Lampiran no : FL-002
Formulir No : SC.02
FORMULIR
PERHITUNGAN TINGKAT KOMPONEN LOKAL DALAM NEGERI
( DOMESTIC CONTENT CALCULATION )
Formulir N0. : SC-02
Jumlah Nilai Penawaran :
Rp
17,577,102,880.00
% Komponen
KDN Penawaran
Dalam
( Quoted DC )
Negeri/KDN
Nilai
( % Domestic
(Value)
d=axc
Content/DC )
a
A.
BARANG ( GOODS )
I. Material Terpakai
2,522,008,680.00
14.35
100%
2,522,008,680.00
14.35
169,848,000.00
0.97
100%
169,848,000.00
0.97
(Material Used )
II. Peralatan
( Equipment )
2,691,856,680.00
15.31
2,691,856,680.00
15.31
JASA ( SERVICES )
III. Personil / Konsultan
3,695,802,000.00
21.03
100%
3,695,802,000.00
21.03
876,506,400.00
4.99
100%
876,506,400.00
4.99
10,312,937,800.00
58.67
100%
10,312,937,800.00
58.67
( Personel )
IV. Alat Kerja/Peralatan
(Equipment)
V.Konstruksi/Fabrikasi
(Construction/Fabrication)
V. Jasa Umum,dll
(Other Services )
Sub Jumlah ( Sub Total ) B
C. JUMLAH ( TOTAL )
= Sub Jumlah ( Sub Total ) A + B
14,885,246,200.00
84.69
14,885,246,200.00
17,577,102,880.00
100.00
17,577,102,880.00
Catatan ( Note )
1 Personil / Konsultan Kerja dll
(Personnel )
2 Alat Kerja / Peralatan
(Equipment)
3 Kontruksi / Fabrikasi
(Contruction/Fabrication)
( Other service )
5 Material terpakai
(Material Used )
6 Peralatan
(Equipment)
84.69
100.00
EXHIBIT C
COMPENSATION
CIVIL MAINTENANCE SERVICES
BQ
NO
DESCRIPTION
Unit
PROJECT MANAGEMENT
COST (Rupah)
UNIT PRICE
Price (Rp)
Monhtly
28 Months
Cost (Rupiah)
c
c=axb
d = c x 28
Qty
Unit
1.2
Ps
Month
12,442,500.00
24,885,000.00
1.3
Ps
Month
12,442,000.00
24,884,000.00
696,752,000.00
49,769,000.00
1,393,532,000.00
Sub Total 1
2
2.6
Ps
a
24,108
b
Daily
d=axb
133,500.00
3,218,418,000.00
Sub Total 2
4
TRANSPORTATION
4.1
Double cabin 4 x 4
4.3
BBM, Solar
696,780,000.00
Ea
Month
Ltr/day
25
Ltr
Sub Total 4
TOTAL ESTIMATE CONTRACT VALUE - 28 Months
Total rata - rata pembiayaan per bulan
3,218,418,000.00
c=axb
d = c x 28
1,694,500.00
1,694,500.00
47,446,000.00
5,500.00
16,500,000.00
462,000,000.00
18,194,500.00
509,446,000.00
IDR
5,121,396,000.00
IDR
182,907,000.00
Note :
1 Formula For 4.3 BBM, Solar "Transfortation", in column Monthly or column C should be filled : c = a x b x 30 days x 4 unit
2 5.1 Capex Maintenance & Opec should be filled with Total estimated price of Unit Price (Supply & Instal)
3 5.2 Supply Material should be filled with Total estimated price of Material Suply Only
4 5.3 Painting should be filled with Total estimated price of Painting works
17,220
Gaji
Over Time
Total
Thr
Pesangon
Cuti
Cto
Svp 4 orang
9,500,000
791,667
791,666.67
791,666.67
2,000,000
HSE 4
9,150,000
762,500
762,500.00
762,500.00
2,500,000
18,650,000
1,554,167
1,554,166.67
1,554,166.67
4,500,000
Call out
6,000,000
2,861,272
8,861,272
500,000.00
500,000.00
500,000.00
6,000,000
2,861,272
8,861,272
500,000.00
500,000.00
500,000.00
24,108
28
##########
22.64
Invoice/ bulan
27,812,500.00
49,769,000.00
10,361,271.68
total
selisih
21,956,500.00
(10,361,271.68)
#REF!
EXHIBIT C
COMPENSATION
CIVIL MAINTENANCE SERVICES
BQ
NO
DESCRIPTION
Unit
PROJECT MANAGEMENT
COST (Rupah)
UNIT PRICE
Price (Rp)
Monhtly
36 Months
Cost (Rupiah)
c
c=axb
d = c x 36
Qty
Unit
1.1
Field Manager
Ps
Month
1,891,500.00
3,783,000.00
136,188,000.00
1.2
Supervisor
Ps
Month
1,891,500.00
7,566,000.00
272,376,000.00
1.3
HSE Inspector
Ps
Month
1,891,500.00
7,566,000.00
272,376,000.00
Sub Total 1
2
680,940,000.00
d=axb
2.1
Ps
1900
Daily
126,100.00
239,590,000.00
2.2
Ps
2700
Daily
126,100.00
340,470,000.00
2.3
Ps
2400
Daily
126,100.00
302,640,000.00
2.4
Ps
1520
Daily
126,100.00
191,672,000.00
2.5
Ps
4320
Daily
126,100.00
544,752,000.00
2.6
Ps
270
Daily
125,400.00
33,858,000.00
Sub Total 2
3
3.1
1,652,982,000.00
SCAFFOLDING :
c=axb
d = c x 36
Material
3.1.1
Tubes (6m)
Jts
1,500 Month
1,500.00
2,250,000.00
81,000,000.00
3.1.2
Ea
2,800 Month
300.00
840,000.00
30,240,000.00
3.1.3
3,900.00
1,560,000.00
56,160,000.00
3.1.4
Alluminium Ladder
6,800.00
68,000.00
Ea
10
Month
2,448,000.00
169,848,000.00
Manpower
c=axb
d = c x 36
3.2.1
Ps
Month
1,891,500.00
3,783,000.00
136,188,000.00
3.2.2
Ps
Month
1,891,500.00
15,132,000.00
544,752,000.00
3.2.3
Ps
10
Month
1,891,500.00
18,915,000.00
680,940,000.00
1,361,880,000.00
TRANSPORTATION
c=axb
d = c x 36
4.1
Double cabin 4 x 4
Ea
Month
1,694,500.00
5,083,500.00
4.2
PS truck
Ea
Month
2,763,900.00
2,763,900.00
183,006,000.00
99,500,400.00
4.3
BBM, Solar
Ltr/day
25
Ltr
5,500.00
16,500,000.00
594,000,000.00
Sub Total 4
5
876,506,400.00
WORK PACKAGE
5.1
Lot
9,286,127,800.00
5.2
Suplly Material
Lot
2,522,008,680.00
5.3
Painting
Lot
1,026,810,000.00
Sub Total 5
TOTAL ESTIMATE CONTRACT VALUE - 36 Months
Total rata - rata pembiayaan per bulan
12,834,946,480.00
IDR 17,577,102,880.00
IDR
Note :
1 Formula For 4.3 BBM, Solar "Transfortation", in column Monthly or column C should be filled : c = a x b x 30 days x 4 unit
2 5.1 Capex Maintenance & Opec should be filled with Total estimated price of Unit Price (Supply & Instal)
3 5.2 Supply Material should be filled with Total estimated price of Material Suply Only
4 5.3 Painting should be filled with Total estimated price of Painting works
488,252,857.78
22,618,691,459
77.71
DESCRIPTION
UNIT
VOLUME
PRICE
(Rp.)
M2
3,200
26,000
M2
11,500
33,200
M2
2,100
39,000
M2
3,100
39,000
M2
1,100
94,200
M2
1,200
54,700
M2
7,500
25,300
TOTAL ESTIMATED
(Rp)
Rp.
Bill Of Quantity
Page 7 of 75
ACT
TOTAL ESTIMATED
(Rp)
83,200,000
381,800,000
81,900,000
120,900,000
103,620,000
65,640,000
189,750,000
1,026,810,000
Bill Of Quantity
Page 8 of 75
NO.
DESCRIPTION
PRICE
UNIT
TOTAL ESTIMATED
PRICE
Bill Of Quantity
M3
M3
M3
M3
M3
M3
M3
M3
1,250
950
600
240
240
120
960
130
89,600.00
98,100.00
29,600.00
53,500.00
124,200.00
245,000.00
34,600.00
245,000.00
roll
M3
M2
Kg
Kg
M3
M3
M3
M3
240
460
8,940
50,000
50
1,100
800
900
250
51,000.00
805,000.00
78,400.00
18,400.00
45,500.00
869,500.00
923,500.00
977,500.00
45,100.00
M2
M2
M2
M2
M2
M2
M2
2,400
2,400
300
320
48
144
48
129,100.00
57,500.00
234,300.00
72,400.00
252,700.00
40,100.00
72,400.00
Kg
Kg
M2
M'
M'
M'
M2
2,400
60
144
48
96
230
750
32,700.00
28,700.00
85,000.00
63,800.00
54,200.00
101,800.00
69,600.00
M2
M2
M2
840
650
201
73,900.00
110,400.00
96,400.00
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
15
15
12
12
25
35
35
54
2,130,000.00
2,646,000.00
1,628,700.00
2,066,400.00
922,000.00
275,200.00
154,000.00
112,600.00
M'
M'
M'
M'
M'
48
720
720
720
720
159,500.00
80,300.00
80,300.00
75,400.00
137,900.00
112,000,000.00
93,195,000.00
17,760,000.00
12,840,000.00
29,808,000.00
29,400,000.00
33,216,000.00
31,850,000.00
12,240,000.00
370,300,000.00
700,896,000.00
920,000,000.00
2,275,000.00
956,450,000.00
738,800,000.00
879,750,000.00
11,275,000.00
309,840,000.00
138,000,000.00
70,290,000.00
23,168,000.00
12,129,600.00
5,774,400.00
3,475,200.00
78,480,000.00
1,722,000.00
12,240,000.00
3,062,400.00
5,203,200.00
23,414,000.00
52,200,000.00
62,076,000.00
71,760,000.00
19,376,400.00
31,950,000.00
39,690,000.00
19,544,400.00
24,796,800.00
23,050,000.00
9,632,000.00
5,390,000.00
6,080,400.00
7,656,000.00
57,816,000.00
57,816,000.00
54,288,000.00
99,288,000.00
9 of 75
NO.
DESCRIPTION
PRICE
UNIT
TOTAL ESTIMATED
PRICE
1
2
3
4
1
2
3
4
5
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
700
700
710
360
110,500.00
100,900.00
309,500.00
156,400.00
17
23
12
25
48
458,200.00
526,200.00
318,500.00
1,482,400.00
151,100.00
60
60
60
60
60
60
60
345,400.00
356,200.00
297,400.00
32,000.00
32,000.00
41,500.00
40,600.00
77,350,000.00
70,630,000.00
219,745,000.00
56,304,000.00
7,789,400.00
12,102,600.00
3,822,000.00
37,060,000.00
7,252,800.00
20,724,000.00
21,372,000.00
17,844,000.00
1,920,000.00
1,920,000.00
2,490,000.00
2,436,000.00
120
96
408
60
60
60
690
15
14
50
1,970
375
1,950
450
381,100.00
52,700.00
115,400.00
94,400.00
78,600.00
88,100.00
1,983,100.00
7,393,600.00
3,244,200.00
112,700.00
36,000.00
298,600.00
40,900.00
1,194,700.00
45,732,000.00
5,059,200.00
47,083,200.00
5,664,000.00
4,716,000.00
5,286,000.00
1,368,339,000.00
110,904,000.00
45,418,800.00
5,635,000.00
70,920,000.00
111,975,000.00
79,755,000.00
537,615,000.00
Rp.
