Anda di halaman 1dari 1

8.

2 Design of Beams

Page No.:

Beam Forces
S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Location /
Size
PB
(0.55 X 0.60m)

PB
(0.45 X 0.60m)
RB-ElectroChlorination Rm
(0.55 x 0.55m)

RB-Pump House
(0.55 x 0.55m)
IB-ElectroChlorination Rm
(0.45 x 0.55m)

Legend:
PB - Plinth Beam
RB - Roof Beam
IB - Intermediate Beam

Beam

L/C

Section

5007
5007
5608
5007
5607
5607
5607
5606
3677
3677
3607
3617
24
24
1308
1308
3687
3687
3784
3784

406
150
406
150
407
195
411
200
406
150
406
158
360
158
359
153
407
187
408
192

0
0
1
0.917
1
1
0
0.667
0
0
0
1
0
0
0.75
0.417
1
1
1
0.333

Axial Force
kN
329.823
183.614
-8.952
183.614
-46.850
-26.816
-38.131
-27.925
40.258
18.573
50.113
32.505
80.257
58.5
34.892
23.54
21.311
8.223
8.911
10.702

Shear-Y
kN
218.812
127.240
83.138
-5.382
-151.246
-80.306
-3.690
0.234
309.298
209.162
-8.889
3.186
249.901
177.724
-0.21
0.175
-230.288
-158.361
14.175
-0.016

Shear-Z
kN
5.094
5.118
0.248
5.118
-0.543
-2.671
0.111
1.030
-0.244
0.079
-0.045
-0.004
0.929
0.608
0.007
0.008
0.985
0.697
-0.097
-0.050

Torsion
kN-m
-2.299
-2.026
-0.165
-2.026
5.936
3.423
4.480
-4.420
-0.341
-0.439
-0.067
0.22
-0.562
-0.393
0.748
0.585
0.475
-1.911
-3.833
-1.563

Moment-Y
kN-m
-8.027
-7.110
0.697
19.114
0.682
-7.557
1.886
0.878
0.135
-0.054
0.007
-0.003
-0.471
-0.307
-0.012
-0.01
0.414
0.290
-0.020
0.020

Moment-Z
kN-m
422.269
214.798
-249.836
-98.695
259.983
108.095
-109.485
-34.973
409.712
257.553
-229.116
-145.356
356.025
258.003
-304.358
-214.29
282.525
178.54
-160.033
-109.271

Notes:
1.) RB at ElectroChlorination Room and Pump House have been similarly designed since
resulting forces are too close.

Remarks
Top Reinf.
Bot. Reinf.
Top Reinf.
Bot. Reinf.
Top Reinf. @
Support
Bot. Reinf. @
Mid-span
Top Reinf. @
Support
Bot. Reinf. @
Mid-span
Top Reinf. @
Support
Bot. Reinf. @
Mid-span

Anda mungkin juga menyukai