DURASI DAN PEKERJA

PEKERJAAN

NRML
ORG

VOL

ORG

Pekerja
Tukang
Kepala Tukang
Mandor

14.4
14.4
14.4
14.4

4.3
3.7
0.4
0.1

5
5
5
5

0.9
0.7
0.1

1
1

Tukang Besi
Kepala Tukang

131
131

2.0
0.5

5
5

0.4
0.1

1
1

Pekerja
Tukang
Mandor

31.2
31.2
31.2

21.8
7.8
3.1

5
5
5

4.4
1.6
0.6

4
2
1

Pekerja
Tukang
Kepala Tukang
Mandor

1003
1003
1003
1003

551.6
220.7
22.1
22.1

30
30
30
30

18.4
7.4
0.7
0.7

18
7
1
1

Tukang Besi
Kepala Tukang

8745.3
8745.3

131.2
35.0

20
20

6.6
1.7

7
2

Pekerja
Tukang
Mandor

120.4
120.4
120.4

84.2
30.1
12.0

10
10
10

8.4
3.0
1.2

8
3
1

Pekerja
Tukang
Kepala Tukang
Mandor

37.2
37.2
37.2
37.2

24.6
12.3
1.2
1.2

5
5
5
5

4.9
2.5
0.2
0.2

5
2
1

Tukang Besi
Kepala Tukang

592.6
592.6

8.9
2.4

5
5

1.8
0.5

2
1

Pekerja
Tukang
Mandor

71.6
71.6
71.6

50.1
17.9
7.2

10
10
10

5.0
1.8
0.7

5
2
1

Pekerja
Tukang
Kepala Tukang
Mandor

200
200
200
200

132.0
66.0
6.6
6.6

9
9
9
9

14.7
7.3
0.7
0.7

15
7
1
1

Tukang Besi
Kepala Tukang

36.6
36.6

0.5
0.1

1
1

0.5
0.1

1
1

Pekerja
Tukang
Mandor

2.4
2.4
2.4

1.7
0.6
0.2

1
1
1

1.7
0.6
0.2

2
1

HR

PEKERJAAN LANTAI 1

Pekerjaan Struktur Tie Beam


Pek. Bekesting
0.300
oh
0.260
oh
0.026
oh
0.005
oh
Pek. Pembesian
0.015
oh
0.004
oh
Pek. Beton
0.700
oh
0.250
oh
0.100
oh

Pekerjaan Struktur Plat Lantai


Pek. Bekesting
0.550
oh
0.220
oh
0.022
oh
0.022
oh
pek. Pembesian
0.015
oh
0.004
oh
Pek. Beton
0.700
oh
0.250
oh
0.100
oh

Pekerjaan Struktur Kolom


Pek. Bekesting
0.660
oh
0.330
oh
0.033
oh
0.033
oh
Pek. Pembesian
0.015
oh
0.004
oh
Pek. Beton
0.700
oh
0.250
oh
0.100
oh

Pekerjaan Tangga
Pek. Bekesting
0.660
oh
0.330
oh
0.033
oh
0.033
oh
Pek. Pembesian
0.015
oh
0.004
oh
Pek. Beton
0.700
oh
0.250
oh
0.100
oh

PEKERJAAN

NRML
ORG

VOL

ORG

Pekerja
Tukang
Kepala Tukang
Mandor

40.5
40.5
40.5
40.5

26.7
13.4
1.3
1.3

10
10
10
10

2.7
1.3
0.1
0.1

3
1

Tukang Besi
Kepala Tukang

742
742

11.1
3.0

9
9

1.2
0.3

Pekerja
Tukang
Mandor

65.9
65.9
65.9

46.1
16.5
6.6

10
10
10

4.6
1.6
0.7

5
2
1

Pekerja
Tukang
Kepala Tukang
Mandor

60
60
60
60

39.6
19.8
2.0
2.0

15
15
15
15

2.6
1.3
0.1
0.1

3
1

Tukang Besi
Kepala Tukang

1369.2
1369.2

20.5
5.5

10
10

2.1
0.5

2
1

Pekerja
Tukang
Mandor

111.7
111.7
111.7

78.2
27.9
11.2

20
20
20

3.9
1.4
0.6

4
2
1

2.4
2.4
2.4

1.7
0.6
0.2

5
5
5

0.3
0.1
0.0

1
1

VOL

ORG

61.5
61.5
61.5

43.1
15.4
6.2

20
20
20

2.2
0.8
0.3

2
1

65.9
65.9
65.9

46.1
16.5
6.6

20
20
20

2.3
0.8
0.3

2
1

108.8
108.8
108.8

76.1
27.2
10.9

20
20
20

3.8
1.4
0.5

4
1

1.4
1.4
1.4

1.0
0.4
0.1

5
5
5

0.2
0.1
0.0

1
1

HR

PEKERJAAN LANTAI 2

Pekerjaan Struktur Balok


Pek. Bekesting
0.660
oh
0.330
oh
0.033
oh
0.033
oh
Pek. Pembesian
0.015
oh
0.004
oh
Pek. Beton
0.700
oh
0.250
oh
0.100
oh

Pekerjaan Struktur Plat


Pek. Bekesting
0.660
oh
0.330
oh
0.033
oh
0.033
oh
Pek. Pembesian
0.015
oh
0.004
oh
Pek. Beton
0.700
oh
0.250
oh
0.100
oh

Pekerjaan Tangga
Pek. Beton
0.700
0.250
0.100

oh
oh
oh

Pekerja
Tukang
Mandor

PEKERJAAN

HR

NRML
ORG

PEKERJAAN LANTAI 3

Pekerjaan Struktur Kolom


Pek. Beton
0.700
0.250
0.100

oh
oh
oh

Pekerja
Tukang
Mandor

Pekerjaan Struktur Balok


Pek. Beton
0.700
0.250
0.100

oh
oh
oh

Pekerja
Tukang
Mandor

Pekerjaan Struktur Plat


Pek. Beton
0.700
0.250
0.100

oh
oh
oh

Pekerja
Tukang
Mandor

Pekerjaan Tangga
Pek. Beton
0.700
0.250
0.100

oh
oh
oh

Pekerja
Tukang
Mandor

PEKERJAAN

NRML
ORG

VOL

ORG

65.9
65.9
65.9

46.1
16.5
6.6

30
30
30

1.5
0.5
0.2

1
1

108.8
108.8
108.8

76.1
27.2
10.9

30
30
30

2.5
0.9
0.4

2
1

2.4
2.4
2.4

1.7
0.6
0.2

5
5
5

0.3
0.1
0.0

1
1

VOL

ORG

11.3
11.3
11.3

7.9
2.8
1.1

5
5
5

1.6
0.6
0.2

2
1

11
11
11
11

7.3
3.6
0.4
0.4

5
5
5
5

1.5
0.7
0.1
0.1

1
1

160.4
160.4

2.4
0.6

5
5

0.5
0.1

42.2
42.2
42.2

29.6
10.6
4.2

15
15
15

2.0
0.7
0.3

2
1

31.1
31.1
31.1

21.8
7.8
3.1

15
15
15

1.5
0.5
0.2

2
1

6.5
6.5
6.5
6.5

4.3
2.1
0.2
0.2

5
5
5
5

0.9
0.4
0.0
0.0

1
1

24.8
24.8

0.4
0.1

5
5

0.1
0.0

6.5
6.5
6.5

4.6
1.6
0.7

5
5
5

0.9
0.3
0.1

1
1

HR

PEKERJAAN LANTAI 4

Pekerjaan Struktur Balok


Pek. Beton
0.700
0.250
0.100

oh
oh
oh

Pekerja
Tukang
Mandor

Pekerjaan Struktur Plat


Pek. Beton
0.700
0.250
0.100

oh
oh
oh

Pekerja
Tukang
Mandor

Pekerjaan Tangga
Pek. Beton
0.700
0.250
0.100

oh
oh
oh

Pekerja
Tukang
Mandor

PEKERJAAN
PEKERJAAN LANTAI ATAP
Pekerjaan Struktur Kolom
Pek. Beton
0.700
oh
Pekerja
0.250
oh
Tukang
0.100
oh
Mandor
Pekerjaan Struktur Ring Balok
Pek. Bekesting
0.660
oh
Pekerja
0.330
oh
Tukang
0.033
oh
Kepala Tukang
0.033
oh
Mandor
Pek. Pembesian 1kg
0.015
oh
Tukang Besi
0.004
oh
Kepala Tukang
Pek. Beton
0.700
oh
Pekerja
0.250
oh
Tukang
0.100
oh
Mandor
Pekerjaan Struktur Dak Beton
Pek. Beton
0.700
oh
Pekerja
0.250
oh
Tukang
0.100
oh
Mandor
Pekerjaan Struktur Roof Tank
Pek. Bekesting
0.660
oh
Pekerja
0.330
oh
Tukang
0.033
oh
Kepala Tukang
0.033
oh
Mandor
Pek. Pembesian 1kg
0.015
oh
Tukang Besi
0.004
oh
Kepala Tukang
Pek. Beton
0.700
oh
Pekerja
0.250
oh
Tukang
0.100
oh
Mandor

HR

NRML
ORG

LUAS BANGUNAN
4765.5

PERLANTAI
balok
kolom
480.8
239.9
144.4

1M2
0.3619 JAM/ORANG
plat
jumlah orang yang dibutuhkan dalam penyelesaian 1 jam
174.00152
dlm 1 hari
21.75019
dlm 7 hari
3.10717
jmlh orang btuh
3
93.6

361.0656

214.8876

7.215
676.8

1m2
0.7238
balok
173.6396
21.70495
3.100708
3

197.7273

335.0088

7.2

184.5

197.7273

326.2725

4.2

197.7273

326.2725

7.2

33.9

126.663

93.3

19.62
2734.1

Rp11,913,750,000.00
1.0857
kolom
156.7751
19.59689
2.799555
3

PEKERJAAN

VOL

SATUAN HARGA SATUAN

PEKERJAAN LANTAI 1

Pekerjaan Struktur Tie Beam


Pek. Bekesting
Pek. Pembesian
Pek. Beton

14.4
131
31.2

m2
kg
m3

Pekerjaan Struktur Plat Lantai


Pek. Bekesting
pek. Pembesian
Pek. Beton

1003 m2
8745.3 kg
120.4 m3

Pekerjaan Struktur Kolom


Pek. Bekesting
Pek. Pembesian
Pek. Beton

37.2
592.6
71.6

m2
kg
m3

200
36.6
2.4

m2
kg
m3

Pekerjaan Tangga
Pek. Bekesting
Pek. Pembesian
Pek. Beton
PEKERJAAN

VOL

SATUAN

PEKERJAAN LANTAI 2

Pekerjaan Struktur Balok


Pek. Bekesting
Pek. Pembesian
Pek. Beton

40.5
742
65.9

m2
kg
m3

Pekerjaan Struktur Plat


Pek. Bekesting
Pek. Pembesian
Pek. Beton

60
m2
1369.2 kg
111.7 m3

Pekerjaan Tangga
Pek. Beton

2.4
PEKERJAAN

VOL

m3

SATUAN

PEKERJAAN LANTAI 3

Pekerjaan Struktur Kolom


Pek. Beton

61.5

m3

65.9

m3

108.8

m3

Pekerjaan Struktur Balok


Pek. Beton

Pekerjaan Struktur Plat


Pek. Beton

Pekerjaan Tangga
Pek. Beton

1.4
PEKERJAAN

VOL

m3

SATUAN

PEKERJAAN LANTAI 4

Pekerjaan Struktur Balok


Pek. Beton

65.9

m3

108.8

m3

2.4

m3

Pekerjaan Struktur Plat


Pek. Beton

Pekerjaan Tangga
Pek. Beton
PEKERJAAN

VOL

SATUAN

PEKERJAAN LANTAI ATAP

Pekerjaan Struktur Kolom


Pek. Beton

11.3

m3

11
160.4
42.2

m2
kg
m3

31.1

m3

6.5
24.8
6.5

m2
kg
m3

Pekerjaan Struktur Ring Balok


Pek. Bekesting
Pek. Pembesian 1kg
Pek. Beton

Pekerjaan Struktur Dak Beton


Pek. Beton

Pekerjaan Struktur Roof Tank


Pek. Bekesting
Pek. Pembesian 1kg
Pek. Beton

B7c
B8
B8a
B9
B9a
B9b
B10
CG
BL
BL1a
BL2
BL3

PEKERJAAN S
P1
P2
P3
P4
P5
P6a
P6b
P7a
P7b
P8
P9
P10
P11a
P11b
P12a
P12b
P13
P14
P15
P16
P18c
P18d

PEKERJAAN S
-beton
- Baja Tulan
- Bekisting
PEKERJAAN K
PEKERJAAN S
KML-2
KML-2a
KML-2b
KML-2c

PEKERJAAN S
B1
B1a
B1b
B2
B3
B3a
B4
B4a
B5a
B5b
B6
B7

B7a
B7b
B7c
B8
B8a
B9
B9a
B9b
B10
CG
BL
BL1
BL2
BL3

PEKERJAAN S
P1
P2
P3
P4
P5
P6a
P6b
P7a
P7b
P8
P9
P10
P11a
P11b
P12a
P12b
P13
P14
P15
P16
P18c
P18d