9,286,127,800
( Say In Word : Nine Billion Ninety Five Million Eight Hundred And Fifty Four Thousand thirty Hundred Rupiahs)
Bill Of Quantity
10 of 75
DESCRIPTION
UNIT
VOLUME
PRICE
(Rp.)
TOTAL ESTIMATED
(Rp)
Gravel 2 - 3
Gravel 3 - 5
Sand for Sand Blasting
Sand Building
Portland Cement ( 50 kg )
Chicken Mess, galvanize
Wire Mesh M6. 150
Wire, Tie, 1mm, Mild Steel
1
2
3
4
1
2
3
4
5
6
7
8
9
10
M3
M3
M3
M3
bag
M2
M2
Kg
750
950
225
2,700
2,800
3,300
850
300
450,000.00
450,000.00
138,000.00
138,000.00
54,000.00
27,000.00
31,746.00
7,300.00
M3
Sheet
Sheet
Sheet
45
500
500
500
1,620,000.00
78,000.00
174,000.00
240,000.00
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Can
Ea
Ea
90
90
90
90
90
90
90
450
40
40
371,400.00
223,920.00
111,000.00
85,800.00
76,200.00
51,000.00
37,200.00
20,400.00
26,880.00
1,200.00
Ea
30
9,180.00
Ea
30
2,460.00
Ea
30
1,920.00
Ea
Ea
Ea
Ea
Ea
Ea
87
90
30
30
30
30
5,880.00
4,500.00
9,840.00
9,840.00
5,820.00
9,180.00
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Can
30
30
60
60
60
60
60
50
50
50
50
30
30
30
30
30
70
1,920.00
2,520.00
2,520.00
1,200.00
1,320.00
4,080.00
1,620.00
4,680.00
3,540.00
8,040.00
1,650.00
4,680.00
3,540.00
2,400.00
1,200.00
1,920.00
20,400.00
Fomwork Materials
Plumbing Material
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Bill Of Quantity
Page 11 of 75
DESCRIPTION
UNIT
VOLUME
PRICE
(Rp.)
TOTAL ESTIMATED
(Rp)
Ea
30
93,000.00
Ea
25
890,400.00
Ea
25
774,000.00
Ea
25
956,400.00
Ea
25
174,000.00
Ea
25
144,000.00
Ea
30
48,000.00
Ea
30
79,200.00
Ea
Can
45
45
19,200.00
43,056.00
Can
Ea
25
25
90,000.00
6,000.00
Can
Ea
50
40
22,800.00
5,400.00
M2
70
134,400.00
Can
Ea
45
68
20,400.00
4,320,000.00
Box
Zak
300
200
270,000.00
81,000.00
35
60
70
443
325
12,000
3,600,000.00
102,000.00
84,000.00
36,000.00
42,000.00
600.00
Painting Material
1
2
3
4
5
6
Other Material
1
2
3
4
5
6
7
8
9
10
11
Sheet
M1
M1
Kg
M1
Ea
Rp.
( Say In Word : Two Billion Five Hundred And Tweenty Two Million And Eight Thousand Six Hundred And Eighty Rupiahs)
Bill Of Quantity
Page 12 of 75
RACT
TOTAL ESTIMATED
(Rp)
337,500,000
427,500,000
31,050,000
372,600,000
151,200,000
89,100,000
26,984,100
2,190,000
72,900,000
39,000,000
87,000,000
120,000,000
33,426,000
20,152,800
9,990,000
7,722,000
6,858,000
4,590,000
3,348,000
9,180,000
1,075,200
48,000
275,400
73,800
57,600
511,560
405,000
295,200
295,200
174,600
275,400
57,600
75,600
151,200
72,000
79,200
244,800
97,200
234,000
177,000
402,000
82,500
140,400
106,200
72,000
36,000
57,600
1,428,000
Bill Of Quantity
Page 13 of 75
2,790,000
22,260,000
19,350,000
23,910,000
4,350,000
3,600,000
1,440,000
2,376,000
864,000
1,937,520
2,250,000
150,000
1,140,000
216,000
9,408,000
918,000
293,760,000
81,000,000
16,200,000
126,000,000
6,120,000
5,880,000
15,948,000
13,650,000
7,200,000
2,522,008,680
Bill Of Quantity
Page 14 of 75
Analisa
15 of 75
Field Manager
Supervisor
Safety Inspector
@ Rp.
@ Rp.
@ Rp.
1,891,500
1,891,500
1,891,500
TOTAL
Rp.
Rp.
Rp.
Rp.
2.000 Person
EXCAVATION < 1.5 M
0.909 Person
0.030 Person
Forement
@ Rp.
126,100
Rp.
Helper
Foreman
@ Rp.
@ Rp.
94,300
126,100
Rp.
Rp.
TOTAL
1 M3
Rp.
Helper
Foreman
@ Rp.
@ Rp.
94,300
126,100
TOTAL
1 M3
Rp.
DISPOSAL < 15 M
0.300 Person
0.010 Person
Helper
Foreman
@ Rp.
@ Rp.
94,300
126,100
TOTAL
1 M3
Rp.
Helper
Foreman
@ Rp.
@ Rp.
94,300
126,100
TOTAL
Rp.
Helper
Foreman
@ Rp.
@ Rp.
94,300
126,100
TOTAL
Rp.
Rp.
Rp.
Hand Compactor
@ Rp.
80,000
Rp.
0.260 Person
Helper
@ Rp.
94,300
Rp.
TOTAL
1 ROLL PLASTIC SHEET 1,2 x 50 M
1 M2 PLASTIC SHEET 1,2 x 50 M
1.000 M2
Plastic Sheet
0.400 Person
Labour
@ Rp.
@ Rp.
Rp.
13,200
94,300
TOTAL
1 M3
Rp.
Rp.
1 M2
Rp.
Rp.
1 M3
Rp.
Rp.
Gravel
Sand
Cement Type I
Concrete Mixer
Foreman
Masonary
Helper
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
TOTAL
Rp.
Rp.
Rp.
450,000
138,000
54,000
50,000
126,100
126,100
94,300
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Analisa
16 of 75
10 M2 FORMWORK
0.400
4.000
0.100
0.260
0.500
M3
Kg
Person
Person
Person
Timber
Nail
Foreman
Carpenter
Helper
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
1,620,000
10,800
126,100
126,100
94,300
TOTAL
for 1 M2 Rp. 2,052.000
783,746
: 10 : 10
1 M2
Rp.
Rp.
Wire
Foreman
Skill
@ Rp.
@ Rp.
@ Rp.
54,000
126,100
126,100
TOTAL
1 KG
Rp.
Kg
Kg
Person
Person
Reinforcement
Wire
Foreman
Skill
@
@
@
@
Rp.
Rp.
Rp.
Rp.
14,904
13,800
126,100
126,100
TOTAL
Rp.
M3
M3
Zak
Unit
Unit
Person
Person
Person
Gravel
Sand
Cement Type I
Concrete Mixer
Vibrator
Foreman
Masonary
Helper
@
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
450,000
138,000
54,000
50,000
50,000
126,100
126,100
94,300
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
CONCRETE K-210
0.820
0.540
6.000
0.250
0.150
0.080
0.250
1.000
M3
M3
Zak
Unit
Unit
Person
Person
Person
Gravel
Sand
Cement Type I
Concrete Mixer
Vibrator
Foreman
Masonary
Helper
@
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
450,000
138,000
54,000
50,000
50,000
126,100
126,100
94,300
TOTAL
1 M3
Rp.
Rp.
Rp.
Rp.
CONCRETE K-175
0.820
0.540
5.000
0.250
0.150
0.080
0.250
1.000
1 M3
Rp.
Rp.
Rp.
REINFORCEMENT
1.100
0.040
0.001
0.010
1 M3
Rp.
Rp.
Rp.
Rp.
Rp.
CONCRETE K-225
0.820 M3
0.540 M3
7.000 Zak
0.250 Unit
0.150 Unit
0.080 Person
0.250 Person
1.000 Person
Gravel
Sand
Cement Type I
Concrete Mixer
Vibrator
Foreman
Masonary
Helper
@
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
450,000
138,000
54,000
50,000
50,000
126,100
126,100
94,300
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Analisa
17 of 75
Rp.
Sand
Foreman
Helper
@ Rp.
@ Rp.
@ Rp.
138,000
126,100
94,300
TOTAL
1 M3
Rp.
Sand
Foreman
Helper
@ Rp.
@ Rp.
@ Rp.
138,000
126,100
94,300
TOTAL
1 M2
Rp.
Each
Zak
M3
Person
Person
Person
Brick
Cement Type I
Sand
Foreman
Masonary
Helper
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
600
54,000
138,000
126,100
126,100
94,300
TOTAL
Rp.
M3
Zak
Person
Person
Person
Sand
Cement Type I
Foreman
Masonary
Helper
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
138,000
54,000
126,100
126,100
94,300
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
M2
Each
Person
Person
Person
Klip lock
Fixing Strap
Foreman
Masonary
Helper
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
54,840
1,200
126,100
126,100
94,300
TOTAL
1 M2
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1 M2
Rp.
Rp.
Rp.
BRICK WALL
50.000
0.420
0.070
0.030
0.200
0.400
1 M2
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
M2
Each
Each
Person
Person
Person
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
72,000
282
48,000
126,100
126,100
94,300
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Analisa
18 of 75
1 M1
RIDGE CHAPPING
1.000 M1
0.080 Kg
0.010 Person
0.050 Person
0.050 Person
Ridge Capping
Nail
Foreman
Masonary
Helper
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,603
10,800
126,100
126,100
94,300
TOTAL
1 M1
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
FLASHING
1.000
0.080
0.010
0.050
0.050
M1
Kg
Person
Person
Person
Flashing
Nail
Foreman
Masonary
Helper
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
41,040
10,800
126,100
126,100
94,300
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
M3
Kg
M'
Each
Each
Person
Person
Timber
Nail
Kawat Nyamuk
Engsel 4"
Grendle
Masonary
Helper
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,620,000
10,800
2,400
16,800
9,000
126,100
94,300
TOTAL
1 M2
Rp.
ACOUSTIC BOARD
0.550
1.400
1.200
6.300
2.000
0.050
0.200
Each
Each
M
Each
Each
Person
Person
Aluminum T (1x1)
Acoustic Panel
Wire
Rivet Nail
Concrete Nail
Foreman
Masonary
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
37,800
54,000
102,000
282
300
126,100
126,100
TOTAL
1 M1
Foreman
Skill
Ea
Ea
Kg
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Foreman
Skill
Ea
Ea
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
126,100
126,100
371,400
21,840
20,400
TOTAL
1 M1
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
126,100
126,100
223,920
18,000
Rp.
Rp.
Rp.
Rp.
Analisa
19 of 75
Kg
@ Rp.
20,400
TOTAL
1 M1
Rp.
Person
Person
PVC 2"
Soc/T
Lem
Foreman
Skill
Ea
Ea
Kg
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
126,100
126,100
111,000
7,200
20,400
TOTAL
1 M1
Rp.
Person
Person
PVC1.5"
Soc/T
Lem
Foreman
Skill
Ea
Ea
Kg
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
126,100
126,100
85,800
7,200
20,400
TOTAL
Rp.
Person
Person
PVC1.1/4"
Soc/T
Lem
Foreman
Skill
Ea
Ea
Kg
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
126,100
126,100
76,200
6,000
20,400
TOTAL
Rp.
