Anda di halaman 1dari 3

URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

ROCK DRILL BREAKER 3.0 HP 10.0 Tahun 1,500.0 Jam 900,000,000 Rupiah

E36

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

90,000,000 0.16275

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

87,882.51

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

1,200.00

Rupiah

Biaya Pasti per Jam C. 1.

89,082.51

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms H 2,117.25 Rupiah

2.

Pelumas Biaya bengkel

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2 = (H+I+K+L+M)

I J

1,170.00 52,500

Rupiah Rupiah

3. 4. 5.

Perawatan dan = perbaikan Operator Pembantu Operator

K L M P T

105,000.00 12,142.86 27,857.13 200,787.24 289,869.75

Rupiah Rupiah Rupiah Rupiah Rupiah

Biaya Operasi per Jam D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

10.00 % / Tahun 12,142.86 Rp./Jam 9,285.71 Rp./Jam 5,011.00 Liter 4,705.00 Liter 26,000.00 Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

COLD RECYCLER 900.0 HP 2,200 M 5.0 Tahun 2,000.0 Jam 19,500,000,000 Rupiah

E38

5.

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

1,950,000,000 0.26380

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

2,314,822.89

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

19,500.00

Rupiah

Biaya Pasti per Jam C. 1.

2,334,322.89

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms H 635,175.00 Rupiah

2.

Pelumas Biaya bengkel

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2 = (H+I+K+L+M)

I J

351,000.00 853,125

Rupiah Rupiah

3. 4. 5.

Perawatan dan = perbaikan Operator Pembantu Operator

K L M P T

1,218,750.00 12,142.86 27,857.13 3,098,049.99 5,432,372.88

Rupiah Rupiah Rupiah Rupiah Rupiah

Biaya Operasi per Jam D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

10.00 % / Tahun 12,142.86 Rp./Jam 9,285.71 Rp./Jam 5,011.00 Liter 4,705.00 Liter 26,000.00 Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

HOT RECYCLER 400.0 3 5.0 2,000.0 29,250,000,000

E39 HP M Tahun Jam Rupiah

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

2,925,000,000 0.26380

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

3,472,234.34

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

29,250.00

Rupiah

Biaya Pasti per Jam C. 1.

3,501,484.34

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms H 282,300.00 Rupiah

2.

Pelumas Biaya bengkel

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2 = (H+I+K+L+M)

I J

156,000.00 1,279,688

Rupiah Rupiah

3. 4. 5.

Perawatan dan = perbaikan Operator Pembantu Operator

K L M P T

1,828,125.00 12,142.86 27,857.13 3,586,112.49 7,087,596.83

Rupiah Rupiah Rupiah Rupiah Rupiah

Biaya Operasi per Jam D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

10.00 % / Tahun 12,142.86 Rp./Jam 9,285.71 Rp./Jam 5,011.00 Liter 4,705.00 Liter 26,000.00 Liter

Anda mungkin juga menyukai