PEKERJAAN S
-beton
- Baja Tulan
- Bekisting

PEKERJAAN S
PEKERJAAN S
B1
B1a

B1b
B2
B3
B3a
B4
B4a
B5a
B5b
B6
B7
B7a
B7b
B7c
B8
B8a
B9
B9a
B9b
B10
CG
BL
BL1
BL2
BL3

PEKERJAAN S
P1
P2
P3
P4
P5
P6a
P6b
P7a
P7b
P8
P9
P10
P11a
P11b
P12a
P12b
P13
P14
P15
P16
P18c
P18d

PEKERJAAN S
-beton
- Baja Tulan
- Bekisting
PEKERJAAN S
PEKERJAAN S
K3
K4
K5

PEKERJAAN S
RB1
RB1a
RB2
RB2A
RB3
RB3a
RB3b
RB4
RB4a
RB5
RB6
RB7
RB8
RB8a
RB8b
RB9
RB10
RB11

PEKERJAAN S
P6a
P6b
P7a
P7b
P9
P10
P17a
P17b
P17c
P18a
P18b
P19
P20
P21
P22
P23

PEKERJAAN R
P18a
P18b
P19
P20

BOQ / VOLUME PEKERJAAN


JUMLAH
JENIS PEKERJAAN
PEKERJAAN STRUKTUR BAWAH
PEKERJAAN PONDASI
- Galian Tanah Fondasi
Pondasi sumuran
P1 ( 64 BUAH )
P2 ( 26 buah )
Total
-tulangan
PEKERJAAN PILECAP/ PC
Pile Cap / PC K350
P1 (64 buah )
- Baja Tulangan
- Bekisting
P2 ( 26 buah)
- Baja Tulangan
- Bekisting
PEKERJAAN TANAH
- Galian Tanah Untuk Pile Cap
- Urugan Pasir di bawah Pile cap,dan Tie beam/Sloof Tebal 10 cm
- Lantai Kerja Tebal 5 cm dibawah pilecap dan tie beam tebal 5 cm
PEKERJAAN STRUKTUR ATAS ( UPPER STRUCTURE )
PEKERJAAN KML LT 1-LT 2
PEKERJAAN STRUKTUR KOLOM
KML-1
KML-1a
KML-1b
KML-1c
K1
VOLUM TOTAL
VOLUM TOT TANPA TULANGAN
PEKERJAAN TIE BEAM
TB- 1
TB- 1a
TB- 1b
TB- 2
TB- 3
TB- 4
TB- 5
TB- 6

TB-7
TB- 8
TB- 9
TB-9a
TB- 10
TB- 11
TB Tangga

PEKERJAAN PLAT LANTAI


- Pelat Tebal 120 mm, dia.8-150/150
- Beton
- Baja Tulangan
- Bekisting
PEKERJAAN STRUKTUR TANGGA
-beton
- Baja Tulangan
- Bekisting
PEKERJAAN STRUKTUR LT. 2
PEKERJAAN STRUKTUR BALOK
B1
B1a
B1b
B2
B3
B3a
B4
B4a
B5a
B5b
B6
B7
B7a
B7b
B7c
B8
B8a
B9
B9a
B9b
B10
CG
BL
BL1a
BL2
BL3

PEKERJAAN STRUKTUR PELAT


P1
P2
P3
P4
P5
P6a
P6b
P7a
P7b
P8
P9
P10
P11a
P11b
P12a
P12b
P13
P14
P15
P16
P18c
P18d

PEKERJAAN STRUKTUR TANGGA


-beton
- Baja Tulangan
- Bekisting
PEKERJAAN KML LT 3 - LT 4
PEKERJAAN STRUKTUR KOLOM
KML-2
KML-2a
KML-2b
KML-2c
PEKERJAAN STRUKTUR BALOK
B1
B1a
B1b
B2
B3
B3a
B4
B4a
B5a
B5b
B6
B7

B7a
B7b
B7c
B8
B8a
B9
B9a
B9b
B10
CG
BL
BL1
BL2
BL3

PEKERJAAN STRUKTUR PLAT


P1
P2
P3
P4
P5
P6a
P6b
P7a
P7b
P8
P9
P10
P11a
P11b
P12a
P12b
P13
P14
P15
P16
P18c
P18d

PEKERJAAN STRUKTUR TANGGA


-beton
- Baja Tulangan
- Bekisting
PEKERJAAN STRUKTUR LT. 4
PEKERJAAN STRUKTUR BALOK
B1
B1a

B1b
B2
B3
B3a
B4
B4a
B5a
B5b
B6
B7
B7a
B7b
B7c
B8
B8a
B9
B9a
B9b
B10
CG
BL
BL1
BL2
BL3

PEKERJAAN STRUKTUR PLAT


P1
P2
P3
P4
P5
P6a
P6b
P7a
P7b
P8
P9
P10
P11a
P11b
P12a
P12b
P13
P14
P15
P16
P18c
P18d

PEKERJAAN STRUKTUR TANGGA


-beton
- Baja Tulangan
- Bekisting
PEKERJAAN STRUKTUUR LT RINGBALK
PEKERJAAN STRUKTUR KOLOM
K3
K4
K5

PEKERJAAN STRUKTUR RING BALK


RB1
RB1a
RB2
RB2A
RB3
RB3a
RB3b
RB4
RB4a
RB5
RB6
RB7
RB8
RB8a
RB8b
RB9
RB10
RB11

PEKERJAAN STRUKTUR PLAT LANTAI DAK


P6a
P6b
P7a
P7b
P9
P10
P17a
P17b
P17c
P18a
P18b
P19
P20
P21
P22
P23

PEKERJAAN ROOF TANK


P18a
P18b
P19
P20

B
(m)

M
(m)

L
(m)

QTY
(BH)

TOTAL

SAT

371.2857 m3
3.14
3.14

0.36
0.25

4
4

1.5

1.5

0.8

64 289.6457 m3
26
81.64 m3
371.2857 m3
14400 kg

64

115.2 m3
11144.05 kg
307.2 m2

1.3

1.3

0.8

26

35.152 m3
3679.112 kg
136.708 m2
150.352 m3
120.03 m3
1002.96 m2

0.3
0.3
0.3
0.3

0.45
0.45
0.45
0.45

6.12
6.12
6.12
6.12

72
8
2
4

59.4864
6.6096
1.6524
3.3048

m3
m3
m3
m3

0.15

0.4

2.4

0.576 m3
71.6292 m3
69.83847 m3

0.2
0.2

0.4
0.4

3.4
3.4

28
2

7.616 m3
0.544 m3

0.2
0.2

0.4
0.4

3.4
3.1

2
8

0.544 m3
1.984 m3

0.2
0.2

0.4
0.4

2.5
3.3

52
4

10.4 m3
1.056 m3

0.2
0.2

0.4
0.4

2.7
1

10
4

2.16 m3
0.32 m3

0.2
0.2
0.2
0.2
0.2
0.2

0.4
0.4
0.4
0.4
0.4
0.4

1
1
2.7
3
2.4
2.9

4
4
10
6
5
4

0.2

0.4

2.8

0.32
0.32
2.16
1.44
0.96
0.928

m3
m3
m3
m3
m3
m3

0.448 m3
31.2 m3
30.42 m3

120.3552 m3
8745.304 kg
1002.96 m2
4.8

14.4 m3

65.7
70.1

3
3

197.1 kg
210.3 m2

0.25
0.25

0.45
0.45

4.39
4.39

28
2

13.8285 m3
0.98775 m3

0.25
0.25

0.45
0.45

4.39
4.24

2
8

0.98775 m3
3.816 m3

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.15
0.15
0.15

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.4
0.4

3.64
3.64
3.15
2.54
4.15
4.15
3.49
1.165
1.865
1.865
1.865
3.665
3.965
3.34
3.34
2.74
2.74
1.52
3.69
3.64
3.25
3.45

28
24
4
2
2
2
4
4
2
2
2
10
4
3
2
2
2
18
14
4
2
4

11.466
9.828
1.4175
0.5715
0.93375
0.93375
1.5705
0.52425
0.419625
0.419625
0.419625
4.123125
1.78425
1.12725
0.7515
0.6165
0.6165
3.078
3.48705
0.9828
0.39
0.828
65.9091

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

64.26137 m3
1.595
1.595
1.595
1.595
1.595
1.845
1.845
1.995
1.995
1.995
1.54
1.4
1.715
1.715
1.715
1.715
2.79
1.065
1.24
0.77
1.395
1.395

0.07
0.07
0.07
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
1.2

4.315
4.315
4.315
3.65
3.69
3.65
3.69
4.135
4.315
4.315
3.69
3.69
1.99
1.99
1.99
1.99
1.85
3.69
3.79
2.1
1.99
1.99

4
4
4
26
52
4
4
2
2
4
22
2
2
2
2
2
2
0
6
25
2
2

4.8
65.7
70.1

3
3
3

1.927079
1.927079
1.927079
18.16386
36.72583
3.23244
3.267864
1.979838
2.066022
4.132044
15.00206
1.23984
0.819084
0.819084
0.819084
0.819084
1.23876
0
3.383712
4.851
0.666252
6.66252
111.6696
108.8779

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

14.4 m3
197.1 kg
210.3 m2

0.3
0.3
0.3
0.3

0.45
0.45
0.45
0.45

6.02
6.02
6.02
5.92

56
0
4
16

45.5112
0
3.2508
12.7872
61.5492

m3
m3
m3
m3
m3

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

4.39
4.39
4.39
4.24
3.64
3.64
3.15
2.54
4.15
4.15
3.49
1.165

28
2
2
8
28
24
4
2
2
2
4
4

13.8285
0.98775
0.98775
3.816
11.466
9.828
1.4175
0.5715
0.93375
0.93375
1.5705
0.52425

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.15
0.15
0.15

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.4
0.4

1.865
1.865
1.865
3.665
3.965
3.34
3.34
2.74
2.74
1.52
3.69
3.64
3.25
3.45

2
2
2
10
4
3
2
2
2
18
14
4
2
4

0.419625
0.419625
0.419625
4.123125
1.78425
1.12725
0.7515
0.6165
0.6165
3.078
3.48705
0.9828
0.39
0.828
65.9091
64.26137

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

1.595
1.595
1.595
1.595
1.595
1.845
1.845
1.995
1.995
1.995
1.54
1.4
1.715
1.715
1.715
1.715
2.79
1.065
1.24
0.77
1.395
1.395

0.07
0.07
0.07
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
1.2

4.315
4.315
4.315
3.65
3.69
3.65
3.69
4.135
4.315
4.315
3.69
3.69
1.99
1.99
1.99
1.99
1.85
3.69
3.79
2.1
1.99
1.99

4
4
4
26
52
4
4
2
2
4
22
2
2
2
2
2
2
1
0
25
2
2

1.927079
1.927079
1.927079
18.16386
36.72583
3.23244
3.267864
1.979838
2.066022
4.132044
15.00206
1.23984
0.819084
0.819084
0.819084
0.819084
1.23876
0.471582
0
4.851
0.666252
6.66252
108.7575
106.0386

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

4.8
65.7
70.1

3
3
3

14.4 m3
197.1 kg
210.3 m2

4.39
4.39

28
2

13.8285 m3
0.98775 m3

0.25
0.25

0.45
0.45

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.15
0.15
0.15

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.4
0.4

4.39
4.24
3.64
3.64
3.15
2.54
4.15
4.15
3.49
1.165
1.865
1.865
1.865
3.665
3.965
3.34
3.34
2.74
2.74
1.52
3.69
3.64
3.25
3.45

2
8
28
24
4
2
2
2
4
4
2
2
2
10
4
3
2
2
2
18
14
4
2
4

0.98775
3.816
11.466
9.828
1.4175
0.5715
0.93375
0.93375
1.5705
0.52425
0.419625
0.419625
0.419625
4.123125
1.78425
1.12725
0.7515
0.6165
0.6165
3.078
3.48705
0.9828
0.39
0.828
65.9091
64.26137

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

1.595
1.595
1.595
1.595
1.595
1.845
1.845
1.995
1.995
1.995
1.54
1.4
1.715
1.715
1.715
1.715
2.79
1.065
1.24
0.77
1.395
1.395

0.07
0.07
0.07
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
1.2

4.315
4.315
4.315
3.65
3.69
3.65
3.69
4.135
4.315
4.315
3.69
3.69
1.99
1.99
1.99
1.99
1.85
3.69
3.79
2.1
1.99
1.99

4
4
4
26
52
4
4
2
2
4
22
2
2
2
2
2
2
1
0
25
2
2

1.927079
1.927079
1.927079
18.16386
36.72583
3.23244
3.267864
1.979838
2.066022
4.132044
15.00206
1.23984
0.819084
0.819084
0.819084
0.819084
1.23876
0.471582
0
4.851
0.666252
6.66252
108.7575

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

106.0386 m3
4.8
65.7
70.1

3
3
3

14.4 m3
197.1 kg
210.3 m2

0.3
0.3
0.3

0.45
0.45
0.45

2.82
1.67
0.8

8
6
64

3.0456
1.3527
6.912
11.3103
11.02754

m3
m3
m3
m3
m3

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.45
0.45

4.39
4.7
4.24
4.24
3.64
3.64
3.64
4
3.965
4.09
3.49
1.8
3.34
2.74
2.59
3.34
5.6
3.49

