1 Aspal AC 60/70 (termasuk Angkutan)

Kg

10,000

2 Aspal Cutback

Kg

7,300

Liter

7,000

4 Filler

Kg

1,350

5 Gedeg Guling

m2

27,591

6 Kayu Gelam dia. 10 -12 cm

Btg

9,384

7 Bambu Bongkotan dia. 8-12 cm ; Pj. 3 m

Btg

13,821

8 Bambu Ori dia. 10-12 cm ; Pj. 3 m

Btg

17,646

9 Kayu Bekisting Meranti

m3

3,657,143

10 Paku

10,895

11 Kapur Pasang

Kg
m3

12 Batu Pecah Mesin 0,5 - 1 cm

m3

155,040

13 Batu Pecah Mesin 1 - 2 cm

m3

161,925

14 Batu Pecah Mesin 2 - 3 cm

m3

185,000

15 Batu Pecah Mesin 3 - 5 cm dan 4 - 6 cm

m3

170,799

16 Batu Kerikil Beton

m3

175,000

17 Batu Kali Belah 15/20 cm

m3

130,100

18 Batu Kali Belah 20/25 cm

m3

125,000

19 Pasir Beton

m3

122,583

20 Pasir Pasang

m3

120,000

21 Agregat Kasar

m3

175,200

22 Agregat Halus

m3

155,040

23 Split (Serbuk Batu)

m3

133,416

24 Tasirtu

m3

92,000

25 Curbing Beton Type A, panjang 60 cm

Buah

40,545

26 Curbing Beton Type B, panjang 50 cm

Buah

34,782

m1

40,545

3 Minyak Aspal / Modifier (termasuk Angkutan)

27 Kanstin Trap uk. 15.25.40 ; K-175

80,000

28 Paving Stone Abu-abu tb. 6 cm (Empat persegi panjang ) ; K-350


Buah

1,275

29 Paving Stone Blok tb. 6 cm (Merah - Empat persegi panjang DT


Buah
3)

1,887

30 Paving Stone Abu-abu tebal 8 cm (empat persegi panjang DTBuah


3)

1,887

31 Paving Stone Merah tebal 8 cm (empat persegi panjang DT 3)


Buah
32 Tegel Trotoar

2,040

m2

33,966

33 Got Talang R.15 (Segmen)

Buah

20,000

34 Got Talang R.25 (Segmen)

Buah

25,000

35 Rabber Bearking Pad

cm3

204

36 Semen (PC) 40 Kg

Sak

44,500

37 Semen (PC) 50 Kg

Sak

55,000

38 Bata Merah Klas I

Biji

550

39 Tanah Urug

m3

66,300

40 Pasir Urug

m3

115,000

41 Kawat Ikat Beton

Kg

15,000

42 Besi Beton Ulir

Kg

9,000

43 Besi Beugel / Baut

Kg

6,800

44 Glass Bead

Kg

40,800

45 Cat Aca

Kg

24,480

46 Thinner

Liter

10,200

47 Cat Besi / Kayu EMCO

Kg

39,780

48 Cat Meni Besi / Kayu cap Pedang

Kg

16,830

49 Cat Tembok Vinilek / Aviapaint ( sejenis )

Kg

15,300

50 Plamir

Kg

16,320

Liter

7,650

52 Thermoplastics

Kg

27,540

53 Ijuk

Kg

5,942

54 Pipa Plastik PVC Tipe AW Uk 2"

M1

17,250

55 Minyak Bekisting

Ltr

2,984

56 Sewa Baja WF 200 mm

Kg

2,800

57 Elektroda Baja

Kg

20,000

58 Besi Siku

Kg

10,000.00

59 Minyak Tanah

Ltr

7,500

60 Lapisan Geotekstile type UW

M2

25,000.00

61 Stopper/Uskup tebal 6 cm

Buah

3,060.00

62 Stopper/Uskup Merah tebal 6 cm

Buah

4,000.00

63 Stopper/Uskup tebal 8 cm

Buah

4,500.00

64 Stopper/Uskup Merah tebal 8 cm

Buah

5,500.00

65 Solar

Buah

5,500.00

66 Kayu Meranti 4/6

m3

2,850,000

67 Plywood tebal 9 mm

Lbr

88230

68 Besi Beton Polos

Kg

8,000

51 Minyak Cat / Afdunner

HUN 2010

KETERANGAN

DAFTAR HARGA DASAR SATUAN UPAH DAN SEWA PERALATAN TAHUN 2010
KOTA SURABAYA

NO

URAIAN

SATUAN

HARGA SATUAN
KETERANGAN
( Rp)

A. HARGA DASAR SATUAN UPAH KERJA


1

Mandor

( / hari = 7 jam kerja. )

Orang

60,000.00

Kepala Tukang Kayu

( / hari = 7 jam kerja. )

Orang

50,000.00

Kepala Tukang Batu

( / hari = 7 jam kerja. )

Orang

50,000.00

Kepala Tukang Besi

( / hari = 7 jam kerja. )

Orang

50,000.00

Kepala Tukang Cat

( / hari = 7 jam kerja. )

Orang

50,000.00

Kepala Tukang Listrik

( / hari = 7 jam kerja. )

Orang

50,000.00

Kepala Tukang Gali Tanah

( / hari = 7 jam kerja. )

Orang

50,000.00

Tukang Kayu

( / hari = 7 jam kerja. )

Orang

50,000.00

Tukang Batu

( / hari = 7 jam kerja. )

Orang

50,000.00

10 Tukang besi

( / hari = 7 jam kerja. )

Orang

50,000.00

11 Tukang Cat

( / hari = 7 jam kerja. )

Orang

50,000.00

12 Tukang Listrik

( / hari = 7 jam kerja. )

Orang

50,000.00

13 Tukang Gali Tanah / Keduk Lumpur Selokan

( / hari = 7 jam kerja. )

Orang

40,000.00

14 Tukang Memasak Aspal

( / hari = 7 jam kerja. )

Orang

40,000.00

15 Pekerja Terampil

( / hari = 7 jam kerja. )

Orang

40,000.00

16 Pekerja / Buruh Tak Terampil

( / hari = 7 jam kerja. )

Orang

40,000.00

17

( / hari = 7 jam kerja. )

Orang

40,000.00

18 Pembantu Masinis

( / hari = 7 jam kerja. )

Orang

40,000.00

19 Mekanik

( / hari = 7 jam kerja. )

Orang

40,000.00

20 Pembantu Mekanik

( / hari = 7 jam kerja. )

Orang

34,400.00

21 Operator

( / hari = 7 jam kerja. )

Orang

40,000.00

22 Pembantu Operator

( / hari = 7 jam kerja. )

Orang

40,000.00

23 Pengemudi

( / hari = 7 jam kerja. )

Orang

50,000.00

24 Pembantu Pengemudi

( / hari = 7 jam kerja. )

Orang

40,000.00

25 Penjaga

( / hari = 7 jam kerja. )

Orang

40,000.00

Masinis

NO

URAIAN

SATUAN

HARGA SATUAN
KETERANGAN
( Rp)

B. HARGA SEWA PERALATAN


1

Road Marking Machine

Jam

41,600.00

Sewa AMP 10,00 Ton

( / hari = 4 jam kerja. )

Jam

1,250,000.00

3
4

Sewa AMP 30,00 Ton

( / hari = 4 jam kerja. )

Jam

3,800,000.00

Sewa Aspal Sprayer

( / hari = 4 jam kerja. )

Jam

25,000.00

Sewa Aspal Finisher

( / hari = 4 jam kerja. )

