1 Helmet

3 Bh / 3 Thn(A.2 x 3 Bh x Harga Satuan)

Rp.

1,041.67

Rp.

833.33

Rp.

625.00

Rp.

1,666.67

Rp.

625.00

Rp.

3,125.00

Rp.

416.67 Rp.

625.00

@ Rp.

75,000 / bh

C.2 Safety Shoes

3 Bh / 3Thn (A.2 x 3 Bh x Harga Satuan)

Rp.

3,750.00

Rp.

3,000.00

Rp.

2,250.00

Rp.

6,000.00

Rp.

2,250.00

Rp.

11,250.00

Rp.

1,500.00 Rp.

2,250.00

@ Rp.

270,000 / ps

C.3 Uniform (coveralls)

6 Bh / 3Thn (A.2 x 6 Bh x Harga Satuan)

Rp.

22,216.67

Rp.

17,773.33

Rp.

13,330.00

Rp.

35,546.67

Rp.

13,330.00

Rp.

66,650.00

Rp.

8,886.67 Rp.

13,330.00

@ Rp.

799,800 / ps

C.4 Safety Glass

9 Bh / 3Thn (A.2 x 3 Bh x Harga Satuan)

Rp.

1,666.67

Rp.

1,333.33

Rp.

1,000.00

Rp.

2,666.67

Rp.

1,000.00

Rp.

5,000.00

Rp.

666.67 Rp.

1,000.00

@ Rp.

40,000 / ps

C.4 Ear Plug

3 Bh / 3Thn (A.2 x 3 Bh x Harga Satuan)

Rp.

347.22

Rp.

277.78

Rp.

208.33

Rp.

555.56

Rp.

208.33

Rp.

1,041.67

Rp.

138.89 Rp.

208.33

@ Rp.

25,000 / ps

C.4 Hand Gove

36 Bh / 3Thn (A.2 x 3 Bh x Harga Satuan)

Rp.

416.67

Rp.

333.33

Rp.

250.00

Rp.

666.67

Rp.

250.00

Rp.

1,250.00

Rp.

166.67 Rp.

250.00

@ Rp.

2,500 / ps

C.5 Rain Coat

3 Bh /3 Thn (A.2 x 3 Bh x Harga Satuan)

Rp.

Rp.

Rp.

@ Rp.

70,000 / bh

Rp.

Rp.

Rp.

Rp.

Rp.

Jumlah ( C )

Rp.

29,438.89

Rp.

23,551.11

Rp.

17,663.33

Rp.

47,102.22

Rp.

17,663.33

Rp.

88,316.67

Rp.

11,775.56 Rp.

17,663.33

Jumlah Biaya Perlengkapan Karyawan Per Hari/Orang ( C : A.2 )

Rp.

5,887.78

Rp.

5,887.78

Rp.

5,887.78

Rp.

5,887.78

Rp.

5,887.78

Rp.

5,887.78

Rp.

5,887.78 Rp.

5,887.78

Biaya Base Camp


D.1 Accomodation

A.2 x Harga Satuan Base Camp.III

Rp.

Rp.

Rp.

D.2 Meal

A.2 x Harga Satuan Base Camp.II

Rp.

145,833.33

Rp.
Rp.

116,666.67

Rp.
Rp.

87,500.00

Rp.
Rp.

233,333.33

Rp.
Rp.

87,500.00

Rp.
Rp.

437,500.00

Rp.

58,333.33 Rp.

87,500.00

D.3 Laundry

A.2 x Harga Satuan Base Camp.I

Rp.

136,833.33

Rp.

109,466.67

Rp.

82,100.00

Rp.

218,933.33

Rp.

82,100.00

Rp.

410,500.00

Rp.

10,946.67 Rp.

82,100.00

D.4 Over Time

(A.3/173 )x 5,5 Jam OT

Jumlah ( D )

Rp.

282,666.67

Rp.

226,133.33

Rp.

169,600.00

Rp.

452,266.67

Rp.

169,600.00

Rp.

848,000.00

Rp.

69,280.00 Rp.

169,600.00

Jumlah Biaya Acommodation, Meal & Loundry Per Hari/Org ( C : A.2 )

Rp.

56,533.333

Rp.

56,533.33

Rp.

56,533.33

Rp.

56,533.33

Rp.

56,533.33

Rp.

56,533.33

Rp.

34,640.00 Rp.

56,533.33

Biaya Kontraktor
E.1 Peralatan Kantor

A.2 x Harga Satuan Biaya O/H. I

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

E.2 Key Personnel

A.2 x Harga Satuan Biaya O/H. II

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

0.00 Rp.

E.3 Transportation

A.2 x Harga Satuan Biaya O/H. III

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

E.4 Mobilsasi Karyawan

A.2 x Harga Satuan Biaya O/H. IV

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

Rp.

0.00 Rp.

Jumlah ( E )

Rp.

0.00

Rp.

0.00

Rp.

Rp.

0.00

Rp.

0.00

Rp.

0.00

Rp.

0.00 Rp.

Jumlah Biaya Over Head Kontraktor Per Hari/Org ( E : A.2 )

Rp.

0.000

Rp.

0.00

Rp.

Rp.

0.00

Rp.

0.00

Rp.

0.00

Rp.

0.00 Rp.

0.00

Rp.

612,105.556

Rp.

489,684.44

Rp.

367,263.33

Rp.

979,368.89

Rp.

367,263.33

Rp. 1,836,316.67

Rp.

241,055.56 Rp.

277,263.33

F.

Biaya Karyawan Sebelum Keuntungan

G.

PPh

H.

Fee Kontraktor

Jumlah ( B + C + D + E )
6% x Jumlah ( B )
10% x Jumlah ( B )

18,000.00
Rp.

14,400.00
Rp.

10,800.00
Rp.

28,800.00
Rp.

10,800.00
Rp.

54,000.00
Rp.

9,600.00

0.00

5,400.00

Rp.

Rp.

I.

Biaya Karyawan Setelah Keuntungan ( F + G + H )

Rp.

630,105.56

Rp.

504,084.44

Rp.

378,063.33

Rp. 1,008,168.89

Rp.

378,063.33

Rp. 1,890,316.67

Rp.

250,655.56 Rp.

J.

Biaya Karyawan Per Hari / Orang ( H : A2 )

Rp.

126,021.11

Rp.

126,021.11

Rp.

126,021.11

Rp.

126,021.11

Rp.

126,021.11

Rp.

126,021.11

Rp.

125,327.78 Rp.

94,221.11

K.

Rounded

Rp.

126,100

Rp.

126,100

Rp.

126,100

21

126,100

Rp.

126,100

Rp.

126,100

Rp.

125,400

94,300

Contract
Remaining

CONOCOPHILLIPS

Rp.

282,663.33

133,500

133,500

133,500

133,500

133,500

133,500

133,500

133,500

7,400

7,400

7,400

7,400

7,400

7,400

8,100

39,200

Civil Maintenance Service

PERHITUNGAN BIAYA KARYAWAN


CIVIL MAINTENANCE SERVICES

NO.

U R A I A N

Contractor
Owner
DASAR PERHITUNGAN

BIAYA / HARI
WASTE SEGREGATION

CONOCOPHILLIPS

PT. Kesayangan Prakarsa


ConocoPhillips

GARDENER

BIO REMEDIATION

WWTP

Civil Maintenance Service

KETERANGAN
NURSERY

MINOR RIPAIR

FORMEN MINOR RIPAIR

HELPER

28000000
3,010.75

1,282,300.00

CONOCOPHILLIPS

Civil Maintenance Service

CONOCOPHILLIPS

Civil Maintenance Service

LIST OF COST for MAN POWER


PEKERJAAN

: CIVIL MAINTENANCE SERVICES

KONTRAK NO.

Contractor

Owner

No.

