Anda di halaman 1dari 12

"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL

A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"

OBRA

MONTO CONTRATADO S/.

2,414,706.92

INCL. IGV

ENTIDAD

:MUNICIPALIDAD PROVINCIAL DE TALARA

CONTRATISTA

:SAVIA SA

CONSTRUCTOR

:PROYECTOS DEL NORTE S.A.C.

SUPERVISOR

:ING. LUIS RAMOS TIMANA

RESIDENTE DE OBRA :ING. CRUZ ENRIQUE PEREZ GONZALES


INICIO DE OBRA

13/11/2012

PLAZO CONTRACTUAL :105 DC


TERMINO DE OBRA

2/25/2013

RESUMEN DE VALORIZACION DE OBRA N 05


DEL 05 DE MARZO AL 04 DE ABRIL DEL 2013
ACUMULADO

ACTUAL

ANTERIOR
A

SALDO

679,794.56

659,684.54

20,110.02

679,794.56

2.96%

0.00

1,366,567.24

1,288,421.91

78,145.31

1,366,567.22

5.72%

0.00

TOTAL S/IGV

2,046,361.80

1,948,106.45

98,255.35

2,046,361.80

8.68%

0.00

% DE AVANCE REAL DE OBRA A LA FECHA

95.20%

4.80%

100.00%

0.00%

% DE AVANCE PROGRAMADO OBRA A LA FECHA

100.00%

0.00%

100.00%

0.00%

818,544.72

818,544.72

0.00

818,544.72

0.00%

0.00

0.00

0.00

0.00

0.00

0.00%

0.00

818,544.72

818,544.72

0.00

818,544.72

0.00%

0.00

1,129,561.73

98,255.35

1,227,817.08

1,129,561.73

98,255.35

1,227,817.08

203,321.11

17,685.96

221,007.07

1,332,882.84

115,941.31

1,448,824.15

1,332,882.84

115,941.31

1,448,824.15

AMORTIZACION ADELANTO DIRECTO


AMORTIZACION ADELANTO MATERIALES
TOTAL AMORTIZACIONES

OTORGADO

D VALORIZACION NETA (VN=V-A)


MONTOS A PAGAR AL CONTRATISTA

S/.

EN EFECTIVO (VN)
IGV = VNx18%)
F

AVANCE

RED DE AGUA POTABLE

C AMORTIZACIONES (A)

ACTUAL

MONTOS CONTRACTUALES (V)


RED DE ALCANTARILADO

ACUMULADO

MONTO TOTAL DE VALORIZACION CON IGV

G TOTAL COMPROMISO A SOLICITAR

S/.

P
R
O
D
E
N
O
R
s
a
c

VALORIZACION N 05 RED DE ALCANTARILLADO - DEL 05 DE MARZO AL 04 DE ABRIL DEL 2013


OBRA:

"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"

FORMULA:01 RED DE ALCANTARILLADO


CONTRATISTA: SAVIA S.A
CONSTRUCTOR: PROYECTOS DEL NORTE SAC

SUPERVISOR: ING. LUIS RAMOS TIMANA


RESIDENTE DE OBRA: ING. CRUZ ENRIQUE PEREZ GONZALES
PLAZO: 105 D.C.
Departamento
PIURA

Item

Provincia

TALARA

DistritoTALARA

Descripcin

Unidad

1.00.00
1.01.00
1.02.00
1.03.00
1.04.00
1.05.00
1.06.00

OBRAS PROVISIONALES
CARTEL DE OBRA (2.40X3.60)
UND
DEPOSITO Y ALMACEN
M2
OFICINA Y GUARDIANIA
MES
SEALIZACION, DESVIO DE TRANSITO Y PROTECCION DE OBRA GLB
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS
GLB
AGUA P/CONSTRUCCION
GLB

2.00.00
2.01.00
2.01.01
2.01.02
2.01.03
2.01.04

ALCANTARILLADO
TRABAJOS PRELIMINARES
REPLANTEO DE EXPEDIENTE TECNICO
TRAZO, NIVEL Y REPLANTEO
TRANSVASE DE AGUAS SERVIDAS - BOMBA 4"
SUPERVISION DE EPS GRAU ALCANTARILLADO

Metrado

Precio

Parcial

ACUMULADO ANTERIOR
Monto
%
S/.