Jam

856,725.00

Sewa Compresor

( / hari = 4 jam kerja. )

Jam

75,000.00

Sewa Concrete Mixer 0,50 m3

( / hari = 4 jam kerja. )

Jam

50,000.00

Sewa Concrete Vibrator

( / hari = 4 jam kerja. )

Jam

8,750.00

Sewa Dump Truck 6,00 ton

( / hari = 4 jam kerja. )

Jam

280,000.00

10 Sewa Dump Truck 5,00 ton

( / hari = 4 jam kerja. )

Jam

65,000.00

11 Sewa Motor Grader 125 - 140 PK

( / hari = 4 jam kerja. )

Jam

270,000.00

12 Sewa Phenumatick Tire Roller

( / hari = 4 jam kerja. )

Jam

226,360.00

13 Sewa Pump Water

( / hari = 3 jam kerja. )

Jam

11,645.00

14 Sewa Tandem Roller

( / hari = 4 jam kerja. )

Jam

223,436.00

15 Sewa Truck Tangki Air

( / hari = 4 jam kerja. )

Jam

70,000.00

16 Sewa Vibrator Roller

( / hari = 5 jam kerja. )

Jam

195,000.00

17 Sewa Walles

( / hari = 4 jam kerja. )

Jam

80,000.00

18 Sewa wheel Loader 1,7 - 2,00 m3

( / hari = 4 jam kerja. )

Jam

300,000.00

19 Sewa Wheel Loader 10-15 HP

( / hari = 4 jam kerja. )

Jam

482,500.00

20 Sewa Crane 10 t

( / hari = 5 jam kerja. )

Jam

125,000.00

21 Sewa Coal Milling Machine

( / hari = 5 jam kerja. )

Jam

2,325,000.00

22 Sewa Compactor Vibrator Plat

( / hari = 5 jam kerja. )

Jam

20,000.00

23 Sewa Alat Bantu ( 1 set @ 3 alat )

Set

1,000.00

24 Biaya Gilas Perkerasan tb. 15 - 20 cm

M2

93,571.00

25 Biaya Gilas Perkerasan ATB/L tb. 3 - 4 cm

M2

47,900.00

ANALISA HARGA SATUAN 2011

Jenis Pekerjaan
Satuan Pembayaran

: Quality Control
: Ls

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Bh
Bh
Ls
Ls
Ls

26.16
3.00
1.00
1.00
1.00

1
2
3
4
5

Setiap 250 M2 luas paving diambil 15


sampling paving stone.
Upah / jasa tes tekan paving stone.
Upah / jasa tes tekan paving stone merah
Upah / jasa tes aus paving stone.
Upah / jasa tes resapan paving stone.
Upah / jasa tes tekan kanstin

Jenis Pekerjaan
Satuan Pembayaran

261,600.00
30,000.00
275,000.00
100,000.00
375,000.00
1,041,600.00

DIBULATKAN

1,041,600.00

: Angkutan Tanah Keluar Proyek


: M3
Kode : 25.01.02.06

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Jam

0.25
0.25

1 Pekerja / Buruh Tak Terampil


2 Sewa Dump Truck 5 T ( min. 5 jam )

: Galian Tanah Biasa


: M3

26,250.00

Kode : 25.01.02.07
KOEFFISIEN

Hr
Hr

0.025
0.750

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00

1,500.00
30,000.00
31,500.00

DIBULATKAN

31,500.00

Kode : 25.01.02.08

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr

0.032
1.000

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00

HARGA SATUAN PEKERJAAN

file name:137689976.xls.ms_office

JUMLAH
( Rp. )
6=45

HARGA SATUAN PEKERJAAN

No.

1 Mandor
2 Pekerja / Buruh Tak Terampil

10,000.00
16,250.00
26,250.00

SAT.

: Galian Tanah Keras


: M3

40,000.00
65,000.00

JUMLAH
( Rp. )
6=45

DIBULATKAN

URAIAN KEGIATAN

1 Mandor
2 Pekerja / Buruh Tak Terampil

HARGA SATUAN
( Rp. )
5

HARGA SATUAN PEKERJAAN

No.

Jenis Pekerjaan
Satuan Pembayaran

10,000.00
10,000.00
275,000.00
100,000.00
375,000.00

JUMLAH
( Rp. )
6=45

HARGA SATUAN PEKERJAAN

No.

Jenis Pekerjaan
Satuan Pembayaran

HARGA SATUAN
( Rp. )
5

JUMLAH
( Rp. )
6=45
1,920.00
40,000.00
41,920.00

DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

: Galian Tanah Lumpur


: M3

Kode : 25.01.02.10

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr

0.0450
1.200

1 Mandor
2 Pekerja / Buruh Tak Terampil

41,920.00

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

2,700.00
48,000.00
50,700.00
50,700.00

Jenis Pekerjaan
Satuan Pembayaran
No.
1

: Pengerukan Lumpur pada Lokasi Sulit ( Gorong-Gorong )


: M3
Kode : 2.1.1.14
HARGA SATUAN
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
2
3
4
5

JUMLAH
( Rp. )
6=45

1 Mandor
2 Pekerja Tak Terampil

Hr
Hr

0.0450
1.2000

60,000.00
40,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

2,700.00
48,000.00
50,700.00
50,700.00

Jenis Pekerjaan
Satuan Pembayaran
No.
1

: Galian ( Tanah Padas / Rabat Beton / Perkerasan Jalan )


: M3
Kode : 25.01.02.09
HARGA SATUAN
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
2
3
4
5

JUMLAH
( Rp. )
6=45

1 Mandor
2 Pekerja / Buruh Tak Terampil

Jenis Pekerjaan
Satuan Pembayaran

Hr
Hr

0.060
1.500

60,000.00
40,000.00

JUMLAH
( Rp. )
6=45
3,600.00
60,000.00

HARGA SATUAN PEKERJAAN

63,600.00

DIBULATKAN

63,600.00

: Urugan Tanah Kembali


: M3
Kode : 24.01.02.14

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr

0.0125
0.3750

1 Mandor
2 Pekerja / Buruh Tak Terampil

file name:137689976.xls.ms_office

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00

JUMLAH
( Rp. )
6=45
750.00
15,000.00

HARGA SATUAN PEKERJAAN

15,750.00

DIBULATKAN

15,750.00

Jenis Pekerjaan
Satuan Pembayaran

: Urugan Pasir ( PADAT )


: M3
Kode : 24.01.02.16

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
M3
Jam

0.01
0.30
1.20
0.0213

1
2
3
4

Mandor
Pekerja Terampil
Pasir Urug
Sewa Alat Bantu ( 1 set @ 3 alat )

Jenis Pekerjaan
Satuan Pembayaran

600.00
12,000.00
138,000.00
21.30
150,621.30

DIBULATKAN

150,620.00

: Urugan Sirtu ( PADAT )


: M3
Kode : 24.01.02.17

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
M3

0.025
0.250
1.200

1 Mandor
2 Pekerja Terampil
3 Tasirtu / Sirtu

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
92,000.00

JUMLAH
( Rp. )
6=45
1,500.00
10,000.00
110,400.00

HARGA SATUAN PEKERJAAN

121,900.00

DIBULATKAN

121,900.00

: Urugan Pasir Untuk Paving


: M3
Kode : 24.01.02.23

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
M3

0.01
0.30
1.20

1 Mandor
2 Pekerja Terampil
3 Pasir Urug

Jenis Pekerjaan
Satuan Pembayaran

60,000.00
40,000.00
115,000.00
1,000.00

JUMLAH
( Rp. )
6=45

HARGA SATUAN PEKERJAAN

No.