4
4
4
4
4
26
22
10
4
4
4
4
2
4
4
3
3
4

1.756
1.88
1.696
1.696
1.456
9.464
8.008
3.665
1.586
1.636
1.396
0.72
0.668
1.096
1.036
1.002
1.89
1.5705
42.2215
41.16596

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

1.845
1.945
1.995
1.995
1.995
1.655
1.395
1.395
1.695
1.395
1.395
1.695
0.9
1.595
1.595
1.595

0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12

3.69
3.69
4.315
4.315
4.315
3.69
4.315
4.315
1.845
1.99
1.99
3.69
3.69
2.065
2.065
2.065

4
4
2
2
4
3
2
2
1
2
2
4
4
4
4
4

3.267864
3.444984
2.066022
2.066022
4.132044
2.198502
1.444662
1.444662
0.375273
0.666252
0.666252
3.002184
1.59408
1.580964
1.580964
1.580964

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

31.1117 m3
30.3339 m3
1.395
1.395
1.695
0.9

0.07
0.07
0.15
0.15

2.015
2.015
3.69
3.69

2
2
4
4

0.39353
0.39353
3.75273
1.9926
6.532389
6.369079

m3
m3
m3
m3
m3
m3

NO.
I

JENIS PEKERJAAN
PEKERJAAN PERSIAPAN
Pekerjaan pengukuran dan pasangan bowplank ( bangunan Utama & Septitank )
Pekerjaan pembersihan lokasi/ stripping
Direksikeet uk. 4 x 8 = 32 m2
Papan nama proyek
Pagar pengaman proyek
Air kerja
Listrik kerja
Administrasi Proyek
Soil Investigation (3 Sondir + 2 Boring + Laporan)
Mob & Demob Peralatan Kerja
Gudang Dan Barak Kerja
Jalan Kerja
SUB TOTAL PEKERJAAN PERSIAPAN
PEKERJAAN STRUKTUR BAWAH
PEKERJAAN PONDASI
Pondasi sumuran
- P1
jml :
64 bh,
64 nos
- P2
jml :
26 bh,
26 nos
Total
90 nos
- Panjang Sumuran
Pemboran sumuran
- Kedalaman sumuran
- Mob/ demob Pengeboran
SUB TOTAL PEKERJAAN PONDASI
PEKERJAAN PILECAP/ PC
Pile Cap / PC
- P1
K-350,
Jml :
64 bh,
96.74 kg/m3
- Beton
- Baja Tulangan
- Bekisting
- P2
K-350,
Jml :
26 bh,
154.33
kg/m3
- Beton
- Baja Tulangan
- Bekisting
SUB TOTAL PEKERJAAN PILECAP
PEKERJAAN TANAH
- Galian Tanah Untuk Pile Cap
- Urugan Pasir di bawah Pile cap,dan Tie beam/Sloof Tebal 10 cm
- Lantai Kerja Tebal 5 cm dibawah pilecap dan tie beam tebal 5 cm
SUB TOTAL PEKERJAAN TANAH
PEKERJAAN STRUKTUR ATAS ( UPPER STRUCTURE )
PEKERJAAN STRUKTUR LT.DASAR
1 PEKERJAAN STRUKTUR KOLOM
KML-1
KML-1a
K1

1
2
3
4
5
6
7
8
9
10
11
12
A.
A.1.

A.2.

A.3

B.
B.1

2
3

B.2
1

K1b
K1c
PEKERJAAN TIE BEAM
S1
PEKERJAAN PLAT LANTAI
Pelat Tebal 120 mm, dia.8-150/150 k 350
72.66 kg/m3
- Beton
- Baja Tulangan
- Bekisting
PEKERJAAN STRUKTUR TANGGA
T1
T2
SUB TOTAL PEKERJAAN STRUKTUR LT. DASAR
PEKERJAAN STRUKTUR LT. 2
PEKERJAAN STRUKTUR BALOK
B-1
B-1a
B-1b
B-2
B-3
B-3a
B-4
B-4a
B-5a
B-5b
B-6
B-7
B-7a
B-7b
B-7c
B-8
B-8a
B-9
B-9a
B-9b
B-10
CG
BL
BL1
BL2
BL3
BL1b
PEKERJAAN STRUKTUR PELAT
P1
P2
P3
P4
P5
P6a
P6b

P7a
P7b
P8
P9
P10
P11a
P11b
P12a
P12b
P13
P15
P16
P18c
P18d
3 PEKERJAAN STRUKTUR TANGGA
T1
T2
SUB TOTAL PEKERJAAN STRUKTUR LT. 2
B.3
PEKERJAAN STRUKTUR LT. 3
1 PEKERJAAN STRUKTUR KOLOM
KML-2
KML-2a
KML-2b
KML-2c
2 PEKERJAAN STRUKTUR BALOK
B-1
B-1a
B-1b
B-2
B-3
B-3a
B-4
B-4a
B-5a
B-5b
B-6
B-7
B-7a
B-7b
B-7c
B-8
B-8a
B-9
B-9a
B-9b
B-10
CG
BL
BL1
BL1b

CG1
BL4
3 PEKERJAAN STRUKTUR PELAT
P1
P2
P3
P4
P5
P6a
P6b
P7a
P7b
P8
P9
P10
P11a
P11b
P12a
P12b
P13
P14
P16
P18c
P18d
4 PEKERJAAN STRUKTUR TANGGA
T1
T2
SUB TOTAL PEKERJAAN STRUKTUR LT. 3
B.4
PEKERJAAN STRUKTUR LT. 4
1 PEKERJAAN STRUKTUR BALOK
B-1
B-1a
B-1b
B-2
B-3
B-3a
B-4
B-4a
B-5a
B-5b
B-6
B-7
B-7a
B-7b
B-7c
B-8
B-8a
B-9
B-9a
B-9b

VI

B-10
CG
BL
BL1
BL1b
CG1
BL4
2 PEKERJAAN STRUKTUR PELAT
P1
P2
P3
P4
P5
P6a
P6b
P7a
P7b
P8
P9
P10
P11a
P11b
P12a
P12b
P13
P14
P16
P18c
P18d
SUB TOTAL PEKERJAAN STRUKTUR LT. 4
PEKERJAAN STRUKTUR LT. RINGBALK
1 PEKERJAAN STRUKTUR KOLOM
KML-3
KML-4
KML-5
2 PEKERJAAN STRUKTUR BALOK
RB-1
RB-1a
RB-2
RB-2a
RB-3
RB-3a
RB-3b
RB-4
RB-4a
RB-5
RB-6
RB-7
RB-8
RB-8a

RB-8b
RB-9
RB-10
RB-11
RB GC
3 PEKERJAAN STRUKTUR PELAT
DAK BETON
P6a
P6b
P7a
P7b
P8
P10
P17a
P17b
P17c
P18a
P18b
P19
P20
P21
P22
P23
DAK ROOFTANK
P18a
P18b
P19
P20
SUB TOTAL PEKERJAAN STRUKTUR LT. RINGBALK
A
PEKERJAAN PASANGAN DAN PLESTERAN
A.1
LANTAI DASAR
1 Dinding Batako adukan 1 PC : 3 PS pada kamar mandi umum+ruang entrance
1a Dinding Bata adukan 1 PC : 3 PS pada kamar mandi umum+ruang entrance
2 Dinding Bata adukan 1 PC : 4 PC Rg. Serbaguna, Musholla, r. Panel, R Pengelola dan tangga
3 Plester + aci adukan 1 PC : 3 PS t. 1,5 cm (eksterior & interior)
4 Plester + aci adukan 1 PC : 4 PS t. 1,5 cm pada Ruanga pengelola, mushola, keamanan) (eksterior dan interior)
5 Lapisan dinding keramik 20 x 20 cm di KM umum dan unit difable
6 Pasang keramik 20 x 20 cm pada lantai kamar mandi KM/WC umum dan unit difable
7 Pasang keramik 30 x 30 cm pada lantai R mushola, keamanan, Pengelola dan hall dan selasar
8 Pasang keramik tangga 20 x 20 cm
9 Pasang Kloset jongkok KM/WC Umum dan toilet rg. Jaga
10 Pasang Sepnozing 10/20
11 Kolom praktis
12 Peninggian lantai h = 20 cm pada kloset jongkok.
13 Waterproofing KM/WC umum dan toilet rg. Penjaga
14 Pekerjaan Paving Blok
15 Kolom Praktis uk. 10x10 cm dinding
16 Balok Praktis uk. 10x10 cm kusen
17 Screed 1 : 3 + aci Lantai Ramp difable entrance, rg. Pompa dan genset
18 Perapihan Kolom

19
20
21
22
23
24
25
26
27
28a
28b
28c
28
29
A.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
A.3
1
2
3

Perapihan Balok
Kitchen zink ex lokal lengkap aksesori dan kran di rg. Penjaga
Pasang Kran dia. 1/2 " T. Wudhu dan KM umum dan unit difable
Pasang Floor Drain
Meja dapur uk. 1.5 x 0.60 x 1 m dari beton (+ keramik)
Screed 1 : 3 + aci t = 3cm Lantai di Rg. Panel & Genset, Rg. Pompa, parkir motor, rg. Komersial,

Waterproofing ( non toxic) di lantai dan dinding ruang GWT


Floor Hardener di area Rg. Pompa genset, Ramp. Parkir motor
Beton Kanopi
Saluran u-30
Bak Kontrol
Beton Rabat pada selasar, ramp dan entrance
Pasang Kran shower di toilet umum
Pasang shower tembok
LANTAI 2
Dinding Bata adukan 1 PC : 3 PS pada toilet umum
Dinding Bata adukan 1 PC : 4 PC pada dinding hunian
Dinding Bata adukan 1 PC : 4 PC pada selasar dan tangga
Plester + aci adukan 1 PC : 3 PS t. 1,5 cm (km. mandi) luar + dalam
Plester + aci adukan 1 PC : 4 PS t. 1,5 cm pada hunian luar + dalam
Plester + aci adukan 1 PC : 4 PS t. 1,5 cm pada selasar (luar+dalam)
Lapisan dinding keramik 20 x 20 cm di kamar mandi
Pasang keramik 30 x 30 cm pada selasar + balkon
Pasang keramik 20 x 20 cm pada lantai kamar mandi + Janitor
Lantai screed t=3 cm Ruang jemur
Kloset jongkok
Kitchen zink ex lokal lengkap dg aksesoris
Pasang keramik tangga 20 x 20 cm
Pasang Keramik lantai 30x30 cm hunian
Stair nozing keramik 10x20 cm tangga utama
Waterproofing kamar mandi dan r. cuci ( coating )
Peninggian lantai pada kloset jongkok.
Meja dapur uk. 1.5 x 0.60 x 1 m dari beton (+ keramik)
Kolom praktis
Peninggian lantai pada bagian bawah meja beton
Kolom Praktis Dinding dan kusen
Pasang Kran shower di toilet umum
Pasang Kran dia. 1/2 " area janitor + area komunal
Pasang Floor Drain
Perapihan Kolom
Perapihan Balok
Pasang shower tembok
Beton balkon (plat + balok)
Pasangan bata balkon
Plester + aci adukan 1 PC : 3 PS t. 1,5 cm (km. mandi) luar + dalam
Jalusi di ruang jemur
LANTAI 3
Dinding Bata adukan 1 PC : 3 PS pada toilet umum
Dinding Bata adukan 1 PC : 4 PC pada dinding hunian
Dinding Bata adukan 1 PC : 4 PC pada selasar dan tangga

4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
28
29
30
31
32
A.4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Plester + aci adukan 1 PC : 3 PS t. 1,5 cm (km. mandi) luar + dalam


Plester + aci adukan 1 PC : 4 PS t. 1,5 cm pada hunian luar + dalam
Plester + aci adukan 1 PC : 4 PS t. 1,5 cm pada selasar (luar+dalam)
Lapisan dinding keramik 20 x 20 cm di kamar mandi
Pasang keramik 30 x 30 cm pada selasar + balkon
Pasang keramik 20 x 20 cm pada lantai kamar mandi + Janitor
Lantai screed t=3 cm Ruang jemur
Kloset jongkok
Kitchen zink ex lokal lengkap dg aksesoris
Pasang keramik tangga 20 x 20 cm
Pasang Keramik lantai 30x30 cm hunian
Stair nozing keramik 10x20 cm tangga utama
Waterproofing kamar mandi dan r. cuci ( coating )
Peninggian lantai pada kloset jongkok.
Meja dapur uk. 1.5 x 0.60 x 1 m dari beton (+ keramik)
Kolom praktis
Peninggian lantai pada bagian bawah meja beton
Kolom Praktis Dinding dan kusen
Pasang Kran shower di toilet umum
Pasang Kran dia. 1/2 " area janitor + area komunal
Pasang Floor Drain
Perapihan Kolom
Perapihan Balok
Pasang shower tembok
Beton balkon (plat + balok)
Pasangan bata balkon
Plester + aci adukan 1 PC : 3 PS t. 1,5 cm (km. mandi) luar + dalam
Jalusi di ruang jemur
LANTAI 4
Dinding Bata adukan 1 PC : 3 PS pada toilet umum
Dinding Bata adukan 1 PC : 4 PC pada dinding hunian
Dinding Bata adukan 1 PC : 4 PC pada selasar dan tangga
Plester + aci adukan 1 PC : 3 PS t. 1,5 cm (km. mandi) luar + dalam
Plester + aci adukan 1 PC : 4 PS t. 1,5 cm pada hunian luar + dalam
Plester + aci adukan 1 PC : 4 PS t. 1,5 cm pada selasar (luar+dalam)
Lapisan dinding keramik 20 x 20 cm di kamar mandi
Pasang keramik 30 x 30 cm pada selasar + balkon
Pasang keramik 20 x 20 cm pada lantai kamar mandi + Janitor
Lantai screed t=3 cm Ruang jemur
Kloset jongkok
Kitchen zink ex lokal lengkap dg aksesoris
Pasang keramik tangga 20 x 20 cm
Pasang Keramik lantai 30x30 cm hunian
Stair nozing keramik 10x20 cm tangga utama
Waterproofing kamar mandi dan r. cuci ( coating )
Peninggian lantai pada kloset jongkok.
Meja dapur uk. 1.5 x 0.60 x 1 m dari beton (+ keramik)
Kolom praktis
Peninggian lantai pada bagian bawah meja beton
Kolom Praktis Dinding dan kusen

