Trouble shooting in Boiler operation & reduction of auxiliary power consumption

Presented by S. Sivakumar AGM- O&M Contracts Cethar Vessels Ltd, Trichy

CETHAR VESSELS LIMITED Leading manufacture of AFBC , CFBC , WHRB for sponge iron kiln Gas, cement kiln gas ,DG exhaust gas & supply of power plant on EPC basis for more than two decades . Tied up with Riley Power Inc, USA for PC fired boilers of sub critical & super critical pressure. Collaboration with Riley / Siemens Benson Technology for super critical PC boilers.

Collaboration with Siemens for Super Critical CFBC boilers.


Tied up with OJSC power machineries , Russia for turbine design and Manufacturing.

Executing O & M contracts of captive power plants of any Capacity through Cethar energy ltd.

Cethar Vessels Ltd, Trichy

Major projects under execution:

2x 135 MWe IPP with CFBC Boiler 2 x 350 MWe PF Fired Boiler 2 x 350 MWe PF Fired Boiler

- M/s.Aryan Coal Benification - M/s.Ind Barath energy Ltd. - M/s.Meenakshi energy Ltd.

2 x 150 MWe IPP with CFBC Boiler


2 x 150 MWe IPP with PF Fired Boiler

- M/s.Shree cement
- M/s.Vandana vidhuyut

3 x 70 MWe CFBC Boiler

- M/s.Jayprakash associates

65 Boilers are under execution for IPP, CPP & Co-gen

10 IPP & Captive power plants are under execution

Cethar Vessels Ltd, Trichy

Credentials
CVL had designed, manufactured, erected and commissioned more than 1000 FBC boilers. Based on our versatile experience during operation and maintenance, we have listed few problems faced and the causes, solution given for the information to this elite league

Cethar Vessels Ltd, Trichy

Low steam generation


Identifications Low steam pressure, low steam flow in the control room Causes Fuel quality Low air box pressure will lead to high bed temperature and limitation in fuel feeding Heavy air leakage in the system and limitation in combustion air to furnace.
5

Cethar Vessels Ltd, Trichy

Low steam generation


Identifications Low steam pressure, low steam flow in the control room Causes Heavy flue gas leakage in the system and limitation in ID fan Fouling in evaporation surface. Deposition in the evaporator tubes due to water chemistry

Cethar Vessels Ltd, Trichy

Low steam temperature


Identifications Low steam temperature indication in control room at boiler outlet and turbine inlet Causes Passing of desuper heater control valve

Low volatile fuel


Low bed temperature operation

Inadequate excess air operation


Fouling in super heater
7

Cethar Vessels Ltd, Trichy

High steam temperature


Identification Steam temperature at boiler outlet and turbine inlet is more Causes Low feed water temperature to boiler

High volatile fuel burning


High excess of air Low air box pressure Inadequate de-super heating

Cethar Vessels Ltd, Trichy

Furnace pressure fluctuation / positive furnace pressure


Identifications Furnace pressure indication variation in control room

Causes
Instrument calibration and impulse tube attachment intact

ID fan damper malfunctioning


Fuel input variation to furnace Pressure part leakage

Cethar Vessels Ltd, Trichy

Furnace pressure fluctuation / positive furnace pressure


Identifications Causes

Furnace pressure indication variation in control room

Fouling in the gas path


Accumulation of ash in gas path and ash chute

Leakage in flue gas duct and limitation of ID fan


Erosion of ID fan impeller

Cethar Vessels Ltd, Trichy

10

Sagging of Super heaters


Identification

Causes

Visual inspection during shut down

Flame impingement on super heater during start up. Frequent lifting of Drum safety valve Over heating of super heater coils due to boiler operation with clinker

Cethar Vessels Ltd, Trichy

11

Sagging of Super heaters


Identification

Causes

Visual inspection during shut down

Compartment transfer without adequate steam flow Boiler operation with more fuel fines

Cethar Vessels Ltd, Trichy

12

Boiler operation with clinker formation


Identification

Cause

Uneven combustor bed temperature

Damage in bed thermocouples.