Jenis Pekerjaan
Satuan Pembayaran

HARGA SATUAN
( Rp. )
5

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
115,000.00

JUMLAH
( Rp. )
6=45
600.00
12,000.00
138,000.00

HARGA SATUAN PEKERJAAN

150,600.00

DIBULATKAN

150,600.00

: Urugan Sirtu Untuk Paving


: M3
Kode : 24.01.02.24

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr

0.025
0.400

1 Mandor
2 Pekerja Tak Terampil

file name:137689976.xls.ms_office

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00

JUMLAH
( Rp. )
6=45
1,500.00
16,000.00

3 Tasirtu / Sirtu

Jenis Pekerjaan
Satuan Pembayaran

M3

1.200

127,900.00

DIBULATKAN

127,900.00

: Pas. Batu Kali Belah 15/20 ( 1 PC : 4 Ps )


: M3
Kode : 25.02.01.12

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M3
Sak
M3

0.075
1.500
0.075
0.750
0.5200
3.2600
1.200

Mandor
Pekerja / Buruh Tak Terampil
Kepala Tukang Batu
Tukang Batu
Pasir Pasang
Semen / PC ( 50 Kg )
Batu Kali 15/20 cm

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
50,000.00
50,000.00
120,000.00
55,000.00
130,100.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M3
Sak
Bh

0.1600
0.1200
1.2000
3.6000
0.4046
2.2254
490.00

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja / Buruh Tak Terampil
Pasir Pasang
Semen / PC ( 50 Kg )
Batu Bata Merah

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
120,000.00
55,000.00
550.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M3
Sak

0.0150
0.0150
0.1500
0.3000
0.0215
0.1030

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja / Buruh Tak Terampil
Pasir Pasang
Semen / PC ( 50 Kg )

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
120,000.00
55,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan

4,500.00
60,000.00
3,750.00
37,500.00
62,400.00
179,300.00
156,120.00
503,570.00
503,570.00

JUMLAH
( Rp. )
6=45
9,600.00
6,000.00
60,000.00
144,000.00
48,552.00
122,397.00
269,500.00
660,049.00
660,045.00

: Plesteran Halus 1 PC : 4 Ps tb. 1,5 cm


: M2
Kode : 25.04.01.30

No.

1
2
3
4
5
6

JUMLAH
( Rp. )
6=45

: Pas. Bata Merah ( 1 PC : 4 Ps )


: M3
Kode : 25.04.01.09

No.

1
2
3
4
5
6
7

110,400.00

HARGA SATUAN PEKERJAAN

No.

1
2
3
4
5
6
7

92,000.00

JUMLAH
( Rp. )
6=45
900.00
750.00
7,500.00
12,000.00
2,580.00
5,665.00
29,395.00
29,395.00

: Pas. Benangan

file name:137689976.xls.ms_office

10

Satuan Pembayaran

: M1

Kode : 25.04.01.38

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
M3
Sak

0.1200
0.0090
0.0030

1 Tukang Batu
2 Pasir Pasang
3 Semen / PC 50 Kg

HARGA SATUAN
( Rp. )
5
50,000.00
120,000.00
55,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

1
2
3
4
5
6
7

Mandor
Pekerja Terampil
Pemasak Aspal
Batu Pecah Mesin (3/5 cm ) dan ( 4/6 cm )
Batu Kali Pecah 15/20 cm
Aspal Panas AC 60/70 ( termasuk angkutan )
Biaya Gilas Perkerasan tb. 5 - 10 cm

Hr
Hr
Hr
M3
M3
Kg
M2

0.0380
0.0750
0.0200
0.0400
0.1000
1.5000
0.0150

7,245.00
7,245.00

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
40,000.00
170,799.00
130,100.00
10,000.00
93,571.00

JUMLAH
( Rp. )
6=45
2,280.00
3,000.00
800.00
6,831.96
13,010.00
15,000.00
1,403.57

HARGA SATUAN PEKERJAAN

42,325.53

DIBULATKAN

42,325.00

: Lapisan Perkerasan tb. 20 cm ( Padat digilas )


: M2
Kode : 25.08.02.26

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
M3
M3
M2

0.0190
0.3750
0.0500
0.2500
0.0150

1
2
3
4
5

6,000.00
1,080.00
165.00

: Lapisan Perkerasan tb. 5 - 10 cm ( Padat digilas )


: M2
Kode : 25.08.02.27

No.

Jenis Pekerjaan
Satuan Pembayaran

JUMLAH
( Rp. )
6=45

Mandor
Pekerja Terampil
Batu Pecah Mesin (3/5 cm ) dan ( 4/6 cm )
Batu Kali Pecah 15/20 cm
Biaya Gilas Perkerasan tb. 15 - 20 cm

file name:137689976.xls.ms_office

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
170,799.00
130,100.00
93,571.00

JUMLAH
( Rp. )
6=45
1,140.00
15,000.00
8,539.95
32,525.00
1,403.57

HARGA SATUAN PEKERJAAN

58,608.52

DIBULATKAN

58,605.00

11

Jenis Pekerjaan
Satuan Pembayaran

: Permasangan Paving Stone Blok tb. 6 cm


: M2
Kode : 24.08.01.07

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
Bh

0.0250
0.0250
0.0500
0.0500
43.000

1
2
3
4
5

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja / Buruh Tak Terampil
Paving Abu-abu tb. 6 cm ( 4 persegi pj. )

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
1,275.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

1,500.00
1,250.00
2,500.00
2,000.00
54,825.00
62,075.00
62,075.00

: Permasangan Paving Stone Blok tb. 8 cm


: M2
Kode : 24.08.01.08

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
Bh

0.0250
0.0250
0.0500
0.0500
43.000

1
2
3
4
5

JUMLAH
( Rp. )
6=45

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja / Buruh Tak Terampil
Paving Abu-abu tb. 8 cm ( 4 persegi pj. )

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
1,887.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

1,500.00
1,250.00
2,500.00
2,000.00
81,141.00
88,391.00
88,390.00

Jenis Pekerjaan
Satuan Pembayaran
No.
1
1
2
3
4
5

: Permasangan Paving Stone Blok tb. 6 cm Warna Merah


: M2
Kode : 24.08.01.09
HARGA SATUAN
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
2
3
4
5

JUMLAH
( Rp. )
6=45

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja / Buruh Tak Terampil
Paving Stone Merah tb. 6 cm ( 4 persegi pj. )

Hr
Hr
Hr
Hr
Bh

0.0250
0.0250
0.0500
0.0500
43.000

60,000.00
50,000.00
50,000.00
40,000.00
1,887.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

1,500.00
1,250.00
2,500.00
2,000.00
81,141.00
88,391.00
88,390.00

Jenis Pekerjaan
Satuan Pembayaran
No.

