Anda di halaman 1dari 2

AS BUILT DRAWING REVISION MAN-HOUR Man-hours Activity per drawing Service Description Piping DCC (Drawing Completion Certificate

Logsheet) Arrange 150 Drawings per DCC Number Fill up ARAMCO DCC Form Edit Title Block (Data Entry) Fill up ARAMCO Excel Form Drawing Verification and CD burning Submission to ARAMCO Drawing Management Team Total Electrical DCC (Drawing Completion Certificate Logsheet) Arrange 150 Drawings per DCC Number Fill up ARAMCO DCC Form Edit Title Block (Data Entry) Fill up ARAMCO Excel Form Drawing Verification and CD burning Submission to ARAMCO Drawing Management Team Total Civil DCC (Drawing Completion Certificate Logsheet) Arrange 150 Drawings per DCC Number Fill up ARAMCO DCC Form Edit Title Block (Data Entry) Fill up ARAMCO Excel Form Drawing Verification and CD burning Submission to ARAMCO Drawing Management Team Total GRAND TOTAL MAN-HOURS GRAND TOTAL MAN-DAYS 0.16 0.16 0.16 0.25 0.16 0.25 0.5 1.64 0.16 0.16 0.16 0.25 0.16 0.25 0.5 1.64 0.16 0.16 0.16 0.25 0.16 0.25 0.5 1.64

No. of Drawings

Total Manhours

12304

20178.56

832

1364.48

905

1484.2 23027 2559

921089.6

Anda mungkin juga menyukai