Load raising restriction


Significant variation in air box pressure

Damage of air nozzle.


Fuel nozzle damage Improper air fuel mixture

Cethar Vessels Ltd, Trichy

13

Low Air box pressure


Identification

Cause

Low air box pressure with normal bed pressure and optimum FD airflow at MCR

FD ducting bellow leakage, heavy air leakage in FD duct, failure of air nozzle and leakage in air heater.
Inspection and rectification on the above to be taken up

Cethar Vessels Ltd, Trichy

14

Coal Jamming in PA line / Mixing nozzle


Identification

Cause

Bed Temperature Drop High negative furnace pressure PA line back pressure

High moisture, low PA header pressure at PA line shall lead to jamming. Inspection from coal feeder to PA line and mixing nozzle, adequate PA header air pressure to be taken care

Cethar Vessels Ltd, Trichy

15

Frequent tripping of FUEL feeder


Identification Trip alarm in DCS. Bed temperature drop. Causes Presence of any foreign materials and cleaning. High moisture choking and de-

High negative furnace pressure

Feeder drive mechanical arrangement failure and rectification

Cethar Vessels Ltd, Trichy

16

Frequent tripping of FUEL feeder


Identification Feeder speed showing zero Causes Testing condition of motor Testing the speed control drive healthiness

Feeder motor over load trip.

Cethar Vessels Ltd, Trichy

17

Oil firing start up failure


Causes

Identification

No bed temperature rise even after 2 hrs of light up

Inspection for nozzle choke &inadequate oil pressure(6Ksc) Ensure optimum pressure. air box

Ensure proper bed material size(2.36 to 0.86). Ensure appropriate charcoal size and moisture free charcoal. Inspection of bed condition
18

Cethar Vessels Ltd, Trichy

High exit flue gas temperature


Identification High flue gas temperature at the outlet of APH Causes High excess air Fouling in evaporator, super heater and air pre heater

Cethar Vessels Ltd, Trichy

19

High unburnt carbon in ash


Identification High % LOI in ash as per lab report Causes Operating the boiler with clinker Inadequate air supply Fuel quality High amount of fines in fuel

Heavy load fluctuation and instable furnace condition


20

Cethar Vessels Ltd, Trichy

High unburnt carbon in ash


Identification High % of LOI in ash Causes Low air box pressure High PA pressure

Improper distribution of fuel in furnace

Cethar Vessels Ltd, Trichy

21

High Plant Heat Rate


Identification

Action to be taken

Steam leakage in boiler and steam piping Low turbine inlet steam pressure and temperature Condenser low vacuum High exhaust steam temperature & pressure

Steam leakage to be arrested Operating the turbine at design temperature and pressure Condenser air ingress to be rectified HP heater under performance Turbine inspection for depositions
22

Cethar Vessels Ltd, Trichy

High Plant Heat Rate


Identification Low boiler efficiency Low Feed water temperature High turbine wheel chamber

Action to be taken
Combustion system heating surface area to be checked. Rectify air ingress, flue gas leakage are to be attended. Insulation condition to be checked and rectified. Turbine blade failure causes exhaust steam temperature
23

Cethar Vessels Ltd, Trichy

Auxiliary power consumption reduction


After plant commissioning and stabilization the design margin in the equipment shall be optimized by implementing modification in the system, providing VFD for the following equipments

Cethar Vessels Ltd, Trichy

24

Auxiliary power consumption reduction

Cooling water pumps


CEP Boiler Feed pumps(case study given) Fans(case study given) ACC fans

Cethar Vessels Ltd, Trichy

25

Auxiliary power consumption reduction


Optimization of coal handling plant operation Optimization of AHP operating and Compressors Optimization of make up water consumption and WTP operation