: Permasangan Paving Stone Blok tb. 8 cm Warna Merah


: M2
Kode : 25.08.01.10
HARGA SATUAN
URAIAN KEGIATAN
SAT.
KOEFFISIEN

JUMLAH
( Rp. )
6=45

file name:137689976.xls.ms_office

JUMLAH

12

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
Bh

0.0250
0.0250
0.0500
0.0500
43.000

1
2
3
4
5

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja / Buruh Tak Terampil
Paving Stone Merah tb. 8 cm ( 4 persegi pj. )

( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
2,040.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M3
Bh

0.0010
0.0100
0.1000
0.2000
0.0010
3.340

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja Terampil
Pasir Pasang
Stopper / Topi Uskup tb. 6 cm

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
120,000.00
3,060.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M3
Bh

0.0010
0.0100
0.1000
0.2000
0.0010
3.340

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja Terampil
Pasir Pasang
Stopper / Topi Uskup Merah tb. 6 cm

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
120,000.00
4,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan

94,970.00
94,970.00

JUMLAH
( Rp. )
6=45
60.00
500.00
5,000.00
8,000.00
120.00
10,220.40
23,900.40
23,900.00

: Pas. Stopper / Topi Uskup Tb. 6 cm Warna Merah


: M1
Kode : 25.08.01.27

No.

1
2
3
4
5
6

1,500.00
1,250.00
2,500.00
2,000.00
87,720.00

: Pas. Stopper / Topi Uskup Tb. 6 cm


: M1
Kode : 24.08.01.27

No.

1
2
3
4
5
6

( Rp. )
6=45

JUMLAH
( Rp. )
6=45
60.00
500.00
5,000.00
8,000.00
120.00
13,360.00
27,040.00
27,040.00

: Pas. Stopper / Topi Uskup Tb. 8 cm

file name:137689976.xls.ms_office

13

Satuan Pembayaran

: M1

Kode : 24.08.01.28

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M3
Bh

0.0010
0.0100
0.1000
0.2000
0.0010
3.340

1
2
3
4
5
6

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja Terampil
Pasir Pasang
Stopper / Topi Uskup tb. 8 cm

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
120,000.00
4,500.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M3
Bh

0.0010
0.0100
0.1000
0.2000
0.0010
3.340

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja Terampil
Pasir Pasang
Stopper / Topi Uskup Merah tb. 8 cm

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
120,000.00
5,500.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

28,710.00
28,710.00

JUMLAH
( Rp. )
6=45
60.00
500.00
5,000.00
8,000.00
120.00
18,370.00
32,050.00
32,050.00

: Pas. Kanstin Trap uk. 15.25.40 K-175


: M1
Kode : 24.08.01.26

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M3
Sak
M1

0.001
0.010
0.050
0.050
0.0010
0.3600
1.000

1
2
3
4
5
6
7

60.00
500.00
5,000.00
8,000.00
120.00
15,030.00

: Pas. Stopper / Topi Uskup Tb. 8 cm Warna Merah


: M1
Kode : 25.08.01.28

No.

1
2
3
4
5
6

JUMLAH
( Rp. )
6=45

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja Terampil
Pasir Pasang
Semen / PC ( 50 Kg )
Kanstin Trap uk. 15.25.40

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
120,000.00
55,000.00
40,545.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

file name:137689976.xls.ms_office

JUMLAH
( Rp. )
6=45
60.00
500.00
2,500.00
2,000.00
120.00
19,800.00
40,545.00
65,525.00
65,525.00

14

Jenis Pekerjaan
Satuan Pembayaran

: Spesi 1 PC : 2 Ps
: M2

Kode :

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M3
Sak

0.0100
0.0150
0.1500
0.2000
0.0119
0.1251

1
2
3
4
5
6

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja / Buruh Tak Terampil
Pasir Pasang
Semen / PC ( 50 Kg )

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
120,000.00
55,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M3
Sak
M3

0.080
0.025
0.250
1.650
0.5081
3.7257
1.0161

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja Terampil
Pasir Cor / Beton
Semen / PC ( 50 Kg )
Batu Pecah 2/3 cm

25,158.50
25,155.00

4,800.00
1,250.00
12,500.00
66,000.00
62,284.42
204,915.70
187,978.50

DIBULATKAN

539,725.00

: Pemasangan Trucuk Bambu dia. 10-12 cm ; Pj. 3 m


: Btg

Kode : 24.02.01.04

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Btg

0.0025
0.0400
0.0500
1.0000

file name:137689976.xls.ms_office

60,000.00
50,000.00
50,000.00
40,000.00
122,583.00
55,000.00
185,000.00

JUMLAH
( Rp. )
6=45

539,728.62

Satuan Pembayaran

Mandor
Tukang Kayu
Pekerja / Buruh Tak Terampil
Bambu Bongkotan dia. 10-12 cm ; Pj. 3 m

HARGA SATUAN
( Rp. )
5

HARGA SATUAN PEKERJAAN

Jenis Pekerjaan

1
2
3
4

600.00
750.00
7,500.00
8,000.00
1,428.00
6,880.50

: RABATAN BETON ( 1 PC : 3 Ps : 6 Kr )
: M3
Kode : 24.03.01.34

No.

1
2
3
4
5
6
7

JUMLAH
( Rp. )
6=45

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
40,000.00
13,821.00

JUMLAH
( Rp. )
6=45
150.00
2,000.00
2,000.00
13,821.00

HARGA SATUAN PEKERJAAN

17,971.00

DIBULATKAN

17,970.00

15

Jenis Pekerjaan
Satuan Pembayaran

: Pembuatan Kisdam tinggi 2 m ; Tb. 0,6 m


: M1
Kode : 24.02.01.09

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Btg
M2
Kg

0.0208
0.4170
0.3000
5.0000
4.4000
0.250

1
2
3
4
5
6

Mandor
Kepala Tukang Batu
Pekerja / Buruh Tak Terampil
Bambu Ori dia. 10-12 cm ; Pj. 3 m
Gedeg Guling
Kawat Ikat Beton

Jenis Pekerjaan
Satuan Pembayaran

60,000.00
50,000.00
40,000.00
17,646.00
27,591.00
15,000.00

JUMLAH
( Rp. )
6=45
1,248.00
20,850.00
12,000.00
88,230.00
121,400.40
3,750.00

HARGA SATUAN PEKERJAAN

247,478.40

DIBULATKAN

247,475.00

: Pas. Dasar Saluran R.15 Segmen


: M1
Kode : 25.07.03.02

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Bh

0.0190
0.3800
1.0000

1 Mandor
2 Pekerja / Buruh Tak Terampil
3 Got Talang R.15 ( segmen )

Jenis Pekerjaan
Satuan Pembayaran

HARGA SATUAN
( Rp. )
5

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
20,000.00

JUMLAH
( Rp. )
6=45
1,140.00
15,200.00
20,000.00

HARGA SATUAN PEKERJAAN

36,340.00

DIBULATKAN

36,340.00

: Pas. Dasar Saluran R.25 Segmen


: M1
Kode : 25.07.03.01

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Bh

0.0238
0.4750
1.0000

1 Mandor
2 Pekerja / Buruh Tak Terampil
3 Got Talang R.25 ( segmen )

file name:137689976.xls.ms_office

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
25,000.00

JUMLAH
( Rp. )
6=45
1,428.00
19,000.00
25,000.00

HARGA SATUAN PEKERJAAN

45,428.00

DIBULATKAN

45,425.00

16

Jenis Pekerjaan
Satuan Pembayaran

: Pekerjaan Spesi Beton Struktur K-225


: M3
Kode : 25.03.01.06

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
Hr
Sak
M3
Liter

0.0830
1.6500
0.0280
0.2750
0.4986
7.4200
0.7756
215.0000

1
2
3
4
5
6
7
8

Mandor
Pekerja / Buruh Tak Terampil
Kepala Tukang Batu
Tukang Batu
Pasir Cor / Beton
Semen / PC ( 50 Kg )
Batu Pecah Mesin 1/2 cm
Air (biaya air tawar)

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
50,000.00
50,000.00
122,583.00
55,000.00
161,925.00
13.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