22
23
24
25
26
28
29
30
31
32
A.5
1
2
3
4
5
6a
6b
7
B
B.1
1
2
3
4
5
6
7
8
B.2
1
2
4
10
12
13
14
B.3
1
2
4
10
12
13
14
B.4
1
2
4

Pasang Kran shower di toilet umum


Pasang Kran dia. 1/2 " area janitor + area komunal
Pasang Floor Drain
Perapihan Kolom
Perapihan Balok
Pasang shower tembok
Beton balkon (plat + balok)
Pasangan bata balkon
Plester + aci adukan 1 PC : 3 PS t. 1,5 cm (km. mandi) luar + dalam
Jalusi di ruang jemur
LANTAI ROOFTANK
Dinding Bata adukan 1 PC : 4 PS
Plester + aci adukan 1 PC : 4 PS t. 1,5 cm
Lantai screed t=3 cm
Waterproofing coating
Kolom Praktis
Dinding pedestal lt.rooftank 1 PC : 4 PS tinggi 60 cm
Plester + aci adukan 1 PC : 4 PS t. 1,5 cm
Tangga monyet
SUB TOTAL PEKERJAAN PASANGAN DAN PLESTERAN
PEKERJAAN PINTU DAN JENDELA
LANTAI DASAR
Pintu Type P1
Pintu Type P2
Pintu Type P3
Pintu Type P4
Pintu Type P6 (PS1)
GG(GRILL GRENSET)
Jendela Type J1 + accessories
Bovenlicht BV1
LANTAI 2
Pintu Type P1
Pintu Type P2
Pintu Type P4
Jendela Type J1 + accessories
Bovenlicht BV1
Pintu Type P3
Pintu Type P5
LANTAI 3
Pintu Type P1
Pintu Type P2
Pintu Type P4
Jendela Type J1 + accessories
Bovenlicht BV1
Pintu Type P3
Pintu Type P5
LANTAI 4
Pintu Type P1
Pintu Type P2
Pintu Type P4

10
12
13
14
C
C.1
1
2
3
4
C.2
1
2
3
C.3
1
2
3
C.4
1
2
3
C.5
3
D
D.1
1
2
3
D.2
1
2
3
D.3
1
2
3
D.4
1
2
3
D.5
1
3
E

Jendela Type J1 + accessories


Bovenlicht BV1
Pintu Type P3
Pintu Type P5
SUB TOTAL PEKERJAAN PINTU DAN JENDELA
PEKERJAAN ACCESSORIES & RAILING
LANTAI DASAR
Railling tangga utama GIP 2" + accessories
Railing tangga darurat GIP 2" + accessories
Railing ramp Difable Pipa GIP 2" + accessories
Hand railing Toilet Difable GIP dia. 2" + accessories
LANTAI 2
Railling tangga utama GIP 2" + accessories
Railing tangga darurat GIP 2" + accessories
Hand railing selasar GIP 2" + accessories
LANTAI 3
Railling tangga utama GIP 2" + accessories
Railing tangga darurat GIP 2" + accessories
Hand railing selasar GIP 2" + accessories
LANTAI 4
Railling tangga utama GIP 2" + accessories
Railing tangga darurat GIP 2" + accessories
Hand railing selasar GIP 2" + accessories
LANTAI DAK ATAP BETON
Tangga Service Vertikal Manhole + Tutup
SUB TOTAL ACCESORIS DAN RAILING
PEKERJAAN PENGECATAN
LANTAI DASAR
Cat dinding (Luar dan Dalam)
Cat plafond expose (perapihan)
Cat Kolom dan Balok Struktur (ekspose)
LANTAI 2
Cat dinding (Luar dan Dalam)
Cat plafond expose (perapihan)
Cat Kolom dan Balok Struktur (ekspose)
LANTAI 3
Cat dinding (Luar dan Dalam)
Cat plafond expose (perapihan)
Cat Kolom dan Balok Struktur (ekspose)
LANTAI 4
Cat dinding (Luar dan Dalam)
Cat plafond expose (perapihan)
Cat Kolom dan Balok Struktur (ekspose)
LANTAI ROOFTANK
Cat dinding (Luar dan Dalam)
Cat Kolom dan Balok Struktur (ekspose)
SUB TOTAL PEKERJAAN PENGECATAN
PEKERJAAN ATAP, CANOPY & PLAFOND
- Pek. Plafond Unit hunian ( Lt. 4) + rangka Hollow 4x4 cm dan selasar (Lt. 4)

Pekerjaan Atap Utama & Canopy Entrance

1
2
3
4
5
6
IV.1
B
1

Kuda - Kuda Baja Ringan bentuk limasan


Atap genteng Beton
Nok genteng beton
Calsiplank
Rangka polycarbonat ( pipa bulat )
Polycarbonat
SUB TOTAL PEKERJAAN ATAP, CANOPY & PLAFON
PEKERJAAN INSTALASI ELEKTRIKAL
PEKERJAAN PANEL
PEKERJAAN PUTR,MDF, INTERLOCK
Pengadaan dan pemasangan PUTR , dengan komponen panel, sbb :
MCCB 4P, 120 A 36kA
: 2 bh
MCCB 3P,100A 36 A
: 1 bh
MCCB 3P, 63 A 36 KA
: 6 bh
MCB 1P, 6 A 4KA
: 18 bh
Ampere 0-150/5 A
: 3 bh
C T 150/5
: 3 bh
Volmeter 0-400 Volt
: 1 bh
Volt Selector
: 1 bh
Fuse
: 3 bh
Pilot lamp
: 3 bh
Bus bar
: 1 Lot
BC 50
: 1 Lot
Box Panel
: 1 Unit/lihat gambar
P-LANTAI.1
Pengadaan dan pemasangan P-LT/1,
dengan komponen panel, sbb :
MCB 3P, 50 A
: 1 bh
MCB 1P, 6 A
: 26 bh
Fuse 2 A
: 3 bh
Indicator Lamp
: 3 bh
Rel MCB 3P
: 1 lot
Cu Bar 5 x 50 A
: 1 lot
Accessories & Termination
: 1 lot
Box Panel
: 1 unit
P-LANTAI.2
Pengadaan dan pemasangan P-LT/2,
dengan komponen panel, sbb :
MCB 3P, 50 A
: 1 bh
MCB 1P, 6 A
: 26 bh
Fuse 2 A
: 3 bh
Indicator Lamp
: 3 bh
Rel MCB 3P
: 1 lot
Cu Bar 5 x 50 A
: 1 lot
Accessories & Termination
: 1 lot
Box Panel
: 1 unit
P-LANTAI.3
Pengadaan dan pemasangan P-LT/3,
dengan komponen panel, sbb :
MCB 3P, 50 A
: 1 bh

10

11

12
13
C

MCB 1P, 6 A
: 26 bh
Fuse 2 A
: 3 bh
Indicator Lamp
: 3 bh
Rel MCB 3P
: 1 lot
Cu Bar 5 x 50 A
: 1 lot
Accessories & Termination
: 1 lot
Box Panel
: 1 unit
P-LANTAI.4
Pengadaan dan pemasangan P-LT/4, dengan komponen panel, sbb :
MCB 3P, 50 A
: 1 bh
MCB 1P, 6 A
: 26 bh
Fuse 2 A
: 3 bh
Indicator Lamp
: 3 bh
Rel MCB 3P
: 1 lot
Cu Bar 5 x 50 A
: 1 lot
Accessories & Termination
: 1 lot
Box Panel
: 1 unit
P-AIR BERSIH
Pengadaan dan pemasangan P-AIR BERSIH , dengan komponen panel WLC sbb :
MCB 3P, 32 A,10 KA
: 1 bh
MCB 3P, 16 A, 6 KA
: 3 bh
WLC 61F G-AP 220 Volt
: 1 lot
DOL ( Direct On Line )
: 3 lot
Radar diantaki air atas
: 1 ot
Fuse 2 A
: 3 bh
Indicator Lamp
: 3 bh
Rel MCB 3P
: 1 lot
Cu Bar 5 x 32 A
: 1 lot
Accessories & Termination
: 1 lot
Box Panel
: 1 unit
Pengadaan dan pemasangan P-UNIT ( HANGER) , dengan komponen panel, sbb :
LANTAI-1
MCB 1P, 6 A
: 1 bh
Box Hanger
: 1 bh
LANTAI-2
MCB 1P, 6 A
: 1 bh
Box Hanger
: 1 bh
LANTAI-3
MCB 1P, 6 :A1 bh
Box Hanger: 1 bh
LANTAI-4
MCB 1P, 6 A
: 1 bh
Box Hanger
: 1 bh
Material Bantu
Testing & Commissioning
Sub Total Pekerjaan Panel Distribusi Daya
PEKERJAAN INSTALASI KABEL FEEDER
NYY 4 x 95 mm2 + E-NYA 50 mm2 Dari KWH-Meter ke P-PLN
NYY 4 x 95 mm2 + E-NYA 50 mm2 Dari P-PLN ke PUTR
Kabel Distribusi Daya dari PUTR :

NYM 4 x 6 mm2 + E-NYA 6 mm2 ke P-Air Bersih


NYM 4 x 6 mm2 + E-NYA 6 mm2 ke P-Kebakaran
NYM 3 x 2,5 mm2 ke P-Unit/1
NYM 3 x 2,5 mm2 ke P-Unit/2
NYM 3 x 2,5 mm2 ke P-Unit/3
NYM 3 x 2,5 mm2 ke P-Unit/4
NYM 3 x 2,5 mm2 ke P-Unit/5
NYM 3 x 2,5 mm2 ke P-Unit/6
NYM 3 x 2,5 mm2 ke P-Unit/7
NYM 3 x 2,5 mm2 ke P-Unit/8
NYM 3 x 2,5 mm2 ke P-Unit/9
NYM 3 x 2,5 mm2 ke P-Unit/10
NYM 3 x 2,5 mm2 ke P-Unit/11
NYM 3 x 2,5 mm2 ke P-Unit/12
NYM 3 x 2,5 mm2 ke P-Unit/13
NYM 3 x 2,5 mm2 ke P-Unit/14
NYM 3 x 2,5 mm2 ke P-Unit/15
NYM 3 x 2,5 mm2 ke P-Unit/16
NYM 3 x 2,5 mm2 ke P-Unit/17
NYM 3 x 2,5 mm2 ke P-Unit/18
NYM 3 x 2,5 mm2 ke P-Unit/19
NYM 3 x 2,5 mm2 ke P-Unit/20
NYM 3 x 2,5 mm2 ke P-Unit/21
NYM 4 x 16 mm2 + E-NYA 10 mm2 ke P-LT/2
NYM 4 x 16 mm2 + E-NYA 10 mm2 ke P-LT/3
NYM 4 x 16 mm2 + E-NYA 10 mm2 ke P-LT/4
Kabel Distribusi Daya dari P-LT/2 ke
NYM 3 x 2,5 mm2 ke P-Unit/1
NYM 3 x 2,5 mm2 ke P-Unit/2
NYM 3 x 2,5 mm2 ke P-Unit/3
NYM 3 x 2,5 mm2 ke P-Unit/4
NYM 3 x 2,5 mm2 ke P-Unit/5
NYM 3 x 2,5 mm2 ke P-Unit/6
NYM 3 x 2,5 mm2 ke P-Unit/7
NYM 3 x 2,5 mm2 ke P-Unit/8
NYM 3 x 2,5 mm2 ke P-Unit/9
NYM 3 x 2,5 mm2 ke P-Unit/10
NYM 3 x 2,5 mm2 ke P-Unit/11
NYM 3 x 2,5 mm2 ke P-Unit/12
NYM 3 x 2,5 mm2 ke P-Unit/13
NYM 3 x 2,5 mm2 ke P-Unit/14
NYM 3 x 2,5 mm2 ke P-Unit/15
NYM 3 x 2,5 mm2 ke P-Unit/16
NYM 3 x 2,5 mm2 ke P-Unit/17
NYM 3 x 2,5 mm2 ke P-Unit/18
NYM 3 x 2,5 mm2 ke P-Unit/19
NYM 3 x 2,5 mm2 ke P-Unit/20
NYM 3 x 2,5 mm2 ke P-Unit/21
NYM 3 x 2,5 mm2 ke P-Unit/22
NYM 3 x 2,5 mm2 ke P-Unit/23