Metrado

Metrado

ACTUAL
Monto
S/.

Metrado

ACUMULADO
Monto
S/.

Metrado

SALDO
Monto
S/.

820.45
60.00
1,587.43
3,500.00
6,916.06
5,000.00

28,586.23
820.45
6,000.00
6,349.72
3,500.00
6,916.06
5,000.00

1.00
100.00
4.00
1.00
1.00
1.00

820.45
6,000.00
6,349.72
3,500.00
6,916.06
5,000.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.00
100.00
4.00
1.00
1.00
1.00

820.45
6000.00
6349.72
3500.00
6916.06
5000.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

15,000.00
3.27
26.82
2,500.00

537,909.23
66,554.82
15,000.00
5,330.98
43,723.84
2,500.00

1.00
1,630.27
1,590.92
1.00

15,000.00
5,330.98
42,668.47
2,500.00

100.00%
100.00%
97.59%
100.00%

0.00
0.00
39.35
0.00

0.00
0.00
1,055.37
0.00

0.00%
0.00%
2.41%
0.00%

1.00
1630.27
1630.27
1.00

15000.00
5330.98
43723.84
2500.00

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

2.02.00
2.02.01
2.02.02
2.02.03
2.02.04
2.02.05

MOVIMIENTO DE TIERRAS
73,360.59
EXCAVACION MANUAL T. NORMAL P/TUBO PVC DN = 110mm Hprom.=1.00m
M
1,630.27
A=0.60 m INC.
19.93DESM. TUBERIA
32,491.28
REFINE Y NIVELACION FONDO DE ZANJA P/TUBO DN 110 mm M
1,630.27
5.31
8,656.73
CAMA DE ARENA MANUAL ZANJA -P/ALCANTARILLADO
M
1,630.27
8.20
13,368.21
RELLENO COMPACTADO C/MATERIAL PROPIO DE ZANJA -P/ALCANTARILLADO
M
1,630.27
DN=110mm
10.54
H=1.00m 17,183.05
PVC
ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
141.63
11.73
1,661.32

1,590.92
1,590.92
1,590.92
1,590.92
138.21

31,707.03
8,447.78
13,045.54
16,768.30
1,621.20

97.59%
97.59%
97.59%
97.59%
97.59%

39.35
39.35
39.35
39.35
3.42

784.25
208.95
322.67
414.75
40.12

2.41%
2.41%
2.41%
2.41%
2.41%

1630.27
1630.27
1630.27
1630.27
141.63

32491.28
8656.73
13368.21
17183.05
1661.32

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

2.03.00
2.03.01
2.03.02

SUMINISTRO E INSTALACION DE TUBERIA PVC-ALCANTARILLADO


SUMINISTRO TUBERIA PVC U U.F. NTP ISO 4435 SN-4 DN 110 mm
M
INSTALACION TUBERIA PVC P/DESAGUE DN 110 mm
M

35,539.88
21,519.56
14,020.32

1,590.92
1,590.92

21,000.14
13,681.91

97.59%
97.59%

39.35
39.35

519.42
338.41

2.41%
2.41%

1630.27
1630.27

21519.56
14020.32

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

2.04.00
2.04.01
2.04.02
2.04.03
2.04.04
2.04.05
2.04.06
2.04.07
2.04.08
2.04.09
2.04.10
2.04.11
2.04.12
2.04.13
2.04.14
2.04.15
2.04.16