Cethar Vessels Ltd, Trichy

26

Case study I :
Reported issue:
Excess coal consumption

Cethar Vessels Ltd, Trichy

27

Plant design details:


Plant capacity : 1 X 8 MWe co-gen plant

Boiler capacity
Type of firing

: 40 TPH
: AFBC

Steam pressure

: 68 ata

Steam temperature : 495 C

Cethar Vessels Ltd, Trichy

28

Design Fuel Analysis Moisture : 13.98% GCV : 6100 kcal/kg

Cethar Vessels Ltd, Trichy

29

Plant visit was made,boiler operating data,fuel input were collected and analyzed

Cethar Vessels Ltd, Trichy

30

Boiler data:
Boiler operating capacity Steam pressure Steam temperature Feed water temperature Flue gas temperature leaving APH : 37.5 TPH : 68.007 ata : 495 C : 122C : 132C

O2 in flue gas is : 4%

Cethar Vessels Ltd, Trichy

31

Fired fuel analysis and efficiency


GCV Moisture : 3950 Kcal/kg : 31.50%

Efficiency achieved : 81.7% Reasons for lower Efficiency:

Excess fired fuel moisture comparing to design fuel moisture


Lower GCV of fuel comparing to design Loss in efficiency due to the above is 3.501%

Cethar Vessels Ltd, Trichy

32

Conclusion:
Corrected efficiency is 85.2% Fuel moisture to be controlled for achieving the guaranteed thermal Efficiency of the boiler

Expected Fuel saving by controlling moisture is 7.6 TPD

Cethar Vessels Ltd, Trichy

33

Case study II :
Reported issue:
Excess steam temperature drop

Cethar Vessels Ltd, Trichy

34

Plant design details: Plant capacity Boiler capacity Type of firing Steam pressure Steam temperature at boiler O/L : 1 X 8 MWe : 40 TPH : AFBC : 68 ata : 495 C

Cethar Vessels Ltd, Trichy

35

Steam temperature at T/G I/L Fuel GCV as fired

: 470C : 3950 Kcal/kg

Boiler efficiency

: 82 %

Cethar Vessels Ltd, Trichy

36

Observation:
Design Steam temperature drop : 5C

Excess Steam temperature drop


Excess energy loss by steam Considering 335 days operation the excess fuel consumption.

: 20C
: 1.5 TPD : 502 MT/year

Cethar Vessels Ltd, Trichy

37

Conclusion:
Steam line insulation to be rectified. Steam traps in steam line to be set right.

Cethar Vessels Ltd, Trichy

38

Case study III :


Reported Issue:
Low thermal Boiler efficiency

Cethar Vessels Ltd, Trichy

39

Design data: Plant capacity Boiler capacity Type of firing Steam pressure Steam temperature : 1 X 8 MWe : 40000 kg/hr : AFBC : 68 ata : 495 C

Cethar Vessels Ltd, Trichy

40

Feed water temperature

: 126 C

Flue gas temperature leaving APH : 140C


Air temperature at APH I/L : 40C

Cethar Vessels Ltd, Trichy

41

PG TEST DATA: Power generation : 1 X 8 MWe

Boiler capacity kg/hr


Steam pressure
Feed water temperature

: 37,500

: 68 ata
: 122 C

Flue gas temperature leaving APH : 132C Air temperature at APH I/L
Cethar Vessels Ltd, Trichy

: 38C
42

Achieved boiler efficiency with Imported coal

: 82 %

% O2 in flue gas

: 4.5%

Cethar Vessels Ltd, Trichy

43

Parameters after 12 months of PG test:

Power generation
Boiler capacity Steam pressure
Steam temperature Feed water temperature

: 8 MWe
: 38,000 kg/hr : 67 ata
: 495 C : 122 C

Flue gas temperature after APH : 159 C % O2 in flue gas : 4.5%

Cethar Vessels Ltd, Trichy

44

Results: Due to increase of flue gas temperature the following losses have been increased.

