Anda di halaman 1dari 10

No

NAMA PEKERJAAN

(1)

(2)

WAKTU

(4)

A PEKERJAAN PERSIAPAN

1.55%

B PEKERJAAN TANAH

1.49%

C PEKERJAAN PONDASI

13

5.25%

D PEKERJAAN DINDING

14

6.92%

E PEKERJAAN PELESTERAN

12

2.01%

F PEKERJAAN KAYU

19

21.52%

G PEKERJAAN BETON

10

8.83%

H PEKERJAAN PENUTUP ATAP

3.08%

0.36%

J PEKERJAAN SANITASI

27

26.30%

K PEKERJAAN PENUTUP LANTAI DAN DINDING

12

19.45%

L PEKERJAAN PENGECATAN

2.79%

M PEKERJAAN INSTALASI LISTRIK

0.45%

PEKERJAAN LANGIT-LANGIT

JUMLAH BOBOT
KOMULATIF HARIAN
RENCANA TIAP MINGGU
RENCANA KUMULATIF

Bulan 1

BOBOT

(HARI)
(3)

Minggu 1
3
4

Minggu 2
9
10

Minggu 3
11

12

13

14

0.29 0.29 0.29 0.29 0.29


0.19 0.19 0.19 0.19 0.19 0.19
0.42 0.42 0.42 0.42 0.42

100.00% 0.29 0.29 0.29 0.29 0.29 0.19 0.19 0.19 0.19 0.61 0.61 0.42 0.42 0.42

0.29 0.58 0.86 1.15 1.44 1.63 1.83 2.02 2.21 2.82 3.43 3.85 4.27 4.69
1.63
2.22
1.63
3.85

2.51
6.36

0.29 0.58 0.86 1.15 1.44 1.63 1.83 2.02 2.21 2.82 3.43 3.85 4.27 4.69

Bulan 1

Bulan 2
Minggu 3
15
16

17

18

19

20

Minggu 4
21
22

23

24

25

26

Minggu 5
27
28

29

30

31

32

Minggu 6
33
34

35

36

37

38

Minggu 7
39
40

0.19 0.19
0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42
0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50

1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13
0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88

0.88 0.88

0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.61 1.08 0.88 0.88 0.88 1.39 2.52 2.52 2.52 1.64 1.64 1.64 1.64 1.64 1.64 1.64 1.64 1.39 1.39
5.11 5.52 5.94 6.36 6.78 7.20 7.61 8.22 9.30 10.2 11.1 11.9 13.3 15.9 18.4 20.9 22.5 24.2 25.8 27.4 29.1 30.7 32.3 34.0 35.4 36.8
2.51
3.82
10.71
9.82
8.31
6.36
10.18
20.89
30.71
39.02

5.11 5.52 5.94 6.36 6.78 7.20 7.61 8.22 9.30 10.2 11.1 11.9 13.3 15.9 18.4 20.9 22.5 24.2 25.8 27.4 29.1 30.7 32.3 34.0 35.4 36.8

KURVA S
2

Bulan 3
Minggu 7
41

42

43

44

Minggu 8
45
46

47

48

49

50

Minggu 9
51
52

53

54

55

56

Minggu 10
57
58

59

60

61

62

Minggu 11
63
64

65

66

0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17
1.13 1.13 1.13

1.13 1.13

0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39

0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97

0.06 0.06 0.06 0.06

8.31
39.02

1.13 1.13 1.13 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 2.17 2.17 1.04 1.04 0.97 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14
37.9 39.0 40.2 40.5 40.9 41.3 41.7 42.1 42.5 42.9 43.3 45.5 47.6 48.7 49.7 50.7 51.8 53.0 54.1 55.2 56.4 57.5 58.7 59.8 61.0 62.1
3.09
6.54
6.59
6.86
42.11
48.65
55.24
62.10

37.9 39.0 40.2 40.5 40.9 41.3 41.7 42.1 42.5 42.9 43.3 45.5 47.6 48.7 49.7 50.7 51.8 53.0 54.1 55.2 56.4 57.5 58.7 59.8 61.0 62.1

Bulan 4
67

68

Minggu 12
69
70

71

72

73

74

Minggu 13
75
76

77

78

79

80

Minggu 14
81
82

83

84

85

86

Minggu 15
87
88

Minggu 16
89

90

91

92

0.17 0.17
1.13 1.13 1.13

0.17 0.17
0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
1.62 1.62 1.62 1.62 1.62 1.62
0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34
0.06 0.06 0.06
1.14 1.14 2.11 2.11 2.11 1.04 1.04 1.04 1.15 1.15 0.97 0.97 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 1.62 1.62 1.62 1.62 1.62 1.62
63.2 64.4 66.5 68.6 70.7 71.7 72.8 73.8 75.0 76.1 77.1 78.1 78.4 78.7 79.1 79.4 79.7 80.1 80.4 80.8 82.4 84.0 85.6 87.2 88.9 90.5
9.64
6.31
2.03
7.16
71.75
78.06
80.09
87.25

9.73
96.98

63.2 64.4 66.5 68.6 70.7 71.7 72.8 73.8 75.0 76.1 77.1 78.1 78.4 78.7 79.1 79.4 79.7 80.1 80.4 80.8 82.4 84.0 85.6 87.2 88.9 90.5

Minggu 16
93
94

95

96

Bulan 5
Minggu 17
97
98

1.62 1.62 1.62 1.62 1.62 1.62

1.62 1.62 1.62 1.62 1.62 1.62


92.1 93.7 95.4 97.0 98.6 100
9.73
3.24
96.98
100

92.1 93.7 95.4 97.0 98.6 100