Uraian

1
2
3

Field Manager
Field Supervisor
Safety Inspector

Civil
- Foreman Civil
- Mansonary
- Carpenter
- Plumber
- Skill Labour
- Call Out

Scafollding
- Foreman Scafolding
- Scafolder
- Skill Labour
Key personil / overhead
1. Project Control
2. Project Admin
3. Admin & Clerk
4. Warehouseman
5. Driver
6. Planner
7. Mechanic
8. Lokal F&A

Jumlah Total

Volume

Unit

Harga
Satuan

Total
Harga

2.00
4.00
4.00
10.00

Prs
Prs
Prs

36
36
36

Month
Month
Month

7,055,555
3,527,778
3,527,778

507,999,960
508,000,000
508,000,000

4.00
6.00
6.00
4.00
16.00
2.00

Prs
Prs
Prs
Prs
Prs
Prs

36
36
36
36
36
36

Month
Month
Month
Month
Month
Month

1,200,000
1,000,000
1,000,000
1,000,000
900,000
900,000

172,800,000
216,000,000
216,000,000
144,000,000
518,400,000
64,800,000
1,332,000,000

2.00
8.00
10.00
58.00

Prs
Prs
Prs

36
36
36

Month
Month
Month

1,200,000
1,000,000
900,000

86,400,000
288,000,000
324,000,000
698,400,000

1.00
1.00
1.00
2.00
6.00
2.00
1.00
1.00
15.00

Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs

83.00

Prs

36
36
36
36
36
36
36
36

Month
Month
Month
Month
Month
Month
Month
Month

6,522,222
2,597,222
1,838,889
2,805,556
2,013,889
4,927,778
2,805,556
3,388,889

Keterangan

19,400,000

234,800,000
93,500,000
66,200,000
202,000,000
435,000,000
354,800,000
101,000,000
122,000,000

7,194,099,960

199,836,110

ESTIMATE COST for OVERHEAD COST CONTRACTOR


CIVIL MAINTENANCE SERVICES
Rev.02-VII-04

I. PERALATAN KANTOR
1.
2.
3.
4.
5.
4.

Komputer P4 + Printer
Alat Tulis Kantor
Forniture (Kursi + Meja)
Facsimile
Communication
Misselinous

2
1
4
1
1
1

Unit
Lot
Set
Unit
Lot
Lot

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,000,000
5,000
400,000
1,250,000
21,000
1,500

/Unit
/Days
/Unit
/Unit
/Days
/Days

1080 Days

x
x

1080 Days
1080 Days

Biaya Per Orang Per Day = ( Total.I : 5 Prs) : 1080 Days

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,680,000
1,620,000

= Rp.

29,700,000

= Rp.

5,500.00

5,400,000

II. KEY PERSONNEL


1.
2.
3.
4.
5.
6.
7.
8.

Project Control
Admin & Cost Control
Admin & Clerk
Warehouseman
Driver
Planner
Mechanic
Lokal F&A

1
1
1
2
6
2
1
1

Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs

x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

217,407
86,574
61,296
93,519
67,130
164,259
93,519
112,963

/Days
/Days
/Days
/Days
/Days
/Days
/Days
/Days

x
x
x
x
x
x
x
x

1080
1080
1080
1080
1080
1080
1080
1080

Days
Days
Days
Days
Days
Days
Days
Days

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

234,800,000
93,500,000
66,200,000
202,000,000
435,000,000
354,800,000
101,000,000
122,000,000

= Rp.

1,609,300,000

= Rp.

298,018.52

1080 Days

= Rp.

166,000,000

1080 Days
1080 Days

= Rp.
= Rp.
= Rp.

85,325,000
89,100,000
36,000,000

= Rp.

376,425,000

= Rp.

69,708.33

= Rp.
= Rp.
= Rp.
= Rp.

18,675,000
199,200,000

= Rp.

218,681,760

= Rp.

40,496.62

Biaya Per Orang Per Day = ( Total.I : 5 Prs) : 1080 Days

=
=
=
=
=
=
=
=

III. TRANSPORTATION & EQUITMENT


1. Medium Bus
2. Equitment
3. BBM, Solar Medium Bus
4. Maintenance

1 Unit
1 Lot
15 Ltr/Day
1 unit

x
x
x
x

Rp.
Rp.
Rp.

153,704 /Days

5,500 /Ltr
33,333 /Days

x
x
x

1
1 x
1 x

Biaya Per Orang Per Day = ( Total.I : 5 Prs) : 1080 Days

IV. MOBILISASI KARYAWAN


1.
2.
3.
4.

Legal Contarct Personnel


Medical Check-Up
HSE Training
Badge + Gate Pass

83
83
1
83

Prs
Prs
Lot
Prs

x
x
x
x

Rp.
Rp.
Rp.
Rp.

208.33
800,000.00
20,000.00
9.00

/Days
/ Prs
/Days
/Days

Biaya Per Orang Per Day = ( Total.IV : 5 Prs) : 1080 Days

Civil Maintenance Service

x
x
x
x

1080
3
1080
1080

Days
Years
Days
Days

806,760.00

ESTIMATE COST for BASE CAMP


CIVIL MAINTENANCE SERVICES
Rev.02-VII-04

I. LAUNDRY
1.
2.
3.
4.
5.

Detergen
Sabun Batang
Sikat (brush)
Pewangi
Tukang Cuci

4
5
2
6
4

Kg/hari
Btg/Hari
Lsn/2 Thn
Ltr/Bln
Org/bulan

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

15,000
1,500
30,000
12,500
500,000

/Kg
/Btg
/Lsn
/Ltr
/Bln

x
x
x
x
x

1080
1080
3
36
36

Hari
Hari
Thn
Bln
Bln

Biaya Per Orang Per Day = ( Total.I : 5 Prs) : 1080 Days

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

64,800,000
8,100,000
180,000
2,700,000
72,000,000

Rp.

147,780,000

Rp.

27,366.7

=
=

Rp.
Rp.

1,242,000,000
18,000,000

Rp.

1,260,000,000

Rp.

29,166.7

=
=

Rp.
Rp.

269,898,920
180,000,000

Rp.

449,898,920

Rp.

83,315
72,000,000

II. MEAL
1.
2

Biaya Makan Rata-rata


Lain-lain

46 Org/Hari
1 Lot

x
x

Rp.
Rp.

25,000 /Hari
500,000 /Lot

x
x

1080 Hari
36 Bulan

Biaya Per Orang Per Day = ( Total.II : 40 Prs) : 1080 Days

III. ACCOMMODATION
III.1. Accomodation Camp Grissik
1
1
2

Biaya Pembuatan/ Rehab Camp Grissik


Biaya scuriti untuk Subcon + Polisi

Rp.

5,000,000 /bln

36 Bulan

Biaya Per Orang Per Day = ( Total.III.1 : 5 Prs) : 1080 Days


III.2. Accomodation Remove Area
1

Sewa Camp

1 Lot

Rp.

Tukang Cuc1

1 Org

Rp.

2,000,000 /Bulan

36 Bulan

Rp.

36 Bulan

Rp.

27,000,000

Rp.

99,000,000

Biaya Per Orang Per Day = ( Total.III.2 : 5 Prs) : 1080 Days

Rp.

18,333

Biaya Per Orang Per Day = ( Total.III.1+III.2)

Rp.

101,647.9

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

336,960,000
7,560,000

750,000

III.2. Fasilitas Base Camp


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

12.
13.

III

Meja Makan + Bangku


Kursi Plastik
Kipas Angin Gantung
Meja u/ R. Tidur
Meja u/ R. Klinik
Kaca Cermin
Tikar u/ Mushalla
Mesin Genset 25 KVA
Solar u/ Genset
Oli u/ Genset
Radio Komunikasi
- Radio Station
- Radio HT
Phone
Fasilitas First Aids

2
72
4
6
2
10
12
4
40
12

Set
Each
Set
Set
Set
Each
Each
Unit
Ltr/Hari
Ltr/Bln

x
x
x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,500,000
75,000
400,000
250,000
250,000
50,000
100,000
10,000,000
7,800
17,500

/Set
/Each
/Set
/Set
/Set
/Each
/Each
/Unit
/Liter
/Liter

x
x

1 x 1080 Hari
1 x
36 Bln

=
=
=
=
=
=
=
=
=
=

Unit
Unit
Unit
Set

x
x
x

Rp.
Rp.
Rp.
Rp.