NYM 3 x 2,5 mm2 ke P-Unit/24


NYM 3 x 2,5 mm2 ke P-Unit/25
Kabel Distribusi Daya dari P-LT/3 ke
NYM 3 x 2,5 mm2 ke P-Unit/1
NYM 3 x 2,5 mm2 ke P-Unit/2
NYM 3 x 2,5 mm2 ke P-Unit/3
NYM 3 x 2,5 mm2 ke P-Unit/4
NYM 3 x 2,5 mm2 ke P-Unit/5
NYM 3 x 2,5 mm2 ke P-Unit/6
NYM 3 x 2,5 mm2 ke P-Unit/7
NYM 3 x 2,5 mm2 ke P-Unit/8
NYM 3 x 2,5 mm2 ke P-Unit/9
NYM 3 x 2,5 mm2 ke P-Unit/10
NYM 3 x 2,5 mm2 ke P-Unit/11
NYM 3 x 2,5 mm2 ke P-Unit/12
NYM 3 x 2,5 mm2 ke P-Unit/13
NYM 3 x 2,5 mm2 ke P-Unit/14
NYM 3 x 2,5 mm2 ke P-Unit/15
NYM 3 x 2,5 mm2 ke P-Unit/16
NYM 3 x 2,5 mm2 ke P-Unit/17
NYM 3 x 2,5 mm2 ke P-Unit/18
NYM 3 x 2,5 mm2 ke P-Unit/19
NYM 3 x 2,5 mm2 ke P-Unit/20
NYM 3 x 2,5 mm2 ke P-Unit/21
NYM 3 x 2,5 mm2 ke P-Unit/22
NYM 3 x 2,5 mm2 ke P-Unit/23
NYM 3 x 2,5 mm2 ke P-Unit/24
NYM 3 x 2,5 mm2 ke P-Unit/25
Kabel Distribusi Daya dari P-LT/4 ke
NYM 3 x 2,5 mm2 ke P-Unit/1
NYM 3 x 2,5 mm2 ke P-Unit/2
NYM 3 x 2,5 mm2 ke P-Unit/3
NYM 3 x 2,5 mm2 ke P-Unit/4
NYM 3 x 2,5 mm2 ke P-Unit/5
NYM 3 x 2,5 mm2 ke P-Unit/6
NYM 3 x 2,5 mm2 ke P-Unit/7
NYM 3 x 2,5 mm2 ke P-Unit/8
NYM 3 x 2,5 mm2 ke P-Unit/9
NYM 3 x 2,5 mm2 ke P-Unit/10
NYM 3 x 2,5 mm2 ke P-Unit/11
NYM 3 x 2,5 mm2 ke P-Unit/12
NYM 3 x 2,5 mm2 ke P-Unit/13
NYM 3 x 2,5 mm2 ke P-Unit/14
NYM 3 x 2,5 mm2 ke P-Unit/15
NYM 3 x 2,5 mm2 ke P-Unit/16
NYM 3 x 2,5 mm2 ke P-Unit/17
NYM 3 x 2,5 mm2 ke P-Unit/18
NYM 3 x 2,5 mm2 ke P-Unit/19
NYM 3 x 2,5 mm2 ke P-Unit/20
NYM 3 x 2,5 mm2 ke P-Unit/21

D
1

NYM 3 x 2,5 mm2 ke P-Unit/22


NYM 3 x 2,5 mm2 ke P-Unit/23
NYM 3 x 2,5 mm2 ke P-Unit/24
NYM 3 x 2,5 mm2 ke P-Unit/25
Kabel Distribusi Daya dari P-AIR BERSIH
NYY 4 x 2,5 mm2 ke LP-1
NYY 4 x 2,5 mm2 ke LP-2
NYY 4 x 4 mm2 ke DWP
Material Bantu
Testing & Commissioning
Material Bantu
Testing & Commissioning
Sub Total Pekerjaan Instalasi Kabel Feeder
PEKERJAAN KABEL LADDER
Pengadaan dan Pemasangan Kabel Ladder lengkap dengan semua fitting, aksesoris, berikut
Lantai-1
Kabel ladder W200 x H100
Fitting-Fitting :
Tee W200 x W200 x W200 x H100
Elbow W200 x W200 x H100
Material bantu ( mur, baut, hanger rod, supporting, dll )
Lantai-2
Kabel ladder W200 x H100
Fitting-Fitting :
Elbow W200 x W200 x H100
Tee W200 x W200 x W200 x H100
Material bantu ( mur, baut, hanger rod, supporting, dll )
Lantai-3
Kabel ladder W200 x H100
Fitting-Fitting :
Elbow W200 x W200 x H100
Tee W200 x W200 x W200 x H100
Material bantu ( mur, baut, hanger rod, supporting, dll )
Lantai-4
Kabel ladder W200 x H100
Fitting-Fitting :
Elbow W200 x W200 x H100
Tee W200 x W200 x W200 x H100
Material bantu ( mur, baut, hanger rod, supporting, dll )
Sub Total Pekerjaan Kabel Ladder
PEKERJAAN ARMATUR LAMPU, SAKLAR & STOP KONTAK
Site Plan
Lampu taman SL-26 Watt, c/w tiang G
Lantai-1
TL 1 x 36 W, TL Balk Type
TL 1 x 18 W, TL Balk Type
Lampu baret isi TL Bulat-32 watt
Lampu Pijar 25 Watt
Stop Kontak 1P, 220 Volt, 13A, Wall Type
Saklar 1 gang

Saklar 2 gang
Lantai-2
Lampu Pijar 25 Watt
Lampu baret isi TL Bulat-32 watt
Stop Kontak 1P, 220 Volt, 13A, Wall Type
Saklar 1 gang
Saklar 2 gang
Saklar 3 gang
Lantai-3
Lampu Pijar 25 Watt
Lampu baret isi TL Bulat-32 watt
Stop Kontak 1P, 220 Volt, 13A, Wall Type
Saklar 1 gang
Saklar 2 gang
Saklar 3 gang
Lantai-4
Lampu Pijar 25 Watt
Lampu baret isi TL Bulat-32 watt
Stop Kontak 1P, 220 Volt, 13A, Wall Type
Saklar 1 gang
Saklar 2 gang
Saklar 3 gang
Material Bantu
Testing & Commissioning
Sub Total Pekerjaan Lampu, Saklar & SSO
F PEKERJAAN INSTALASI FINAL
Lantai Basement
NYFGBY 3 x 2,5 mm2 untuk Lampu luar
Lantai-1
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
Lantai-2
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
Lantai-3
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
Lantai-4
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
Material Bantu
Testing & Commissioning
Sub Total Pekerjaan Instalasi Final
G PEKERJAAN SISTEM PENTANAHAN
Pentanahan (Grounding) Netral Sistem & Pentanahan Body
Item SBB:
Grounding Box 40x40x40 cm
Grounding Rod GIP 1' ( untuk R lebih kecil dari 3 ohm )
Connector Test Box
Termination R.Supporting Material

Kabel BC 50 mm2
Material Bantu
Testing & Commissioning
Sub Total Pekerjaan Sistem Pentanahan
H PEKERJAAN PENANGKAL PETIR
Spitzen (Copper Rod) Height 1,2 meter
Grounding Box 40x40x40 cm
Grounding Rod GIP 1' ( untuk R lebih kecil dari 3 ohm )
Connector Test Box
Termination R.Supporting Material
Kabel BC 50 mm2
Material Bantu
Testing & Commissioning
Sub Total Pekerjaan Penangkal Petir
TOTAL PEKERJAAN ELEKTRIKAL
IV.3
IV.3.1
A
1

PEKERJAAN MEKANIKAL
PEKERJAAN INSTALASI PLAMBING
INSTALASI AIR BERSIH
PERALATAN UTAMA
Pengadaan dan pemasangan unit
b Lift Pump
Kapasitas
: 275 l/menit
Head
: 37 mka
Speed
: 1450 rpm
PI
: 5,5 KW/380V/50Hz/3ph
1 duty, 1 standby ( bergantian), lengkap dengan panel control, WLC di Tanki Air Atas dan Accessories

c Tangki Air Atas


kapasitas
: 4m3
Fiber Rainforcement Plastic, lengkap dengan dudukan
dan kaki Tangki Air Atas 1,5 m
INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan GIP Medium Class (Incl. Fitting & All Accessories)
a SITE PLAN & LANTAI 1
GIP dia. 50 (Dari Box Meter PDAM ke GWT)
GIP dia. 50 (Dari Deep Well ke GWT)
GIP dia. 65 ( pipa riser dari GWT s/d shaft lt-1 )
GIP dia. 15
GIP dia. 20
GIP dia. 25
GIP dia. 32
dia. 25
dia. 20
b LANTAI 2
GIP dia. 15
GIP dia. 20
GIP dia. 25
GIP dia. 32
GIP dia. 32 (Riser dari TAA)

B
a

GIP dia. 65 (Riser ke tanki air atas)


dia. 32
LANTAI 3
GIP dia. 15
GIP dia. 20
GIP dia. 25
GIP dia. 32
GIP dia. 32 (Riser dari TAA)
GIP dia. 65 (Riser ke tanki air atas)
dia. 32
dia. 25
LANTAI 4
GIP dia. 15
GIP dia. 20
GIP dia. 25
GIP dia. 32
GIP dia. 32 (Riser dari TAA)
GIP dia. 65 (Riser ke tanki air atas)
dia. 32
LANTAI ATAP & TANGKI AIR ATAS
GIP dia. 125 ( pipa header )
GIP dia. 80
GIP dia. 65
GIP dia. 50
GIP dia. 40
GIP dia. 32
dia. 40
dia. 50
dia. 65
dia. 80
TOTAL A. INSTALASI AIR BERSIH
INSTALASI AIR KOTOR & AIR BEKAS
Pipa PVC Kelas AW(Incl. Fitting & Accessories)
SITE PLAN & LANTAI 1
dia. 100
dia. 80
dia. 50
dia. 100 ( riser )
dia. 80 ( riser )
Floor Drain (FD)
dia. 50
Clean Out (CO) / Clean Eye (CE)
CO, dia. 100
CO, dia. 80
CO, dia. 50
LANTAI 2
dia. 100
dia. 80
dia. 50
dia. 100 ( riser )

C
1

dia. 80 ( riser )
Floor Drain (FD)
dia. 50
Clean Out (CO) / Clean Eye (CE)
CO, dia. 100
CO, dia. 80
LANTAI 3
dia. 100
dia. 80
dia. 50
dia. 100 ( riser )
dia. 80 ( riser )
Floor Drain (FD)
dia. 50
Clean Out (CO) / Clean Eye (CE)
CO, dia. 100
CO, dia. 80
LANTAI 4
dia. 100
dia. 80
dia. 50
dia. 100 ( riser )
dia. 80 ( riser )
Floor Drain (FD)
dia. 50
Clean Out (CO) / Clean Eye (CE)
CO, dia. 100
CO, dia. 80
TOTAL B. INSTALASI AIR KOTOR & AIR BEKAS
INSTALASI AIR HUJAN
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
SITE PLAN & LANTAI 1
dia. 100
dia. 80
dia. 80 ( Pipa Riser )
dia. 50 ( Pipa Riser perporated )
dia. 50 ( Pipa perporated )
LANTAI 2
dia. 80 ( Pipa Riser )
dia. 50 ( Pipa Riser perporated )
dia. 50 ( Pipa perporated )
LANTAI 3
dia. 80 ( Pipa Riser )
dia. 50 ( Pipa Riser perporated )
dia. 50 ( Pipa perporated )
LANTAI 4
dia. 80 ( Pipa Riser )
dia. 50 ( Pipa Riser perporated )
dia. 50 ( Pipa perporated )
LANTAI ATAP

D
1

E
F
IV3.2
B
1

Roof Drain, Cast Iron


dia. 100
TOTAL C. INSTALASI AIR HUJAN
INSTALASI VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
LANTAI 1
Dia. 50 ( Pipa Riser )
Dia. 50
Dia. 32
LANTAI 2
Dia. 50 ( pipa riser )
Dia. 50
Dia. 32
LANTAI 3
Dia. 50 ( pipa riser )
Dia. 50
Dia. 32
LANTAI 4
Dia. 50 ( pipa riser )
Dia. 50
Dia. 32
LANTAI 5
Dia. 50 ( pipa riser )
Dia. 50
Dia. 32
LANTAI ATAP
Dia. 65 ( pipa riser )
Vent cup Dia. 65
TOTAL D. INSTALASI VENT
MATERIAL BANTU
TESTING COMMISSIONING
TOTAL IV 3.1. INSTALASI PLAMBING
PEKERJAAN PEMADAM KEBAKARAN
INSTALASI PEMIPAAN HYDRANT
SITE PLAN & LANTAI 1
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
dia. 150 mm (Pipa Tegak Hydrant+Sprinkler)
dia. 150 mm
dia. 100 mm
Out Hydrant Box
Siamese Connection (SMC)
Hydrant Pillar (HP)
Fire Extiunguisher Tabung Cat Oven sesuai SPEK & Skedul :
Type DCP Class 2,3 - 2,5 kg Seamless, c/w support
Gate Valve
dia. 100 mm
Check Valve
dia. 100 mm
Pit Valve

ukuran 500 x 500 mm


ukuran 1000 x 500 mm
2 LANTAI 2
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
dia. 150 mm (Pipa Tegak Hydrant+Sprinkler)
dia. 65 mm
Indoor Hydrant Box (IHB) 750x1200x180 lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle dan Accessories

