Anda di halaman 1dari 12

HARI

Ruang Kapasitas 07.00 - 07.50 07.50 - 08.40 08.40 - 09.30 09.40 - 10.30 10.30 - 11.20 11.20 - 12.10 12.10 - 13.00 13.00 - 13.50 13.50 - 14.40 14.40 - 15.30 15.30 - 16.20 16.20 - 17.10 17.10 - 18.00

TI - 101 60 TTC & PK (Smt. 4) B (AM)


SisMan (Smt. 4) A (SB/MA)

TI - 102 50 Statistik Industri I (Smt. 2) Q (IB)

TI - 108 50 TPK (Smt. 6) A (HS/PDK)

TI - 104 60 Man. Logistik (Smt. 6) B (AR)

Perenc. Sistem Industri (Sem. 6) A (MA) B (NAW) TTC & PK (Smt. 4) A (SGP)

Statistik Industri I (Smt. 2 B (IV)


Teknik Penjualan (MB-4)

SENIN

Sistem Manufaktur (Smt. 4) B (USCM/YP) C (YP/MA)

A (LT)

Proses Manufaktur (Smt. 2) A (SB/HS) Q (PDK/YP)

Perenc. Sistem Industri (Sem. 6) C (YAS) D (BSY)

07.00 - 07.50 SisMan (Smt. 4) K3 (EPSK) 07.50 - 08.40 Q (MA/YP) 08.40 - 09.30 A (SW) 09.40 - 10.30 Teknik Pengendalian Kualitas (Smt. Ekotek (Sem. 5) 6) 10.30 - 11.20 11.20 - 12.10 B (HS/PDK) C (PDK/HS) A (IKG/NAW) SELASA 12.10 - 13.00 Pemodelan Sistem (Smt. 6) 13.00 - 13.50 13.50 - 14.40 14.40 - 15.30 15.30 - 16.20 16.20 - 17.10 17.10 - 18.00 07.00 - 07.50 07.50 - 08.40 08.40 - 09.30 09.40 - 10.30 10.30 - 11.20 RABU 11.20 - 12.10 12.10 - 13.00 13.00 - 13.50 13.50 - 14.40 14.40 - 15.30 15.30 - 16.20 16.20 - 17.10 17.10 - 18.00 A (BW) Algoritma dan Pemrograman C B (SEW) C (YAS)

Man. Logistik (Smt. 6) A (IV) TTC & PK (Smt. 4) C (SW)

TTC & PK (Smt. 4) Q (ARK) Penelitian Operasional (Smt. 4) B (SEW) Proses Manufaktur B (SB/HS)

Simulasi Sist. Industri (Smt. 6) A (SPN) Penelitian Operasional (Smt. 4) Q (NS) Penelitian Operasional A (SPN) Penelitian Operasional A (SPN) C (SEW) Man. Jasa (PSMI) A (LT)
Strategi Korporasi (PSMI)

B (NS) Six Sigma (Sisman) A (HS) Proses Manufaktur C (YP/PDK)

A (NAW/IKG)

07.00 - 07.50 07.50 - 08.40 08.50 - 09.40 09.50 - 10.30 10.30 - 11.20 KAMIS 11.30 - 12.20 12.20 - 13.00 13.10 - 13.30 13.30 - 14.20 14.20 - 15.10 15.10 - 16.00 07.00 - 07.50 07.50 - 08.40 08.50 - 09.40 09.40 - 10.30 10.40 - 11.30 11.30 - 13.30 13.30 - 14.20 14.20 - 15.10 15.10 - 16.00 16.10 - 17.00

Man. Keuangan (MB-4) A (NPN) A (BAN)

Man. Material (LSCM) A (SPN) MOSDM (SMT. 6) B (BSY) C (IH) Man. Proyek (Smt. 4) A (LT)

Mekanika Teknik (Sem.2) A Q B C

Matematika Optimasi II (Smt. 4) A (ARK)


SI.Bisnis (MB-4)

B (DH)

C (EW) MOSDM (SMT. 6)

Q (BS)

A (ARK) A

A (BAN) B (BSY) Fisika Dasar (Smt. 2) Q B

C (IH) C

JUMAT

SHOLAT JUM Algoritma dan Pemrograman (Smt. 2) A Sustainable Mfg (SIsman) Q B A (MA) Responsi Sistem Manufaktur A,B,C,Q

