Anda di halaman 1dari 2

No

1
2
3
4

Catchment Area

A (m2)

Area Hijau
Area Kolam

13856.00
6075.00
10893.60
389.60

Total

31214.20

Basement/bangunan
Area Jalan

Run off
A * C (m2)
coef.( C )

1.0 13856.00
1.0 10348.92
0.00
24204.92

Koefisien Run Off


total

0.78

Anda mungkin juga menyukai