Anda di halaman 1dari 6

Location

Input

q (t/m2)

Top wall level


River bed level
Ground water level
River water level
Foundation level

=
=
=
=
=

Dimension
H = 10.00

B =

0.32

10.00
7.00

m
m

hw1 =

0.00

q =
c =

1.10
1 10
2.40

t/m
t/ 2
t/m3

h1 =
h2 =

H=h1

hw1
hw2
h2

Section of Sheet Pile

Backfill soil
soil =
1.80
=
20
c =
1.50

m
m
m
m
m
L

Properties of Material
Concrete
Fc =
Steel
Fy =

Cover of bar
W ll
Wall
d back =
5
5
d front =

1.30

cm
cm

(unit length)
0.50
m

hw2 =

0.00

w =

1.00

t/m3

42
400

t/m2

Foundation soil
t/m3
1.80
s' =
1
80
o
20
B =
t/m2
cB =
0.00

Safety Factor

Sheet_Pile-12/21/2012

t/m3

10.00
0.00
0.00
0.00
0.00

MPa
MPa

Structure2/6

Location
:
Structure Calculation
q =

1.10

t/m2

3.00
Pa1

10.00
Pa2
Pp1

7.00

0.32

Load Diagram on Wall in Normal Condition


Ka = 0.490
Kp = Ka x cos (+)
h = 10.00 m
qa1 = Ka x q
qa2 = Ka x h x soil

=
h2 =

2.040
7.00

qp1 = Kp x h x soil
No.
Pa1
Pa2
Pa3

0.270 x
0.441 x
1 836 x
1.836

Description
3.00
10.00 x
0.50
7 00
7.00
x
0 50
0.50

0.270 ton/m

0.441 ton/m

1.836 ton/m
Hb
0.809
2.206
6 425
6.425

Momen Tanah Aktif


Momen Tanah Pasif

Ma =
Mp =
SF =

Vmax =

Sheet_Pile-12/21/2012

9.440

ton

Mmax =

Y
5.000
3.333
2 333
2.333

Ha x Y
4.045
7.354
14 991
14.991

11.399 ton m
14.991 ton m
1.315 > 1.30
14.991 ton m

Ok

Location
Re-Bar Calculation
Vmax
Mmax

9.44 Ton
14.99 Ton m

Data penampang dan tulangan


width Sheet Pile, b =
length Sheet Pile, h =
tulangan =
sengkang =
asumsi lapis tul =
selimut beton =
jumlah tul/lapis =
spasi tulangan =
tinggi manfaat, d =
geser =
lentur =

500.00
320.00
19
10
1
50
8
33
250.5
0.75
0.8

mm
mm
mm
mm
mm
mm > 30 (ok)
mm

Data bahan
beton, fc' =
baja tulangan, fy =
baja sengkang, fy =

42 MPa
400 MPa
400 MPa

Desain Tulangan Lentur akibat beban maksimum


Mu (-) =
14.99
b=
500
h=
320
d=
251
fc' =
42
fy =
400
=
0.80
7
187,388,868
Mnp = 10 *Mu / =
b = 0,85 fc'/fy. 0,85(600/(600+fy) =
0.045
max = 0,75 b =
0.034
min = 1,4/fy =
0.004
m = fy/o,85 fc' =
11.339
2
5.973
Rn = Mnp/ b d =
= 1/m (1-(1-2*m*Rn/fy) =
0.016
< max ---> tulangan tunggal
> min ---> pakai
As = b d =
2,062.76
2)
n perlu = As/ (1/4 =
7.27
n dibulatkan keatas =
8
8 D19
320
8 D19
500

tm
mm
mm
mm
Mpa
MPa
Nmm

mm2

Location
Re-Bar Calculation

Desain Tulangan Lentur akibat beban angkat


Mu (-) =
1.92 tm
b=
500 mm
h=
320 mm
d=
251 mm
fc' =
42 Mpa
fy =
400 MPa
=
1
7
24,000,000 Nmm
Mnp = 10 *Mu / =
b = 0,85 fc'/fy. 0,85(600/(600+fy) =
0.045
max = 0,75 b =
0.034
min = 1,4/fy =
0.004
m = fy/o,85 fc' =
11.339
2
0.765
Rn = Mnp/ b d =
= 1/m (1-(1-2*m*Rn/fy) =
0.002
< max ---> tulangan tunggal
> min ---> pakai
As = b d =
242.18 mm2
2)
0.85
n perlu = As/ (1/4 =
n dibulatkan keatas =
1

8 D19
320

2x 1 D19
8 D19
500

Desain Tulangan Geser


Tulangan geser pada daerah tumpuan kiri
Vu =
94,400
b=
500
h=
320
d=
251
fc' =
42
fy =
400
geser =
0.75
sengkang =
10
Vc = 1/6 fc' bw d =
134,478
Vc =
100,858
Vu < Vc ---> Pakai tulangan geser minimum

N
mm
mm
mm
Mpa
MPa
mm
N
N

Location
Re-Bar Calculation

Vs = Vu - Vc =
2
s,p = ((2.1/4.. ) fy d / Vs) =
s,max = d/2
Dipasang : sengkang s =

(6,458)
(2,438)
125
125

D10 - 125
220

400

N
mm
mm
mm

Location
:
Estimated Price
concrete

reinforcement

D 19
=
D 10
=
Jumlah

concrete
reinforcement

=
=

1.60
462.48

1.60 m

x
x

401.40 Kg
61.08 Kg
462.48 Kg
700,000 =
7,000 =
Rp

reinforcement

289.05

kg/m3-concrete

2.23
0.617

1,120,000
3,237,390

26%
74%

4,357,390 ,- /buah(0,5m)