4,980.00
66,000.00
1,400.00
13,750.00
61,119.88
408,100.00
125,589.03
2,795.00
683,733.91
683,730.00

: Pekerjaan Spesi Beton Struktur K-350


: M3
Kode : 25.03.01.06

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
Hr
Sak
M3
Liter

0.0830
1.6500
0.0280
0.2750
0.4986
8.9600
0.5263
215.0000

1
2
3
4
5
6
7
8

JUMLAH
( Rp. )
6=45

Mandor
Pekerja / Buruh Tak Terampil
Kepala Tukang Batu
Tukang Batu
Pasir Cor / Beton
Semen / PC ( 50 Kg )
Batu Pecah Mesin 1/2 cm
Air (biaya air tawar)

file name:137689976.xls.ms_office

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
50,000.00
50,000.00
122,583.00
55,000.00
161,925.00
13.00

JUMLAH
( Rp. )
6=45
4,980.00
66,000.00
1,400.00
13,750.00
61,119.88
492,800.00
85,221.13
2,795.00

17

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

: Pekerjaan Pembesian dengan Besi Polos


: Kg
Kode : 25.03.01.05

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
Kg
Kg

0.0004
0.0007
0.0070
0.0070
1.0500
0.0150

1
2
3
4
5
6

Mandor
Tukang Besi
Pekerja / Buruh Tak Terampil
Pekerja / Buruh Semi Terampil
Besi Beton Polos
Kawat Ikat Beton

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
40,000.00
40,000.00
9,000.00
15,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
Kg
Kg

0.0004
0.0007
0.0070
0.0070
1.0500
0.0150

Mandor
Tukang Besi
Pekerja / Buruh Tak Terampil
Pekerja / Buruh Semi Terampil
Besi Beton Ulir
Kawat Ikat Beton

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
40,000.00
40,000.00
12,500.00
15,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

24.00
35.00
280.00
280.00
9,450.00
225.00
10,294.00
10,290.00

JUMLAH
( Rp. )
6=45
24.00
35.00
280.00
280.00
13,125.00
225.00
13,969.00
13,965.00

: Acuan untuk Beton Struktur ( Bekisting )


: M3
Kode : 25.03.01.02

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M3
Kg
Liter
M3
Lembar
Batang

0.0600
3.0000
0.3300
3.3000
0.0400
0.4000
0.2000
0.0150
0.3500
2.0000

1
2
3
4
5
6
7
8
9
10

JUMLAH
( Rp. )
6=45

: Pekerjaan Pembesian dengan Besi Ulir


: Kg
Kode : 25.03.01.

No.

1
2
3
4
5
6

728,066.01
728,065.00

Mandor
Pekerja / Buruh Tak Terampil
Kepala Tukang Kayu
Tukang Kayu
Kayu Meranti ( bekisting )
Paku Klem
Solar
Kayu Meranti 4/6
Plywood tebal 9 mm
Dolken kayu gelam dia. 8-10

file name:137689976.xls.ms_office

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
50,000.00
50,000.00
3,657,142.86
10,894.88
5,500.00
2,850,000.00
88,230.00
9,384.00

JUMLAH
( Rp. )
6=45
3,600.00
120,000.00
16,500.00
165,000.00
146,285.71
4,357.95
1,100.00
42,750.00
30,880.50
18,768.00

18

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

549,242.16
549,240.00

: Pembongkaran Cetakan dan Penyiraman Beton


: M3
Kode : 25.03.01.08

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr

3.000

1 Pekerja / Buruh Tak Terampil

HARGA SATUAN
( Rp. )
5
40,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

: Pekerjaan Cor Beton Bertulang Praktis ( K-225 ) ; Pemakaian Besi 100 Kg


: M3
Kode : 25.03.01.11
HARGA SATUAN
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
2
3
4
5

JUMLAH
( Rp. )
6=45
120000
120,000.00
120,000.00

Jenis Pekerjaan
Satuan Pembayaran
No.
1
1
2
3
4

Pekerjaan Beton Struktur K-225


Pekerjaan Pembesian, Pemakaian Besi :
Acuan untuk Beton Struktur ( Bekisting )
Pembongkaran dan Penyiraman

M3
Kg
M3
M3

1.00
100.00
0.500
1.00

683,733.91
10,294.00
549,242.16
120,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

: Pekerjaan Cor Beton Bertulang ( K-350 ) ; Pemakaian Besi 200 Kg


: M3
Kode : 25.03.01.11
HARGA SATUAN
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
2
3
4
5

JUMLAH
( Rp. )
6=45
683,733.91
1,029,400.00
274,621.08
120,000.00
2,107,755.00
2,107,750.00

Jenis Pekerjaan
Satuan Pembayaran
No.
1
1
2
3
4

Pekerjaan Beton Struktur K-350


Pekerjaan Pembesian, Pemakaian Besi :
Acuan untuk Beton Struktur ( Bekisting )
Pembongkaran dan Penyiraman

M3
Kg
M3
M3

1.00
200.00
1.00
1.00

728,065.00
13,965.00
549,242.16
120,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan

JUMLAH
( Rp. )
6=45
728,065.00
2,793,000.00
549,242.16
120,000.00
4,190,307.16
4,190,305.00

: Pekerjaan Cor Beton Bertulang ( K-350 ) ; Pemakaian Besi 320 Kg

file name:137689976.xls.ms_office

19

Satuan Pembayaran

: M3

Kode : 25.03.01.11

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

M3
Kg
M3
M3

1.00
320.00
1.00
1.00

1
2
3
4

Pekerjaan Beton Struktur K-350


Pekerjaan Pembesian, Pemakaian Besi :
Acuan untuk Beton Struktur ( Bekisting )
Pembongkaran dan Penyiraman

HARGA SATUAN
( Rp. )
5
728,065.00
13,965.00
549,242.16
120,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

728,065.00
4,468,800.00
549,242.16
120,000.00
5,866,107.16
5,866,105.00

Jenis Pekerjaan
Satuan Pembayaran
No.
1
1
2
3
4

: Pekerjaan Cor Beton Bertulang ( K-350 ) ; Pemakaian Besi 360 Kg


: M3
Kode : 25.03.01.11
HARGA SATUAN
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
2
3
4
5

JUMLAH
( Rp. )
6=45

Pekerjaan Beton Struktur K-350


Pekerjaan Pembesian, Pemakaian Besi :
Acuan untuk Beton Struktur ( Bekisting )
Pembongkaran dan Penyiraman

M3
Kg
M3
M3

1.00
360.00
1.00
1.00

728,065.00
13,965.00
549,242.16
120,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

728,065.00
5,027,400.00
549,242.16
120,000.00
6,424,707.16
6,424,705.00

Jenis Pekerjaan
Satuan Pembayaran
No.
1
1
2
3
4

: Pekerjaan Cor Beton Bertulang Tutup Gorong-Gorong ( 1PC:2PS:3Kr )


: M3
Kode : 25.07.03.07
HARGA SATUAN
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
2
3
4
5

JUMLAH
( Rp. )
6=45

Pekerjaan Beton Struktur K-225


Pekerjaan Pembesian, Pemakaian Besi :
Acuan untuk Beton Struktur ( Bekisting )
Pembongkaran dan Penyiraman

M3
Kg
M3
M3

1.00
160.00
0.25
0.25

683,733.91
10,294.00
549,242.16
120,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

683,733.91
1,647,040.00
137,310.54
30,000.00
2,498,084.45
2,498,080.00

: Pekerjaan Cor Beton Inrit ( 1PC:2PS:3Kr )


