Machinery Audit Check List - Blow room

Line No. : Sr.No. Observation / Checks


1 General Good / Poor (a) Cleaning Frequency Good / Poor Last Done On -

Checked by :

Date -Remarks

(b) Lubrication Mechanical condition of (a) Lattices (b) Grid bars

Good / Cracked / Torn / Need replacement Good / Worn / Some Scratches / Need replacement

(c) Beaters 3 4 5 6

Good / Some Bend Segments / Some Missing Segments / Need replacement

Settings of beaters Uniform / Non-uniform (Throughout the width) List Of Non Working Stop motions 1 Checked Level Sensors For material Level in reserve box Yes / No Leakages in the duct (Holes, clearance, cuts, etc.) none/ A Few / Many Synchronization of machines (Does feed to any machine stop for more then 10% of the time?) LAP FORMING Piano feed regulating motion (a) position of belt on cone drums (b) pedal movement transmission (c) Sensitivity

7 8

Note : Feeding should be a continuous process.

In Center /off set by___mm smooth / With jerk

9 10

(Check by removing or adding about 20 % of the material during any lap formation. The lap should be of normal weight) All Right / Need Correction Condition of belts and ropes Good / minor cracks / split Uniformity of lap rods and Calibration Of weights Within Tolerance / Out of range

Beater speed 11 12 Deviation Of beater Speed Than Nominal Deviation Of Fan Speed Than Nominal Deviation % -