Person
Person
PVC 1"
Soc/T
Lem
Foreman
Skill
Ea
Ea
Kg
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
126,100
126,100
51,000
2,400
20,400
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Person
Person
Galvanis
Soc/T
Foreman
Skill
Ea
Ea
@
@
@
@
Rp.
Rp.
Rp.
Rp.
TOTAL
1 M1
Rp.
Rp.
Rp.
Rp.
Rp.
1 M1
Rp.
Rp.
Rp.
Rp.
Rp.
1 M1
Rp.
Rp.
Rp.
Rp.
Rp.
1 M1
Rp.
126,100
126,100
366,000
9,600
Rp.
Rp.
Rp.
Rp.
Rp.
Analisa
20 of 75
Person
Galvanis
Soc/T
Person
Foreman
Ea
Ea
Skill
@
@
@
@
Rp.
Rp.
Rp.
Rp.
126,100
595,200
15,600
126,100
TOTAL
1 M1
Rp.
Person
Galvanis
Soc/T
Person
Foreman
Ea
Ea
Skill
@
@
@
@
Rp.
Rp.
Rp.
Rp.
126,100
534,000
32,400
126,100
TOTAL
1 M1
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Person
Galvanis
Soc/T
Person
Foreman
Ea
Ea
Skill
@
@
@
@
Rp.
Rp.
Rp.
Rp.
126,100
1,461,600
37,200
126,100
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
SURFACE PREPARATION
a. Labor Cost, 18,52 M2/Day
1.000 Person
3.000 Person
Foreman
Grinder
@ Rp.
@ Rp.
126,100
126,100
TOTAL
for 1 M2 Rp. 1.021.000
504,400
: 18,52
: 18,52
Rp.
Rp.
Rp.
Rp.
Granding
Wire Brush Cup
Others
@ Rp.
@ Rp.
@ Rp.
5,000
19,200
500
TOTAL
for 1 M2 Rp. 84 ,50073,100
: 18,52 : 18,52 m
1 M2
Rp.
Rp.
Liter
Liter
Liter
M2
M2
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
239,237
239,237
43,056
27,235
3,947
TOTAL
1 M2
Rp.
Rp.
Rp.
PAINTING CAMP
0.200 Liter
Emulsion
@ Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
72,000
Rp.
Analisa
21 of 75
Kg
Each
Lot
Person
Person
Wallfiller
Emery Clotch
Consumable
Painter
Foreman
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
26,160
2,160
1,000
126,100
126,100
TOTAL
1 M2
Rp.
CUTTING GRASS
0.00120 Person
0.00005 Person
Helper
Foreman
@ Rp.
@ Rp.
94,300
126,100
TOTAL
Untuk 1 Ha 10000 x
1 Ea
Rp.
36,000
94,300
TOTAL
Rp.
Skill
@ Rp.
@ Rp.
32,400
126,100
TOTAL
@
@
@
@
Rp.
Rp.
Rp.
Rp.
@
@
@
@
Rp.
Rp.
Rp.
Rp.
63,000
869,433
126,100
94,300
53,400
869,433
126,100
94,300
Rp.
Rp.
Rp.
Rp.
Rp.
@ Rp.
@ Rp.
@ Rp.
TOTAL
1 Kg
Rp.
Rp.
Rp.
Rp.
Rp.
TOTAL
1 Kg
Rp.
Rp.
Rp.
TOTAL
1 M2
Rp.
Rp.
Grouting
1.000 Grouting
0.100 Person
1 M2
Rp.
Rp.
119
1 Ltr
Rp.
Rp.
Rp.
Rp.
Rp.
126,100
94,300
19,440
Rp.
Rp.
Rp.
Rp.
Analisa
22 of 75
@ Rp.
@ Rp.
@ Rp.
126,100
94,300
18,000
TOTAL
1 M2
Rp.
Skill
Helper
@ Rp.
@ Rp.
@ Rp.
42,000
126,100
94,300
TOTAL
1 M2
Rp.
@ Rp.
@ Rp.
@ Rp.
27,000
126,100
126,100
TOTAL
Downspot PVC 4"
0.250 Each
0.500 Each
1.000 Each
4.000 Each
@
@
@
@
Rp.
Rp.
Rp.
Rp.
@ Rp.
@ Rp.
@ Rp.
371,400
21,840
45,360
2,592
126,100
126,100
367,200
Rp.
M2
Kg
Person
Person
@
@
@
@
Rp.
Rp.
Rp.
Rp.
51,000
10,800
126,100
94,300
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Plafond Triplek 6 mm
0.350
0.080
0.020
0.200
0.015
M2
Kg
Person
Person
M3
Triplek 6 mm
Nail
Skill
Helper
Timber
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
78,000
10,800
126,100
94,300
1,620,000
TOTAL
1 M2
Rp.
Rp.
Rp.
Plaster Board
0.350
0.080
0.020
0.200
1 M2
Rp.
Rp.
Rp.
Rp.
Rp.
TOTAL
1 M2
Rp.
Rp.
Rp.
Rp.
TOTAL
1 M'
Rp.
Rp.
Rp.
1 M'
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Plafond Triplek 9 mm
0.350 M2
Triplek 9 mm
@ Rp.
182,400
Rp.
Analisa
23 of 75
Kg
Person
Person
M3
Nail
Skill
Helper
Timber
@
@
@
@
Rp.
Rp.
Rp.
Rp.
10,800
126,100
94,300
1,620,000
TOTAL
1 M2
Rp.
Calci Board
Skill
Helper
@ Rp.
@ Rp.
@ Rp.
75,000
126,100
94,300
TOTAL
1 M2
Rp.
Gypsum
Skill
Helper
@ Rp.
@ Rp.
@ Rp.
51,000
126,100
94,300
TOTAL
Rp.
M2
EA
M1
Ea
M1
Person
Person
Gypsum
Nail Concrete
Wire
Rivet Nail
Hollo Frame
Skill
Helper
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
51,000
300
102,000
282
36,000
126,100
94,300
TOTAL
Rp.
Formica
Glue
Skill
@ Rp.
@ Rp.
@ Rp.
240,000
20,400
126,100
TOTAL
Rp.
Rp.
Rp.
Rp.
Poliprint
0.350 Ea
0.300 Kg
0.200 Person
Poliprint
Glue
Skill
@ Rp.
@ Rp.
@ Rp.
180,000
20,400
126,100
TOTAL
1 M2
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Formica
0.350 Ea
0.300 Kg
0.200 Person
1 M2
Rp.
Rp.
Rp.
1 M2
Rp.
Rp.
Rp.
GYPSUM
1.000 M2
0.020 Person
0.200 Person
1 M2
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Teak Wood
0.350 Ea
0.300 Kg
Teak Wood
Glue
@ Rp.
@ Rp.
135,000
20,400
Rp.
Rp.
Analisa
24 of 75
Skill
@ Rp.
126,100
TOTAL
1 M2
Rp.
Soft Board
0.350 Ea
0.300 Kg
0.200 Person
@ Rp.
@ Rp.
@ Rp.
162,000
20,400
126,100
TOTAL
1 Ea
Kunci SES
Rp.
Kunci SES
Skill
Cosumable
@ Rp.
@ Rp.
@ Rp.
210,000
126,100
7,500
TOTAL
Rp.
Handle
Skill
Cosumable
@ Rp.
@ Rp.
@ Rp.
300,000
126,100
7,500
TOTAL
Rp.
Cylinder Lock
Skill
Cosumable
@ Rp.
@ Rp.
@ Rp.
291,600
126,100
7,500
TOTAL
Rp.
Hinge Door
Skill
Cosumable
@ Rp.
@ Rp.
@ Rp.
36,000
126,100
7,500
TOTAL
Rp.
Hinge Furniture
Skill
Cosumable
@ Rp.
@ Rp.
@ Rp.
14,400
126,100
7,500
TOTAL
Rp.
Rp.
Rp.
Rp.
Alfa Kens
Skill
Cosumable
@ Rp.
@ Rp.
@ Rp.
TOTAL
1 Ea
Rp.
Rp.
Rp.
Hinge Furniture
1.000 Ea
0.080 Person
1.000 Lot
1 Ea
Rp.
Rp.
Rp.
1 Ea
Rp.
Rp.
Rp.
1 Ea
Rp.
Rp.
Rp.
Handle 1 set
1.000 Ea
0.300 Person
1.000 Lot
1 Ea
Rp.
Rp.
Rp.
1 set
1.000 Ea
0.300 Person
1.000 Lot
1 Ea
Rp.
Door Closer
135,000
126,100
7,500
Rp.
Rp.
Rp.
Rp.
Analisa
25 of 75
1.000 Ea
0.300 Person
1.000 Lot
Door Closer
Skill
Cosumable
@ Rp.
@ Rp.
@ Rp.
252,000
126,100
7,500
TOTAL
1 Ea
Rp.
Engsel
Skill
@ Rp.
@ Rp.
14,400
126,100
TOTAL
1 Ea
Rp.
Engsel
Skill
@ Rp.
@ Rp.
10,800
126,100
TOTAL
Rp.
Rp.
Rp.
Drawer Lock
1.000 Ea
0.200 Person
Drawer Lock
Skill
@ Rp.
@ Rp.
16,200
126,100
TOTAL
1 Ea
Rp.
Rp.
1 Ea
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Grandel
1.000 Ea
0.250 Person
Grandel
Skill
@ Rp.
@ Rp.
9,000
126,100
TOTAL
Rp.
Rp.
Rp.
M1
M1
Lot
Person
Person
Allumunium Frame
Moher + stopper list
rivet + acc
Skill
Foreman
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
37,800
27,000
282
126,100
126,100
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
M1
M1
Lot
Person
Person
Allumunium Frame
Moher
Consumable
Skill
Foreman
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
37,800
27,000
10,000
126,100
126,100
TOTAL
1 Set
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
M1
Lot
Lot
Person
Allumunium Frame
Accessories
Consumable
Skill
@
@
@
@
Rp.
Rp.
Rp.
Rp.
37,800
45,000
10,000
126,100
Rp.
Rp.
Rp.
Rp.
Analisa
26 of 75
Foreman
@ Rp.
126,100
TOTAL
1 Ea
Rp.
Ea
Lot
Lot
Person
Person
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
1,320,000
25,000
10,000
126,100
126,100
TOTAL
1 M2
Rp.
Liter
Kg
Lot
Person
Person
Platone
Wallfiller
Consumable
Painter
Foreman
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
40,000
21,800
1,000
126,100
126,100
TOTAL
Western Closet
1.000
0.200
1.000
0.500
0.500
Squatsing Closet
1.000
0.200
1.000
0.500
0.500
Westeren Closet
Cement
Cosumabel
Skill
Helper
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
2,004,000
54,000
5,000
126,100
94,300
Ea
Kg
Ea
Person
Person
S. Closet
Cement
Cosumabel
Skill
Helper
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
2,520,000
54,000
5,000
126,100
94,300
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Ea
Kg
Ea
Person
Person
Urinoir
Cement
Cosumabel
Skill
Helper
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
1,500,000
54,000
5,000
126,100
94,300
TOTAL
1 Ea
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
TOTAL
1 Ea
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
TOTAL
1 Ea
Rp.
Rp.
Rp.
Rp.
Rp.
1 Ea
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Wash Basin
1.000
0.200
1.000
0.500
0.500
Ea
Kg
Ea
Person
Person
Wash Basin
Cement
Cosumabel
Skill
Helper
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
1,940,400
54,000
5,000
126,100
94,300
Rp.
Rp.
Rp.
Rp.
Rp.
Analisa
27 of 75
TOTAL
1 Ea
Rp.
Shower Head
Skill
@ Rp.
@ Rp.
890,400
126,100
TOTAL
1 Ea
Hand Shower
Rp.