10,000
1,875
1,400
50,000

/Days
/Days
/Days
/set

x
x
x
x

1080
1080
1080
1 x
36

=
=
=
=

Rp.
Rp.
Rp.
Rp.

3,600,000

Rp.

348,120,000

Biaya Per Orang Per Day = ( Total.III.2 : 5Prs) : 1080 Days

Rp.

64,466.7

Total Biaya Accomodation PerHari/Orang (III.1 + III.2)

Rp.

166,114.6

2
4
1
2

Civil Maintenance Service

Days
Days
Days
Bln

LIST OF COST for BASE CAMP


PEKERJAAN

: CIVIL MAINTENANCE SERVICES

KONTRAK NO.

Contractor

Owner

No.

Uraian

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Batu bata
Semen
Pasir
Kerikil
Kayu
Seng Gelombang
Seng Gelombang
Rabung Seng
Paku Seng
Paku Campur
Pintu (lengkap)
Plywood 4 mm
Jendela Nako 4 mm
Kawat harmonika
Besi Dia 6 mm
Besi Dia 8 mm
Besi Dia 10 mm
Besi Dia 18 mm
Kawat Ikat
Glass Wool
Excavation
Back Fill
PAINTING
Cat Emulsion, Nippon Paint
Cat Wathherseid, Nippo Paint
Kuas 6 inc
Kuas 4 inc
Kuas 2 inc
Scrap 3 inc
PLUMBING
Kran Air 3/4"
Wastafel
Pipa PVC Dia 3/4"
Pipa PVC Dia 1"
Pipa PVC Dia 3"
Pipa PVC Dia 4"
Pipa PVC Dia 5"
Socket PVC Dia 3/4"
Socket drat PVC Dia 3/4"
Socket PVC Dia 3"
Socket PVC Dia 4"
Socket PVC Dia 5"
Elbow PVC Dia 3/4"
Elbow PVC Dia 1"
Elbow PVC Dia 3"
Elbow PVC Dia 4"
Elbow PVC Dia 5"
Tee PVC 3/4"

Volume

15%
Harga
Satuan

Total
Harga

Keterangan

CIVIL

1
2
3
4
5
6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

58,882
1,165
82
66
34
866
278
104
14
159
49
362
41
105
160
586
840
492
30
115
32
4

Ea
Zak
M3
M3
M3
Ea
Ea
Ea
Kg
Kg
Set
Ea
Set
M2
M1
M1
M1
M1
Kg
M2
M3
M3

560
50,000
130,000
450,000
2,200,000

90,000
60,000

32,973,920
58,250,000
10,660,000
29,655,000
75,240,000
0
2,880,000
240,000

85
22
17
2
2
11

Ltr
Can
Ea
Ea
Ea
Ea

36
3
15
28
17
16
8
33
36
15
14
7
35
8
10
8
3
31

Ea
Set
Btng
Btng
Btng
Btng
Btng
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea

LIST OF COST for BASE CAMP


PEKERJAAN

: CIVIL MAINTENANCE SERVICES

KONTRAK NO.

Contractor

Owner

No.

Uraian

19
20
21
22
23
24
25
26

Tee PVC Dia 1"


Tee PVC Dia 3"
Tee PVC Dia 4"
Tee PVC Dia 5"
Reducer 1" - 3/4"
Lem Pipa
Teflon 1"
Closed Jongkok
Electric
Kabel Putih 12 mm x 100 m
Clam Cable 12 mm
Saklar
Stop Kontak
Fitting Lampu Duduk
Lampu TL 20 Watt
Lampu TL 40 Watt
Lampu Hemat Energi 8 Watt
Isolatif
Exhause Fan 10"
Others
Sumur Bor
Sewa Tanah

1
2
3
4
5
6
7
8
9
10
1
2

T O T A L IV

Volume

15%
Harga
Satuan

Total
Harga

Keterangan

14
9
10
9
5
12
12
18

Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea

17
16
16
30
22
24
54
22
17
16

Roll
Box
Ea
Ea
Ea
Set
Set
Ea
Ea
Unit

1 Set
3 Thn

10,000,000
15,000,000

15,000,000
45,000,000

269,898,920

PT. KESAYANGAN PRAKARSA

Ir. ZULHEIDI JAFAR

TABULASI MATERIAL
Civil Maintenance Services
Contract No.

No.

Contractor
Owner
Description Material

1
2
3
4

SCAFOLDING
Tubes BS 1139
Couplers & Fitting
Wooden Plank
Alluminium Ladder

1
2
3
4
5
6
7
8

Concrete Material
Gravel 2 -3
Gravel 3 -4
Sand For Blasting
Sand Building
Portland Cement
Chiken Mess Galvanize
Wire Mash - M6
Wire - Tie - Mild Steel

Spec / MFG

Dia. 48,28 mm, 3,6 mm Thick, 6 M Lenght


Swivel Clamp, Fixed Clamp, Bone Joint
50mm thick, 250mm width, 3 M length
Length 6 M

Type I (50 Kg)

Quantity

Unit

1,500 Ea
2,800 Ea
400 sheet
10 Ea

750
950
225
2,700
2,800
3,300
850
300

M3
M3
M3
M3
Bag
M2
M2
Kg

Harga
Beli

: PT. Kesayangan Prakarsa


: CONOCOPHILLIPS
Total

Jual

Harga

120%

Beli

1,500
300
3,900
6,800

1,500
300
3,900
6,800

2,250,000
840,000
1,560,000
68,000
4,718,000

450,000
450,000
115,000
115,000
45,000
22,500
26,455
7,300

450,000
450,000
138,000
138,000
54,000
27,000
31,746
7,300

337,500,000
427,500,000
31,050,000
372,600,000
151,200,000
89,100,000
26,984,100
2,190,000

Supplier Description

Remark
Rev. 00

1,438,124,100

1
2
3
4

Formwork material
Timber
Plywood
Plywood
Plywood

min Class2
6 mm x 4' x 8', Elephant
12 mm x 4' x 8', Elephant
18 mm x 4' x 8', Elephant

45 M3
500 sheet
500 sheet
500 sheet

1,350,000
65,000
145,000
200,000

1,620,000
78,000
174,000
240,000

72,900,000
39,000,000
87,000,000
120,000,000
318,900,000

1
2
3
4
5
6
7
8
9
10

Plumbing Material AW, Wavin, or Equal


PVC Pipe
PVC Pipe
PVC Pipe
PVC Pipe
PVC Pipe
PVC Pipe
PVC Pipe
Adhesive, Synthetic
Pipe, 1/2 In, Min AW, Lg 13 Ft, Conn Socket, PVC
Adafter, Pipe, 1/2 IN MNPT x Socket,
minimum AW, PVC

TABULASI MATERIAL

Dia. 4", Length 4 M, Sch 40


Dia. 3", Length 4 M, Sch 40
Dia. 2", Length 4 M, Sch 40
Dia. 1,5", Length 4 M, Sch 40
Dia. 1 1/4", Length 4 M, Sch 40
Dia. 1", Length 4 M, Sch 40
Dia. 3/4", Length 4 M, Sch 40
601, Rubber, 0,5 Kg / Can, Aica - Aibon

90
90
90
90
90
90
90
450
40
40

Ea
Ea
Ea
Ea
Ea
Ea
Ea
Can
Ea
Ea

309,500
186,600
92,500
71,500
63,500
42,500
31,000
17,000
22,400
1,000

371,400
223,920
111,000
85,800
76,200
51,000
37,200
20,400
26,880
1,200

33,426,000
20,152,800
9,990,000
7,722,000
6,858,000
4,590,000
3,348,000
9,180,000
1,075,200
48,000
-

Page 56 of 82

TABULASI MATERIAL
Civil Maintenance Services
Contract No.