Fire Extiunguisher Tabung Cat Oven sesuai SPEK & Skedul :


Type DCP Class 2,3 - 2,5 kg Seamless, c/w support
3 LANTAI 3
Pemipaan BSP Sch. 40 (Incl.Fitting & All Accessories)
dia. 150 mm (Pipa Tegak Hydrant+Sprinkler)
dia. 65 mm
Indoor Hydrant Box (IHB) 750x1200x180
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extiunguisher Tabung Cat Oven sesuai SPEK & Skedul :
Type DCP Class 2,3 - 2,5 kg Seamless, c/w support
4 LANTAI 4
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
dia. 150 mm (Pipa Tegak Hydrant+Sprinkler)
dia. 65 mm
Indoor Hydrant Box (IHB) 750x1200x180 lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle dan Accessories

2
3
4
5
1
2
3
4
5
6
1

Fire Extiunguisher Tabung Cat Oven sesuai SPEK & Skedul :


Type DCP Class 2,3 - 2,5 kg Seamless, c/w support
TOTAL B. INSTALASI PEMIPAAN HYDRANT
TOTAL IV.3.2 PEKERJAAN PEMADAM KEBAKARAN
PEKERJAAN MEKANIKAL
PEKERJAAN GROUND TANK, RUMAH POMPA
Pekerjaan Tanah, Pasir, Lantai Kerja
Pondasi Cerucuk beton 10 x 10 cm atau 16 x 16 x 16 cm
- Jumlah Pondasi Cerucuk, L=15 m
- Ongkos Pemancangan Pondasi Cerucuk
- Pemotongan Kepala tiang
- Mob/demob alat
Galian ground tank
Urugan Tanah Kembali
Pasir urug t = 10 cm
Lantai Kerja t = 5 cm
Pekerjaan Struktur Beton
Plat beton dasar t = 20 cm
Plat dak beton t = 10 cm
Dinding beton penyekat t = 15 cm
Balok 200 X 400 mm
Kolom 300 x 300 mm
Lisplank beton t = 10 cm
Pekerjaan Arsitektur & Sarana
Pekerjaan dinding batu bata

2
3
4
5
6
7
8
9
10
11
12
13
14

1
2
3
4

8
1
2
3
4
5

Pekerjaan plesteran & acian dinding


Pekerjaan pengecatan dinding & plafond
Pekerjaan cat epoxi ground tank
Pintu besi & pengecatan
Jendela jalusi besi 2.25 m
Waterprofing & screed atap beton
Pipa talang PVC dia 4''
Roof drain
Tutup manhole plat baja & tangga besi
Ramp
Rabat beton
Saluran air hujan 30 cm
Tangga besi
Sub Total Pekerjaan Grountank
a. Pekerjaan pembuatan Septictank
Galian Tanah
Pasir Urug t = 5cm
Lantai Kerja t = 5 cm
Cor plat lantai bawah t = 15 cm
- Beton
- Besi tulangan
- Bekisting
Cor plat atas t = 15 cm
- Beton
- Besi tulangan
- Bekisting
Cor Dinding
- Beton
- Besi tulangan
- Bekisting
Monhole + Tutup
- Beton
- Besi tulangan
- Bekisting
Pipa Vent
b. Pekerjaan pembuatan Resapan Septictank
Galian Tanah
Urugan Tanah
Batu koral (gravel dia. 20 - 50)
Ijuk
Pipa resapan dia. 4"
Sub Total Pekerjaan Septitank

Total Harga

94,685.6

SAT.

BIAYA

VOL.

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,226.69
253,956,306.55
1,639,254.02
51,226.69
51,226.69
51,226.69
51,226.69
51,226.69
51,226.69
51,226.69
3,842,001.61
51,226.69

m'

360.00 Rp

18,441,607.74

m'
unit

360.00 Rp
1.00 Rp

18,441,607.74
51,226.69

m3
kg
m2

115.20 Rp
11,144.05 Rp
307.20 Rp

5,901,314.48
570,872,518.06
15,736,838.60

m3
kg
m2

23.84 Rp
3,679.11 Rp
136.71 Rp

1,221,193.02
188,468,723.13
7,003,098.09

m3
m3
m2

159.75 Rp
129.10 Rp
120.03 Rp

8,183,463.43
6,613,467.89
6,148,739.38

bh
bh
bh

72.00 Rp
8.00 Rp
2.00 Rp

3,688,321.55
409,813.51
102,453.38

Ls
m2
m2
bh
Ls
Ls
Ls
Ls
Ls
Ls
m2
Ls

1.00
4,957.50
32.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
75.00
1.00

bh
bh

4.00 Rp
4.00 Rp

204,906.75
204,906.75

bh

143.00 Rp

7,325,416.41

m3
kg
m2

131.24 Rp
9,536.34 Rp
1,093.68 Rp

6,723,072.52
488,514,918.63
56,025,604.31

bh
bh

2.00 Rp
4.00 Rp

102,453.38
204,906.75

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

28.00
2.00
2.00
8.00
28.00
24.00
4.00
2.00
2.00
2.00
4.00
4.00
2.00
2.00
2.00
10.00
4.00
3.00
2.00
2.00
2.00
18.00
14.00
4.00
2.00
4.00
4.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,434,347.27
102,453.38
102,453.38
409,813.51
1,434,347.27
1,229,440.52
204,906.75
102,453.38
102,453.38
102,453.38
204,906.75
204,906.75
102,453.38
102,453.38
102,453.38
512,266.88
204,906.75
153,680.06
102,453.38
102,453.38
102,453.38
922,080.39
717,173.63
204,906.75
102,453.38
204,906.75
204,906.75

bh
bh
bh
bh
bh
bh
bh

4.00
4.00
4.00
26.00
52.00
4.00
4.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

204,906.75
204,906.75
204,906.75
1,331,893.89
2,663,787.78
204,906.75
204,906.75

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

102,453.38
102,453.38
204,906.75
1,126,987.14
102,453.38
102,453.38
102,453.38
102,453.38
102,453.38
102,453.38
307,360.13
1,280,667.20
102,453.38
102,453.38

2.00 Rp
4.00 Rp

102,453.38
204,906.75

2.00
2.00
4.00
22.00
2.00
2.00
2.00
2.00
2.00
2.00
6.00
25.00
2.00
2.00

bh
bh
bh
bh

54.00
10.00
10.00
12.00

Rp
Rp
Rp
Rp

2,766,241.16
512,266.88
512,266.88
614,720.26

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

28.00
2.00
2.00
8.00
28.00
24.00
4.00
2.00
2.00
2.00
4.00
4.00
2.00
2.00
2.00
10.00
4.00
3.00
2.00
2.00
2.00
18.00
14.00
4.00
4.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,434,347.27
102,453.38
102,453.38
409,813.51
1,434,347.27
1,229,440.52
204,906.75
102,453.38
102,453.38
102,453.38
204,906.75
204,906.75
102,453.38
102,453.38
102,453.38
512,266.88
204,906.75
153,680.06
102,453.38
102,453.38
102,453.38
922,080.39
717,173.63
204,906.75
204,906.75

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

2.00 Rp
1.00 Rp

102,453.38
51,226.69

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

204,906.75
204,906.75
204,906.75
1,331,893.89
2,663,787.78
204,906.75
204,906.75
102,453.38
102,453.38
204,906.75
1,126,987.14
102,453.38
102,453.38
102,453.38
102,453.38
102,453.38
102,453.38
51,226.69
1,280,667.20
102,453.38
102,453.38

2.00 Rp
4.00 Rp

102,453.38
204,906.75

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,434,347.27
102,453.38
102,453.38
409,813.51
1,434,347.27
1,229,440.52
204,906.75
102,453.38
102,453.38
102,453.38
204,906.75
204,906.75
102,453.38
102,453.38
102,453.38
512,266.88
204,906.75
153,680.06
102,453.38
102,453.38

4.00
4.00
4.00
26.00
52.00
4.00
4.00
2.00
2.00
4.00
22.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
25.00
2.00
2.00

28.00
2.00
2.00
8.00
28.00
24.00
4.00
2.00
2.00
2.00
4.00
4.00
2.00
2.00
2.00
10.00
4.00
3.00
2.00
2.00

bh
bh
bh
bh
bh
bh
bh

2.00
18.00
14.00
4.00
4.00
2.00
1.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

102,453.38
922,080.39
717,173.63
204,906.75
204,906.75
102,453.38
51,226.69

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

4.00
4.00
4.00
26.00
52.00
4.00
4.00
2.00
2.00
4.00
22.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
25.00
2.00
2.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

204,906.75
204,906.75
204,906.75
1,331,893.89
2,663,787.78
204,906.75
204,906.75
102,453.38
102,453.38
204,906.75
1,126,987.14
102,453.38
102,453.38
102,453.38
102,453.38
102,453.38
102,453.38
51,226.69
1,280,667.20
102,453.38
102,453.38

bh
bh
bh

8.00 Rp
6.00 Rp
56.00 Rp

409,813.51
307,360.13
2,868,694.54

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

4.00
4.00
4.00
4.00
4.00
26.00
22.00
10.00
4.00
4.00
4.00
4.00
2.00
4.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

204,906.75
204,906.75
204,906.75
204,906.75
204,906.75
1,331,893.89
1,126,987.14
512,266.88
204,906.75
204,906.75
204,906.75
204,906.75
102,453.38
204,906.75

bh
bh
bh
bh
bh

4.00
3.00
3.00
4.00
18.00

Rp
Rp
Rp
Rp
Rp

204,906.75
153,680.06
153,680.06
204,906.75
922,080.39

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

4.00
4.00
2.00
2.00
4.00
3.00
2.00
2.00
1.00
2.00
2.00
4.00
4.00
4.00
4.00
4.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

204,906.75
204,906.75
102,453.38
102,453.38
204,906.75
153,680.06
102,453.38
102,453.38
51,226.69
102,453.38
102,453.38
204,906.75
204,906.75
204,906.75
204,906.75
204,906.75

bh
bh
bh
bh

2.00
2.00
4.00
4.00

Rp
Rp
Rp
Rp

102,453.38
102,453.38
204,906.75
204,906.75

m2
m2
m2
m2
m2
m2
m2
m2
bh
m2
m3
m2
m2
m2
m3
m3
m2
m2

481.68
860.80
963.36
1,721.60
304.80
86.40
978.00
34.43
16.00
103.68
3.68
3.07
143.20
372.06
3.04
3.51
4.80
315.90

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

24,674,871.15
44,095,984.40
49,349,742.31
88,191,968.79
15,613,894.55
4,425,985.86
50,099,701.02
1,763,734.87
819,627.01
5,311,183.03
188,432.25
157,368.39
7,335,661.74
19,059,401.60
155,729.13
179,805.68
245,888.10
16,182,510.79

m2
bh
bh
bh
m3
m2
m2
m2
m3
m2
bh
m2
bh
bh

507.90
2.00
24.00
24.00
0.18
272.40
87.84
112.74
5.51
180.60
8.00
263.83
16.00
16.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

26,018,034.92
102,453.38
1,229,440.52
1,229,440.52
9,220.80
13,954,149.85
4,499,752.29
5,775,296.82
282,156.60
9,251,539.88
409,813.51
13,515,137.14
819,627.01
819,627.01

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
m2
m2
m1
m2
m2
m3
m3
m2
m3
bh
bh
bh
m2
m2
bh
m3
m2
m2
unit

481.68
760.33
117.80
963.36
1,520.66
235.60
304.80
270.38
86.40
55.22
16.00
2.00
34.43
620.00
103.68
87.84
5.04
0.18
3.68
75.60
6.55
24.00
24.00
24.00
262.50
434.53
16.00
2.30
79.20
158.40
5.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

24,674,871.15
38,949,187.81
6,034,503.87
49,349,742.31
77,898,375.62
12,069,007.73
15,613,894.55
13,850,671.94
4,425,985.86
2,828,737.72
819,627.01
102,453.38
1,763,734.87
31,760,546.66
5,311,183.03
4,499,752.29
258,182.51
9,220.80
188,432.25
3,872,737.62
335,534.81
1,229,440.52
1,229,440.52
1,229,440.52
13,447,005.64
22,259,532.81
819,627.01
118,026.29
4,057,153.70
8,114,307.40
256,133.44

481.68 Rp
760.33 Rp
117.80 Rp

24,674,871.15
38,949,187.81
6,034,503.87

m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
bh
bh
m2
m2
m1
m2
m2
m3
m3
m2
m3
bh
bh
bh
m2
m2
bh
m3
m2
m2
unit

963.36
1,520.66
235.60
304.80
270.38
86.40
55.22
16.00
2.00
34.43
620.00
103.68
87.84
5.04
0.18
3.68
75.60
6.55
24.00
24.00
24.00
262.50
434.53
16.00
2.30
79.20
158.40
5.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