LAB-MM 50 Man. Logistik (Smt. 6) C (NIA)

TI-103 35
Komunikasi Bisnis (MB-2)

TI-204 30
Peranc. Sist. Mnfg (Smt. 2 - Sisman)

TI-224 20
Pemodelan Optimasi (Smt. 2 - KOI)

RUANG 208 8
Prod. Mfg (Sisman)

LAB SISMAN

A (MLS/PDK)

A (SGP) SCM (LSCM) A (INP) Kapita Selekta (GS) B (PDK) Perenc. Sistem Industri (Sem. 6) E (BAN) MCDM (KOI) A (USCM)
Komunikasi Pemasaran (MB-6)

A (MLS/MA)
Analisa Keputusan (KOI)

A (BS)
Human Reliability (EPSK)

tatistik Industri I (Smt. 2) C (NIA) Statistik Industri I (Smt. 2) A (DH)

A (SEW/YAS) Kapita Selekta (GS) A (IB)

A (ARK)
Man. Kualitas (Smt. 2 - Sisman)

A (MLS)

M. Transportasi Udara (LSCM)

A (AR) Man. Logistik (Smt. 6) D (INP)

A (JG)

Anprod (SISMAN) A (MLS) Aplikasi Ergo (Smt. 2 - EPSK) A (SGP/ARK)

Man. Strategi (Smt. 2 - PSMI) A (IKG/PS)


Know. Mgt (PSMI)

A (BSY)

Pemodelan Optimasi (S-3) A (SPN/BS)

Pem. Bisnis (MB-4) Rekayasa Rantai Pasok

A (IKG)

(Smt. 2 - LSCM)

A (INP/SPN)

Perencanaan Sistem Trans (Smt. 2 - LSCM)

Man. Pemasaran (MB-2)

A (AR/NS)
Met. Kuantitatif Bisnis (MB-4)

A (JG)
Man. Keuangan (PSMI)

PPC Lanjut (Smt. 1) A (INP)

Faktor Manusia (Smt. 2 - EPSK) A (SW)

Kebijakan Inovasi (S-3) A (USCM/MLS)

Sistem Dinamik Stat. Lanjut (Smt. 1) (Smt. 2 - KOI) A (BS/EW) A (BW)

A (IB/NIA) Penelitian Operasional C (AM)

A (IKG/NPN)
Dinamika Organisasi (MB-4)

A (SW) Man. Tekologi (Sisman) A (USCM)

Makro Ekonomi Man.Pemasaran & Sistem Dinamik Plng (Smt. 2 - PSMI) (MB-2) (KOI) A (NPN) A (BAN) A (BW)

Metaheuristik (KOI) S1+S2

Metpen (Smt. 2) A (JG) Pengukuran Kinerja (PSMI) A (NAW)


Keb. Fiskal (MB-6)

AkMan Lanjut (Smt. 1)

A (IKG)
e-Business (LSCM)

A (BS) Man. Proyek (Smt. 4) B (IKG)

A (IB/EW) Metpen (Smt. 2) B (IV)


Pemodelan Rantai Pasok (S-3)

A (NPN) MCDM (KOI) A (USCM)

Analisa Biaya (Smt. 3) A (IH)

Akuntansi Fin (MB-4) A (NAW) Statistika Bisnis (MB-2) A (NIA)

OR Lanjut (Smt. 1) A (SPN/BW)


Kluster Ind (PSMI)
Met. Pengukuran (EPSK)

Comp. Int. Mfg (Sisman) A (YP)

A (INP/AR) Seminar Riset S-3

A (SGP/JG)

A (SW)

SHOLAT JUM'AT e-Business Proyek Penciptaan Bisnis (MB-2) (PSMI) A (EW) A (AR)

Man. Strategis (MB-6)

A (YAS)

S-1 TI (Wajib Smt. 2) S-1 TI (Wajib Smt. 4) S-1 TI (Wajib Smt. 6) S-1 TI (Pilihan) S-1 TI (Penawaran MK di semester gasal)