No.

Contractor
Owner
Description Material

Spec / MFG

11 Adapter, Pipe, Hex Head, 2 IN FNPT X 2 IN


Socket, minimum AW, PVC
12 Coupling, Pipe, Size, 1 IN Thereaded Femele
x 1 IN Socket, PVC minimum AW
13 Copling, Pipe, Size 1 IN, Socket, PVC, minimum AW
Coupling, Pipe, Size, 1/2 IN Thereaded Femele
x 1/2 IN Socket, PVC minimum AW
14 Coupling, Pipe, Socket, 1-1/4 IN, minimum AW, PVC
15 Coupling , Pipe, Threaded, 1 IN MNPT, PVC; minimum AW
16 Coupling, Pipe, Threaded, 1 - 1/2 IN FNPT, PVC; minimum AW
17 Coupling , Pipe, Threaded, 1 - 1/2 IN MNPT, PVC; minimum AW
18 Elbow, Pipe, Socket, 1 - 1/2 IN, minimum AW, mat'l PVC
19 Elbow, Socket, Size 2 IN, PVC, RAD 90 DEG
20 Elbow, Pipe, Size 3/4 IN, Socket, PVC, minimum AW,
RAD 90 DEG
21 Elbow, Pipe, Socket, 1 IN, minimum AW, RAD 45 DEG, PVC
22 Elbow, Pipe, Socket, 1 IN, minimum AW, RAD 90 DEG, PVC
23 Elbow, Pipe, Socket, 1/2 IN, minimum AW, RAD 45 DEG, PVC
24 Elbow, Pipe, Socket, 1/2 IN, minimum AW, RAD 90 DEG, PVC
25 Elbow, Pipe, Socket, 1 - 1/4 IN, minimum AW, RAD 90 DEG, PVC
26 Elbow, Pipe, Socket, 3/4 IN, minimum AW, RAD 45 DEG, PVC
27 Reducer, Pipe, Concentric, Socket, 1 - 1/2 x 1 IN, min AW PVC
28 Reducer, Pipe, Concentric, Socket, 1 - 1/2 x 1/2 IN, min AW PVC
29 Reducer, Pipe, Concentric, Socket, 2 x1-1/2 IN, min AW PVC
30 Reducer, Pipe, Concentric, Socket, 3/4 x1/2 IN, min AW PVC
31 Reducer, Pipe; Dia 1 x 1/2 IN, minimum AW
32 Reducer, Conn Socket, Mat'l PVC; minimum AW
33 Socket, Pipe, 1 IN Lg 4 M, Plastic, PVC, minimum AW
34 Socket, Pipe, 1/2 IN, Lg 4 M, Plastic, PVC, minimum AW
35 Tee, 1/2 IN, Mat'l PVC, minimum AW, Socket ;
36 Tropical Glue, Basmatl Solvent Cement,
Appl PVC Pipe and Fitting ;

Quantity

Unit

Harga
Beli

: PT. Kesayangan Prakarsa


: CONOCOPHILLIPS
Total

Jual

Harga

120%

Beli

30

Ea

7,650

9,180

30

Ea

2,050

2,460

30

Ea

1,600

1,920

87
90
30
30
30
30

Ea
Ea
Ea
Ea
Ea
Ea

4,900
3,750
8,200
8,200
4,850
7,650

5,880
4,500
9,840
9,840
5,820
9,180

30
30
60
60
60
60
60
50
50
50
50
30
30
30
30
30
70

Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Can

1,600
2,100
2,100
1,000
1,100
3,400
1,350
3,900
2,950
6,700
1,375
3,900
2,950
2,000
1,000
1,600
17,000

1,920
2,520
2,520
1,200
1,320
4,080
1,620
4,680
3,540
8,040
1,650
4,680
3,540
2,400
1,200
1,920
20,400

TABULASI MATERIAL

Alpha Dexon

30

Ea

77,500

93,000

Cisa

25

Ea

742,000

890,400

Remark
Rev. 00

275,400
73,800
57,600
511,560
405,000
295,200
295,200
174,600
275,400
57,600
75,600
151,200
72,000
79,200
244,800
97,200
234,000
177,000
402,000
82,500
140,400
106,200
72,000
36,000
57,600
1,428,000

102,267,060
Door Lock Material/
1 Lock - Set, door, Double Cylinder,
1 x 7 IN, Steel, good quality
2 Lock - Set, door, 1/2 x 2-1/2 x 9 -1/2,
IN, Steel, good quality

Supplier Description

1,859,291,160

2,790,000
22,260,000
-

Page 57 of 82

TABULASI MATERIAL
Civil Maintenance Services
Contract No.

No.

Contractor
Owner
Description Material

3 Lock - Set, door, Type 36 - L, 3/4 x


1 -3/4 x 11 -1/2, Steel; good quality
4 Lock - Set, door, Type 49 - L, 1/2 x 3 - 1/2
x 9 - 1/2 IN, Steel ; good quality
5 Lock - Set, door, Type Extra - A, 40 mm,
Steel ; good quality
6 Lock - Set, door, Standart, Type Spain,
Steel, Plated ; good quality
7 Lock - Set, door, Type 693 LD
Standart, Steel, Plated ; good quality
8 Lock - Set, door, Type England,
1/2 x 2 - 1/2 x 6 IN, Steel ; good quality
1
2
3
4
5
6
1
2
3
4
5
6
7
8
9
10

PAINTING MATERIAL
Brush, Paint, 4 In ; good quality
Thinner, Liquid, Cap 1 Kg/ Can, Appl for
Mixing Paints ; good quality
Varnish, Oil, Wood Protection, Package 1 ltr/Can, good quality
Brush, Wire, Scrate, 1 x 10 IN
Carbon Steel, Handle Wood ;
Putty, Wood Filler, Impra SH 113, Teak ;
Mattock
Others Material
Panel, Ceiling, Suspended, Acoustic
thk 15 mm, Lg 1210 mm, W.603 mm,
Colour White
Adhesive, Synthetic, Glue, White, Cap 1 Kg/ Can
Grating, Metal, Matl Galvanish, Length 6100 mm,
Width 900 mm, Load Bea 30 x 5 mm, Load Bar
30 mm, Cross RO 100 mm
Acoustic Tile
( 15 mm x 59 mm X 119 cm );
Cement, Concrete, Color White, VOL 40,
Cap Kg/Zak ;
Terpaulin Sheet 20m x 20 m
Glass 40% 5 mm
Glass Clear 5mm
Concrete Nail
Insulation (chainlink, aluminium single sided, glasswool)
TABULASI MATERIAL

Spec / MFG

Quantity

Unit

Harga
Beli

Total
Jual

Harga

120%

Beli

Cisa

25

Ea

645,000

774,000

Cisa

25

Ea

797,000

956,400

Fino Art

25

Ea

145,000

174,000

SES

25

Ea

120,000

144,000

Shanghai

30

Ea

40,000

48,000

30

Ea

66,000

79,200

Hempel

45
45

Ea
Can

16,000
35,880

25
25

Can
Ea

75,000
5,000

50
40

Can
Ea

19,000
4,500

19,200
43,056
90,000
6,000
22,800
5,400

70

M2

112,000

134,400

45
68

Can
Ea

17,000
3,600,000

20,400
4,320,000

300

Box

225,000

270,000

200

Zax

67,500

81,000

3,000,000
85,000
70,000
30,000
35,000

3,600,000
102,000
84,000
36,000
42,000

35 sheet
60 M'
70 M'
443 Kg
325 M'

: PT. Kesayangan Prakarsa


: CONOCOPHILLIPS
Supplier Description

Remark
Rev. 00

19,350,000
23,910,000
4,350,000
3,600,000
1,440,000
2,376,000
80,076,000

1,939,367,160

864,000
1,937,520
2,250,000
150,000
1,140,000
216,000
6,557,520

1,945,924,680

9,408,000
918,000
293,760,000
81,000,000
16,200,000
126,000,000
6,120,000
5,880,000
15,948,000
13,650,000
Page 58 of 82

TABULASI MATERIAL
Civil Maintenance Services
Contract No.

