DAILY PROGRESS REPORT- PLANT BUILDINGS GANNON DUNKERLEY LIMITED OMPL - Mangalore Aromatic Complex, Mangalore

REPORTING DATE: PROGRESS DATE: LOA NO : Date WEATHER:


SI No. Description Unit Scope Quantity Drg / Front Upto Available Previous Day For the Day Cumml. Achieved % Complete Remark COMBINED CIVIL PACKAGES (EPCM - 010, 011, 013, 014) EQUIPMENT MOB NOS SUPERVISIOR STAFF Project Manager Planning & Billing Quality Safety Survey Sr.Engineer /Section Incharge Asst Engineers Jr.Engineer Supervisiors HR Accounts / Admin Stores Mechanical Dept Electrician Operators,Drivers& Helpers NOS 4 5 3 8 2 7 5 8 39 2 3 8 4 7 29 NON SUPERVISIOR STAFF Supervisor Fitter/Helper Barbender/Helper Carpenter/Helper Welder/Helper Mason/ Helper M/c F/c Security Labour Colony Nos 4 15 40 80 6 25 70 22 6 15

30.01.2013 29.01.2013 OMPL / 5027, 25.06.2010 CLOUDY RAIN CLEAR DAY

Bunk House DG - 15KV


1 2 3 4 5 6 Excavation PCC RCC Pile Head Treatment Anti-Termite Treatment Soling CUM CUM CUM Nos Cu.M Cu.M 48589 1892 32306 600 7325 1822 27998 1176 11568 396 8121 1868 20814.0 2145.5 17935.9 401.5 1035 250 12.5 17.0 20814.0 2158.0 17952.9 401.5 1035 250 43% 114% 56% 67% 14% 14%

1 1 2 3 2 2 1 1 2 3 4 1 3 5 4 2 1 1 22 32 1 5 4 1 1

DG - 63KV DG - 40KV DG - 75KV DG - 125KV DG - 200KV DG 5KVA WITH MOBILE TOWER LIGHT JCB Poclain 200/75 Tipper Batching Plant Cutting Machine Bending Machine Transit Miller

ANY SITE MAJOR CONSTRAINTS:

Material Transportor Vehicle (407) Diesel Concrete Pump Quality Lab Set Vibrator Dewatering / Curing Pump Boom Placer

ANY MAJOR ACHIEVEMENT ON PROGRESS

Welding Machine Earth Rammer (Deisel / Electrical) Hydra Hollow Block Machine

TOTAL

134

283

CLIENT / PMC SUPPORT REQUIREMENT:

Approval for Finishing items D.RAMAKUMAR

For M/s GDCL

For M/s OMPL

For M/s TOYO

M/s. GANNON DUNKERLEY & CO.LTD., OMPL PROJECT, MANGALORE. WORK : CONSTRUCTION OF PLANT BUILDINGS FOR ONGC MANGALORE PETROCHEMICAL LTD. AT AROMATIC COMPLEX PROJECT, MANGALORE SPECIAL ECONOMIC ZONE, MANGALORE, KARNATAKA.

LOA NO : OMPL / 5027, 25.06.2010 Reporting Date: 30.01.2013 STATUS OF WORK DONE UPTO 29.01.2012 Sl.No I Excavation Flare Trestle Master Control Building SS-08 SS-07 SS-02 SS-01A Compressor Shed Pump House - 02 Pump House - 03 Pipe Culvert OSBL Pipe Sleeper - PA 3 Pipe Sleeper - PA 5 Pipe Sleeper - PA 6 Pipe Sleeper - PA 7 Pipe Sleeper - PA 8 Pipe Sleeper - PA 09 Pipe Sleeper - PA 10 Sub Total : Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum 2050.00 4201.00 2152.00 950.00 1789.00 300.00 600.00 788.00 950.00 152.00 1350.00 1050.00 1280.00 1400.00 1102.00 200.00 500.00 20814.00 2050.00 4201.00 2152.00 950.00 1789.00 300.00 600.00 788.00 950.00 152.00 1350.00 1050.00 1280.00 1400.00 1102.00 200.00 500.00 20814.00 Description Unit Upto Previous Day For the Day Cumulative Achieved Remarks