San EI
1.000 Ea
0.250 Person
Hand Shower
Skill
@ Rp.
@ Rp.
243,600
126,100
TOTAL
1 Ea
Rp.
Toilet Shower
Skill
@ Rp.
@ Rp.
122,400
126,100
TOTAL
Rp.
Valve
Skill
@ Rp.
@ Rp.
81,000
126,100
TOTAL
Rp.
Box
Zak
M3
Ea
Person
Person
Ganito Tile
Cement
Pasir
Cosumabel
Skill
Helper
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
240,000
54,000
138,000
5,000
126,100
94,300
TOTAL
Rp.
M2
Ea
Ea
Person
Person
Polycarbonate
Nail
Cosumabel
Skill
Helper
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
84,746
250
5,000
126,100
94,300
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Ea
Ea
Ea
Person
Person
Corrugated zinc
Nail
Cosumabel
Skill
Helper
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
TOTAL
1 M'
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Polycarbonate
1.000
6.000
1.000
0.020
0.200
1 M2
Rp.
Rp.
Granito Tile
1.000
0.300
0.030
1.000
0.200
0.200
1 M2
Rp.
Rp.
1 M2
Rp.
Rp.
1 Ea
Rp.
Rp.
Barbed Wire
116,640
250
5,000
126,100
94,300
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Analisa
28 of 75
0.100 Roll
0.020 Person
0.100 Person
@ Rp.
@ Rp.
@ Rp.
240,000
126,100
94,300
TOTAL
1 M2
Rp.
Rp.
Rp.
Rp.
Vinil Tile
1.000
0.300
0.015
0.300
M2
Can
Person
Person
Vinil Tile
Lem Fox
Skill
Helper
@
@
@
@
Rp.
Rp.
Rp.
Rp.
120,000
20,400
126,100
94,300
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
BBM/ Bulan
1.000 Mobil
@ Rp.
5,500
TOTAL
1 M2
Rp.
Rp.
Liter
Liter
Lot
Person
Person
Lot
Platone
Thinner
Consumable
Painter
Foreman
Surface preparation
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
48,000
43,056
1,000
126,100
126,100
5,000
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Ltr
Ltr
Ltr
Person
Person
Lot
Epoxy Phenolic
Shop Epoxy Primer
Thinner
Painter
Foreman
Paint Equitment
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
140,098
140,098
43,056
126,100
126,100
5,000
TOTAL
1 M2
Rp.
Liter
Liter
Lot
Person
Person
Platone
Thinner
Consumable
Painter
Foreman
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
TOTAL
1 M2
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
48,000
43,056
1,000
126,100
126,100
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Analisa
29 of 75
Wire
Foreman
Skill
@ Rp.
@ Rp.
@ Rp.
54,000
126,100
126,100
TOTAL
1 M1
Rp.
Rp.
Rp.
Rp.
Instal Dick 60 x 40
0.240
0.060
1.200
1.400
0.140
M3
M3
M2
M2
M3
Excavation
Disposal
Formwork
Wiremash M6
Concrete K225
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
89,510
29,551
78,375
31,746
977,433
TOTAL
Industrial Chain Pole & Pondation jarak 3 m
5.820 M2
Chain Link Fence
11.000 M1
Angle Steel L75x75x6
0.072 M3
Concrete K175
9.000 M1
Barbed Wire
10.000 M'
Round bar 8 mm
50.000 Ea
Welding rod
1.000 Lot
Consumable
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,871
40,000
869,433
35,952
9,900.00
16,200.00
10,000
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
M1
M1
M2
M1
M3
M1
Ea
Lot
@
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
283,290
128,450
40,871
40,000
869,433
35,952
16,200
10,000
TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
M1
M1
M2
M3
M1
M1
Ea
M1
Lot
@
@
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
283,290
128,450
40,871
869,433
35,952
40,000
16,200
22,000
10,000
TOTAL
1 Bln
Double Cabin
Maintenance
@ Rp.
@ Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
60,000,000
1,000,000
TOTAL
1 Bln = Total/36
Rp.
Rp.
Rp.
Rp.
Analisa
30 of 75
@ Rp.
@ Rp.
98,500,000
1,000,000
TOTAL
1 Bln = Total/36
Rp.
Rp.
Rp.
Rp.
Analisa
31 of 75
3,783,000
7,566,000
7,566,000
18,915,000
7,566,000
85,727
3,783
89,510
94,300
3,783
98,083
28,290
1,261
29,551
47,150
6,305
53,455
117,875
6,305
124,180
10,000
24,518
34,518
13,200
37,720
50,920
369,000
69,000
216,000
12,500
12,610
31,525
94,300
804,935
Analisa
32 of 75
648,000
43,200
12,610
32,786
47,150
783,746
78,375
54,000
126
1,261
55,387
16,394
552
126
1,261
18,334
369,000
74,520
270,000
12,500
7,500
10,088
31,525
94,300
869,433
369,000
74,520
324,000
12,500
7,500
10,088
31,525
94,300
923,433
369,000
74,520
378,000
12,500
7,500
10,088
31,525
94,300
Analisa
33 of 75
T
977,433
138,000
12,610
94,300
244,910
138,000
12,610
94,300
244,910
30,000
22,680
9,660
3,783
25,220
37,720
129,063
1,932
7,020
1,261
18,915
28,290
57,418
54,840
2,400
1,261
15,132
11,316
84,949
72,000
1,128
960
1,261
15,132
11,316
Analisa
34 of 75
T
101,797
50,603
864
1,261
6,305
4,715
63,748
41,040
864
1,261
6,305
4,715
54,185
64,800
864
6,000
50,400
18,000
6,305
4,715
151,084
20,790
75,600
122,400
1,777
600
6,305
25,220
252,692
1,261
6,305
92,850
21,840
1,020
123,276
1,261
12,610
55,980
9,000
Analisa
35 of 75
T
1,428
80,279
80,279
1,261
12,610
27,750
3,600
1,428
46,649
1,261
12,610
21,450
3,600
1,428
40,349
1,261
12,610
19,050
3,000
1,428
37,349
1,261
12,610
12,750
1,200
1,428
29,249
1,261
12,610
61,000
480
75,351
75,351
Analisa
36 of 75
T
6,305
99,200
780
31,525
137,810
6,305
89,000
1,620
31,525
128,450
6,305
243,600
1,860
31,525
283,290
126,100
378,300
504,400
27,235
15,000
57,600
500
73,100
3,947
29,905
28,708
4,306
27,235
3,947
94,101
14,400
Analisa
37 of 75
T
3,662
259
1,000
12,610
1,261
33,193
113
6
119
1,194,650.00
36,000
9,430
45,430
32,400
12,610
45,010
63,000
26,083
2,522
18,860
110,464.99
110,465
53,400
26,083
2,522
18,860
100,865
100,865
3,783
9,430
19,440
32,653
Analisa
38 of 75
T
1,261
9,430
18,000
28,691
42,000
1,261
9,430
52,691
27,000
1,261
12,610
40,871
92,850
10,920
45,360
10,368
159,498
1,261
12,610
367,200
381,071
17,850
864
2,522
18,860
40,096
27,300
864
2,522
18,860
24,300
73,846
63,840
Analisa
39 of 75
T
864
2,522
18,860
24,300
110,386
75,000
2,522
18,860
96,382
51,000
2,522
18,860
72,382
51,000
1,800
122,400
1,692
36,000
2,522
18,860
234,274
84,000
6,120
25,220
115,340
63,000
6,120
25,220
94,340
47,250
6,120
Analisa
40 of 75
T
25,220
78,590
56,700
6,120
25,220
88,040
210,000
37,830
7,500
255,330
300,000
37,830
7,500
345,330
291,600
37,830
7,500
356,200
36,000
10,088
7,500
53,588
14,400
10,088
7,500
31,988
135,000
37,830
7,500
180,330
Analisa
41 of 75
252,000
37,830
7,500
297,330
14,400
37,830
52,230
10,800
37,830
48,630
16,200
25,220
41,420
9,000
31,525
40,525
192,780
137,700
282
126,100
1,261
458,123
226,800
162,000
10,000
126,100
1,261
526,161
136,080
45,000
10,000
126,100
Analisa
42 of 75
T
1,261
318,441
1,320,000
25,000
10,000
126,100
1,261
1,482,361
8,000
3,052
1,000
12,610
1,261
25,923
2,004,000
10,800
5,000
63,050
47,150
2,130,000
2,520,000
10,800
5,000
63,050
47,150
2,646,000
1,500,000
13,500
5,000
63,050
47,150
1,628,700
1,940,400
10,800
5,000
63,050
47,150
Analisa
43 of 75
2,066,400
890,400
31,525
921,925
243,600
31,525
275,125
122,400
31,525
153,925
81,000
31,525
112,525
240,000
16,200
4,140
5,000
25,220
18,860
309,420
84,746
1,500
5,000
2,522
18,860
112,628
41,657
1,500
5,000
2,522
18,860
69,539
Analisa
44 of 75
24,000
2,522
9,430
35,952
120,000
6,120
1,892
28,290
156,302
165,000
165,000
7,200
4,306
1,000
18,915
2,522
5,000
38,943
21,015
16,812
4,306
6,305
1,261
5,000
54,698
4,800
4,306
1,000
12,610
2,522
25,238
Analisa
45 of 75
T
54,000
126
1,261
55,387
21,482
1,773
94,050
44,444
136,841
298,590
237,869
440,000
62,599
323,568
99,000
810,000
10,000
1,983,036
1,133,160
770,700
81,742
240,000
54,774
143,808
810,000
10,000
3,244,184
1,133,160
2,569,000
490,452
306,040
862,848
1,080,000
810,000
132,000
10,000
7,393,500
60,000,000
1,000,000
61,000,000
1,694,444.44
Analisa
46 of 75
98,500,000
1,000,000
99,500,000
2,763,888.89
NO.
Contractor
Owner
U R A I A N
DASAR PERHITUNGAN
BIAYA / HARI
WASTE SEGREGATION
A.
B.
WWTP
KETERANGAN
NURSERY
MINOR RIPAIR
HELPER
Standart / Bulan
Rp.
60,000.00
Rp.
60,000.00
Rp.
60,000.00
Rp.
60,000.00
Rp.
60,000.00
Rp.
60,000.00
Rp.
80,000.00 Rp.
30,000.00
10
10
10
10
10
10
10.00
10
5.00
4.00
3.000
8.00
3.00
15.00
2.00
3.00
Rp.
300,000.00
Rp.
240,000.00
Rp.
180,000.00
Rp.
480,000.00
Rp.
180,000.00
Rp.
900,000.00
90,000.00
Jam/Bulan
Orang
Orang/Hari
x Jumlah (B.1)
Rp.
160,000.00 Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (B.1) : 12
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.00 Rp.
Jumlah (B.1) : 12
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.00 Rp.
B.5 Pesangon
Jumlah (B.1) : 12
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.00 Rp.
B.6 Askes
E.
BIO REMEDIATION
B.2 Jamsostek
D.
GARDENER
C.
Rp.
Jumlah ( B )
Rp.
300,000.00
Rp.
240,000.00
Rp.
180,000.00
Rp.
480,000.00
Rp.
180,000.00
Rp.
900,000.00
Rp.
160,000.00 Rp.
90,000.00
Rp.
60,000.00
Rp.
60,000.00
Rp.
60,000.00
Rp.
60,000.00
Rp.
60,000.00
Rp.
60,000.00
Rp.
80,000.00 Rp.
30,000.00
Perlengkapan Karyawan
C.1 Helmet
Rp.
1,041.67
Rp.
833.33
Rp.
625.00
Rp.
1,666.67
Rp.
625.00
Rp.
3,125.00
Rp.