No.

Contractor
Owner
Description Material

11 Brick wall, commond brick 10 x 10 20 cm

TABULASI MATERIAL

Spec / MFG

Quantity

12,000

Unit

Ea

Harga
Beli

500

: PT. Kesayangan Prakarsa


: CONOCOPHILLIPS
Total

Jual

Harga

120%

Beli

600

7,200,000
576,084,000

Supplier Description

Remark
Rev. 00

2,522,008,680

Page 59 of 82

TABULASI MATERIAL
Civil Maintenance Services
Contract No.

No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

Contractor
Owner
Description Material

Unit rate
Plastic Sheet
Nail
Wiremesh M8
Reinforcement
Wire
Klip Lock
Fixing Strap
zink Gutter BJLS30
Revet Nail
Silicon Sealen
Ridge Chaping
Flashing
Kawat Nyamuk
Engsel 4"
Grendel
Alumunium T (1 x1)
Wire
Concrete Nail
Pipa Galvanize < 2= "
Soc/T 2 "
Pipa Galvanize <3= "
Soc/T 3 "
Pipa Galvanize <4= "
Soc/T 4 "
Pipa Galvanize <6= "
Pipa Galvanize <8= "
Soc/T 6 "
Brush Wire Scratch
High Heat Silicon, Thinner 08080 20% (primer)
Heat Resisting Silicon Alum, Thinner 08080 20% (topcoat)
Epoxy Phenolic
Shop Epoxy Primer
Oil Paint
Emultion
Wallfililler
Emery Clotch
Anchor Bolt
Grouting
Ceramic Foor Floor 0.3 x 0.3
Ceramic For Wall 0.2 x 0.2 M
TABULASI MATERIAL

Spec / MFG

1 x 10", Bristles Carbon Steel, Handle Wood


Hempel silicone acrylic, allum 56940-19000
Hempel silicone acrylic, allum 56940-19000
Hempadur M.Red 45881 - 50630
Hempadur M.Grey 45881-11480
Platone
Dulux
Diamond
Diamond
3/4" - 30

Quantity

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Unit

M2
Kg
M2
Kg
Kg
M2
Ea
M2
Ea
Ea
M1
M1
M1
Ea
Ea
M1
M
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ea
Ea
Ea
Box
Box

Harga
Beli

11,000
9,000
45,000
12,420
11,500
45,700
1,000
60,000
235
40,000
42,169
34,200
2,000
14,000
7,500
31,500
85,000
250
305,000
8,000
496,000
13,000
445,000
27,000
1,218,000
1,836,000
31,000
16,000
199,364
199,364
116,748
116,748
40,000
60,000
21,800
1,800
30,000
27,000
52,500
44,500

: PT. Kesayangan Prakarsa


: CONOCOPHILLIPS
Total

Jual

Harga

120%

Beli

13,200
10,800
54,000
14,904
13,800
54,840
1,200
72,000
282
48,000
50,603
41,040
2,400
16,800
9,000
37,800
102,000
300
366,000
9,600
595,200
15,600
534,000
32,400
1,461,600
2,203,200
37,200
19,200
239,237
239,237
140,098
140,098
48,000
72,000
26,160
2,160
36,000
32,400
63,000
53,400

Supplier Description

Remark
Rev. 00

13,200
10,800
54,000
14,904
13,800
54,840
1,200
72,000
282
48,000
50,603
41,040
2,400
16,800
9,000
37,800
102,000
300
366,000
9,600
595,200
15,600
534,000
32,400
1,461,600
2,203,200
37,200
19,200
239,237
239,237
140,098
140,098
48,000
72,000
26,160
2,160
36,000
32,400
63,000
53,400
Page 60 of 82

TABULASI MATERIAL
Civil Maintenance Services
Contract No.

No.

41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81

Contractor
Owner
Description Material

Steel Structure
Bolt & Nut Dia
Glasswool
Chaink Link
Galvanize Steel Dia 8 "
Gypsum
Calci Board
Triplek 9 MM
Formica
Poliprint
Teak Wood
Soft Board
Kunci
Handle
Cylinder Lock
Hinge Door
Hinge
Kunci
Door Closer
Engsel Pintu
Engsel Jendela
Drawer Lock
Grandel
Allumunium
Moher + Stoper list
Soc/ T. PVC/ Elbow
Soc/ T. PVC
Soc/ T. PVC
Soc/ T. PVC
Soc/ T. PVC
Soc/ T. PVC
Plate
Fisher S - 8 + Screew
Hollow Frame
Door Leaf 0.82 m x 2.2
Wastern Closed
Sguatsing Closed
Urinoir
Wash Basim
Shower Head
Hand Shower
TABULASI MATERIAL

Spec / MFG

9 - 19 mm
Galvanize
Jaya Board

SES
1 Set
Door 4 "
Furniture
Afa Kens

4 " AW Wavin
3 " AW Wavin
2 " AW Wavin
1.5 " AW Wavin
1.1/4 " AW Wavin
1 " AW Wavin
1" x 2 mm x 6 M
S-8
Panel
Toto
Toto
Toto
Toto
Toto
Toto

Quantity

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Unit

Kg
Kg
M2
M2
Ea
M2
M2
Ea
Ea
Ea
Ea
Ea
Ea
EA
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
M1
M1
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
M
Ea
Ea
Ea
Ea
Ea
Ea
Ea

Harga
Beli

16,200
15,000
35,000
22,500
1,836,000
42,500
62,500
152,000
200,000
150,000
112,500
135,000
175,000
250,000
243,000
30,000
12,000
112,500
210,000
12,000
9,000
13,500
7,500
31,500
22,500
18,200
15,000
6,000
6,000
5,000
2,000
37,800
2,160
30,000
1,100,000
1,670,000
2,100,000
1,250,000
1,617,000
742,000
203,000

: PT. Kesayangan Prakarsa


: CONOCOPHILLIPS
Total

Jual

Harga

120%

Beli

19,440
18,000
42,000
27,000
2,203,200
51,000
75,000
182,400
240,000
180,000
135,000
162,000
210,000
300,000
291,600
36,000
14,400
135,000
252,000
14,400
10,800
16,200
9,000
37,800
27,000
21,840
18,000
7,200
7,200
6,000
2,400
45,360
2,592
36,000
1,320,000
2,004,000
2,520,000
1,500,000
1,940,400
890,400
243,600

Supplier Description

Remark
Rev. 00

19,440
18,000
42,000
27,000
2,203,200
51,000
75,000
182,400
240,000
180,000
135,000
162,000
210,000
300,000
291,600
36,000
14,400
135,000
252,000
14,400
10,800
16,200
9,000
37,800
27,000
21,840
18,000
7,200
7,200
6,000
2,400
45,360
2,592
36,000
1,320,000
2,004,000
2,520,000
1,500,000
1,940,400
890,400
243,600
Page 61 of 82

TABULASI MATERIAL
Civil Maintenance Services
Contract No.

No.