1) Dry flue gas loss.


2) Loss due to moisture in flue gas. 3) Loss due to hydrogen in flue gas. 4) Air moisture loss.

Cethar Vessels Ltd, Trichy

45

The overall thermal efficiency reduction is 2%.

Equivalent coal consumption

: 4878 kg/day.

Considering 335 day operation : 1635 MT/335day Coal consumption Reason:

Fouling in the cold air side of APH due to high moisture content imported coal .
Rectification: Periodic inspection and cleaning APH by water Jet.

Cethar Vessels Ltd, Trichy

46

CASE STUDY-IV

POWER REDUCTION OF BOILER FEEDWATER PUMP

Cethar Vessels Ltd, Trichy

47

Boiler Details

Boiler capacity Steam pressure :

140 Tph

86 kg/cm (g)

Drum pressure
Steam temperature Fuel Type of firing

:
: : :

98 kg/cm (g)
510c Baggasse Traveling grate

Cethar Vessels Ltd, Trichy

48

Boiler Feed Pump Details


Feed pump capacity Head Speed No.of pumps Pump driven by Drum level control by : : 92.1 Cum/hr 1231 mwc : 2980 rpm : 3 (2w + 1s) : Motor with VFD : FCV

Cethar Vessels Ltd, Trichy

49

Existing operating data


Feed water flow Feed water temperature : : 144 M3 140C

Control valve opening


Pump operating speed Feed water suction pressure Feed water delivery pressure Power consumption

:
: : : :

35%
2900 rpm 3.5 kg/cm 138 kg/cm 790 Kw (2 pumps working)

Cethar Vessels Ltd, Trichy

50

Initially boiler feed pump was operated at constant

speeds of around 2900 rpm and drum level control was


operated by varying the feed control valve with three element level control .

Cethar Vessels Ltd, Trichy

51

MODIFIED DATA :

Feed water flow : 144 m3/hr Feed water temperature : 140C Control valve opening : 100% Pump speed : (2675 2700 ) rpm Power : 660 kw (2 pumps working) Power saving : 790 660 = 130 Kw

Drum level control was implemented by VFD operation of the feed pump .The feed control valve was kept 100 % open and system pressure drop has been reduced from boiler feed pump to economizer . Based on the drum level VFD speed was varied in automatic control.

Cethar Vessels Ltd, Trichy

52

CASE STUDY-V FD fan motor power consumption reduction

Cethar Vessels Ltd, Trichy

53

FD Fan Power Saving with VFD

Boiler Capacity : 40 TPH Steam pressure : 68 ata Steam Temperature : 485 +-5 Deg CEL Type of boiler : AFBC FD fan motor : 250kW Speed : 1440 rpm Fuel : Imported coal
Cethar Vessels Ltd, Trichy 54

FD Fan Power Saving with VFD

Initially FD fan was operated without VFD and the details of operating data are given Steam generation : 37.5 TPH Power generation : 8 Mwe

FD fan damper opening : 38%


Fan speed : 1440 rpm

Power consumption : 195kW


O2 in flue gas : 4%
Cethar Vessels Ltd, Trichy 55

FD Fan Power Saving with VFD

Data after implementation of VFD for FD fan Steam generation : 37.5 TPH Power generation : 8 MWe FD fan damper opening : 100% Fan speed : 1250 rpm Power consumption : 160kW O2 in flue gas : 4%
Cethar Vessels Ltd, Trichy 56

FD Fan Power Saving with VFD

Pressure drop in the damper has been eliminated by damper full open and the power saving was achieved through speed control

Power saving : 35kW / hr


840 kW/Day 281400kW for 335 days

Cethar Vessels Ltd, Trichy

57

FD Fan Power Saving with VFD

Fuel saving (Plant heat rate of 4050Kcal/kWh and fired GCV of fuel is 3950 Kcal) ---861 kg/day --- 26 MT / month --- 312 MT / year

---12.5 lakhs per annum