Anda di halaman 1dari 3

ANALISA AYAK AGREGAT GABUNGAN

Lubang

Berat Tertahan

Berat Tertahan

Brt. Tertahan Kom.

Brt. Lolos Kom.

No.

Ayakan

(gr)

(%)

(%)

(%)

Ayakan

(mm)

3/4"

1/2"

3/8"

9.52

497

2.38

30

0.59

43

967

200

0.075

PAN

401
43

1013
5

80.85 50.83 2.054 91.33 99.75 98.9 8.669 0.251 1.102 0.433 0.075 0.716

496

1993 1996

No.

30%

65%

Gabungan Agr.
Hls + Med + Ksr

SPESIFIKASI
B.B

19.1

100

100

100

30

65

100.00

100

12.7

100

100

100

30

65

100.00

90

24.9

24.9

100

100

75.1

30

48.82

83.82

65

1329 1.815 0.401 66.58 1.815 0.401 91.48 98.19 99.6 8.517 4.909 29.88 5.536
107 8.669 48.52 5.361 10.48 48.92 96.84 89.52 51.08 3.156 4.476 15.32 2.052

40.32

35

21.85

15

1.23

Jumlah

% Gabungan
5%

41
22

8.669 0.251 1.102


100

100

100

100

100

100

GRAFIK AGREGAT GABUNGAN

1. Fly Ash

500 gr

2. Pasir Mahakam

2000 gr

3. Chipping Besar

2000 gr

Perkiraan Kadar Aspal dengan Konstanta 0.75


PB
=
5.275
5

%
=

Kebutuhan Bahan

1200

gr

Tabel Kebutuhan Bahan


BU

PB (%)

Aspal (gr)

CA

FA

4.0

48

748.8 345.6

II

4.5

54

744.9 343.8

III

60

IV

5.5

66

737.1 340.2

6.0

72

733.2 338.4

300

3705 1710

741

342

FILL
57.6 1200
57.3 1200
57 1200
56.7 1200
56.4 1200
285 6000

% Gabungan

Keterangan:

110
100
90
80
70
60
50
40
30
20
10
0
0.01

0.1
Lubang Ayakan (mm)

SPESIFIKASI
B.A
100
100
100
55
35
9

AGREGAT GABUNGAN

1
Lubang Ayakan (mm)

10

100

BU
I
II
III
IV
V

PB (%)
#REF!
#REF!
#REF!
#REF!
#REF!

Tabel Kebutuhan Bahan


Aspal (gr)
CA
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

FA
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

FILL
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Jumlah
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Tabel Kebutuhan Bahan


BU
PB (%)
Aspal (gr) CA
FA
FILL
Jumlah
I
4.0
48
748.8
345.6
57.6
1200
II
4.5
54
744.9
343.8
57.3
1200
III
5
60
741
342
57
1200
IV
5.5
66
737.1
340.2
56.7
1200
V
6.0
72
733.2
338.4
56.4
1200
300
3705
1710
285
6000

Anda mungkin juga menyukai