82
83
84
85
86
87
88
89
90
91
92
93
94
95

Contractor
Owner
Description Material

Toilet Shower
Valve
Granito Tile
Poly Carbonate
Corrugated Zink
Barber Wire
Angle Steel
Vinil Tile
Cat Silver
Welding Rod
Ford Ranger, Double Cabin,
Truck
PS 125
Medium Bus
Wire Sling

TABULASI MATERIAL

Spec / MFG

Toto
San EI
4 ' x 8"
Fence
L 75 x 75 x 6
Platon
thn 2004
kapasitas 8 Ton
Sparta
4MM

Quantity

1
1
1
1
1
1
1
1
1
1
1
1
1
1

Unit

Ea
Ea
Ea
Roll
M2
Roll
M
M2
Ltr
M2
Unit
Unit
Unit
M1

Harga
Beli

102,000
67,500
200,000
1,750,000
97,200
200,000
33,333
100,000
40,000
13,500
60,000,000
98,500,000
166,000,000
20,000

: PT. Kesayangan Prakarsa


: CONOCOPHILLIPS
Total

Jual

Harga

120%

Beli

122,400
81,000
240,000
2,100,000
116,640
240,000
40,000
120,000
48,000
16,200
60,000,000
98,500,000
166,000,000
22,000

Supplier Description

Remark
Rev. 00

122,400
81,000
240,000
2,100,000
116,640
240,000
40,000
120,000
48,000
16,200
60,000,000
98,500,000
166,000,000
22,000

Page 62 of 82

CIVIL MAINTENANCE SERVICES


LIST OF EQUIPMENT, TOOL & ACCESSORIES
NO.

DESCRIPTION

QTY

UNIT

UNIT
PRICE

DURASI

SCAFOLLDING

1
2
B

Scafollding Key
Body Harnes
PAINTING CAMP

3
15

Set
Ea

1
2
3
4
C

Hand Tools
Kereta Sorong
Tangga Aluminum
Consumable
PAINTING PLANT

1
4
4
1

Lot
Unit
Unit
Lot

Rp.
Rp.
Rp.
Rp.

1
2
3
4
5
6
D

Paint Pot + Accessories


Hose + Accessories
Air Filter + Accessories
Air Receiver & Accessories
Tools
Gun Cat
BLASTING EQUIPMENT

2
2
2
2
1
1

Unit
Unit
Unit
Lot
Lot
Unit

1
2
3
4
5
E

Air Hose 1/2" + Accessories


Hose Blasting 1,5" + Accessories
Nozzle
Blasting Coverall/Helmet Blasting
Accessories
CIVIL WORK
E.1. Fencing
Hand Tools
Hand Compactor
Vibrator
Grinding Machine
E.2. Insulation
Hand Tools
E.3. Equipment

100
100
2
2
1

1
2
3
4
1

36
36

Month
Month

Rp.
Rp.

TOTAL
PRICE

188,000
1,200,000

564,000
18,000,000

Beli

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Punya
Punya
Punya
Punya
Punya
Punya

Sendiri
Sendiri
Sendiri
Sendiri
Sendiri
Sendiri

Mtr
Mtr
Each
Set
Lot

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

Punya
Punya
Punya
Punya
Punya

Sendiri
Sendiri
Sendiri
Sendiri
Sendiri

1
1
1
2

Lot
Unit
Unit
Unit

Rp.
Rp.
Rp.
Rp.

80,000
50,000

Rp.
Rp.
Rp.
Rp.

Punya Sendiri
Punya Sendiri
Punya Sendiri

Lot

Rp.

375,000

Rp.

36

Month

1
2
3
4
5
6

Compressor 250 cfm


Cement Mixer Cap. 0.25 M3
Bar Cutting / Bender
Sand Blasting 100 Kg Min
Welding Machine 400 A
Cutting Touch Equipment
E.4. Others Equipment

1
3
1
1
1
1

Unit
Unit
Unit
Set
Unit
Set

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1
2
3
4
5
6
7
8
9
10
11
12
13
F
1
2

Tangga Alluminium Tinggi 2 M


Bor Tangan
Tools
Water Pump
Kereta Sorong
Mata Bor Concrete
Mata Bor Kayu
Hole Saw
Chain Saw
Circular Saw
Router Makita
Mesin Amplas
Mesin Sugu
MOBILISASI PERALATAN
Container
Double Cabin + PS Truck
Medium Bus

5
2
1
2
6
2
2
1
1
1
1
1
1

Unit
Unit
Lot
Unit
Unit
Ea
Ea
Set
Ea
Ea
Ea
Ea
Ea

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Unit

Unit

Rp.
Rp.

Keterangan

50,000

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

punya sendiri
punya sendiri
punya sendiri

375,000.00
-

250,000
18,000
150,000
1,700,000
450,000
1,850,000
750,000
1,200,000

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

500,000.00
36,000.00
150,000.00
1,700,000.00
450,000.00
1,850,000.00
750,000.00
1,200,000.00

Rp.

17,000,000

Rp.

51,000,000.00

Rp.

1,750,000

Rp.

8,750,000.00

Rp.

85,325,000.00

Punya
Punya
Punya
Punya
Punya
Punya

Sendiri
Sendiri
Sendiri
Sendiri
Sendiri
Sendiri

Punya
Punya
Punya
Punya
Punya

Sendiri
Sendiri
Sendiri
Sendiri
Sendiri

RENCANA ANGGARAN BIAYA


( R.A.B )
Contract Title
Contract No.
Owner
Location

: CIVIL MAINTANANCE SERVICE 3


: CS-13291205
: CONOCOPHILLIPPS GRISSIK
: PSC AREA

NO

DESCRIPTION

I.
A.

Job Number
Duration
Division
Project Duration
QTY

UNIT

FREQ
(Month)

UNIT PRICE
(Rp.)

:
:
:
: 36 months

AMOUNT
(Rp.)

REMARKS

Indirect Cost
TRANSPORTATION
A.1. Rental Equipment

- Rental Medium Bus


- Rental Ford double cabin 4 x 4
- Rental Ps Truck

1
3
1

Unit
Unit
Unit

36
36
36

4,611,111
1,666,667
2,736,111
Sub Total - A.1

166,000,000
180,000,000
98,500,000

Ford Double Cabin/2002

444,500,000

A.2. Maintenance

- Rental Medium Bus


- Maintenance Unit Ford
- Maintenance Unit Ps - truck

1
3
1

Unit
Unit
Unit

36
36
36

750,000
1,000,000
1,000,000
Sub Total - A.2

27,000,000
108,000,000
36,000,000

Oli, Part & Others

171,000,000

A.3. F u e l & O i l

- Rental Medium Bus


- Fuel Unit Ford
- Fuel Unit Ps Truck

1
3
1

Unit
Unit
Unit

36
36
36

4,600
4,600
4,600
Sub Total - A.3

Sub Total - A (A1 + A2 + A3)

10
25
25

Liter/day
Liter/day
Liter/day

546,480,000
1,161,980,000

Cost per Month

B.

49,680,000
372,600,000
124,200,000

5.34%

32,277,222

OFFICE COST
B.1. Field Office

Telecomunication
Office Supplies
PLN ( Power Energy)
Contract employee
Others

1
1
83
1

Ls
Ls
Ls
Ls
Ls

36
36

1,000,000
750,000

36,000,000
27,000,000

1
36

45,000
300,000

3,735,000
10,800,000

Sub Total - B.1

Phone, Fax, Email, HP


Paper, Foto Copy & Others

77,535,000

B.2. Head Office

- Telecomunication
- Office Supplies
- PLN ( Power Energy)

1
1
1

Ls
Ls
Ls

36
36
36

1,500,000
200,000
3,000,000

Sub Total - B.2

54,000,000
7,200,000
108,000,000

Phone, Fax, Email, HP


Paper, Foto Copy & Others

169,200,000

B.3. Representative Office

Telecomunication
Office Supplies
PLN ( Power Energy)
Others

1
1
1
1

Ls
Ls
Ls
Ls

Sub Total - B.3

Sub Total - B

246,735,000

Cost per Month

C.

