Anda di halaman 1dari 2

LATIHAN/TUGAS

KG-2B
RENCANAKAN DAN GAMBARKAN PENULANGAN DARI BALOK T DARI STRUKTUR DI
BAWAH INI BILA DATA-DATA PERENCANAAN SEPERTI PADA TABEL .
I

L(M)

POT.I-I
150

l(M)

No.Absen

L(M)

l(M)

fy(MPa)

fc(MPa)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

6
7
8
9
10
7
8
9
10
6
8
9
10
6
7
9
10
6
7

1.5
1.6
1.7
1.8
1.9
1.6
1.7
1.8
1.9
1.5
1.7
1.8
1.9
1.5
1.6
1.8
1.9
1.5
1.6

240
400
320
300
320
240
400
300
320
400
300
240
300
320
400
300
240
320
400

20
30
25
35
30
20
25
30
35
20
35
25
20
35
30
25
20
30
35

Beban
hidup(kg/m)
1000
1150
1100
1200
1250
1100
1000
1150
1250
1100
1000
1150
1200
1250
1000
1100
1150
1000
1250

No.Absen

L(M)

l(M)

fy(MPa)

fc(MPa)

20
21
22
23
24
25
26
27
28
29
30
31
32

8
10
6
7
8
9
6
7
8
9
10
7
8

1.7
1.9
1.5
1.6
1.7
1.8
1.9
1.5
1.6
1.7
1.8
1.9
1.5

300
320
240
400
300
320
400
240
300
320
400
240
300

20
30
25
35
20
25
30
35
25
20
35
30
20

Beban
hidup(kg/m)
1100
1150
1200
1000
1100
1250
1200
1100
1000
1150
1200
1100
1000

Catatan:

-)Tugas dikumpulkan hari Jumat ( 25 November 2011).


-)Dikerjakan pada kertas folio bergaris.(lembar jawaban
dapat diambil dijurusan).

Anda mungkin juga menyukai