101 MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS

A.- MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO TRANSPORTADO


PESO
(TON)
UND

CANTIDAD

PESO
TOTAL

Cama
Baja
25 Ton.

CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3


CARGADOR SOBRE LLANTAS 200-250 HP 4-4.1 yd3
CHANCADORA PRIMARIA SECUNDARIA 46 - 70 ton/h (*)
EXCAVADORA SOBRE ORUGA 115-165 HP 0.75-1.4 Y3
LAVADORA DE GUSANO 48" 25 - 150Tn/hr
MINICARGADOR 70 HP
MOTONIVELADORA DE 145-150 HP
PAVIMENTADORA SOBRE ORUGAS 105 HP 10-16'
PLANTA ASFALTO EN CALIENTE 60-115 ton/h
RETROEXCAVADOR SOBRE LLANTAS 58 HP 1 YD3

16.59
20.83
39.00
23.40
12.70
12.30
13.54
12.00
60.00
9.00

16.00
11.00
4.00
6.00
1.00
1.00
10.00
1.00
3.00
3.00

265.36
229.13
156.00
140.40
12.70
12.30
135.40
12.00
180.00
27.00

16
11
12
6
1

ESTRUCTURA DOSIFICADORA DE CONCRETO POR VOLUMEN 40 HP - 50 m3/hr (*)

17.00

1.00

RODILLO LISO VIBRATORIO AUTOPROPULSADO 101-135HP 10-12 ton


RODILLO NEUMATICO AUTOPROPULSADO 135 HP 9.26 ton
RODILLO TANDEM VIBRATORIO AUTOPROPULSADO 111-130HP 9-11 ton
TRACTOR DE ORUGAS DE 140-160 HP
TRACTOR DE ORUGAS DE 190-240 HP
ZARANDA VIBRATORIA 4" X 6" X 14" MOTOR ELECTRICO 15 HP (*)

11.10
9.00
11.00
14.90
20.52
7.00

10.00
1.00
1.00
4.00
28.00
6.00

EQUIPO

N VIAJES
Cama
Camion
Baja
Plataforma
18 Ton.
19 Ton.

1
10
1
9
3

17.00

111.00
9.00
11.00
59.60
574.56
42.00

10
1
1

Total de viajes
Duracin del viaje IDA (HM)
FRV : Factor de Retornol Vaco
Costo de alquiler de Equipo (S/. / HM)
MOVILIZACIN DE EQUIPO TRANSPORTADO (S/.)
DESMOVILIZACIN DE EQUIPO TRANSPORTADO (S/.)
SEGUROS DE TRANSPORTE
MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO TRANSPORTADO (S/.)

4
28
6
95.00
20.50
1.40
250.39
682,688.34
682,688.34
68,268.83

28

54.00
7.00
20.50
20.50
1.40
1.40
263.94
263.94
409,054.21
53,025.55
409,054.21
53,025.55
40,905.42
5,302.55
2,464,251.65

(*) D.S N 010-2006/MTC del 26.03.06

Origen / Destino

Distancia Real
(Km.)

Lima - Camana
Camana - Dv. Quilca
Dv. Quilca -Quilca
Quilca C.G Obra
TOTAL

839.12
9.10
30.90
47.10
926.22

Velocidad
(Km./h)
50.00
30.00
30.00
20.00
130.00

Tiempo
(Horas)
Ida
16.80
0.30
1.00
2.40
20.50

B.- MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO AUTOTRANSPORTADO


EQUIPO AUTOTRANSPORTADO
CAMION VOLQUETE 15 m3
CAMION IMPRIMADOR 210 HP DE 2000 GLN
CAMION CISTERNA 4 X 2 (AGUA) 145 - 165 HP DE 2000 GLN (*****)
CAMIONETA PICK UP 4 X 2 84 HP
CAMION GRUA DE 5 ton
GRUA HIDRAULICA AUTOPROPULSADA 127 HP 18 ton 9 m
CAMION MIXER 8 m3

SemiTrailer
35 Ton.

CANTIDAD

HM (S/.)

Distancia
(Km.)

Velocidad
(Km./h)

HORAS

83
1
43
2
1
1
1

259.60
136.58
156.54
51.27
125.00
239.13
267.46

926.22
926.22
926.22
926.22
926.22
926.22
926.22

45.00
45.00
45.00
70.00
45.00
45.00
45.00

21.00
21.00
21.00
13.00
21.00
21.00
21.00

MOVILIZACIN DE EQUIPO AUTOTRANSPORTADO (S/.)


DESMOVILIZACIN DE EQUIPO AUTOTRANSPORTADO (S/.)
SEGUROS DE TRANSPORTE
MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO AUTOTRANSPORTADO (S/.)

PARCIAL (S/.)
452,482.80
2,868.18
141,355.62
1,333.02
2,625.00
5,021.73
5,616.66
611,303.01
611,303.01
61,130.30
1,283,736.32

4.00
20.50
1.40
249.87
28,685.08
28,685.08
2,868.51

101 MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS


C.- MONTAJE Y DESMONTAJE DE PLANTAS DE ASFALTO
CANTIDAD

PRECIO (S/.)

HORAS

1
2
2
4

19.18
14.75
12.83
11.58

240.00
240.00
240.00
240.00

100.00

16.86

HERRAMIENTAS MANUALES
GRUA HIDRAULICA AUTOPROPULSADA 127 HP 18 ton 9 m
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3
GRUPO ELECTROGENO 116 HP 75 KW (***)
SOLDADORA ELECTRICA TRIFASICA 400 A
SUBPARTIDAS

5%
1
1
1
1

28,958.40
239.13
170.08
140.27
10.63

CONCRETO CLASE D(F'C=210KG/CM2)


ACERO DE REFUERZO
ENCOFRADO Y DESENCOFRADO

8
480
33.6

332.15
4.26
51.10

PARCIAL (S/.)