Phone, Fax, Email, HP


Paper, Foto Copy & Others

6,853,750

0.03%

PROJECT MANAGEMENT TEAM


S A L L E R Y
C.1. Overhead Cost (Head Office)

- Project Coordinator
- Sistem Application / Doc Control

1
1

Prs
Prs

36
36

1,500,000
1,000,000

Sub Total - C.1

54,000,000
36,000,000
90,000,000

C.2. Site Personnel

Field Manager
Supervisor
Safety Insp
Lokal FA & Clerk
Administration & Clerk
Project Control
Planners/Estimator
Warehouseman
Mechanic
Drivers

2
4
4
1
1
1
2
2
1
6

Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs

36
36
36
36
36
36
36
36
36
36

6,000,000
2,750,000
2,750,000
2,000,000
1,000,000
4,500,000
3,500,000
900,000
1,500,000
900,000

432,000,000
396,000,000
396,000,000
72,000,000
36,000,000
162,000,000
252,000,000
64,800,000
54,000,000
194,400,000

Sub Total - C.2

2,059,200,000

Sub Total - C.2

C.3. Others

Page 64 Of 75

NO

DESCRIPTION

QTY

UNIT

FREQ
(Month)

UNIT PRICE
(Rp.)

AMOUNT
(Rp.)

Sub Total - C

2,149,200,000

Cost per Month

D.

REMARKS

0.27%

59,700,000

SOCIAL ALLOWANCE (Overhead Man power)


D.1. Jamsostek ( 2,89 % )

1. Overhead Cost
- Project Coordinator
- Sistem Application / Doc Control
2. Site Personnel
- Field Manager
- Supervisor
- Safety Insp
- Project Administration & Clerk
- Administration & Clerk
- Project Control
- Planners/Estimator
- Warehouseman
- Mechanic
- Drivers
- Polisi

1
1

Prs
Prs

36
36

2
4
4
1
1
1
2
2
1
3

Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs

36
36
36
36
36
36
36
36
36
36

1
Prs
Sub Total - D.1

36

173,400
79,475
79,475
57,800
28,900
130,050
130,050
101,150
26,010
43,350
-

12,484,800
11,444,400
11,444,400
2,080,800
1,040,400
4,681,800
9,363,600
7,282,800
936,360
4,681,800
-

1
1

Prs
Prs

3
3

1,500,000
1,000,000

4,500,000
3,000,000

2
4
4
1
1
1
2
2
1
6

Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs

3
3
3
3
3
3
3
3
3
3

6,000,000
2,750,000
2,750,000
2,000,000
1,000,000
4,500,000
3,500,000
900,000
1,500,000
900,000

36,000,000
33,000,000
33,000,000
6,000,000
3,000,000
13,500,000
21,000,000
5,400,000
4,500,000
16,200,000
-

65,441,160
65,441,160

65,441,160

D.2. T H R

1. Overhead Cost
- Project Coordinator
- Sistem Application / Doc Control
2. Site Personnel
- Field Manager
- Supervisor
- Safety Insp
- Project Administration & Clerk
- Administration & Clerk
- Project Control
- Planners/Estimator
- Warehouseman
- Mechanic
- Drivers

Sub Total - D.2

100%

179,100,000

D.3. CUTI

1. Overhead Cost
- Project Coordinator
- Sistem Application / Doc Control
2. Site Personnel
- Field Manager
- Supervisor
- Safety Insp
- Project Administration & Clerk
- Administration & Clerk
- Project Control
- Planners/Estimator
- Warehouseman
- Mechanic
- Drivers

1
1

Prs
Prs

3
3

1,500,000
1,000,000

4,500,000
3,000,000

2
4
4
1
1
1
2
2
1
6

Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs

3
3
3
3
3
3
3
3
3
3

6,000,000
2,750,000
2,750,000
2,000,000
1,000,000
4,500,000
3,500,000
900,000
1,500,000
900,000

36,000,000
33,000,000
33,000,000
6,000,000
3,000,000
13,500,000
21,000,000
5,400,000
4,500,000
16,200,000
-

Sub Total - D.3

100%

179,100,000

D.4. Pesangon / PSP 3 Migas

a. Overhead Cost
- Project Coordinator
- Sistem Application / Doc Control
b. Site Personnel
- Field Manager
- Supervisor
- Safety Insp
- Project Administration & Clerk
- Administration & Clerk
- Project Control
- Planners/Estimator
- Warehouseman
- Mechanic
- Drivers

1
1

Prs
Prs

3
3

1,500,000
1,000,000

4,500,000
3,000,000

2
4
4
1
1
1
2
2
1
6

Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs

3
3
3
3
3
3
3
3
3
3

6,000,000
2,750,000
2,750,000
2,000,000
1,000,000
4,500,000
3,500,000
900,000
1,500,000
900,000

36,000,000
33,000,000
33,000,000
6,000,000
3,000,000
13,500,000
21,000,000
5,400,000
4,500,000
16,200,000

Sub Total - D.4

100%

179,100,000

D.5. ASKES

a. Overhead Cost
- Project Coordinator

Prs

36

Page 65 Of 75

NO

DESCRIPTION

- Sistem Application / Doc Control


b. Site Personnel
- Field Manager
- Supervisor
- Safety Insp
- Lokal FA & Clerk
- Administration & Clerk
- Project Control
- Planners/Estimator
- Warehouseman
- Mechanic
- Drivers

QTY

UNIT

FREQ
(Month)

UNIT PRICE
(Rp.)

AMOUNT
(Rp.)

REMARKS

Prs

36

2
4
4
1
1
1
2
2
1
3

Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs

36
36
36
36
36
36
36
36
36
36

161,250
161,250
161,250
161,250
161,250
161,250
161,250
161,250
161,250
161,250

11,610,000
23,220,000
23,220,000
5,805,000
5,805,000
5,805,000
11,610,000
11,610,000
5,805,000
17,415,000

21.00
Sub Total - D.5

121,905,000

D.6. C T O

Field Manager
Supervisor
Safety Insp
Administration & Clerk
Project Control
Planners/Estimator
Warehouseman
Mechanic

2
4
4
1
1
2
2
1

Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs

36
36
36
36
36
36
36
36

1,500,000
500,000
750,000
500,000
850,000
850,000
150,000
1,000,000

108,000,000 FM Tiket Pesawat


72,000,000 Key Personel disesuai degan
108,000,000 Lokasi pulang CTO
18,000,000
30,600,000
61,200,000
10,800,000
36,000,000
-

Sub Total - D.4

444,600,000

Sub Total - D

1,169,246,160

Cost per Month

E.

CAMP FACILITIES
1.
2.
3.
4.
6.

Direction Keet & Facilities


Keet For Suban/Dayung
Laundry
Meal
Electric Power Plan

1.00
1.00
1.00
45.00
900.00

Ls
Ls
Ls
Prs
ltr /month

36
36
36
36
36

12,497,192
2,750,000
4,105,000
25,000
5,500

Sub Total - E

449,898,920
99,000,000
147,780,000
1,215,000,000
178,200,000

Maintenance
Keet For Dayung

30 ltr/day

2,089,878,920

Cost per Month

F.

0.15%

32,479,060

0.27%

58,052,192

TOOLS, SAFETY & CONSUMABLE S


1.
2.
3.
4.

Tools (Safety )
PPE & Safety Equipment
Consumables Material
MCU

1.00
83.00
54.00
83.00

Ls
Ls
Ls
Prs

1.00
3.00
36.00
3.00

7,500,000
800,000
10,000
800,000

7,500,000
199,200,000
19,440,000 Glove/Masker/Glass/Barricade
199,200,000
Reward HSE

Sub Total - F

425,340,000

Cost per Month

G.

ENTERTAIMENT & SERVICE FEE


1.
2.
3.
3.
4

Entertainment
Service Fee
Security Risk
Fee Contractor
Fee Procurement

1.00
1.00
1.00
1.00
1.00

Ls
Ls
Ls
Ls
Ls

36.00
1.00
36.00
1.00
1.00

1,000,000
50,000,000
4,500,000
-

Sub Total - G

6,888,889

Penawaran
0.03%

SURETY BOND & OTHERS


1.
2.
3.
4.
5

Performance Bond
Certificate/License
Company Fee (if any)
Bid Bond

1.00
0.00
0.00
1.00
1.00

Ls
Ls
Ls
Ls
Ls

1.00
-

3,717,557
413,062
-

Sub Total - H

3,717,557
413,062
4,130,619

Cost per Month

I.