: M3
Kode : 25.03.01.10

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

M3
Kg
M3
M3

1.00
130.00
0.25
0.25

1
2
3
4

JUMLAH
( Rp. )
6=45

Pekerjaan Beton Struktur K-225


Pekerjaan Pembesian
Acuan untuk Beton Struktur ( Bekisting )
Pembongkaran dan Penyiraman

HARGA SATUAN
( Rp. )
5
683,733.91
10,294.00
549,242.16
120,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

file name:137689976.xls.ms_office

JUMLAH
( Rp. )
6=45
683,733.91
1,338,220.00
137,310.54
30,000.00
2,189,264.45
2,189,260.00

20

Jenis Pekerjaan
Satuan Pembayaran

: Pekerjaan Spesi Strauss Pall ( 1PC : 1,5 Ps : 2,5 Kr )


: M3
Kode : 25.03.01.10

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
Hr
Sak
M3
Kg

0.0830
0.0280
0.2750
1.6500
0.4986
7.4200
0.7756
130.00

1
3
4
2
5
6
7
8

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja Terampil
Pasir Cor / Beton
Semen / PC ( 50 Kg )
Batu Kerikil
Pekerjaan Pembesian

HARGA SATUAN
( Rp. )
5
10,294.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

1,338,220.00
1,338,220.00
1,338,220.00

: Agregat Lapis Pondasi Atas Klas A


: M3

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
Hr
Hr
M3
M3
M3
M3
Jam
Jam
Jam
Jam

0.006667
0.013333
0.040000
0.006667
0.006667
0.013340
0.406667
0.480000
0.293333
0.126667
0.033333
0.033333
0.033333
0.001675

1
2
3
4
5
6
7
8
9
10
11
12
13
13

JUMLAH
( Rp. )
6=45

Mandor
Operator
Pekerja / Buruh Tak Terampil
Pengemudi / Sopir
Pembantu Sopir
Pembantu Operator
Batu Pecah Mesin 1/2 cm
Batu Pecah Mesin 2/3 cm
Batu Pecah Mesin 0,5/1 cm
Pasir Pasang
Sewa Motor Grader 125-140 PK (min. 5 jam)
Sewa Truck Tangki Air ( min. 5 jam )
Sewa walles ( min. 5 jam )
Sewa Alat Bantu ( 1 set @ 3 alat )

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
40,000.00
50,000.00
40,000.00
40,000.00
161,925.00
185,000.00
155,040.00
120,000.00
270,000.00
70,000.00
80,000.00
1,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

file name:137689976.xls.ms_office

JUMLAH
( Rp. )
6=45
400.02
533.32
1,600.00
333.35
266.68
533.60
65,849.55
88,800.00
45,478.35
15,200.04
8,999.91
2,333.31
2,666.64
1.68
232,996.45
232,995.00

21

Jenis Pekerjaan
Satuan Pembayaran

: Agregat Lapis Pondasi Atas Klas B


: M3

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
Hr
Hr
M3
M3
Jam
Jam
Jam
Jam

0.003000
0.013333
0.040000
0.006667
0.006667
0.013340
0.160000
1.040000
0.033333
0.033333
0.033333
0.001608

1
2
3
4
5
6
7
8
9
10
11
12

Mandor
Operator
Pekerja / Buruh Tak Terampil
Pengemudi / Sopir
Pembantu Sopir
Pembantu Operator
Pasir Pasang
Batu Kerikil Beton
Sewa Motor Grader 125-140 PK (min. 5 jam)
Sewa Truck Tangki Air ( min. 5 jam )
Sewa walles ( min. 5 jam )
Sewa Alat Bantu ( 1 set @ 3 alat )

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
40,000.00
50,000.00
40,000.00
40,000.00
120,000.00
175,000.00
270,000.00
70,000.00
80,000.00
1,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
m2
jam

0.0182
0.0183
0.0820
1.1000
0.0387

Mandor
Pekerja Terampil
Pekerja / Buruh Tak Terampil
Lapisan Geotekstile
Sewa Alat Bantu / Mesin Jahit Tangan

Jenis Pekerjaan
Satuan Pembayaran

218,648.42
218,645.00

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
40,000.00
25,000.00
1,000.00

JUMLAH
( Rp. )
6=45
1,092.00
732.00
3,280.00
27,500.00
38.70

HARGA SATUAN PEKERJAAN

32,642.70

DIBULATKAN

32,640.00

: Perataan Tanah dan Memadatkan


: M2

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
Hr
Hr
Jam
Jam
Jam
Jam

0.007500
0.013333
0.040000
0.006667
0.006667
0.013340
0.012500
0.012500
0.012500
0.001675

1
2
3
4
5
6
7
8
9
10

180.00
533.32
1,600.00
333.35
266.68
533.60
19,200.00
182,000.00
8,999.91
2,333.31
2,666.64
1.61

: Pemasangan Lapisan Geotextile Tipe UW 250


: M2
Kode : 24.08.02.52

No.

1
2
3
4
5

JUMLAH
( Rp. )
6=45

Mandor
Operator
Pekerja / Buruh Tak Terampil
Pengemudi / Sopir
Pembantu Sopir
Pembantu Operator
Sewa Motor Grader 125-140 PK (min. 5 jam)
Sewa Truck Tangki Air ( min. 5 jam )
Sewa walles ( min. 5 jam )
Sewa Alat Bantu ( 1 set @ 3 alat )

file name:137689976.xls.ms_office

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
40,000.00
50,000.00
40,000.00
40,000.00
270,000.00
70,000.00
80,000.00
1,000.00

JUMLAH
( Rp. )
6=45
450.00
533.32
1,600.00
333.35
266.68
533.60
3,375.00
875.00
1,000.00
1.68

22

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

: Pemasangan Lubang Drainase


: Bh
Kode : 25.02.01.09
25.07.02.24

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr
Hr
M
Kg

0.0025
0.0030
0.0300
0.0600
0.5000
0.050

1
2
3
4
5
6

8,968.63
8,965.00

Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja / Buruh Tak Terampil
Pipa PVC 2" Panjang 4.00 Mt type C
Ijuk

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
50,000.00
40,000.00
17,250.00
5,941.50

HARGA SATUAN PEKERJAAN


DIBULATKAN

JUMLAH
( Rp. )
6=45
150.00
150.00
1,500.00
2,400.00
8,625.00
297.08
13,122.08
13,120.00

Jenis Pekerjaan
Satuan Pembayaran
No.
1

: Saluran U-Gutter 800/1000-1200 ( Precast Fabrikan) termasuk penurunan dan pemasangan


: M1
HARGA SATUAN
JUMLAH
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
( Rp. )
2
3
4
5
6=45

1
2
3
4
5

Mandor
Operator
Pekerja Tak Terampil
U-Gutter 800x1000x1200
Sewa Crane 10 t - min. 5 jam
(termasuk mob/demob operator BBM)
6 Sewa Alat Bantu ( 1 set @ 3 alat )

Hr
Hr
Hr
M
Jam

0.030595
0.434028
0.157143
1.000000
0.434000

60,000.00
40,000.00
40,000.00
2,500,000.00
125,000.00

1,835.71
17,361.11
6,285.71
2,500,000.00
54,250.00

Jam

0.250000

1,500.00

375.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

2,580,107.54
2,580,105.00

Jenis Pekerjaan
Satuan Pembayaran
No.
1

: Box Culvert 1000/1500-1200 ( Precast Fabrikan) termasuk penurunan dan pemasangan