BUZONES
EMPALME DE TUBERIA PVC Dim = 110mm a BUZON EXISTENTE
UND
11.00
65.87
DADOS DE CONCRETO F'C=140 KG/CM2
UND
216.00
50.25
DOBLE PRUEBA HIDRAULICA EN TUBERIA - ALCANTARILLADO M
1,630.27
6.07
EXCAVACION DE ZANJA PARA BUZONES O CAJAS CONDOMINIALES
M3 HASTA 1.50m
36.82
33.21
ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
45.83
11.73
BUZON TIPICO D=1.20 C/MARCO Y TAPA CONCRETO HASTA H=1.20m
UND DE PROFUNDIDAD
3.00
1,881.86
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.45m
2.00
DE PROFUNDIDAD
1,277.74
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.55m
8.00
DE PROFUNDIDAD
1,287.74
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.65m
4.00
DE PROFUNDIDAD
1,293.74
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.75m
16.00
DE PROFUNDIDAD
1,318.74
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.85m
23.00
DE PROFUNDIDAD
1,328.74
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=0.95m
26.00
DE PROFUNDIDAD
1,338.24
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=1.05m
5.00
DE PROFUNDIDAD
1,361.94
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=1.15m
4.00
DE PROFUNDIDAD
1,366.94
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=1.25m
4.00
DE PROFUNDIDAD
1,371.94
CAJA CONDOMINIAL D=0.60m C/MARCO Y TAPA CONCRETO HASTA
UND H=1.35m
5.00
DE PROFUNDIDAD
1,376.94

158,017.65
724.57
10,854.00
9,895.74
1,222.79
537.59
5,645.58
2,555.48
10,301.92
5,174.96
21,099.84
30,561.02
34,794.24
6,809.70
5,467.76
5,487.76
6,884.70

11.00
212.00
1,590.92
36.82
45.83
3.00
0.00
8.00
4.00
16.00
23.00
26.00
5.00
4.00
4.00
5.00

724.57
10,653.00
9,656.88
1,222.79
537.59
5,645.58
0.00
10,301.92
5,174.96
21,099.84
30,561.02
34,794.24
6,809.70
5,467.76
5,487.76
6,884.70

100.00%
98.15%
97.59%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
4.00
39.35
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
201.00
238.86
0.00
0.00
0.00
2,555.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
1.85%
2.41%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

11.00
216.00
1630.27
36.82
45.83
3.00
2.00
8.00
4.00
16.00
23.00
26.00
5.00
4.00
4.00
5.00

724.57
10854.00
9895.74
1222.79
537.59
5645.58
2555.48
10301.92
5174.96
21099.84
30561.02
34794.24
6809.70
5467.76
5487.76
6884.70

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

UND
M
M
GLB

1.00
100.00
4.00
1.00
1.00
1.00

1.00
1,630.27
1,630.27
1.00

1,630.27
1,630.27

13.20
8.60

VALORIZACION N 05 RED DE ALCANTARILLADO - DEL 05 DE MARZO AL 04 DE ABRIL DEL 2013


OBRA:

"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"

FORMULA:01 RED DE ALCANTARILLADO


CONTRATISTA: SAVIA S.A
CONSTRUCTOR: PROYECTOS DEL NORTE SAC

SUPERVISOR: ING. LUIS RAMOS TIMANA


RESIDENTE DE OBRA: ING. CRUZ ENRIQUE PEREZ GONZALES
PLAZO: 105 D.C.
Departamento
PIURA

Item

Provincia

TALARA

Descripcin

DistritoTALARA

Unidad

Metrado

Precio

Parcial

ACUMULADO ANTERIOR
Monto
%
S/.