II

PCC Flare Trestle Master Control Building SS-08 SS-07 SS-02 SS-01A Compressor Shed Pump House - 01 Pump House - 02 Pump House - 03 Pipe Culvert OSBL Pipe Sleeper - PA 03 Pipe Sleeper - PA 05 Pipe Sleeper - PA 06 Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum 236.50 406.00 145.50 58.50 255.00 36.00 49.50 11.50 120.50 29.50 149.50 77.50 56.00 65.50 1.50 4.00 1.00 236.50 406.00 145.50 58.50 259.00 37.00 49.50 11.50 120.50 29.50 151.00 83.50 56.00 65.50 M10 M10

6.00

FOR GDCL

D.RAMAKUMAR Sr.R.E

FOR TEIL

M/s. GANNON DUNKERLEY & CO.LTD., OMPL PROJECT, MANGALORE. WORK : CONSTRUCTION OF PLANT BUILDINGS FOR ONGC MANGALORE PETROCHEMICAL LTD. AT AROMATIC COMPLEX PROJECT, MANGALORE SPECIAL ECONOMIC ZONE, MANGALORE, KARNATAKA.

LOA NO : OMPL / 5027, 25.06.2010 Reporting Date: 30.01.2013 STATUS OF WORK DONE UPTO 29.01.2012 Sl.No Description Pipe Sleeper - PA 07 Pipe Sleeper - PA 08 Pipe Sleeper - PA 09 Pipe Sleeper - PA 10 Pipe Sleeper - PA 31 Weigh Bridge C.B.D Pit - 1 Wer Slop pumphouse Sub Total : III RCC Flare Trestle KOD Fdn Master Control Building SS-06 SS-07 SS-08 SS-01A SS-02 Compressor Shed/IA-PA / Operator Sheltor Pump House - 01 Pump House - 02 Pump House - 03 Pipe Sleeper - PA 03 Pipe Sleeper - PA 05 Pipe Sleeper - PA 06 Pipe Sleeper - PA 07 Pipe Sleeper - PA 08 Pipe Sleeper - PA 09 Pipe Sleeper - PA 10 Pipe Culvert OSBL C.B.D Pit - 1 Flare Stack C.B.D Pit - 2 Weigh Bridge Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum 434.00 144.00 572.00 92.00 357.00 411.50 225.50 753.50 880.50 221.50 154.00 2441.50 282.50 847.00 149.50 117.00 7.00 8.00 434.00 151.00 580.00 92.00 357.00 411.50 225.50 753.50 880.50 221.50 154.00 2441.50 282.50 847.00 149.50 117.00 Cum Cum Cum Cum Cum Cum Cum Cum 87.80 1587.60 256.00 2615.50 0.50 1.50 87.80 1589.10 256.00 2616.00 2069.50 78.00 3140.50 2069.50 78.00 3140.50 Unit Cum Cum Cum Cum Cum Cum Cum Cum Cum Upto Previous Day 172.50 188.50 29.00 29.00 0.50 19.50 7.00 2.50 2145.50 12.50 For the Day Cumulative Achieved 172.50 188.50 29.00 29.00 0.50 19.50 7.00 2.50 2158.00 Remarks

FOR GDCL

D.RAMAKUMAR Sr.R.E

FOR TEIL

M/s. GANNON DUNKERLEY & CO.LTD., OMPL PROJECT, MANGALORE. WORK : CONSTRUCTION OF PLANT BUILDINGS FOR ONGC MANGALORE PETROCHEMICAL LTD. AT AROMATIC COMPLEX PROJECT, MANGALORE SPECIAL ECONOMIC ZONE, MANGALORE, KARNATAKA.

LOA NO : OMPL / 5027, 25.06.2010 Reporting Date: 30.01.2013 STATUS OF WORK DONE UPTO 29.01.2012 Sl.No Dyke 3 Pipe Sleeper - PA 31 Wer Slop pumphouse Sub Total : IV Pile Head Treatment Flare Trestle Master Control Building Sub Station Building - 08 Compressor Shed Sub Total : V Anti-Termite Treatment Master Control Building SS-01A Sub Total : VI Soling Master Control Building Sub Total : Cum Cum 250 250 250 250 Sqm Sqm Sqm 910 125 1035 910 125 1035 Nos Nos Nos Nos Nos 51.5 211 111 28 401.5 51.5 211 111 28 401.5 Cum Cum 15.00 17935.90 17.00 15.00 17952.90 Description Unit Cum Upto Previous Day 3.00 For the Day Cumulative Achieved 3.00 Remarks

FOR GDCL

D.RAMAKUMAR Sr.R.E