: M1
HARGA SATUAN
JUMLAH
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
( Rp. )
2
3
4
5
6=45

1
2
3
4
5

Mandor
Operator
Pekerja Tak Terampil
Box Culvert 1000x1500x1200
Sewa Crane 10 t - min. 5 jam
(termasuk mob/demob operator BBM)
6 Sewa Alat Bantu ( 1 set @ 3 alat )

Hr
Hr
Hr
M
Jam

0.030595
0.434028
0.157143
1.000000
0.434000

60,000.00
40,000.00
40,000.00
6,700,000.00
125,000.00

1,835.71
17,361.11
6,285.71
6,700,000.00
54,250.00

Jam

0.250000

1,500.00

375.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

file name:137689976.xls.ms_office

6,780,107.54
6,780,105.00

23

Jenis Pekerjaan
Satuan Pembayaran
No.
1
1
2
3
4
5
6
7
8
9

: Pemasangan (sewa) Turap Sheet Pile Baja (tinggi = 6 m) untuk Pengaman Galian / Tebing
: M1
HARGA SATUAN
JUMLAH
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
( Rp. )
2
3
4
5
6=45

Mandor
Kepala Tukang Besi
Tukang besi
Pekerja / Buruh Tak Terampil
Sewa Baja WF 200 X 100
Sewa Baja C 100 - 150 mm
Elektrode Baja
Gedeg Guling
Sewa Crane 10 t - min. 5 jam
(termasuk mob/demob, operator, BBM)

Hr
Hr
Hr
Hr
Kg
Kg
Kg
M2
Jam

0.100
0.200
0.400
1.000
319.50
22.70
0.200
2.500
0.5712

60,000.00
50,000.00
50,000.00
40,000.00
2,800.00
2,800.00
20,000.00
27,591.00
125,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Hr
Hr

0.5000
0.5000
1.5000

1 Mandor
2 Tukang Listrik
3 Pekerja tak trampil

HARGA SATUAN
( Rp. )
5
60,000.00
50,000.00
40,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

JUMLAH
( Rp. )
6=45
30,000.00
25,000.00
60,000.00
115,000.00
115,000.00

: Pemasangan Panel Lampu PJU-1 Phase


: Unit

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Hr
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Pasang

0.5000
1.0000
3.0000
1.0000
2.0000
2.0000
1.0000
1.0000
2.0000

1
2
3
4
5
6
7
8
9

1,178,537.50
1,178,535.00

: Pemasangan Panel Lampu PJU


: Unit

No.

Jenis Pekerjaan
Satuan Pembayaran

6,000.00
10,000.00
20,000.00
40,000.00
894,600.00
63,560.00
4,000.00
68,977.50
71,400.00

Pemasangan Panel Lampu PJU


Panel (60x40x20) Cm
Pilot Lamp
Time Switch
MCB 16 A - 1 Phase
MCB 10 A - 1 Phase
Magnetic Contactor ( AC-3 12A: AC-1 25A )
Grounding Roud
Besi Beugel/Baut (Ornamen)

file name:137689976.xls.ms_office

HARGA SATUAN
( Rp. )
5
115,000.00
827,200.00
72,400.00
284,350.00
196,479.00
177,850.00
258,500.00
280,550.00
32,450.00

JUMLAH
( Rp. )
6=45
57,500.00
827,200.00
217,200.00
284,350.00
392,958.00
355,700.00
258,500.00
280,550.00
64,900.00

24

HARGA SATUAN PEKERJAAN


DIBULATKAN

2,738,858.00
2,738,855.00

Jenis Pekerjaan
Satuan Pembayaran
No.
1
1
2
3
4
5
6
7

: Pemasangan Tiang Oktagonal 7 m Double Hot Dipped Galvanized dgn Flenders


: Unit
HARGA SATUAN
JUMLAH
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
( Rp. )
2
3
4
5
6=45

Mandor
Hr
0.0250
Tukang Listrik
Hr
0.1250
Pekerja trampil
Hr
0.2500
Pekerja/Buruh tak trampil
Hr
0.2500
Operator Alat Konstruksi
Hr
0.1250
Tiang Oktagonal 7 m Double Hot Dipped Galvanized
Unitdgn Flenders
1.0000
Sewa Crane 10 t - min. 5 jam
Jam
0.5000
(termasuk mob/demob operator BBM)

60,000.00
50,000.00
40,000.00
40,000.00
40,000.00
2,362,400.00
125,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

2,457,650.00
2,457,650.00

Jenis Pekerjaan
Satuan Pembayaran
No.
1
1
2
3
4
5

: Pemasangan Lampu Natrium 250W/220 V dengan Ballast


: Unit
HARGA SATUAN
URAIAN KEGIATAN
SAT.
KOEFFISIEN
( Rp. )
2
3
4
5

1,500.00
6,250.00
10,000.00
10,000.00
5,000.00
2,362,400.00
62,500.00

Mandor
Hr
Tukang Listrik
Hr
Pekerja/Buruh tak trampil
Hr
Lampu Natrium 250W/220 V dengan Ballast
Unit
Sewa Alat Bantu Penerangan Jalan Umum (PJU)Jam

0.0250
0.2500
1.5000
1.0000
1.0000

60,000.00
50,000.00
40,000.00
295,000.00
6,500.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

JUMLAH
( Rp. )
6=45
1,500.00
12,500.00
60,000.00
295,000.00
6,500.00
375,500.00
375,500.00

: Pemasangan Lampu PJU


: M1
HARGA SATUAN
( Rp. )
5

JUMLAH
( Rp. )
6=45

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Unit
Unit

1.0000
1.0000

2,738,855.00
2,457,650.00

2,738,855.00
2,457,650.00

Unit

2.0000

375,500.00

751,000.00

1 Pemasangan Panel Lampu PJU-1 Phase


2 Pemasangan Tiang Oktagonal 7 m Double Hot
Dipped Galvanized dgn Flenders
3 Pemasangan Lampu Natrium 250W/220 V
dengan Ballast

HARGA SATUAN PEKERJAAN

file name:137689976.xls.ms_office

5,947,505.00

25

DIBULATKAN

5,947,505.00

ASPAL

Jenis Pekerjaan
Satuan Pembayaran

: Lapisan AC tb. 4 cm
: M2

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Jam
Jam
M3
M3
Kg
Kg
Jam
Jam
Jam
Jam
Jam
Jam
Ls

0.00241
0.02410
0.03360
0.01490
4.80150
6.61500
0.00241
0.00160
0.03850
0.00300
0.00180
0.00250
1.00000

1
2
3
4
5
6
7
8
9
10
11
12
13

Mandor
Pekerja
Agregat Kasar
Agregat Halus
Filler
Aspal Curah
Asphalt Mixing Plant
Wheel Loader 10-15 HP
Dump Truck 8-10 m3
Asphalt Finisher
Tandem Roller
P. Tire Roller
Sewa Alat Bantu ( 1 set @ 3 alat )

HARGA SATUAN
( Rp. )
5
8,571.43
5,714.29
175,200.00
155,040.00
1,350.00
7,300.00
3,800,000.00
482,500.00
65,000.00
856,725.00
223,436.00
226,360.00
1,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

JUMLAH
( Rp. )
6=45
20.66
137.71
5,886.72
2,310.10
6,482.03
48,289.50
9,158.00
772.00
2,502.50
2,570.18
402.18
565.90
1,000.00
80,097.47
80,095.00

