CANTIDAD
PESO
TOTAL
Cama
Baja
25 Ton.
16.59
20.83
39.00
23.40
12.70
12.30
13.54
12.00
60.00
9.00
16.00
11.00
4.00
6.00
1.00
1.00
10.00
1.00
3.00
3.00
265.36
229.13
156.00
140.40
12.70
12.30
135.40
12.00
180.00
27.00
16
11
12
6
1
17.00
1.00
11.10
9.00
11.00
14.90
20.52
7.00
10.00
1.00
1.00
4.00
28.00
6.00
EQUIPO
N VIAJES
Cama
Camion
Baja
Plataforma
18 Ton.
19 Ton.
1
10
1
9
3
17.00
111.00
9.00
11.00
59.60
574.56
42.00
10
1
1
Total de viajes
Duracin del viaje IDA (HM)
FRV : Factor de Retornol Vaco
Costo de alquiler de Equipo (S/. / HM)
MOVILIZACIN DE EQUIPO TRANSPORTADO (S/.)
DESMOVILIZACIN DE EQUIPO TRANSPORTADO (S/.)
SEGUROS DE TRANSPORTE
MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO TRANSPORTADO (S/.)
4
28
6
95.00
20.50
1.40
250.39
682,688.34
682,688.34
68,268.83
28
54.00
7.00
20.50
20.50
1.40
1.40
263.94
263.94
409,054.21
53,025.55
409,054.21
53,025.55
40,905.42
5,302.55
2,464,251.65
Origen / Destino
Distancia Real
(Km.)
Lima - Camana
Camana - Dv. Quilca
Dv. Quilca -Quilca
Quilca C.G Obra
TOTAL
839.12
9.10
30.90
47.10
926.22
Velocidad
(Km./h)
50.00
30.00
30.00
20.00
130.00
Tiempo
(Horas)
Ida
16.80
0.30
1.00
2.40
20.50
SemiTrailer
35 Ton.
CANTIDAD
HM (S/.)
Distancia
(Km.)
Velocidad
(Km./h)
HORAS
83
1
43
2
1
1
1
259.60
136.58
156.54
51.27
125.00
239.13
267.46
926.22
926.22
926.22
926.22
926.22
926.22
926.22
45.00
45.00
45.00
70.00
45.00
45.00
45.00
21.00
21.00
21.00
13.00
21.00
21.00
21.00
PARCIAL (S/.)
452,482.80
2,868.18
141,355.62
1,333.02
2,625.00
5,021.73
5,616.66
611,303.01
611,303.01
61,130.30
1,283,736.32
4.00
20.50
1.40
249.87
28,685.08
28,685.08
2,868.51
PRECIO (S/.)
HORAS
1
2
2
4
19.18
14.75
12.83
11.58
240.00
240.00
240.00
240.00
100.00
16.86
HERRAMIENTAS MANUALES
GRUA HIDRAULICA AUTOPROPULSADA 127 HP 18 ton 9 m
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3
GRUPO ELECTROGENO 116 HP 75 KW (***)
SOLDADORA ELECTRICA TRIFASICA 400 A
SUBPARTIDAS
5%
1
1
1
1
28,958.40
239.13
170.08
140.27
10.63
8
480
33.6
332.15
4.26
51.10
PARCIAL (S/.)
MANO DE OBRA
CAPATAZ "A"
OPERARIO
OFICIAL
PEON
4,603.20
7,080.00
6,158.40
11,116.80
MATERIALES
SOLDADURA
1,686.00
EQUIPO
120.00
120.00
120.00
120.00
1,447.92
28,695.60
20,409.60
16,832.40
1,275.36
2,657.20
2,044.80
1,716.96
105,724.24
3.00
317,172.72
PRECIO (S/.)
HORAS
PARCIAL (S/.)
1
2
4
19.18
14.75
11.58
160.00
160.00
160.00
3,068.80
4,720.00
7,411.20
5%
15,200.00
170.08
80.00
13,606.40
332.15
1,328.60
240
16.8
4.26
51.10
1,022.40
858.48
MANO DE OBRA
CAPATAZ "A"
OPERARIO
PEON
EQUIPO
HERRAMIENTAS MANUALES
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3
SUBPARTIDAS
CONCRETO CLASE D(F'C=210KG/CM2)
ACERO DE REFUERZO
ENCOFRADO Y DESENCOFRADO
760.00
32,775.88
4.00
131,103.52
PRECIO (S/.)
HORAS
PARCIAL (S/.)
1
2
4
19.18
14.75
11.58
80.00
80.00
80.00
1,534.40
2,360.00
3,705.60
5%
1
7,600.00
170.08
40.00
380.00
6,803.20
4
240
16.8
332.15
4.26
51.10
MANO DE OBRA
CAPATAZ "A"
OPERARIO
PEON
EQUIPO
HERRAMIENTAS MANUALES
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3
SUBPARTIDAS
CONCRETO CLASE D(F'C=210KG/CM2)
ACERO DE REFUERZO
ENCOFRADO Y DESENCOFRADO
1,328.60
1,022.40
858.48
17,992.68
7.00
125,948.76
PRECIO (S/.)
HORAS
PARCIAL (S/.)
1
2
4
19.18
14.75
11.58
60.00
60.00
60.00
1,150.80
1,770.00
2,779.20
5%
1
1
1
1
1,150.80
239.13
170.08
140.27
10.63
120.00
120.00
120.00
120.00
57.54
28,695.60
20,409.60
16,832.40
1,275.36
4
240
16.80
20
332.15
4.26
51.10
52.65
MANO DE OBRA
CAPATAZ "A"
OPERARIO
PEON
EQUIPO
HERRAMIENTAS MANUALES
GRUA HIDRAULICA AUTOPROPULSADA 127 HP 18 ton 9 m
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3
GRUPO ELECTROGENO 116 HP 75 KW (***)
SOLDADORA ELECTRICA TRIFASICA 400 A
SUBPARTIDAS
CONCRETO CLASE D(F'C=210KG/CM2)
ACERO DE REFUERZO
ENCOFRADO Y DESENCOFRADO
MURO DE LADRILLO KK 18 HUECOS INC TARRAJEO PARA TANQUE DE AGUA
1,328.60
1,022.40
858.48
1,053.00
77,232.98
1.00
77,232.98
2,464,251.65
1,283,736.32
317,172.72
131,103.52
125,948.76
77,232.98
TOTAL (S/.)
4,399,445.96