Metrado

2.05.00
2.05.01
2.05.02
2.05.03
2.05.04
2.05.05
2.05.06
2.05.07
2.05.08
2.05.09

CONEXIONES DOMICILIARIAS
201,119.01
EXCAVACION TERRENO MANUAL P/CONX. DSG TUBO DIAM 160mm
M INC DESMONTAJE
31.45
DE13.28
TUB. EXISTENTE
417.66
0.00
0.00
0.00%
EXCAVACION TERRENO MANUAL P/CONX. DSG TUBO DIAM 110mm
M INC DESMONTAJE
666.75
DE19.93
TUB. EXISTENTE
13,288.33
651.15
12,977.42
97.66%
REFINE / NIVELACION Y CAMA DE APOYO DE ZANJA P/TUBO DIAM
M = 160-110mm
698.20 e=0.10m2.97
2,073.65
651.15
1,933.92
93.26%
RELLENO Y COMPCT. C/ MATERIAL PROPIO DE ZANJA TUBO DIAM=160-110mm
M
698.20
7,324.12
651.15
6,830.57
93.26%
10.49
ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
69.99
820.98
65.27
765.62
93.26%
11.73
CONEXION DOMICILIARIA CONVENCIONAL EN DESAGUE DN=160
UND
mm PVC U12.00
UF NTP ISO468.99
4435 SN-2 L=3M
5,627.88
PARA RED COLECTORA
0.00
DIAM=200
0.00 mm 0.00%
CONEXION DOMICILIARIA CONDOMINIAL EN DES. DN=110mm UND
PVC U UF NTP
237.00
ISO 4435 SN-4
L=3M P/RAMAL
111,871.11
CONDOMIN
231.00
DIAM =109,038.93
110mm
97.47%
472.03
PRUEBA HIDRAULICA A ZANJA TAPADA
M
698.20
2,995.28
651.15
2,793.43
93.26%
4.29
ADECUACION DE CONEXIONES EXISTENTES EN ACTUAL FUNCIONAMIENTO
A LA NUEVA300.00
RED
UND
189.00
56,700.00
189.00
56,700.00 100.00%

2.06.00
2.06.01
2.06.02
2.06.03
2.06.04
2.06.05
2.06.06
2.06.07
2.06.08
2.06.09

VARIOS
3,317.28
RETIRO Y REPOSICION DE PAVIMEMTO DE ASFALTO
M2
6.67
4.20
28.01
DEMOLICION DE LOSA DE CONCRETO DE E=0.10 m
M2
10.66
4.98
53.09
LOSA DE CONCRETO F'C=175kg/cm2
M2
10.66
61.24
652.82
RETIRO DE ADOQUIN (20 x 10 x 8 cm)
M2
19.42
9.96
193.42
COLOCACION DE ADOQUIN (20 x 10 x 8 cm)
M2
19.42
61.00
1,184.62
REFINE, NIVELACION Y COMPACTACION DE SUB RASANTE PARAM2
PAVIMENTO
36.75
DE ASFALTO10.25
376.69
CONFORMACION DE SUB BASE GRANULAR; e=0.20m PARA PAVIMENTO
M2
DE26.09
ASFALTO Y ADOQUIN
15.61
407.26
CONFORMACION DE BASE GRANULAR; e=0.20m PARA PAVIMENTO
M2 DE ASFALTO,
36.75 CONCRETO
9.64Y ADOQUIN354.27
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
4.65
14.43
67.10
COSTO DIRECTO
566,495.46
GASTOS GENERALES VARIABLES 9.46%
53,590.47
GASTOS GENERALES FIJOS
0.540%
3059.08
UTILIDAD
10.00%
56649.55
SUB TOTAL
679,794.56
I.G.V.
18.00%
122363.02
TOTAL PRESUPUESTO
802,157.58

6.67
10.66
10.66
19.42
19.42
36.75
26.09
36.75
4.65

28.01
53.09
652.82
193.42
1,184.62
376.69
407.26
354.27
67.10
549,737.06
52,005.13
2,968.58
54,973.71
659,684.48
118,743.21
778,427.69

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

97.04%

Metrado

ACTUAL
Monto
S/.

Metrado

ACUMULADO
Monto
S/.

Metrado

SALDO
Monto
S/.

31.45
15.60
47.05
47.05
4.72
12.00
6.00
47.05
0.00

417.66
310.91
139.73
493.55
55.36
5,627.88
2,832.18
201.85
0.00

100.00%
2.34%
6.74%
6.74%
6.74%
100.00%
2.53%
6.74%
0.00%

31.45
666.75
698.20
698.20
69.99
12.00
237.00
698.20
189.00

417.66
13288.33
2073.65
7324.12
820.98
5627.88
111871.11
2995.28
56700.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16,758.40
1,585.34
90.50
1,675.84
20,110.02
3,619.80
23,729.82

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

6.67
10.66
10.66
19.42
19.42
36.75
26.09
36.75
4.65

28.01
53.09
652.82
193.42
1184.62
376.69
407.26
354.27
67.10
566,495.46
53,590.47
3,059.08
56,649.55
679,794.56
122,363.02
802,157.58