: Lapisan ATB tb. 4 cm


: TON

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Jam
Jam
M3

0.06130
0.42930
0.70280

1 Mandor
2 Pekerja
3 Agregat Kasar

file name:137689976.xls.ms_office

HARGA SATUAN
( Rp. )
5
8,571.43
5,714.29
175,200.00

JUMLAH
( Rp. )
6=45
525.43
2,453.14
123,130.56

26

4
5
6
7
8
9
10
11
12
13

Agregat Halus
Filler
Aspal Curah
Asphalt Mixing Plant
Wheel Loader 10-15 HP
Dump Truck 8-10 m3
Asphalt Finisher
Tandem Roller
P. Tire Roller
Sewa Alat Bantu ( 1 set @ 3 alat )

M3
Kg
Kg
Jam
Jam
Jam
Jam
Jam
Jam
Ls

0.53410
139.20000
157.00000
0.06130
0.04210
0.54290
0.07670
0.04760
0.03560
1.00000

155,040.00
1,350.00
7,300.00
3,800,000.00
482,500.00
65,000.00
856,725.00
223,436.00
226,360.00
1,000.00

HARGA SATUAN PEKERJAAN (M3)


HARGA SATUAN PEKERJAAN (TON)
DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

jam
jam
kg
Lt
jam
jam
jam

0.00300
0.02010
0.62260
0.46500
0.00210
0.00210
0.00200

Mandor
Pekerja Terampil
Aspal Curah
Minyak Tanah
Sewa Aspal Sprayer ( min 4 jam )
Sewa Compresor ( min 5 jam )
Sewa Dump Truck 8 - 10m3 ( min 5 jam )

HARGA SATUAN
( Rp. )
5
8,571.43
5,714.29
7,300.00
7,500.00
25,000.00
75,000.00
65,000.00

HARGA SATUAN PEKERJAAN (M3)


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

jam
jam
kg
Lt
jam
jam
jam

0.00300
0.02010
0.88935
0.25300
0.00301
0.00625
0.00301

Mandor
Pekerja Terampil
Aspal Curah
Minyak Tanah
Sewa Aspal Sptayer ( min 4 jam )
Sewa Compresor ( min 5 jam )
Sewa Dump Truck 8 - 10m3 ( min 5 jam )

HARGA SATUAN
( Rp. )
5
8,571.43
5,714.29
7,300.00
7,500.00
25,000.00
75,000.00
65,000.00

HARGA SATUAN PEKERJAAN (M3)


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran
No.

JUMLAH
( Rp. )
6=45
25.71
114.86
4,544.98
3,487.50
52.50
157.50
130.00
8,513.05
8,510.00

: Lapis Perekat ( Tack Coat )


: Liter

No.

1
2
3
4
5
6
7

1,916,882.52
840,737.95
840,735.00

: Lapis Pengikat ( Prime Coat )


: Liter

No.

1
2
3
4
5
6
7

82,806.86
187,920.00
1,146,100.00
232,940.00
20,313.25
35,288.50
65,710.81
10,635.55
8,058.42
1,000.00

JUMLAH
( Rp. )
6=45
25.71
114.86
6,492.26
1,897.50
75.30
468.75
195.78
9,270.17
9,270.00

: Lapisan AC tb. 4 cm ( manual )


: M2

URAIAN KEGIATAN

file name:137689976.xls.ms_office

SAT.

KOEFFISIEN

HARGA SATUAN

JUMLAH

27

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Jam
Jam
M3
M3
Kg
Kg
Jam
Jam
Jam
Ls

0.00241
0.07230
0.03360
0.01490
4.80150
6.61500
0.00241
0.00160
0.04633
1.00000

1
2
3
4
5
6
7
8
9
10

Mandor
Pekerja
Agregat Kasar
Agregat Halus
Filler
Aspal Curah
Asphalt Mixing Plant
Wheel Loader 10-15 HP
Compactor Vibrator Plat
Sewa Alat Bantu ( 1 set @ 3 alat )

( Rp. )
5
8,571.43
5,714.29
175,200.00
155,040.00
1,350.00
7,300.00
3,800,000.00
482,500.00
20,000.00
1,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Jam
Jam
M3
M3
Kg
Kg
Jam
Jam
Jam
Ls

0.06130
1.28790
0.70280
0.53410
139.20000
157.00000
0.06130
0.04210
0.04633
1.00000

Mandor
Pekerja
Agregat Kasar
Agregat Halus
Filler
Aspal Curah
Asphalt Mixing Plant
Wheel Loader 10-15 HP
Compactor Vibrator Plat
Sewa Alat Bantu ( 1 set @ 3 alat )

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
175,200.00
155,040.00
1,350.00
7,300.00
3,800,000.00
482,500.00
20,000.00
1,000.00

HARGA SATUAN PEKERJAAN (M3)


HARGA SATUAN PEKERJAAN (TON)
DIBULATKAN

Jenis Pekerjaan
Satuan Pembayaran

75,258.81
75,255.00

JUMLAH
( Rp. )
6=45
3,678.00
51,516.00
123,130.56
82,806.86
187,920.00
1,146,100.00
232,940.00
20,313.25
926.67
1,000.00
1,850,331.34
811,548.83
811,545.00

: Scrapping Aspal ( Coal Milling )


: M3

No.

URAIAN KEGIATAN

SAT.

KOEFFISIEN

Jam
Jam
Jam
Jam
Ls

0.12500
0.75000
0.12500
0.23440
1.00

1
2
3
4
5

20.66
413.14
5,886.72
2,310.10
6,482.03
48,289.50
9,158.00
772.00
926.67
1,000.00

: Lapisan ATB tb. 4 cm ( manual )


: TON

No.

1
2
3
4
5
6
7
8
9
10

( Rp. )
6=45

Mandor
Pekerja
Coal Milling Machine
Dump Truck
Sewa Alat Bantu ( 1 set @ 3 alat )

HARGA SATUAN
( Rp. )
5
60,000.00
40,000.00
2,325,000.00
280,000.00
10,000.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

file name:137689976.xls.ms_office

JUMLAH
( Rp. )
6=45
7,500.00
30,000.00
290,625.00
65,632.00
10,000.00
403,757.00
403,755.00

28

file name:137689976.xls.ms_office

29

file name:137689976.xls.ms_office

30

file name:137689976.xls.ms_office

31

file name:137689976.xls.ms_office

32

file name:137689976.xls.ms_office

33

file name:137689976.xls.ms_office

34

file name:137689976.xls.ms_office

35

harusnya butuh = 1 Kg saja ! ( 0,15 )

file name:137689976.xls.ms_office

36

file name:137689976.xls.ms_office

37

file name:137689976.xls.ms_office

38

file name:137689976.xls.ms_office

39

file name:137689976.xls.ms_office

40

file name:137689976.xls.ms_office

41

file name:137689976.xls.ms_office

42

file name:137689976.xls.ms_office

43

UW = Un Woven ( Tidak Anyaman )

file name:137689976.xls.ms_office

44

1,766,666.67
708,333.33
2,475,000.00

file name:137689976.xls.ms_office

45

Baja WF 200X100 = 21,3 kg/m'


319.50

1,428,000.00

file name:137689976.xls.ms_office

46

file name:137689976.xls.ms_office

47

file name:137689976.xls.ms_office

48

file name:137689976.xls.ms_office

49

uk. Plat = 40x60 1 lintasan


16.66666667
33.33

1 PP lebar = 1 m
66.67
2.5 166.67
2.78
utk 1X10 m2 dibutuhkan waktu : +/0.04633

187,500.00
750,000.00
7,265,625.00
250,000.00

16,150.20

file name:137689976.xls.ms_office

50