49,349,742.31
77,898,375.62
12,069,007.73
15,613,894.55
13,850,671.94
4,425,985.86
2,828,737.72
819,627.01
102,453.38
1,763,734.87
31,760,546.66
5,311,183.03
4,499,752.29
258,182.51
9,220.80
188,432.25
3,872,737.62
335,534.81
1,229,440.52
1,229,440.52
1,229,440.52
13,447,005.64
22,259,532.81
819,627.01
118,026.29
4,057,153.70
8,114,307.40
256,133.44

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
m2
m2
m1
m2
m2
m3
m3
m2
m3

481.68
760.33
128.00
963.36
1,520.66
256.00
304.80
270.38
86.40
55.22
16.00
2.00
34.43
620.00
103.68
87.84
5.04
0.18
3.68
75.60
6.55

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

24,674,871.15
38,949,187.81
6,557,016.08
49,349,742.31
77,898,375.62
13,114,032.17
15,613,894.55
13,850,671.94
4,425,985.86
2,828,737.72
819,627.01
102,453.38
1,763,734.87
31,760,546.66
5,311,183.03
4,499,752.29
258,182.51
9,220.80
188,432.25
3,872,737.62
335,534.81

bh
bh
bh
m2
m2
bh
m3
m2
m2
unit

24.00
24.00
24.00
262.50
434.53
16.00
2.30
79.20
158.40
5.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,229,440.52
1,229,440.52
1,229,440.52
13,447,005.64
22,259,532.81
819,627.01
118,026.29
4,057,153.70
8,114,307.40
256,133.44

m2
m2
m2
m2
m3
m2
m2
ls

36.84
73.68
769.02
769.02
0.12
143.28
143.28
1.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,887,191.19
3,774,382.38
39,394,347.73
39,394,347.73
6,147.20
7,339,759.88
7,339,759.88
51,226.69

bh
bh
bh
bh
bh
bh
bh
bh

23.00
2.00
4.00
2.00
4.00
1.00
22.00
20.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,178,213.83
102,453.38
204,906.75
102,453.38
204,906.75
51,226.69
1,126,987.14
1,024,533.76

bh
bh
bh
bh
bh
bh
bh

24.00
24.00
2.00
25.00
20.00
4.00
4.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,229,440.52
1,229,440.52
102,453.38
1,280,667.20
1,024,533.76
204,906.75
204,906.75

bh
bh
bh
bh
bh
bh
bh

24.00
24.00
2.00
25.00
20.00
4.00
4.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,229,440.52
1,229,440.52
102,453.38
1,280,667.20
1,024,533.76
204,906.75
204,906.75

bh
bh
bh

24.00 Rp
24.00 Rp
2.00 Rp

1,229,440.52
1,229,440.52
102,453.38

bh
bh
bh
bh

25.00
20.00
4.00
4.00

Rp
Rp
Rp
Rp

1,280,667.20
1,024,533.76
204,906.75
204,906.75

m'
m2
m2
m

18.52
13.00
6.00
4.00

Rp
Rp
Rp
Rp

948,718.26
665,946.95
307,360.13
204,906.75

m'
m2
m1

18.52 Rp
13.00 Rp
130.80 Rp

948,718.26
665,946.95
6,700,450.81

m'
m2
m1

18.52 Rp
13.00 Rp
130.80 Rp

948,718.26
665,946.95
6,700,450.81

m'
m2
m1

18.52 Rp
13.00 Rp
130.80 Rp

948,718.26
665,946.95
6,700,450.81

unit

1.00 Rp

51,226.69

m2
m2
m2

1,992.32 Rp
1,424.64 Rp
430.68 Rp

102,060,057.81
72,979,589.02
22,062,310.06

m2
m2
m2

2,402.42 Rp
900.30 Rp
280.17 Rp

123,068,020.17
46,119,387.35
14,351,929.19

m2
m2
m2

2,402.42 Rp
900.30 Rp
280.17 Rp

123,068,020.17
46,119,387.35
14,351,929.19

m2
m2
m2

2,402.42 Rp
900.30 Rp
280.17 Rp

123,068,020.17
46,119,387.35
14,351,929.19

m2
m2

237.60 Rp
142.94 Rp

12,171,461.11
7,322,407.86

m2

809.58 Rp

41,472,102.20

Rp
Rp
Rp
Rp
Rp
Rp

37,497,935.73
37,497,935.73
5,949,979.83
11,700,175.58
16,784,936.64
16,784,936.64

unit

1.00 Rp

51,226.69

unit

1.00 Rp

51,226.69

unit

1.00 Rp

51,226.69

unit

1.00 Rp

51,226.69

m2
m2
m'
m'
m2
m2

732.00
732.00
116.15
228.40
327.66
327.66

unit

1.00 Rp

51,226.69

unit

1.00 Rp

51,226.69

unit

25.00 Rp

1,280,667.20

unit

25.00 Rp

1,280,667.20

unit

25.00 Rp

1,280,667.20

unit

25.00 Rp

1,280,667.20

lot
lot

1.00 Rp
1.00 Rp

51,226.69
51,226.69

m'
m'

50.00 Rp
12.00 Rp

2,561,334.41
614,720.26

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

76.00
76.00
22.00
22.00
30.00
30.00
40.00
40.00
45.00
45.00
31.00
35.00
41.00
45.00
35.00
31.00
26.00
23.00
18.00
18.00
23.00
26.00
31.00
50.00
55.00
60.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,893,228.30
3,893,228.30
1,126,987.14
1,126,987.14
1,536,800.64
1,536,800.64
2,049,067.53
2,049,067.53
2,305,200.97
2,305,200.97
1,588,027.33
1,792,934.09
2,100,294.21
2,305,200.97
1,792,934.09
1,588,027.33
1,331,893.89
1,178,213.83
922,080.39
922,080.39
1,178,213.83
1,331,893.89
1,588,027.33
2,561,334.41
2,817,467.85
3,073,601.29

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

35.00
31.00
26.00
23.00
18.00
18.00
23.00
26.00
31.00
35.00
41.00
45.00
35.00
31.00
26.00
23.00
18.00
18.00
23.00
26.00
31.00
35.00
41.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,792,934.09
1,588,027.33
1,331,893.89
1,178,213.83
922,080.39
922,080.39
1,178,213.83
1,331,893.89
1,588,027.33
1,792,934.09
2,100,294.21
2,305,200.97
1,792,934.09
1,588,027.33
1,331,893.89
1,178,213.83
922,080.39
922,080.39
1,178,213.83
1,331,893.89
1,588,027.33
1,792,934.09
2,100,294.21

m'

45.00 Rp

2,305,200.97

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

35.00
31.00
26.00
23.00
18.00
18.00
23.00
26.00
31.00
35.00
41.00
45.00
35.00
31.00
26.00
23.00
18.00
18.00
23.00
26.00
31.00
35.00
41.00
45.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,792,934.09
1,588,027.33
1,331,893.89
1,178,213.83
922,080.39
922,080.39
1,178,213.83
1,331,893.89
1,588,027.33
1,792,934.09
2,100,294.21
2,305,200.97
1,792,934.09
1,588,027.33
1,331,893.89
1,178,213.83
922,080.39
922,080.39
1,178,213.83
1,331,893.89
1,588,027.33
1,792,934.09
2,100,294.21
2,305,200.97

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

35.00
31.00
26.00
23.00
18.00
18.00
23.00
26.00
31.00
35.00
41.00
45.00
35.00
31.00
26.00
23.00
18.00
18.00
23.00
26.00
31.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,792,934.09
1,588,027.33
1,331,893.89
1,178,213.83
922,080.39
922,080.39
1,178,213.83
1,331,893.89
1,588,027.33
1,792,934.09
2,100,294.21
2,305,200.97
1,792,934.09
1,588,027.33
1,331,893.89
1,178,213.83
922,080.39
922,080.39
1,178,213.83
1,331,893.89
1,588,027.33

m'
m'
m'

35.00 Rp
41.00 Rp
45.00 Rp

1,792,934.09
2,100,294.21
2,305,200.97

m'
m'
m'
lot
lot
lot
lot

10.00
10.00
8.00
1.00
1.00
1.00
1.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

512,266.88
512,266.88
409,813.51
51,226.69
51,226.69
51,226.69
51,226.69

m'

161.20 Rp

8,257,742.13

bh
bh
lot

2.00 Rp
4.00 Rp
1.00 Rp

102,453.38
204,906.75
51,226.69

m'

152.20 Rp

7,796,701.94

bh
bh
lot

4.00 Rp
2.00 Rp
1.00 Rp

204,906.75
102,453.38
51,226.69

m'

147.20 Rp

7,540,568.50

bh
bh
lot

4.00 Rp
2.00 Rp
1.00 Rp

204,906.75
102,453.38
51,226.69

m'

147.20 Rp

7,540,568.50

bh
bh
lot

4.00 Rp
2.00 Rp
1.00 Rp

204,906.75
102,453.38
51,226.69

bh

18.00 Rp

922,080.39

bh
bh
bh
bh
bh
bh

10.00
12.00
25.00
18.00
25.00
14.00

Rp
Rp
Rp
Rp
Rp
Rp

512,266.88
614,720.26
1,280,667.20
922,080.39
1,280,667.20
717,173.63

bh

10.00 Rp

512,266.88

bh
bh
bh
bh
bh
bh

12.00
25.00
100.00
25.00
8.00
8.00

Rp
Rp
Rp
Rp
Rp
Rp

614,720.26
1,280,667.20
5,122,668.82
1,280,667.20
409,813.51
409,813.51

bh
bh
bh
bh
bh
bh

12.00
25.00
100.00
25.00
8.00
8.00

Rp
Rp
Rp
Rp
Rp
Rp

614,720.26
1,280,667.20
5,122,668.82
1,280,667.20
409,813.51
409,813.51

bh
bh
bh
bh
bh
bh
lot
lot

12.00
25.00
100.00
25.00
8.00
8.00
1.00
1.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

614,720.26
1,280,667.20
5,122,668.82
1,280,667.20
409,813.51
409,813.51
51,226.69
51,226.69

ttk

18.00 Rp

922,080.39

ttk
ttk

65.00 Rp
25.00 Rp

3,329,734.73
1,280,667.20

ttk
ttk

37.00 Rp
100.00 Rp

1,895,387.46
5,122,668.82

ttk
ttk

37.00 Rp
100.00 Rp

1,895,387.46
5,122,668.82

ttk
ttk
lot
lot

37.00
100.00
1.00
1.00

Rp
Rp
Rp
Rp

1,895,387.46
5,122,668.82
51,226.69
51,226.69

bh
bh
set
lot

4.00
4.00
4.00
1.00

Rp
Rp
Rp
Rp

204,906.75
204,906.75
204,906.75
51,226.69

30.00 Rp
1.00 Rp
1.00 Rp

1,536,800.64
51,226.69
51,226.69

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

614,720.26
204,906.75
204,906.75
204,906.75
204,906.75
15,572,913.20
51,226.69
51,226.69

bh

2.00 Rp

102,453.38

unit

4.00 Rp

204,906.75

m
lot
lot

bh
bh
bh
set
lot
m
lot
lot

12.00
4.00
4.00
4.00
4.00
304.00
1.00
1.00

m
m
m
m
m
m
m
bh
bh

20.00
12.00
8.00
67.00
11.00
32.00
2.00
3.00
2.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,024,533.76
614,720.26
409,813.51
3,432,188.11
563,493.57
1,639,254.02
102,453.38
153,680.06
102,453.38

m
m
m
m
m

185.00
12.00
40.00
3.00
6.00

Rp
Rp
Rp
Rp
Rp

9,476,937.31
614,720.26
2,049,067.53
153,680.06
307,360.13

m
bh

3.00 Rp
2.00 Rp

153,680.06
102,453.38

m
m
m
m
m
m
bh
bh

185.00
12.00
40.00
3.00
12.00
3.00
2.00
2.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,476,937.31
614,720.26
2,049,067.53
153,680.06
614,720.26
153,680.06
102,453.38
102,453.38

m
m
m
m
m
m
bh

185.00
12.00
40.00
3.00
18.00
3.00
2.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,476,937.31
614,720.26
2,049,067.53
153,680.06
922,080.39
153,680.06
102,453.38

m
m
m
m
m
m
bh
bh
bh
bh

5.00
5.00
56.00
6.00
13.00
35.00
3.00
3.00
3.00
1.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