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

2.96%

100.00%

0.00%

VALORIZACION N05 DE RED DE AGUA POTABLE - DEL 05 DE MARZO AL 04 DE ABRIL DEL 2013
OBRA:

"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"

FORMULA: 02 RED DE AGUA POTABLE


CONTRATISTA: SAVIA S.A
CONSTRUCTOR: PROYECTOS DEL NORTE SAC

SUPERVISOR: ING. LUIS RAMOS TIMANA


RESIDENTE DE OBRA: ING. CRUZ ENRIQUE PEREZ GONZALES.
PLAZO: 105 D.C.
Departamento
PIURA

Item

Provincia

TALARA

Descripcin

Distrito

TALARA

Unidad

Metrado

Precio

Parcial

3.27
2.49
1.33
1,682.36

ACUMULADO ANTERIOR
Monto
%
S/.

Metrado

Metrado

ACTUAL
Monto
S/.

Metrado

ACUMULADO
Monto
S/.

Metrado

SALDO
Monto
S/.

3.00.00
3.01.00
3.01.01
3.01.02
3.01.03
3.01.04

AGUA POTABLE
TRABAJOS PRELIMINARES
TRAZO, NIVEL Y REPLANTEO
DEMOLICION DE DADOS DE ANCLAJE
DESMONTAJE DE ACCESORIOS EXISTENTE
SUPERVISION DE EPS GRAU AGUA

950,997.31
18,429.75
16,483.81
171.81
91.77
1,682.36

5,040.92
69.00
69.00
1.00

16,483.81
171.81
91.77
1,682.36

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

5040.92
69.00
69.00
1.00

16,483.81
171.81
91.77
1,682.36

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

3.02.00
3.02.01
3.02.02
3.02.03
3.02.04
3.02.05

MOVIMIENTO DE TIERRAS
207,632.09
EXCAVACION C/EQUIPO T. NORMAL P/TUBO PVC DN = 110mm Hprom.=1.00m
M
5,040.92A=0.60 m
15.52
INC. DESM.78,235.08
TUBERIA
REFINE Y NIVELACION FONDO DE ZANJA P/TUBO DN 110 mm. M
5,040.92
5.31
26,767.29
CAMA DE ARENA MANUAL ZANJA P/ AGUA e=0.10 m DN =110 mm
M A= 0.60
5,040.92
m
8.54
43,049.46
RELLENO COMPACTADO C/MATERIAL PROPIO DE ZANJA -P/AGUA
M DN=110mm
5,040.92
H=1.00m 9.58
PVC
48,292.01
ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
962.34
11.73
11,288.25

5,040.92
5,040.92
5,040.92
5,040.92
962.34

78,235.08
26,767.29
43,049.46
48,292.01
11,288.25

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

5040.92
5040.92
5040.92
5040.92
962.34

78,235.08
26,767.29
43,049.46
48,292.01
11,288.25

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

3.03.00
3.03.01.00
3.03.01.01
3.03.01.02
3.03.01.03
3.03.01.04

SUMINISTRO E INSTALACION DE TUBERIA


TUBERIA PDN
SUMINISTRO TUB. PRESION UR PN 7.5 PVC NTP ISO 4422 DN 110Mmm F 2.5
4,580.65
INSTALACION TUBERIA PVC-U P/ AGUA POTABLE DN 110 mm M
4,580.65
SUMINISTRO TUB. PRESION UR PN 7.5 PVC NTP ISO 4422 DN 63 M
mm F 2.5 480.00
INSTALACION TUBERIA PVC-U P/ AGUA POTABLE DN 63 mm M
480.00

17.22
5.03
14.65
3.24

139,963.94
110,506.66
78,878.79
23,040.67
7,032.00
1,555.20

4,580.65
4,580.65
0.00
0.00

78,878.79
23,040.67
0.00
0.00

100.00%
100.00%
0.00%
0.00%

0.00
0.00
480.00
480.00

0.00
0.00
7,032.00
1,555.20

0.00%
0.00%
100.00%
100.00%

4580.65
4580.65
480.00
480.00

78,878.79
23,040.67
7,032.00
1,555.20

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

3.03.02.00 LINEA DE ADUCCION


3.03.02.01 SUMINISTRO TUB. PRESION UR PN 7.5 PVC NTP ISO 4422 DN 200Mmm F 2.5460.27
3.03.02.02 INSTALACION TUBERIA PVC-U P/ AGUA POTABLE DN 200 mm M
460.27