416.67 Rp.
625.00
@ Rp.
75,000 / bh
Rp.
3,750.00
Rp.
3,000.00
Rp.
2,250.00
Rp.
6,000.00
Rp.
2,250.00
Rp.
11,250.00
Rp.
1,500.00 Rp.
2,250.00
@ Rp.
270,000 / ps
Rp.
22,216.67
Rp.
17,773.33
Rp.
13,330.00
Rp.
35,546.67
Rp.
13,330.00
Rp.
66,650.00
Rp.
8,886.67 Rp.
13,330.00
@ Rp.
799,800 / ps
Rp.
1,666.67
Rp.
1,333.33
Rp.
1,000.00
Rp.
2,666.67
Rp.
1,000.00
Rp.
5,000.00
Rp.
666.67 Rp.
1,000.00
@ Rp.
40,000 / ps
Rp.
347.22
Rp.
277.78
Rp.
208.33
Rp.
555.56
Rp.
208.33
Rp.
1,041.67
Rp.
138.89 Rp.
208.33
@ Rp.
25,000 / ps
Rp.
416.67
Rp.
333.33
Rp.
250.00
Rp.
666.67
Rp.
250.00
Rp.
1,250.00
Rp.
166.67 Rp.
250.00
@ Rp.
2,500 / ps
Rp.
Rp.
Rp.
@ Rp.
70,000 / bh
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah ( C )
Rp.
29,438.89
Rp.
23,551.11
Rp.
17,663.33
Rp.
47,102.22
Rp.
17,663.33
Rp.
88,316.67
Rp.
11,775.56 Rp.
17,663.33
Rp.
5,887.78
Rp.
5,887.78
Rp.
5,887.78
Rp.
5,887.78
Rp.
5,887.78
Rp.
5,887.78
Rp.
5,887.78 Rp.
5,887.78
Rp.
Rp.
Rp.
D.2 Meal
Rp.
145,833.33
Rp.
Rp.
116,666.67
Rp.
Rp.
87,500.00
Rp.
Rp.
233,333.33
Rp.
Rp.
87,500.00
Rp.
Rp.
437,500.00
Rp.
58,333.33 Rp.
87,500.00
D.3 Laundry
Rp.
136,833.33
Rp.
109,466.67
Rp.
82,100.00
Rp.
218,933.33
Rp.
82,100.00
Rp.
410,500.00
Rp.
10,946.67 Rp.
82,100.00
Jumlah ( D )
Rp.
282,666.67
Rp.
226,133.33
Rp.
169,600.00
Rp.
452,266.67
Rp.
169,600.00
Rp.
848,000.00
Rp.
69,280.00 Rp.
169,600.00
Rp.
56,533.333
Rp.
56,533.33
Rp.
56,533.33
Rp.
56,533.33
Rp.
56,533.33
Rp.
56,533.33
Rp.
34,640.00 Rp.
56,533.33
Biaya Kontraktor
E.1 Peralatan Kantor
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.00 Rp.
E.3 Transportation
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.00 Rp.
Jumlah ( E )
Rp.
0.00
Rp.
0.00
Rp.
Rp.
0.00
Rp.
0.00
Rp.
0.00
Rp.
0.00 Rp.
Rp.
0.000
Rp.
0.00
Rp.
Rp.
0.00
Rp.
0.00
Rp.
0.00
Rp.
0.00 Rp.
0.00
Rp.
612,105.556
Rp.
489,684.44
Rp.
367,263.33
Rp.
979,368.89
Rp.
367,263.33
Rp. 1,836,316.67
Rp.
241,055.56 Rp.
277,263.33
F.
G.
PPh
H.
Fee Kontraktor
Jumlah ( B + C + D + E )
6% x Jumlah ( B )
10% x Jumlah ( B )
18,000.00
Rp.
14,400.00
Rp.
10,800.00
Rp.
28,800.00
Rp.
10,800.00
Rp.
54,000.00
Rp.
9,600.00
0.00
5,400.00
Rp.
Rp.
I.
Rp.
630,105.56
Rp.
504,084.44
Rp.
378,063.33
Rp. 1,008,168.89
Rp.
378,063.33
Rp. 1,890,316.67
Rp.
250,655.56 Rp.
J.
Rp.
126,021.11
Rp.
126,021.11
Rp.
126,021.11
Rp.
126,021.11
Rp.
126,021.11
Rp.
126,021.11
Rp.
125,327.78 Rp.
94,221.11
K.
Rounded
Rp.
126,100
Rp.
126,100
Rp.
126,100
21
126,100
Rp.
126,100
Rp.
126,100
Rp.
125,400
94,300
Contract
Remaining
CONOCOPHILLIPS
Rp.
282,663.33
133,500
133,500
133,500
133,500
133,500
133,500
133,500
133,500
7,400
7,400
7,400
7,400
7,400
7,400
8,100
39,200
NO.
U R A I A N
Contractor
Owner
DASAR PERHITUNGAN
BIAYA / HARI
WASTE SEGREGATION
CONOCOPHILLIPS
GARDENER
BIO REMEDIATION
WWTP
KETERANGAN
NURSERY
MINOR RIPAIR
HELPER
28000000
3,010.75
1,282,300.00
CONOCOPHILLIPS
CONOCOPHILLIPS
KONTRAK NO.
Contractor
Owner
No.
Uraian
1
2
3
Field Manager
Field Supervisor
Safety Inspector
Civil
- Foreman Civil
- Mansonary
- Carpenter
- Plumber
- Skill Labour
- Call Out
Scafollding
- Foreman Scafolding
- Scafolder
- Skill Labour
Key personil / overhead
1. Project Control
2. Project Admin
3. Admin & Clerk
4. Warehouseman
5. Driver
6. Planner
7. Mechanic
8. Lokal F&A
Jumlah Total
Volume
Unit
Harga
Satuan
Total
Harga
2.00
4.00
4.00
10.00
Prs
Prs
Prs
36
36
36
Month
Month
Month
7,055,555
3,527,778
3,527,778
507,999,960
508,000,000
508,000,000
4.00
6.00
6.00
4.00
16.00
2.00
Prs
Prs
Prs
Prs
Prs
Prs
36
36
36
36
36
36
Month
Month
Month
Month
Month
Month
1,200,000
1,000,000
1,000,000
1,000,000
900,000
900,000
172,800,000
216,000,000
216,000,000
144,000,000
518,400,000
64,800,000
1,332,000,000
2.00
8.00
10.00
58.00
Prs
Prs
Prs
36
36
36
Month
Month
Month
1,200,000
1,000,000
900,000
86,400,000
288,000,000
324,000,000
698,400,000
1.00
1.00
1.00
2.00
6.00
2.00
1.00
1.00
15.00
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
83.00
Prs
36
36
36
36
36
36
36
36
Month
Month
Month
Month
Month
Month
Month
Month
6,522,222
2,597,222
1,838,889
2,805,556
2,013,889
4,927,778
2,805,556
3,388,889
Keterangan
19,400,000
234,800,000
93,500,000
66,200,000
202,000,000
435,000,000
354,800,000
101,000,000
122,000,000
7,194,099,960
199,836,110
I. PERALATAN KANTOR
1.
2.
3.
4.
5.
4.
Komputer P4 + Printer
Alat Tulis Kantor
Forniture (Kursi + Meja)
Facsimile
Communication
Misselinous
2
1
4
1
1
1
Unit
Lot
Set
Unit
Lot
Lot
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,000,000
5,000
400,000
1,250,000
21,000
1,500
/Unit
/Days
/Unit
/Unit
/Days
/Days
1080 Days
x
x
1080 Days
1080 Days
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,680,000
1,620,000
= Rp.
29,700,000
= Rp.
5,500.00
5,400,000
Project Control
Admin & Cost Control
Admin & Clerk
Warehouseman
Driver
Planner
Mechanic
Lokal F&A
1
1
1
2
6
2
1
1
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
217,407
86,574
61,296
93,519
67,130
164,259
93,519
112,963
/Days
/Days
/Days
/Days
/Days
/Days
/Days
/Days
x
x
x
x
x
x
x
x
1080
1080
1080
1080
1080
1080
1080
1080
Days
Days
Days
Days
Days
Days
Days
Days
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
234,800,000
93,500,000
66,200,000
202,000,000
435,000,000
354,800,000
101,000,000
122,000,000
= Rp.
1,609,300,000
= Rp.
298,018.52
1080 Days
= Rp.
166,000,000
1080 Days
1080 Days
= Rp.
= Rp.
= Rp.
85,325,000
89,100,000
36,000,000
= Rp.
376,425,000
= Rp.
69,708.33
= Rp.
= Rp.
= Rp.
= Rp.
18,675,000
199,200,000
= Rp.
218,681,760
= Rp.
40,496.62
=
=
=
=
=
=
=
=
1 Unit
1 Lot
15 Ltr/Day
1 unit
x
x
x
x
Rp.
Rp.
Rp.
153,704 /Days
5,500 /Ltr
33,333 /Days
x
x
x
1
1 x
1 x
83
83
1
83
Prs
Prs
Lot
Prs
x
x
x
x
Rp.
Rp.
Rp.
Rp.
208.33
800,000.00
20,000.00
9.00
/Days
/ Prs
/Days
/Days
x
x
x
x
1080
3
1080
1080
Days
Years
Days
Days
806,760.00
I. LAUNDRY
1.
2.
3.
4.
5.
Detergen
Sabun Batang
Sikat (brush)
Pewangi
Tukang Cuci
4
5
2
6
4
Kg/hari
Btg/Hari
Lsn/2 Thn
Ltr/Bln
Org/bulan
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
15,000
1,500
30,000
12,500
500,000
/Kg
/Btg
/Lsn
/Ltr
/Bln
x
x
x
x
x
1080
1080
3
36
36
Hari
Hari
Thn
Bln
Bln
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
64,800,000
8,100,000
180,000
2,700,000
72,000,000
Rp.
147,780,000
Rp.
27,366.7
=
=
Rp.
Rp.
1,242,000,000
18,000,000
Rp.
1,260,000,000
Rp.
29,166.7
=
=
Rp.
Rp.
269,898,920
180,000,000
Rp.
449,898,920
Rp.
83,315
72,000,000
II. MEAL
1.
2
46 Org/Hari
1 Lot
x
x
Rp.
Rp.
25,000 /Hari
500,000 /Lot
x
x
1080 Hari
36 Bulan
III. ACCOMMODATION
III.1. Accomodation Camp Grissik
1
1
2
Rp.
5,000,000 /bln
36 Bulan
Sewa Camp
1 Lot
Rp.
Tukang Cuc1
1 Org
Rp.
2,000,000 /Bulan
36 Bulan
Rp.
36 Bulan
Rp.
27,000,000
Rp.
99,000,000
Rp.
18,333
Rp.
101,647.9
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
336,960,000
7,560,000
750,000
12.
13.
III
2
72
4
6
2
10
12
4
40
12
Set
Each
Set
Set
Set
Each
Each
Unit
Ltr/Hari
Ltr/Bln
x
x
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,500,000
75,000
400,000
250,000
250,000
50,000
100,000
10,000,000
7,800
17,500
/Set
/Each
/Set
/Set
/Set
/Each
/Each
/Unit
/Liter
/Liter
x
x
1 x 1080 Hari
1 x
36 Bln
=
=
=
=
=
=
=
=
=
=
Unit
Unit
Unit
Set
x
x
x
Rp.
Rp.
Rp.
Rp.
10,000
1,875
1,400
50,000
/Days
/Days
/Days
/set
x
x
x
x
1080
1080
1080
1 x
36
=
=
=
=
Rp.
Rp.
Rp.
Rp.
3,600,000
Rp.
348,120,000
Rp.