256,133.44
256,133.44
2,868,694.54
307,360.13
665,946.95
1,792,934.09
153,680.06
153,680.06
153,680.06
51,226.69

m
m
m
m
m

68.00
53.00
25.00
8.00
8.00

Rp
Rp
Rp
Rp
Rp

3,483,414.79
2,715,014.47
1,280,667.20
409,813.51
409,813.51

bh

7.00 Rp

358,586.82

bh
bh
bh

4.00 Rp
3.00 Rp
1.00 Rp

204,906.75
153,680.06
51,226.69

Rp
Rp
Rp
Rp

1,229,440.52
1,639,254.02
4,712,855.31
307,360.13

m
m
m
m

24.00
32.00
92.00
6.00

6.00 Rp

307,360.13

bh

16.00 Rp

819,627.01

bh
bh

2.00 Rp
4.00 Rp

102,453.38
204,906.75

m
m
m
m
m

24.00
32.00
92.00
6.00
6.00

Rp
Rp
Rp
Rp
Rp

1,229,440.52
1,639,254.02
4,712,855.31
307,360.13
307,360.13

bh

16.00 Rp

819,627.01

bh
bh

2.00 Rp
4.00 Rp

102,453.38
204,906.75

m
m
m
m
m

24.00
32.00
92.00
6.00
6.00

Rp
Rp
Rp
Rp
Rp

1,229,440.52
1,639,254.02
4,712,855.31
307,360.13
307,360.13

bh

16.00 Rp

819,627.01

bh
bh

2.00 Rp
4.00 Rp

102,453.38
204,906.75

m
m
m
m
m

120.00
66.00
144.00
12.00
17.00

Rp
Rp
Rp
Rp
Rp

6,147,202.58
3,380,961.42
7,376,643.10
614,720.26
870,853.70

m
m
m

108.00 Rp
9.00 Rp
23.00 Rp

5,532,482.32
461,040.19
1,178,213.83

m
m
m

108.00 Rp
9.00 Rp
23.00 Rp

5,532,482.32
461,040.19
1,178,213.83

m
m
m

108.00 Rp
9.00 Rp
23.00 Rp

5,532,482.32
461,040.19
1,178,213.83

bh

24.00 Rp

1,229,440.52

m
m
m

8.00 Rp
60.00 Rp
49.00 Rp

409,813.51
3,073,601.29
2,510,107.72

m
m
m

6.00 Rp
152.00 Rp
40.00 Rp

307,360.13
7,786,456.60
2,049,067.53

m
m
m

6.00 Rp
152.00 Rp
40.00 Rp

307,360.13
7,786,456.60
2,049,067.53

m
m
m

6.00 Rp
152.00 Rp
40.00 Rp

307,360.13
7,786,456.60
2,049,067.53

m
m
m

6.00 Rp
152.00 Rp
40.00 Rp

307,360.13
7,786,456.60
2,049,067.53

m
bh

6.00 Rp
2.00 Rp

307,360.13
102,453.38

lot
lot

1.00 Rp
1.00 Rp

51,226.69
51,226.69

Rp
Rp
Rp
Rp
Rp
Rp

409,813.51
1,792,934.09
9,323,257.25
204,906.75
51,226.69
204,906.75

bh

2.00 Rp

102,453.38

bh

5.00 Rp

256,133.44

bh

1.00 Rp

51,226.69

m
m
m
set
bh
bh

8.00
35.00
182.00
4.00
1.00
4.00

bh
bh

4.00 Rp
1.00 Rp

204,906.75
51,226.69

m
m
set

3.00 Rp
5.00 Rp
1.00 Rp

153,680.06
256,133.44
51,226.69

bh

2.00 Rp

102,453.38

m
m
set

3.00 Rp
5.00 Rp
1.00 Rp

153,680.06
256,133.44
51,226.69

bh

2.00 Rp

102,453.38

m
m
set

3.00 Rp
5.00 Rp
1.00 Rp

153,680.06
256,133.44
51,226.69

bh

2.00 Rp

102,453.38

m'
m'
nos
ls
m3
m3
m3
m3

270.00
270.00
18.00
1.00
8.10
8.10
4.05
40.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,831,205.80
13,831,205.80
922,080.39
51,226.69
414,936.17
414,936.17
207,468.09
2,074,680.87

m3
m3
m3
m3
m3
m3

8.10
4.05
16.20
3.96
3.35
0.09

Rp
Rp
Rp
Rp
Rp
Rp

414,936.17
207,468.09
829,872.35
202,857.69
171,506.95
4,825.55

m2

81.00 Rp

4,149,361.74

m2
m2
m2
bh
bh
m2
m1
bh
bh
m2
m2
m1
unit

81.00
81.00
70.56
2.00
7.00
87.75
21.00
6.00
2.00
9.00
41.17
42.60
1.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,149,361.74
4,149,361.74
3,614,555.12
102,453.38
358,586.82
4,495,141.89
1,075,760.45
307,360.13
102,453.38
461,040.19
2,109,130.82
2,182,256.92
51,226.69

m3
m3
m3

29.52 Rp
1.20 Rp
24.00 Rp

1,512,211.83
61,472.03
1,229,440.52

m3
kg
m2

1.80 Rp
198.65 Rp
12.00 Rp

92,208.04
10,176,034.17
614,720.26

m3
kg
m2

1.80 Rp
198.65 Rp
12.00 Rp

92,208.04
10,176,034.17
614,720.26

m3
kg
m2

1.48 Rp
164.97 Rp
9.84 Rp

75,610.59
8,450,794.69
504,070.61

m3
kg
m2
bh

0.29
32.93
1.92
3.00

Rp
Rp
Rp
Rp

14,753.29
1,687,079.35
98,355.24
153,680.06

m3
m3
m3
ls
m1

24.00
24.00
7.32
1.00
32.00

Rp
Rp
Rp
Rp
Rp

1,229,440.52
1,229,440.52
374,979.36
51,226.69
1,639,254.02

Rp 4,850,429,500.00

94,685.60

STANDART HARGA SATUAN BARANG


KEBUTUHAN PEMERINTAH KOTAMADYA MALANG

KELOMPOK BAHAN DAN UPAH BANGUNAN


TAHUN ANGGARAN 2009
No.
A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

Jenis Bahan
BAHAN
Pasir Urug
Pasir Pasang
Pasir Cor
Tanah urug
Batu Belah Gunung
Tenslah Pecah 2-3 Cm
Bata Merah
Paving Stone ConBlock
Portland Cement (PC)
Semen Warna
Angker Dia 22
Mur baut 5/8 x1 1/2"
Jarum keras 3/4 "
Besi Beton Ulir
Baja Profil WF
Baja Canal 100 s/d 150 mm
Kawat Beton (bendrat)
Besi Beugel
Buis Beton O 20 Cm
Cat Meni Kayu
Cat Meni Besi
Cat Kayu Merk Emco
Cat Dinding Dalam Merk Decolith
Cat Dinding Luar Mowilek Wheatershield
Plamur Dinding
Plamur Kayu
Kertas Gosok
Kuas
Politur
Teer/Residu/minyak bekisting
Kaca Bening 5 mm
Kaca Rayben 5 mm
Kayu Meranti 5/7 Cm
Kayu Meranti 8/12 Cm
Kayu Papan sgl ukuran (meranti)
Kayu Papan sgl ukuran (kamper)
Kayu Kamper 6/12 Cm

Sat.
m3
m3
m3
m3
m3
m3
bj
m2
kg
kg
bh
bh
bh
kg
kg
kg
kg
kg
bj
kg
kg
kg
kg
kg
kg
kg
lbr
bh
ltr
ltr
m2
m2
m3
m3
m3
m3
m3

Kode
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.

38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86

Asbes Datar 1x1


Triplek (90x210x4) mm
Keramik Dinding 25 x 33
List Keramik cutting Dinding 10 x 33 motif
Keramik Lantai 20 x 20
Keramik Lantai 40/40 ex. Roman
Paku Kayu Ukuran 2"-5"
Paku Kayu Ukuran 1",11/2"
Engsel Jendela ukuran 6 Cm
Hak Angin Kait
Kran Air dia 1/2"
Pipa PVC dia 1/2"- 4 m' maspion
Pipa PVC dia 2"- 4 m' maspion
Pipa PVC dia 3" - 4 m' maspion
Pipa PVC dia 4" - 4 M' maspion
Pipa galvanis 1" medium
Pipa galvanis 3/4" medium
Pipa galvanis 1/2" medium
Stop kontak
Saklar Tunggal
Saklar Ganda
Kunci Tanam
Engsel Pintu 5 "
Lampu TL 1 x 40 Watt
Lampu TL 2 x 40 Watt
Lampu Diding 60 Watt
Lampu SL
Genteng keramik kanmuri
Bubungan Genteng keramik kanmuri
Kabel NYY 4x6 mm2
Kabel NYA 2.5 mm2
Pipa Paralon 5/8"
Fitting Plafond
Klam
Las Doof
T Doos PVC
Box Panel 60x80x20
Box Panel 40x50x20
Pilot Lamp.Telecomunique
MCCB 35 A 3 Phase MG
MCCB 50 A 3 Phase MG
MCB 1 Phase, 4 A + 10 a MG
Fuse + sekering 2 A
Ampere Meter
CT 50/5
Volt Meter
Selector Switch/Volt

lbr
lbr
m2
bh
m2
m2
kg
kg
bj
bj
bj
m'
m'
m'
m'
m'
m'
m'
bj
bj
bj
bh
bj
bj
bj
bj
bj
bj
bj
m'
m'
Ljr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.

87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132

Rel Cooper 1.5 m 4x2.5


Isolator
Rel MCB 1.5 m
Terminal Nol
Terminal Arde
Secum Cable 25 mm
Secum Cable 10 mm
Secum Cable 2.5 mm
Kabel Trey 5x7
Kabel NYAF 2.5 mm
Grounding + Instalasi PMD
Kabel NYY 25 mm
Kabel NYY 4x10 mm
Kabel NYFGbY 4x16 mm
Arister PRD 65R 3P+N MG
Kabel BC 25 mm
Kabel BC 50 mm
Central PABX TSS 308 GE
Telepon Panasonix KX TS 505
Kabel Telepon PVC isi 2
Split Tembaga 3/4 "
Klam Penangkal petir
Bak Kontrol Penagkal Petir
Hollow Profile 40x40x3.2
Hollow Profile 20x40x3.2

Sekrup
Roof Tank 1.6 m3
Kloset duduk Toto Komplit
Wastafel Komplit
Tempat Sabun Kecil TOTO
Floor drain
Kanstin
Profil Gyipsum Board A
Profil Gyipsum Board B
Paku Gybsum board
Papan Gybsum Board
Kusen Almunium
Batu Alam Pipih Panjang
Batu Alam Motif Garis / Abstrak
Bak Cuci Pantry
Water Proofing
Usuk dan Reng Baja Ringan
Besi Plat Strip
Trekstang 12 mm
Ikatan Angin besi 16 mm
Besi Beton Polos

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ljr
m'
Unit
m'
m'
m'
m'
m'
m'
m'
bh
m'
unit
bh
unit
m'
m'
bh
bh
bh
bh
bh
bh
m'
m'
m'
dos
lbr
m'
m2
m2
bh
m2
m2
Kg
kg
Kg
kg

Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.
Sat.

B.

UPAH TENAGA KERJA

1
2
3
4
5
6
7
8
9
10
11
12

Mandor
Kepala Tukang Kayu
Tukang Kayu
Kepala Tukang Batu
Tukang Batu
Kepala Tukang Cat
Tukang Cat
Kepala Tukang Listrik
Tukang Listrik
Kepala Tukang Besi
Tukang Besi
Pembantu Tukang

Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr

NG

MALANG

UNAN
Kode

Harga
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

45,000.00
52,500.00
67,500.00
42,500.00
60,000.00
150,000.00
325.00
55,000.00
1,100.00
1,500.00
37,500.00
7,500.00
75,000.00
7,300.00
8,500.00
7,000.00
12,000.00
6,500.00
32,500.00
12,000.00
12,000.00
35,000.00
12,500.00
47,500.00
4,500.00
5,000.00
1,500.00
10,000.00
22,000.00
5,000.00
51,000.00
65,000.00
1,750,000.00
2,400,000.00
2,400,000.00
7,000,000.00
6,500,000.00

38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,500.00
50,000.00
54,000.00
2,200.00
32,500.00
70,000.00
13,000.00
13,000.00
24,000.00
20,000.00
70,000.00
17,500.00
21,000.00
27,500.00
30,000.00
42,500.00
31,000.00
22,500.00
42,000.00
27,500.00
34,000.00
100,000.00
17,500.00
155,000.00
210,000.00
115,000.00
78,000.00
9,400.00
14,000.00
52,500.00
2,000.00
5,500.00
12,500.00
500.00
500.00
1,000.00
225,000.00
200,000.00
7,500.00
190,000.00
190,000.00
12,500.00
5,000.00
25,000.00
25,000.00
25,000.00
35,000.00

87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132

Rp
25,000.00
Rp
2,500.00
Rp
10,000.00
Rp
15,000.00
Rp
16,000.00
Rp
2,500.00
Rp
2,000.00
Rp
1,250.00
Rp
21,000.00
Rp
2,000.00
Rp
125,000.00
Rp
55,000.00
Rp
21,000.00
Rp
58,000.00
Rp
600,000.00
Rp
20,500.00
Rp
22,000.00
Rp
350,000.00
Rp
245,000.00
Rp
7,500.00
Rp
38,000.00
Rp
2,500.00
Rp
500,000.00
Rp
9,000.00
Rp
8,000.00
Rp
500.00
Rp 2,500,000.00
Rp 1,250,000.00
Rp
650,000.00
Rp
90,000.00
Rp
75,000.00
Rp
8,000.00
Rp
12,000.00
Rp
12,500.00
Rp
14,000.00
Rp
49,000.00
Rp
42,500.00
Rp
125,000.00
Rp
120,000.00
Rp
375,000.00
Rp
47,500.00
Rp
92,500.00
Rp
7,000.00
Rp
6,500.00
Rp
6,500.00
Rp
6,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

55,000.00
47,500.00
42,500.00
47,500.00
42,500.00
47,500.00
42,500.00
47,500.00
42,500.00
47,500.00
42,500.00
27,500.00