S1 Man. Bisnis Pasca S-2 (Wajib) Pasca S-2 (Pilihan) Pasca S-3

HARI

Ruang Kapasitas 07.00 - 07.50 07.50 - 08.40 08.40 - 09.30 09.40 - 10.30 10.30 - 11.20 11.20 - 12.10 12.10 - 13.00 12.45 - 13.35 13.35 - 14.25 14.25 - 15.15 15.30 - 16.20 16.20 - 17.10 17.10 - 18.00

TI - 101 60 TTC & PK (Smt. 4) B (AM)


SisMan (Smt. 4) A (SB/MA)

TI - 102 50 Statistik Industri I (Smt. 2) Q (IB)

TI - 108 50 TPK (Smt. 6) A (HS/PDK)

TI - 104 60 Man. Logistik (Smt. 6) B (AR)

Perenc. Sistem Industri (Sem. 6) A (MA) B (NAW) TTC & PK (Smt. 4) A (SGP)

Statistik Industri I (Smt. 2 B (IV)


Teknik Penjualan (MB-4)

SENIN

Sistem Manufaktur (Smt. 4) B (USCM/YP) C (YP/MA)

A (LT)

Proses Manufaktur (Smt. 2) A (SB/HS) Q (PDK/YP)

Perenc. Sistem Industri (Sem. 6) C (YAS) D (BSY)

07.00 - 07.50 SisMan (Smt. 4) K3 (EPSK) 07.50 - 08.40 Q (MA/YP) 08.40 - 09.30 A (SW) 09.40 - 10.30 Teknik Pengendalian Kualitas (Smt. Ekotek (Sem. 5) 6) 10.30 - 11.20 11.20 - 12.10 B (HS/PDK) C (PDK/HS) A (IKG/NAW) SELASA 12.10 - 13.00 Pemodelan Sistem (Smt. 6) 13.00 - 13.50 13.50 - 14.40 14.40 - 15.30 15.30 - 16.20 16.20 - 17.10 17.10 - 18.00 A (BW) Algoritma dan Pemrograman C B (SEW) C (YAS)

Man. Logistik (Smt. 6) A (IV) TTC & PK (Smt. 4) C (SW)

RABU

TTC & PK 07.00 - 07.50 Simulasi Sist. Industri (Smt. 6) (Smt. 4) 07.50 - 08.40 08.40 - 09.30 Q (ARK) A (SPN) C (SEW) B (NS) Six Sigma 09.40 - 10.30 Penelitian Operasional (Smt. 4) Man. Jasa (PSMI) (Sisman) 10.30 - 11.20 11.20 - 12.10 B (SEW) Q (NS) A (LT) A (HS) 12.10 - 13.00 Proses Penelitian Proses Strategi Korporasi 13.00 - 13.50 (PSMI) Manufaktur Operasional Manufaktur 13.50 - 14.40 14.40 - 15.30 B (SB/HS) A (SPN) A (NAW/IKG) C (YP/PDK) Penelitian 15.30 - 16.20 Operasional 16.20 - 17.10 17.10 - 18.00 A (SPN)

07.00 - 07.50 07.50 - 08.40 08.50 - 09.40 09.50 - 10.30 10.30 - 11.20 KAMIS 11.30 - 12.20 12.20 - 13.10 13.10 - 13.30 13.30 - 14.20 14.20 - 15.10 15.10 - 16.00 07.00 - 07.50 07.50 - 08.40 08.50 - 09.40 09.40 - 10.30 10.40 - 11.30 11.30 - 13.30 13.30 - 14.20 14.20 - 15.10 15.10 - 16.00 16.10 - 17.00

Man. Keuangan (MB-4) A (NPN) A (BAN)

Man. Material (LSCM) A (SPN) MOSDM (SMT. 6) B (BSY) C (IH) Man. Proyek (Smt. 4) A (LT)

Mekanika Teknik (Sem.2) A Q B C

Matematika Optimasi II (Smt. 4) A (ARK)


SI.Bisnis (MB-4)

B (DH)

C (EW) MOSDM (SMT. 6)

Q (BS)

A (ARK) A

A (BAN) B (BSY) Fisika Dasar (Smt. 2) Q B

C (IH) C

JUMAT

SHOLAT JUM Sustainable Mfg Algoritma dan Pemrograman (Smt. 2) (SIsman) A Q B A (MA) Responsi Sistem Manufaktur A,B,C,Q