MANO DE OBRA
CAPATAZ "A"
OPERARIO
OFICIAL
PEON

4,603.20
7,080.00
6,158.40
11,116.80

MATERIALES
SOLDADURA

1,686.00

EQUIPO
120.00
120.00
120.00
120.00

1,447.92
28,695.60
20,409.60
16,832.40
1,275.36
2,657.20
2,044.80
1,716.96

MONTAJE Y DESMONTAJE DE (01) PLANTA DE ASFALTO (S/.)


NRO. DE UBICACIONES DE LAS PLANTAS DE ASFALTO (3)

105,724.24
3.00

MONTAJE Y DESMONTAJE DE PLANTAS DE ASFALTO (S/.)

317,172.72

D.- MONTAJE Y DESMONTAJE DE PLANTAS CHANCADORAS


CANTIDAD

PRECIO (S/.)

HORAS

PARCIAL (S/.)

1
2
4

19.18
14.75
11.58

160.00
160.00
160.00

3,068.80
4,720.00
7,411.20

5%

15,200.00

170.08

80.00

13,606.40

332.15

1,328.60

240
16.8

4.26
51.10

1,022.40
858.48

MANO DE OBRA
CAPATAZ "A"
OPERARIO
PEON
EQUIPO
HERRAMIENTAS MANUALES
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3
SUBPARTIDAS
CONCRETO CLASE D(F'C=210KG/CM2)
ACERO DE REFUERZO
ENCOFRADO Y DESENCOFRADO

760.00

MONTAJE Y DESMONTAJE DE (01) PLANTA CHANCADORA (S/.)


NRO. DE UBICACIONES DE LAS PLANTAS CHANCADORAS (4)

32,775.88
4.00

MONTAJE Y DESMONTAJE DE PLANTAS CHANCADORAS (S/.)

131,103.52

101 MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS


E.- MONTAJE Y DESMONTAJE DE ZARANDAS VIBRATORIAS, LAVADORA DE AGREGADOS
CANTIDAD

PRECIO (S/.)

HORAS

PARCIAL (S/.)

1
2
4

19.18
14.75
11.58

80.00
80.00
80.00

1,534.40
2,360.00
3,705.60

5%
1

7,600.00
170.08

40.00

380.00
6,803.20

4
240
16.8

332.15
4.26
51.10

MANO DE OBRA
CAPATAZ "A"
OPERARIO
PEON
EQUIPO
HERRAMIENTAS MANUALES
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3
SUBPARTIDAS
CONCRETO CLASE D(F'C=210KG/CM2)
ACERO DE REFUERZO
ENCOFRADO Y DESENCOFRADO

1,328.60
1,022.40
858.48

MONTAJE Y DESMONTAJE DE (01) ZARANDA VIBRATORIA (S/.)


NRO. DE UBICACIONES DE LAS ZARANDAS VIBRATORIAS (6) + LAVADORA DE AGREGADOS (1)
MONTAJE Y DESMONTAJE DE ZARANDAS VIBRATORIAS (S/.)

17,992.68
7.00
125,948.76

F.- MONTAJE Y DESMONTAJE DE ESTRUCTURA DOSIFICADORA DE CONCRETO POR VOLUMEN 40 HP - 50 m3/hr


CANTIDAD

PRECIO (S/.)

HORAS

PARCIAL (S/.)

1
2
4

19.18
14.75
11.58

60.00
60.00
60.00

1,150.80
1,770.00
2,779.20

5%
1
1
1
1

1,150.80
239.13
170.08
140.27
10.63

120.00
120.00
120.00
120.00

57.54
28,695.60
20,409.60
16,832.40
1,275.36

4
240
16.80
20

332.15
4.26
51.10
52.65

MANO DE OBRA
CAPATAZ "A"
OPERARIO
PEON
EQUIPO
HERRAMIENTAS MANUALES
GRUA HIDRAULICA AUTOPROPULSADA 127 HP 18 ton 9 m
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3
GRUPO ELECTROGENO 116 HP 75 KW (***)
SOLDADORA ELECTRICA TRIFASICA 400 A
SUBPARTIDAS
CONCRETO CLASE D(F'C=210KG/CM2)
ACERO DE REFUERZO
ENCOFRADO Y DESENCOFRADO
MURO DE LADRILLO KK 18 HUECOS INC TARRAJEO PARA TANQUE DE AGUA

1,328.60
1,022.40
858.48
1,053.00

MONTAJE Y DESMONTAJE DE (01) PLANTA DE ASFALTO (S/.)


NRO. DE UBICACIONES DE ESTRUCTURA DOSIFICADORA DE CONCRETO POR VOLUMEN 40 HP - 50 m3/hr
MONTAJE Y DESMONTAJE DE PLANTA DOSIFICADORA DE CONCRETO (S/.)

77,232.98
1.00
77,232.98

MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS


A.- MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO TRANSPORTADO
B.- MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO AUTOTRANSPORTADO
C.- MONTAJE Y DESMONTAJE DE PLANTAS DE ASFALTO
D.- MONTAJE Y DESMONTAJE DE PLANTAS CHANCADORAS
E.- MONTAJE Y DESMONTAJE DE ZARANDAS VIBRATORIAS, LAVADORA DE AGREGADOS
F.- MONTAJE Y DESMONTAJE DE ESTRUCTURA DOSIFICADORA DE CONCRETO POR VOLUMEN 40 HP - 50 m3/hr

2,464,251.65
1,283,736.32
317,172.72
131,103.52
125,948.76
77,232.98

TOTAL (S/.)

4,399,445.96