64,466.7
Rp.
166,114.6
2
4
1
2
Days
Days
Days
Bln
KONTRAK NO.
Contractor
Owner
No.
Uraian
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Batu bata
Semen
Pasir
Kerikil
Kayu
Seng Gelombang
Seng Gelombang
Rabung Seng
Paku Seng
Paku Campur
Pintu (lengkap)
Plywood 4 mm
Jendela Nako 4 mm
Kawat harmonika
Besi Dia 6 mm
Besi Dia 8 mm
Besi Dia 10 mm
Besi Dia 18 mm
Kawat Ikat
Glass Wool
Excavation
Back Fill
PAINTING
Cat Emulsion, Nippon Paint
Cat Wathherseid, Nippo Paint
Kuas 6 inc
Kuas 4 inc
Kuas 2 inc
Scrap 3 inc
PLUMBING
Kran Air 3/4"
Wastafel
Pipa PVC Dia 3/4"
Pipa PVC Dia 1"
Pipa PVC Dia 3"
Pipa PVC Dia 4"
Pipa PVC Dia 5"
Socket PVC Dia 3/4"
Socket drat PVC Dia 3/4"
Socket PVC Dia 3"
Socket PVC Dia 4"
Socket PVC Dia 5"
Elbow PVC Dia 3/4"
Elbow PVC Dia 1"
Elbow PVC Dia 3"
Elbow PVC Dia 4"
Elbow PVC Dia 5"
Tee PVC 3/4"
Volume
15%
Harga
Satuan
Total
Harga
Keterangan
CIVIL
1
2
3
4
5
6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
58,882
1,165
82
66
34
866
278
104
14
159
49
362
41
105
160
586
840
492
30
115
32
4
Ea
Zak
M3
M3
M3
Ea
Ea
Ea
Kg
Kg
Set
Ea
Set
M2
M1
M1
M1
M1
Kg
M2
M3
M3
560
50,000
130,000
450,000
2,200,000
90,000
60,000
32,973,920
58,250,000
10,660,000
29,655,000
75,240,000
0
2,880,000
240,000
85
22
17
2
2
11
Ltr
Can
Ea
Ea
Ea
Ea
36
3
15
28
17
16
8
33
36
15
14
7
35
8
10
8
3
31
Ea
Set
Btng
Btng
Btng
Btng
Btng
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
KONTRAK NO.
Contractor
Owner
No.
Uraian
19
20
21
22
23
24
25
26
1
2
3
4
5
6
7
8
9
10
1
2
T O T A L IV
Volume
15%
Harga
Satuan
Total
Harga
Keterangan
14
9
10
9
5
12
12
18
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
17
16
16
30
22
24
54
22
17
16
Roll
Box
Ea
Ea
Ea
Set
Set
Ea
Ea
Unit
1 Set
3 Thn
10,000,000
15,000,000
15,000,000
45,000,000
269,898,920
TABULASI MATERIAL
Civil Maintenance Services
Contract No.
No.
Contractor
Owner
Description Material
1
2
3
4
SCAFOLDING
Tubes BS 1139
Couplers & Fitting
Wooden Plank
Alluminium Ladder
1
2
3
4
5
6
7
8
Concrete Material
Gravel 2 -3
Gravel 3 -4
Sand For Blasting
Sand Building
Portland Cement
Chiken Mess Galvanize
Wire Mash - M6
Wire - Tie - Mild Steel
Spec / MFG
Quantity
Unit
1,500 Ea
2,800 Ea
400 sheet
10 Ea
750
950
225
2,700
2,800
3,300
850
300
M3
M3
M3
M3
Bag
M2
M2
Kg
Harga
Beli
Jual
Harga
120%
Beli
1,500
300
3,900
6,800
1,500
300
3,900
6,800
2,250,000
840,000
1,560,000
68,000
4,718,000
450,000
450,000
115,000
115,000
45,000
22,500
26,455
7,300
450,000
450,000
138,000
138,000
54,000
27,000
31,746
7,300
337,500,000
427,500,000
31,050,000
372,600,000
151,200,000
89,100,000
26,984,100
2,190,000
Supplier Description
Remark
Rev. 00
1,438,124,100
1
2
3
4
Formwork material
Timber
Plywood
Plywood
Plywood
min Class2
6 mm x 4' x 8', Elephant
12 mm x 4' x 8', Elephant
18 mm x 4' x 8', Elephant
45 M3
500 sheet
500 sheet
500 sheet
1,350,000
65,000
145,000
200,000
1,620,000
78,000
174,000
240,000
72,900,000
39,000,000
87,000,000
120,000,000
318,900,000
1
2
3
4
5
6
7
8
9
10
TABULASI MATERIAL
90
90
90
90
90
90
90
450
40
40
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Can
Ea
Ea
309,500
186,600
92,500
71,500
63,500
42,500
31,000
17,000
22,400
1,000
371,400
223,920
111,000
85,800
76,200
51,000
37,200
20,400
26,880
1,200
33,426,000
20,152,800
9,990,000
7,722,000
6,858,000
4,590,000
3,348,000
9,180,000
1,075,200
48,000
-
Page 56 of 82
TABULASI MATERIAL
Civil Maintenance Services
Contract No.
No.
Contractor
Owner
Description Material
Spec / MFG
Quantity
Unit
Harga
Beli
Jual
Harga
120%
Beli
30
Ea
7,650
9,180
30
Ea
2,050
2,460
30
Ea
1,600
1,920
87
90
30
30
30
30
Ea
Ea
Ea
Ea
Ea
Ea
4,900
3,750
8,200
8,200
4,850
7,650
5,880
4,500
9,840
9,840
5,820
9,180
30
30
60
60
60
60
60
50
50
50
50
30
30
30
30
30
70
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Can
1,600
2,100
2,100
1,000
1,100
3,400
1,350
3,900
2,950
6,700
1,375
3,900
2,950
2,000
1,000
1,600
17,000
1,920
2,520
2,520
1,200
1,320
4,080
1,620
4,680
3,540
8,040
1,650
4,680
3,540
2,400
1,200
1,920
20,400
TABULASI MATERIAL
Alpha Dexon
30
Ea
77,500
93,000
Cisa
25
Ea
742,000
890,400
Remark
Rev. 00
275,400
73,800
57,600
511,560
405,000
295,200
295,200
174,600
275,400
57,600
75,600
151,200
72,000
79,200
244,800
97,200
234,000
177,000
402,000
82,500
140,400
106,200
72,000
36,000
57,600
1,428,000
102,267,060
Door Lock Material/
1 Lock - Set, door, Double Cylinder,
1 x 7 IN, Steel, good quality
2 Lock - Set, door, 1/2 x 2-1/2 x 9 -1/2,
IN, Steel, good quality
Supplier Description
1,859,291,160
2,790,000
22,260,000
-
Page 57 of 82
TABULASI MATERIAL
Civil Maintenance Services
Contract No.
No.
Contractor
Owner
Description Material
PAINTING MATERIAL
Brush, Paint, 4 In ; good quality
Thinner, Liquid, Cap 1 Kg/ Can, Appl for
Mixing Paints ; good quality
Varnish, Oil, Wood Protection, Package 1 ltr/Can, good quality
Brush, Wire, Scrate, 1 x 10 IN
Carbon Steel, Handle Wood ;
Putty, Wood Filler, Impra SH 113, Teak ;
Mattock
Others Material
Panel, Ceiling, Suspended, Acoustic
thk 15 mm, Lg 1210 mm, W.603 mm,
Colour White
Adhesive, Synthetic, Glue, White, Cap 1 Kg/ Can
Grating, Metal, Matl Galvanish, Length 6100 mm,
Width 900 mm, Load Bea 30 x 5 mm, Load Bar
30 mm, Cross RO 100 mm
Acoustic Tile
( 15 mm x 59 mm X 119 cm );
Cement, Concrete, Color White, VOL 40,
Cap Kg/Zak ;
Terpaulin Sheet 20m x 20 m
Glass 40% 5 mm
Glass Clear 5mm
Concrete Nail
Insulation (chainlink, aluminium single sided, glasswool)
TABULASI MATERIAL
Spec / MFG
Quantity
Unit
Harga
Beli
Total
Jual
Harga
120%
Beli
Cisa
25
Ea
645,000
774,000
Cisa
25
Ea
797,000
956,400
Fino Art
25
Ea
145,000
174,000
SES
25
Ea
120,000
144,000
Shanghai
30
Ea
40,000
48,000
30
Ea
66,000
79,200
Hempel
45
45
Ea
Can
16,000
35,880
25
25
Can
Ea
75,000
5,000
50
40
Can
Ea
19,000
4,500
19,200
43,056
90,000
6,000
22,800
5,400
70
M2
112,000
134,400
45
68
Can
Ea
17,000
3,600,000
20,400
4,320,000
300
Box
225,000
270,000
200
Zax
67,500
81,000
3,000,000
85,000
70,000
30,000
35,000
3,600,000
102,000
84,000
36,000
42,000
35 sheet
60 M'
70 M'
443 Kg
325 M'
Remark
Rev. 00
19,350,000
23,910,000
4,350,000
3,600,000
1,440,000
2,376,000
80,076,000
1,939,367,160
864,000
1,937,520
2,250,000
150,000
1,140,000
216,000
6,557,520
1,945,924,680
9,408,000
918,000
293,760,000
81,000,000
16,200,000
126,000,000
6,120,000
5,880,000
15,948,000
13,650,000
Page 58 of 82
TABULASI MATERIAL
Civil Maintenance Services
Contract No.
No.
Contractor
Owner
Description Material
TABULASI MATERIAL
Spec / MFG
Quantity
12,000
Unit
Ea
Harga
Beli
500
Jual
Harga
120%
Beli
600
7,200,000
576,084,000
Supplier Description
Remark
Rev. 00
2,522,008,680
Page 59 of 82
TABULASI MATERIAL
Civil Maintenance Services
Contract No.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Contractor
Owner
Description Material
Unit rate
Plastic Sheet
Nail
Wiremesh M8
Reinforcement
Wire
Klip Lock
Fixing Strap
zink Gutter BJLS30
Revet Nail
Silicon Sealen
Ridge Chaping
Flashing
Kawat Nyamuk
Engsel 4"
Grendel
Alumunium T (1 x1)
Wire
Concrete Nail
Pipa Galvanize < 2= "
Soc/T 2 "
Pipa Galvanize <3= "
Soc/T 3 "
Pipa Galvanize <4= "
Soc/T 4 "
Pipa Galvanize <6= "
Pipa Galvanize <8= "
Soc/T 6 "
Brush Wire Scratch
High Heat Silicon, Thinner 08080 20% (primer)
Heat Resisting Silicon Alum, Thinner 08080 20% (topcoat)
Epoxy Phenolic
Shop Epoxy Primer
Oil Paint
Emultion
Wallfililler
Emery Clotch
Anchor Bolt
Grouting
Ceramic Foor Floor 0.3 x 0.3
Ceramic For Wall 0.2 x 0.2 M
TABULASI MATERIAL
Spec / MFG
Quantity
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Unit
M2
Kg
M2
Kg
Kg
M2
Ea
M2
Ea
Ea
M1
M1
M1
Ea
Ea
M1
M
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ea
Ea
Ea
Box
Box
Harga
Beli
11,000
9,000
45,000
12,420
11,500
45,700
1,000
60,000
235
40,000
42,169
34,200
2,000
14,000
7,500
31,500
85,000
250
305,000
8,000
496,000
13,000
445,000
27,000
1,218,000
1,836,000
31,000
16,000
199,364
199,364
116,748
116,748
40,000
60,000
21,800
1,800
30,000
27,000
52,500
44,500
Jual
Harga
120%
Beli
13,200
10,800
54,000
14,904
13,800
54,840
1,200
72,000
282
48,000
50,603
41,040
2,400
16,800
9,000
37,800
102,000
300
366,000
9,600
595,200
15,600
534,000
32,400
1,461,600
2,203,200
37,200
19,200
239,237
239,237
140,098
140,098
48,000
72,000
26,160
2,160
36,000
32,400
63,000
53,400
Supplier Description
Remark
Rev. 00
13,200
10,800
54,000
14,904
13,800
54,840
1,200
72,000
282
48,000
50,603
41,040
2,400
16,800
9,000
37,800
102,000
300
366,000
9,600
595,200
15,600
534,000
32,400
1,461,600
2,203,200
37,200
19,200
239,237
239,237
140,098
140,098
48,000
72,000
26,160
2,160
36,000
32,400
63,000
53,400
Page 60 of 82
TABULASI MATERIAL
Civil Maintenance Services
Contract No.