LAB-MM 50 Man. Logistik (Smt. 6) C (NIA)

TI-103 35
Komunikasi Bisnis (MB-2)

TI-204 30
Peranc. Sist. Mnfg (Smt. 2 - Sisman)

TI-224 20
Pemodelan Optimasi (Smt. 2 - KOI)

RUANG 208 8
Prod. Mfg (Sisman)

LAB SISMAN

A (MLS/PDK)

A (SGP) SCM (LSCM) A (INP) Kapita Selekta (GS) B (PDK) Perenc. Sistem Industri (Sem. 6) E (BAN) MCDM (KOI) A (USCM)
Komunikasi Pemasaran (MB-6)

A (MLS/MA)
Analisa Keputusan (KOI)

A (BS)
Human Reliability (EPSK)

tatistik Industri I (Smt. 2) C (NIA) Statistik Industri I (Smt. 2) A (DH)

A (SEW/YAS) Kapita Selekta (GS) A (IB)

A (ARK)
Man. Kualitas (Smt. 2 - Sisman)

A (MLS)

M. Transportasi Udara (LSCM)

A (AR) Man. Logistik (Smt. 6) D (INP)

A (JG)

Anprod (SISMAN) A (MLS) Aplikasi Ergo (Smt. 2 - EPSK) A (SGP/ARK)

Man. Strategi (Smt. 2 - PSMI) A (IKG/PS)


Know. Mgt (PSMI)

A (BSY)

Pemodelan Optimasi (S-3) A (SPN/BS)

Pem. Bisnis (MB-4) Rekayasa Rantai Pasok

A (IKG)

(Smt. 2 - LSCM)

A (INP/SPN)

Perencanaan Sistem Trans (Smt. 2 - LSCM)

Man. Pemasaran (MB-2)

A (AR/NS)
Met. Kuantitatif Bisnis (MB-4)

A (JG)
Man. Keuangan (PSMI)

A (IB/NIA) Penelitian Operasional C (AM)

A (IKG/NPN)
Dinamika Organisasi (MB-4)

Faktor Manusia (Smt. 2 - EPSK) A (SW) Sistem Dinamik Stat. Lanjut (Smt. 1) (Smt. 2 - KOI) A (BS/EW) A (BW)

PPC Lanjut (Smt. 1) A (INP)

Kebijakan Inovasi (S-3) A (USCM/MLS)

A (SW) Man. Tekologi (Sisman) A (USCM)

Makro Ekonomi Man.Pemasaran & Sistem Dinamik Plng (Smt. 2 - PSMI) (MB-2) (KOI) A (NPN) A (BAN) A (BW)

Metaheuristik (KOI) S1+S2

Metpen (Smt. 2) A (JG) Pengukuran Kinerja (PSMI) A (NAW)


Keb. Fiskal (MB-6)

AkMan Lanjut (Smt. 1)

A (IKG)
e-Business (LSCM)

A (BS) Man. Proyek (Smt. 4) B (IKG)

A (IB/EW) Metpen (Smt. 2) B (IV)


Pemodelan Rantai Pasok (S-3)

A (NPN) MCDM (KOI) A (USCM)

Analisa Biaya (Smt. 3) A (IH)

Akuntansi Fin (MB-4) A (NAW) Statistika Bisnis (MB-2) A (NIA)

OR Lanjut (Smt. 1) A (SPN/BW)


Kluster Ind (PSMI)
Met. Pengukuran (EPSK)

Comp. Int. Mfg (Sisman) A (YP)

A (INP/AR) Seminar Riset S-3

A (SGP/JG)

A (SW)

SHOLAT JUM'AT e-Business Proyek Penciptaan Bisnis (MB-2) (PSMI) A (EW) A (AR)

Man. Strategis (MB-6)

A (YAS)

S-1 TI (Wajib Smt. 2) S-1 TI (Wajib Smt. 4) S-1 TI (Wajib Smt. 6) S-1 TI (Pilihan) S-1 TI (Penawaran MK di semester gasal)

S1 Man. Bisnis Pasca S-2 (Wajib) Pasca S-2 (Pilihan) Pasca S-3

Anda mungkin juga menyukai