: : Splice Bar & Sleeve Continuity bar & Spiral Connector Chamber Block-out Dimension & position of block-out
Consultant Date
: :
Component
Mould
Reinforcement
Strand
Others
Jointly -Inspected By
Cover (0 to +10mm)
Position (+/-2mm)
Opening (+6mm)
Elongation (+/-5%)
Precaster RTO QC/RE (Name & (Name & Signature) Signature) Cleanliness
NOTE :
ticked where applicable All items are checked & ticked ( ) to conform compliance (as at Jan 2011)
Tile placing
Size of bar
Openings
Condition