No.
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
Contractor
Owner
Description Material
Steel Structure
Bolt & Nut Dia
Glasswool
Chaink Link
Galvanize Steel Dia 8 "
Gypsum
Calci Board
Triplek 9 MM
Formica
Poliprint
Teak Wood
Soft Board
Kunci
Handle
Cylinder Lock
Hinge Door
Hinge
Kunci
Door Closer
Engsel Pintu
Engsel Jendela
Drawer Lock
Grandel
Allumunium
Moher + Stoper list
Soc/ T. PVC/ Elbow
Soc/ T. PVC
Soc/ T. PVC
Soc/ T. PVC
Soc/ T. PVC
Soc/ T. PVC
Plate
Fisher S - 8 + Screew
Hollow Frame
Door Leaf 0.82 m x 2.2
Wastern Closed
Sguatsing Closed
Urinoir
Wash Basim
Shower Head
Hand Shower
TABULASI MATERIAL
Spec / MFG
9 - 19 mm
Galvanize
Jaya Board
SES
1 Set
Door 4 "
Furniture
Afa Kens
4 " AW Wavin
3 " AW Wavin
2 " AW Wavin
1.5 " AW Wavin
1.1/4 " AW Wavin
1 " AW Wavin
1" x 2 mm x 6 M
S-8
Panel
Toto
Toto
Toto
Toto
Toto
Toto
Quantity
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Unit
Kg
Kg
M2
M2
Ea
M2
M2
Ea
Ea
Ea
Ea
Ea
Ea
EA
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
M1
M1
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
M
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Harga
Beli
16,200
15,000
35,000
22,500
1,836,000
42,500
62,500
152,000
200,000
150,000
112,500
135,000
175,000
250,000
243,000
30,000
12,000
112,500
210,000
12,000
9,000
13,500
7,500
31,500
22,500
18,200
15,000
6,000
6,000
5,000
2,000
37,800
2,160
30,000
1,100,000
1,670,000
2,100,000
1,250,000
1,617,000
742,000
203,000
Jual
Harga
120%
Beli
19,440
18,000
42,000
27,000
2,203,200
51,000
75,000
182,400
240,000
180,000
135,000
162,000
210,000
300,000
291,600
36,000
14,400
135,000
252,000
14,400
10,800
16,200
9,000
37,800
27,000
21,840
18,000
7,200
7,200
6,000
2,400
45,360
2,592
36,000
1,320,000
2,004,000
2,520,000
1,500,000
1,940,400
890,400
243,600
Supplier Description
Remark
Rev. 00
19,440
18,000
42,000
27,000
2,203,200
51,000
75,000
182,400
240,000
180,000
135,000
162,000
210,000
300,000
291,600
36,000
14,400
135,000
252,000
14,400
10,800
16,200
9,000
37,800
27,000
21,840
18,000
7,200
7,200
6,000
2,400
45,360
2,592
36,000
1,320,000
2,004,000
2,520,000
1,500,000
1,940,400
890,400
243,600
Page 61 of 82
TABULASI MATERIAL
Civil Maintenance Services
Contract No.
No.
82
83
84
85
86
87
88
89
90
91
92
93
94
95
Contractor
Owner
Description Material
Toilet Shower
Valve
Granito Tile
Poly Carbonate
Corrugated Zink
Barber Wire
Angle Steel
Vinil Tile
Cat Silver
Welding Rod
Ford Ranger, Double Cabin,
Truck
PS 125
Medium Bus
Wire Sling
TABULASI MATERIAL
Spec / MFG
Toto
San EI
4 ' x 8"
Fence
L 75 x 75 x 6
Platon
thn 2004
kapasitas 8 Ton
Sparta
4MM
Quantity
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Unit
Ea
Ea
Ea
Roll
M2
Roll
M
M2
Ltr
M2
Unit
Unit
Unit
M1
Harga
Beli
102,000
67,500
200,000
1,750,000
97,200
200,000
33,333
100,000
40,000
13,500
60,000,000
98,500,000
166,000,000
20,000
Jual
Harga
120%
Beli
122,400
81,000
240,000
2,100,000
116,640
240,000
40,000
120,000
48,000
16,200
60,000,000
98,500,000
166,000,000
22,000
Supplier Description
Remark
Rev. 00
122,400
81,000
240,000
2,100,000
116,640
240,000
40,000
120,000
48,000
16,200
60,000,000
98,500,000
166,000,000
22,000
Page 62 of 82
DESCRIPTION
QTY
UNIT
UNIT
PRICE
DURASI
SCAFOLLDING
1
2
B
Scafollding Key
Body Harnes
PAINTING CAMP
3
15
Set
Ea
1
2
3
4
C
Hand Tools
Kereta Sorong
Tangga Aluminum
Consumable
PAINTING PLANT
1
4
4
1
Lot
Unit
Unit
Lot
Rp.
Rp.
Rp.
Rp.
1
2
3
4
5
6
D
2
2
2
2
1
1
Unit
Unit
Unit
Lot
Lot
Unit
1
2
3
4
5
E
100
100
2
2
1
1
2
3
4
1
36
36
Month
Month
Rp.
Rp.
TOTAL
PRICE
188,000
1,200,000
564,000
18,000,000
Beli
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Punya
Punya
Punya
Punya
Punya
Punya
Sendiri
Sendiri
Sendiri
Sendiri
Sendiri
Sendiri
Mtr
Mtr
Each
Set
Lot
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Punya
Punya
Punya
Punya
Punya
Sendiri
Sendiri
Sendiri
Sendiri
Sendiri
1
1
1
2
Lot
Unit
Unit
Unit
Rp.
Rp.
Rp.
Rp.
80,000
50,000
Rp.
Rp.
Rp.
Rp.
Punya Sendiri
Punya Sendiri
Punya Sendiri
Lot
Rp.
375,000
Rp.
36
Month
1
2
3
4
5
6
1
3
1
1
1
1
Unit
Unit
Unit
Set
Unit
Set
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1
2
3
4
5
6
7
8
9
10
11
12
13
F
1
2
5
2
1
2
6
2
2
1
1
1
1
1
1
Unit
Unit
Lot
Unit
Unit
Ea
Ea
Set
Ea
Ea
Ea
Ea
Ea
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Unit
Unit
Rp.
Rp.
Keterangan
50,000
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
punya sendiri
punya sendiri
punya sendiri
375,000.00
-
250,000
18,000
150,000
1,700,000
450,000
1,850,000
750,000
1,200,000
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
500,000.00
36,000.00
150,000.00
1,700,000.00
450,000.00
1,850,000.00
750,000.00
1,200,000.00
Rp.
17,000,000
Rp.
51,000,000.00
Rp.
1,750,000
Rp.
8,750,000.00
Rp.
85,325,000.00
Punya
Punya
Punya
Punya
Punya
Punya
Sendiri
Sendiri
Sendiri
Sendiri
Sendiri
Sendiri
Punya
Punya
Punya
Punya
Punya
Sendiri
Sendiri
Sendiri
Sendiri
Sendiri
NO
DESCRIPTION
I.
A.
Job Number
Duration
Division
Project Duration
QTY
UNIT
FREQ
(Month)
UNIT PRICE
(Rp.)
:
:
:
: 36 months
AMOUNT
(Rp.)
REMARKS
Indirect Cost
TRANSPORTATION
A.1. Rental Equipment
1
3
1
Unit
Unit
Unit
36
36
36
4,611,111
1,666,667
2,736,111
Sub Total - A.1
166,000,000
180,000,000
98,500,000
444,500,000
A.2. Maintenance
1
3
1
Unit
Unit
Unit
36
36
36
750,000
1,000,000
1,000,000
Sub Total - A.2
27,000,000
108,000,000
36,000,000
171,000,000
A.3. F u e l & O i l
1
3
1
Unit
Unit
Unit
36
36
36
4,600
4,600
4,600
Sub Total - A.3
10
25
25
Liter/day
Liter/day
Liter/day
546,480,000
1,161,980,000
B.
49,680,000
372,600,000
124,200,000
5.34%
32,277,222
OFFICE COST
B.1. Field Office
Telecomunication
Office Supplies
PLN ( Power Energy)
Contract employee
Others
1
1
83
1
Ls
Ls
Ls
Ls
Ls
36
36
1,000,000
750,000
36,000,000
27,000,000
1
36
45,000
300,000
3,735,000
10,800,000
77,535,000
- Telecomunication
- Office Supplies
- PLN ( Power Energy)
1
1
1
Ls
Ls
Ls
36
36
36
1,500,000
200,000
3,000,000
54,000,000
7,200,000
108,000,000
169,200,000
Telecomunication
Office Supplies
PLN ( Power Energy)
Others
1
1
1
1
Ls
Ls
Ls
Ls
Sub Total - B
246,735,000
C.
6,853,750
0.03%
- Project Coordinator
- Sistem Application / Doc Control
1
1
Prs
Prs
36
36
1,500,000
1,000,000
54,000,000
36,000,000
90,000,000
Field Manager
Supervisor
Safety Insp
Lokal FA & Clerk
Administration & Clerk
Project Control
Planners/Estimator
Warehouseman
Mechanic
Drivers
2
4
4
1
1
1
2
2
1
6
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
36
36
36
36
36
36
36
36
36
36
6,000,000
2,750,000
2,750,000
2,000,000
1,000,000
4,500,000
3,500,000
900,000
1,500,000
900,000
432,000,000
396,000,000
396,000,000
72,000,000
36,000,000
162,000,000
252,000,000
64,800,000
54,000,000
194,400,000
2,059,200,000
C.3. Others
Page 64 Of 75
NO
DESCRIPTION
QTY
UNIT
FREQ
(Month)
UNIT PRICE
(Rp.)
AMOUNT
(Rp.)
Sub Total - C
2,149,200,000
D.