36,000,000
50,000,000
162,000,000
- 0.50%
248,000,000

Cost per Month

H.

0.05%

11,815,000

114,739

(Bukopin)

Insurance/Bank

0.00%

MOB - DEMOBILIZATION
1.
2.
3.
4.
5.
6.

Mob - Demobilization
Mob - Demobilization
Mob - Demobilization
Mob - Demobilization
Business Travel
Others

Sub Total - I

Cost per Month

(Overhead)
(Labor)
(Equipments)
(Materials)

1.00
0.00
1.00
0.00
0.00
0.00

Ls
Ls
Ls
Ls
Ls
Ls

1.00
1.00
1.00
36.00
-

12,200,000
85,325,000
2,500,000
-

12,200,000
85,325,000
90,000,000
187,525,000

5,209,028

Site Personnel
Labor
Equipment
Material
Accomodation, Meal & Ticket

0.02%

Page 66 Of 75

NO

DESCRIPTION

QTY

UNIT

FREQ
(Month)

Ls

1.00

UNIT PRICE
(Rp.)

1.00

2,000,000

Cost per Month

II

7,682,035,699

35.29%

7,428,902,240
2,017,606,944
821,448,000

Max 80 %

MATERIALS
1
1
1

Ls
Ls
Ls

1.00
1.00
1.00

7,428,902,240
2,017,606,944
821,448,000

Sub Total - A

10,267,957,184

Cost per Month

EQUIPMENTS

285,221,033
1

Ls

1.00

1.31%

Sub Total - B

Cost per Month

0.00%

MAN POWER
1. Foreman
2. Skill
3. Skill Labour

6.00
24.00
26.00

Psn
Psn
Psn

36.00
36.00
36.00

1,200,000
1,000,000
900,000

Sub Total - C

259,200,000
864,000,000
842,400,000

1,965,600,000

Cost per Month

0.00%

Direct Cost

1. Unit Rate
2. Suply Material
3. Painting

Sub Total - J

TOTAL INDIRECT COST ( I )

REMARKS

OPERATIONAL COST
- Miscellaneous Cost

AMOUNT
(Rp.)

54,600,000

0.25%

SOCIAL ALLOWANCE (L a b o r)
D.1. Jamsostek ( 2,89 % )

1. Foreman
2. Skill
3. Skill Labour

6.00
24.00
26.00

Psn
Psn
Psn

36.00
36.00
36.00

34,680
28,900
26,010

Sub Total - D.1

7,490,880
24,969,600
24,345,360

56,805,840

D.2. T H R

1. Foreman
2. Skill
3. Skill Labour

6.00
24.00
26.00

Psn
Psn
Psn

3.00
3.00
3.00

1,200,000
1,000,000
900,000

Sub Total - D.2

21,600,000
72,000,000
70,200,000

163,800,000

D.3. CUTI

1. Foreman
2. Skill
3. Skill Labour

6.00
24.00
26.00

Psn
Psn
Psn

3.00
3.00
3.00

1,200,000
1,000,000
900,000

Sub Total - D.3

21,600,000
72,000,000
70,200,000

163,800,000

D.4. Pesangon

1. Foreman

6.00

Psn

3.00

1,200,000

21,600,000

Page 67 Of 75

NO

DESCRIPTION

QTY

2. Skill
3. Skill Labour

24.00
26.00

UNIT

FREQ
(Month)

Psn
Psn

3.00
3.00

UNIT PRICE
(Rp.)

AMOUNT
(Rp.)

1,000,000
900,000

REMARKS

72,000,000
70,200,000

Sub Total - D.4

163,800,000

D.5. A s k e s

- Carpenter, Manson, Iron Man

58.00

Prs

36.00

172,000

Sub Total - D.5

359,136,000

silver

359,136,000

D.6. Other

5,5 Jam/hrx Upah jam

- Over Time Otomatis


1. Foreman
2. Skill
3. Skill Labour

6.00
24.00
26.00

Psn
Psn
Psn

36.00
36.00
36.00

575,723
479,769
431,792

Sub Total - D.6

rate 83 jam / month

0.24%

51,399,316

SUB-CONTRACT

Sub Total - E

Cost per Month

21,765,968,249

GRAND TOTAL (Direct + Indirect)

604,610,229

Cost per Month (Direct + Indirect)

III

0.00%

14,083,932,550

TOTAL INDIRECT COST ( II )

Incoming
INVOICING
-

rate 83 jam / month

1,850,375,366

Cost per Month

rate 83 jam / month

943,033,526

Sub Total - D

124,356,069
414,520,231
404,157,225

Projeck Managemen
Civil Maitenance
Scafolding
Transfortation
Work Package

Pajak 2
- PPH psl 21

1
1
1
1
1

Lot
Lot
Lot
Lot
Lot

1
1
1
1
1

680,940,000
1,652,982,000
1,531,728,000
876,506,400
12,834,946,480

680,940,000
1,652,982,000
1,531,728,000
876,506,400
12,834,946,480

-0.06

tms

17,577,102,880

(1,054,626,173)

TOTAL INCOMING/INVOICING

16,522,476,707

TOTAL INCOMING/INVOICING

458,957,686

IV.

Provit & Loss Estimation (Bruto)

V.

PPn

VI.

Bank Interest

214,792,197

VII.

Provit & Loss Estimation ( III - IV - V )

VIII.

Incoming from the others source

VIII.

Fix Cost Coorporate

Total Provit & Loss

IX.

ROUNDED

(5,243,491,542)

BRUTO

10%

x Penerimaan

1,5 - 1,6 % per month

(5,458,283,739)
-

Performance Bond

(209,739,661.68)

4%

(5,248,544,078)

NETTO

-24.11%

(5,248,544,080)

R E M A R K S:
1. RAB adalah sebagai refrensi biaya dalam pelaksanaan pekerjaan.
2. Seluruh biaya tercatat tidak menjadi keharusan untuk dikeluarkan.
3. Untuk item pekerjaan yang belum termasuk dalam RAB dapat
ditambahkan sesuai dengan keperluan, tetapi TIDAK boleh
merubah Format yang telah ada.
4. RAB yang sah hanya yang telah disetujui oleh direksi.

Prepared by,

BUSINESS ANALYST.

DATE

Acknowleged by,

ORIGINATOR

DATE

Approved by,

PRESIDENT DIRECTOR

DATE

Page 68 Of 75

NO

DESCRIPTION

QTY

UNIT

FREQ
(Month)

UNIT PRICE
(Rp.)

AMOUNT
(Rp.)

REMARKS

2160
2016

Page 69 Of 75

14000000

150000

717,480,000
119580000
95664000

FM
487500
3737500

24

375,679,060.00

20.35
3.391667

13.65
2.275

1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1

5,600,000
3,400,000
2,500,000
3,000,000
800,000
4,500,000
3,400,000
1,600,000
1,600,000
900,000

300000
500000
250000
400000

Page 70 Of 75

1,450,000.00
2,000,000.00
800,000.00
200,000.00
300,000.00
4,750,000.00

FM
487500
3737500

20.35
3.391667

13.65
2.275

FM
487500
487500
3737500

20.35
20.35
3.391667

13.65
2.275

FM
487500
487500
3737500

20.35
20.35
3.391667

13.65
2.275

FM
487500
3737500
6987500

20.35
3.391667
0.565278

13.65
13.65
2.275

Page 71 Of 75

FM
487500
3737500

20.35
3.391667

13.65
2.275

4,000,000.00

6,100,000

yg baru dikalkulasi

16

Page 72 Of 75

56

56

Page 73 Of 75

3334091.098

3,627,661,374.86
100,768,371.52

58
56
1782000000

Page 74 Of 75

Page 75 Of 75

Anda mungkin juga menyukai