REMARKS
0.27%
59,700,000
1. Overhead Cost
- Project Coordinator
- Sistem Application / Doc Control
2. Site Personnel
- Field Manager
- Supervisor
- Safety Insp
- Project Administration & Clerk
- Administration & Clerk
- Project Control
- Planners/Estimator
- Warehouseman
- Mechanic
- Drivers
- Polisi
1
1
Prs
Prs
36
36
2
4
4
1
1
1
2
2
1
3
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
36
36
36
36
36
36
36
36
36
36
1
Prs
Sub Total - D.1
36
173,400
79,475
79,475
57,800
28,900
130,050
130,050
101,150
26,010
43,350
-
12,484,800
11,444,400
11,444,400
2,080,800
1,040,400
4,681,800
9,363,600
7,282,800
936,360
4,681,800
-
1
1
Prs
Prs
3
3
1,500,000
1,000,000
4,500,000
3,000,000
2
4
4
1
1
1
2
2
1
6
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
3
3
3
3
3
3
3
3
3
3
6,000,000
2,750,000
2,750,000
2,000,000
1,000,000
4,500,000
3,500,000
900,000
1,500,000
900,000
36,000,000
33,000,000
33,000,000
6,000,000
3,000,000
13,500,000
21,000,000
5,400,000
4,500,000
16,200,000
-
65,441,160
65,441,160
65,441,160
D.2. T H R
1. Overhead Cost
- Project Coordinator
- Sistem Application / Doc Control
2. Site Personnel
- Field Manager
- Supervisor
- Safety Insp
- Project Administration & Clerk
- Administration & Clerk
- Project Control
- Planners/Estimator
- Warehouseman
- Mechanic
- Drivers
100%
179,100,000
D.3. CUTI
1. Overhead Cost
- Project Coordinator
- Sistem Application / Doc Control
2. Site Personnel
- Field Manager
- Supervisor
- Safety Insp
- Project Administration & Clerk
- Administration & Clerk
- Project Control
- Planners/Estimator
- Warehouseman
- Mechanic
- Drivers
1
1
Prs
Prs
3
3
1,500,000
1,000,000
4,500,000
3,000,000
2
4
4
1
1
1
2
2
1
6
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
3
3
3
3
3
3
3
3
3
3
6,000,000
2,750,000
2,750,000
2,000,000
1,000,000
4,500,000
3,500,000
900,000
1,500,000
900,000
36,000,000
33,000,000
33,000,000
6,000,000
3,000,000
13,500,000
21,000,000
5,400,000
4,500,000
16,200,000
-
100%
179,100,000
a. Overhead Cost
- Project Coordinator
- Sistem Application / Doc Control
b. Site Personnel
- Field Manager
- Supervisor
- Safety Insp
- Project Administration & Clerk
- Administration & Clerk
- Project Control
- Planners/Estimator
- Warehouseman
- Mechanic
- Drivers
1
1
Prs
Prs
3
3
1,500,000
1,000,000
4,500,000
3,000,000
2
4
4
1
1
1
2
2
1
6
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
3
3
3
3
3
3
3
3
3
3
6,000,000
2,750,000
2,750,000
2,000,000
1,000,000
4,500,000
3,500,000
900,000
1,500,000
900,000
36,000,000
33,000,000
33,000,000
6,000,000
3,000,000
13,500,000
21,000,000
5,400,000
4,500,000
16,200,000
100%
179,100,000
D.5. ASKES
a. Overhead Cost
- Project Coordinator
Prs
36
Page 65 Of 75
NO
DESCRIPTION
QTY
UNIT
FREQ
(Month)
UNIT PRICE
(Rp.)
AMOUNT
(Rp.)
REMARKS
Prs
36
2
4
4
1
1
1
2
2
1
3
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
36
36
36
36
36
36
36
36
36
36
161,250
161,250
161,250
161,250
161,250
161,250
161,250
161,250
161,250
161,250
11,610,000
23,220,000
23,220,000
5,805,000
5,805,000
5,805,000
11,610,000
11,610,000
5,805,000
17,415,000
21.00
Sub Total - D.5
121,905,000
D.6. C T O
Field Manager
Supervisor
Safety Insp
Administration & Clerk
Project Control
Planners/Estimator
Warehouseman
Mechanic
2
4
4
1
1
2
2
1
Prs
Prs
Prs
Prs
Prs
Prs
Prs
Prs
36
36
36
36
36
36
36
36
1,500,000
500,000
750,000
500,000
850,000
850,000
150,000
1,000,000
444,600,000
Sub Total - D
1,169,246,160
E.
CAMP FACILITIES
1.
2.
3.
4.
6.
1.00
1.00
1.00
45.00
900.00
Ls
Ls
Ls
Prs
ltr /month
36
36
36
36
36
12,497,192
2,750,000
4,105,000
25,000
5,500
Sub Total - E
449,898,920
99,000,000
147,780,000
1,215,000,000
178,200,000
Maintenance
Keet For Dayung
30 ltr/day
2,089,878,920
F.
0.15%
32,479,060
0.27%
58,052,192
Tools (Safety )
PPE & Safety Equipment
Consumables Material
MCU
1.00
83.00
54.00
83.00
Ls
Ls
Ls
Prs
1.00
3.00
36.00
3.00
7,500,000
800,000
10,000
800,000
7,500,000
199,200,000
19,440,000 Glove/Masker/Glass/Barricade
199,200,000
Reward HSE
Sub Total - F
425,340,000
G.
Entertainment
Service Fee
Security Risk
Fee Contractor
Fee Procurement
1.00
1.00
1.00
1.00
1.00
Ls
Ls
Ls
Ls
Ls
36.00
1.00
36.00
1.00
1.00
1,000,000
50,000,000
4,500,000
-
Sub Total - G
6,888,889
Penawaran
0.03%
Performance Bond
Certificate/License
Company Fee (if any)
Bid Bond
1.00
0.00
0.00
1.00
1.00
Ls
Ls
Ls
Ls
Ls
1.00
-
3,717,557
413,062
-
Sub Total - H
3,717,557
413,062
4,130,619
I.
36,000,000
50,000,000
162,000,000
- 0.50%
248,000,000
H.
0.05%
11,815,000
114,739
(Bukopin)
Insurance/Bank
0.00%
MOB - DEMOBILIZATION
1.
2.
3.
4.
5.
6.
Mob - Demobilization
Mob - Demobilization
Mob - Demobilization
Mob - Demobilization
Business Travel
Others
Sub Total - I
(Overhead)
(Labor)
(Equipments)
(Materials)
1.00
0.00
1.00
0.00
0.00
0.00
Ls
Ls
Ls
Ls
Ls
Ls
1.00
1.00
1.00
36.00
-
12,200,000
85,325,000
2,500,000
-
12,200,000
85,325,000
90,000,000
187,525,000
5,209,028
Site Personnel
Labor
Equipment
Material
Accomodation, Meal & Ticket
0.02%
Page 66 Of 75
NO
DESCRIPTION
QTY
UNIT
FREQ
(Month)
Ls
1.00
UNIT PRICE
(Rp.)
1.00
2,000,000
II
7,682,035,699
35.29%
7,428,902,240
2,017,606,944
821,448,000
Max 80 %
MATERIALS
1
1
1
Ls
Ls
Ls
1.00
1.00
1.00
7,428,902,240
2,017,606,944
821,448,000
Sub Total - A
10,267,957,184
EQUIPMENTS
285,221,033
1
Ls
1.00
1.31%
Sub Total - B
0.00%
MAN POWER
1. Foreman
2. Skill
3. Skill Labour
6.00
24.00
26.00
Psn
Psn
Psn
36.00
36.00
36.00
1,200,000
1,000,000
900,000
Sub Total - C
259,200,000
864,000,000
842,400,000
1,965,600,000
0.00%
Direct Cost
1. Unit Rate
2. Suply Material
3. Painting
Sub Total - J
REMARKS
OPERATIONAL COST
- Miscellaneous Cost
AMOUNT
(Rp.)
54,600,000
0.25%
SOCIAL ALLOWANCE (L a b o r)
D.1. Jamsostek ( 2,89 % )
1. Foreman
2. Skill
3. Skill Labour
6.00
24.00
26.00
Psn
Psn
Psn
36.00
36.00
36.00
34,680
28,900
26,010
7,490,880
24,969,600
24,345,360
56,805,840
D.2. T H R
1. Foreman
2. Skill
3. Skill Labour
6.00
24.00
26.00
Psn
Psn
Psn
3.00
3.00
3.00
1,200,000
1,000,000
900,000
21,600,000
72,000,000
70,200,000
163,800,000
D.3. CUTI
1. Foreman
2. Skill
3. Skill Labour
6.00
24.00
26.00
Psn
Psn
Psn
3.00
3.00
3.00
1,200,000
1,000,000
900,000
21,600,000
72,000,000
70,200,000
163,800,000
D.4. Pesangon
1. Foreman
6.00
Psn
3.00
1,200,000
21,600,000
Page 67 Of 75
NO
DESCRIPTION
QTY
2. Skill
3. Skill Labour
24.00
26.00
UNIT
FREQ
(Month)
Psn
Psn
3.00
3.00
UNIT PRICE
(Rp.)
AMOUNT
(Rp.)
1,000,000
900,000
REMARKS
72,000,000
70,200,000
163,800,000
D.5. A s k e s
58.00
Prs
36.00
172,000
359,136,000
silver
359,136,000
D.6. Other
6.00
24.00
26.00
Psn
Psn
Psn
36.00
36.00
36.00
575,723
479,769
431,792
0.24%
51,399,316
SUB-CONTRACT
Sub Total - E
21,765,968,249
604,610,229
III
0.00%
14,083,932,550
Incoming
INVOICING
-
1,850,375,366
943,033,526
Sub Total - D
124,356,069
414,520,231
404,157,225
Projeck Managemen
Civil Maitenance
Scafolding
Transfortation
Work Package
Pajak 2
- PPH psl 21
1
1
1
1
1
Lot
Lot
Lot
Lot
Lot
1
1
1
1
1
680,940,000
1,652,982,000
1,531,728,000
876,506,400
12,834,946,480
680,940,000
1,652,982,000
1,531,728,000
876,506,400
12,834,946,480
-0.06
tms
17,577,102,880
(1,054,626,173)
TOTAL INCOMING/INVOICING
16,522,476,707
TOTAL INCOMING/INVOICING
458,957,686
IV.
V.
PPn
VI.
Bank Interest
214,792,197
VII.
VIII.
VIII.
IX.
ROUNDED
(5,243,491,542)
BRUTO
10%
x Penerimaan
(5,458,283,739)
-
Performance Bond
(209,739,661.68)
4%
(5,248,544,078)
NETTO
-24.11%
(5,248,544,080)
R E M A R K S:
1. RAB adalah sebagai refrensi biaya dalam pelaksanaan pekerjaan.
2. Seluruh biaya tercatat tidak menjadi keharusan untuk dikeluarkan.
3. Untuk item pekerjaan yang belum termasuk dalam RAB dapat
ditambahkan sesuai dengan keperluan, tetapi TIDAK boleh
merubah Format yang telah ada.
4. RAB yang sah hanya yang telah disetujui oleh direksi.
Prepared by,
BUSINESS ANALYST.
DATE
Acknowleged by,
ORIGINATOR
DATE
Approved by,
PRESIDENT DIRECTOR
DATE
Page 68 Of 75
NO
DESCRIPTION
QTY
UNIT
FREQ
(Month)
UNIT PRICE
(Rp.)
AMOUNT
(Rp.)
REMARKS
2160
2016
Page 69 Of 75
14000000
150000
717,480,000
119580000
95664000
FM
487500
3737500
24
375,679,060.00
20.35
3.391667
13.65
2.275
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
5,600,000
3,400,000
2,500,000
3,000,000
800,000
4,500,000
3,400,000
1,600,000
1,600,000
900,000
300000
500000
250000
400000
Page 70 Of 75
1,450,000.00
2,000,000.00
800,000.00
200,000.00
300,000.00
4,750,000.00
FM
487500
3737500
20.35
3.391667
13.65
2.275
FM
487500
487500
3737500
20.35
20.35
3.391667
13.65
2.275
FM
487500
487500
3737500
20.35
20.35
3.391667
13.65
2.275
FM
487500
3737500
6987500
20.35
3.391667
0.565278
13.65
13.65
2.275
Page 71 Of 75
FM
487500
3737500
20.35
3.391667
13.65
2.275
4,000,000.00
6,100,000
yg baru dikalkulasi
16
Page 72 Of 75
56
56
Page 73 Of 75
3334091.098
3,627,661,374.86
100,768,371.52
58
56
1782000000
Page 74 Of 75
Page 75 Of 75