57.39
6.61

29,457.28
26,414.90
3,042.38

430.27
430.27

24,693.20
2,844.08

93.48%
93.48%

30.00
30.00

1,721.70
198.30

6.52%
6.52%

460.27
460.27

26,414.90
3,042.38

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

1,323.81
6,658.40
0.00
432.50
203.24
3,890.52
44,808.66
525.72
430.48
700.96
735.48
1,171.44
0.00
0.00
99.20
0.00
2,111.56
1,454.25
1,454.25
51,120.05
3,985.60

100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
0.00%
100.00%
50.00%
100.00%
90.87%
100.00%

0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
3.00
0.00
4.00
0.00
1.00
0.00
460.27
0.00

0.00
0.00
360.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250.00
375.00
0.00
6,589.96
0.00
1,454.25
0.00
5,136.62
0.00

0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
100.00%
0.00%
50.00%
0.00%
9.13%
0.00%

3.00
35.00
2.00
2.00
1.00
3.00
39.00
3.00
2.00
4.00
3.00
6.00
2.00
3.00
1.00
4.00
4.00
2.00
1.00
5040.92
106.00

1,323.81
6,658.40
360.00
432.50
203.24
3,890.52
44,808.66
525.72
430.48
700.96
735.48
1,171.44
250.00
375.00
99.20
6,589.96
2,111.56
2,908.50
1,454.25
56,256.67
3,985.60

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

3.04.00.00
3.04.01.00
3.04.02.01
3.04.02.02
3.04.03.00
3.04.04.00
3.04.05.050
3.04.06.00
3.04.07.00
3.04.08.00
3.04.09.00
3.04.10.00
3.04.11.01
3.04.11.02
3.04.11.03
3.04.12.00
3.04.13.00
3.04.14.00
3.04.15.00
3.04.16.00
3.04.17.00
3.04.18.00

M
UND
UND
GLB

5,040.92
69.00
69.00
1.00

ACCESORIOS (TUBERIA DN 110mm Y LINEA DE ADUCCION)


135,271.95
SUMINISTRO E INSTALACION DE TEE DE FF DE 200mm x 110mm
UNDC/ EMBONE
3.00
ISO INCLUYE
441.27ANILLOS 1,323.81
3.00
SUMINISTRO E INSTALACION DE TEE DE FF DE 110mm x 110mm
UNDC/ EMBONE
35.00
ISO INCLUYE
190.24ANILLOS 6,658.40
35.00
SUMINISTRO E INSTALACION DE TEE DE FF DE 110mm x 63mm
UND
C/ EMBONE2.00
ISO INCLUYE
180.00
ANILLOS
360.00
0.00
SUMINISTRO E INSTALACION DE CRUZ DE FF DE 110mm x 110mm
UND C/ EMBONE
2.00ISO INCLUYE
216.25 ANILLOS 432.50
2.00
SUMINISTRO E INSTALACION DE TRANSICION UF PVC - FF DE UND
160mm C 7.5 1.00
INCLUYE ANILLOS
203.24
203.24
1.00
SUMINISTRO E INSTALACION DE VALVULA DE FF DE 200mm C/
UND
EMBONE ISO
3.00
INC. CAJA
Y ANILLOS 3,890.52
3.00
1,296.84
SUMINISTRO E INSTALACION DE VALVULA DE FF DE 110mm C/
UND
EMBONE ISO
39.00
INC. CAJA
Y ANILLOS 44,808.66
39.00
1,148.94
SUMINISTRO E INSTALACION DE CODO DE FF DE 110mm x 90
UND
C/ EMBONE3.00
ISO INCLUYE
ANILLOS
525.72
3.00
175.24
SUMINISTRO E INSTALACION DE CODO DE FF DE 200mm x 45
UND
C/ EMBONE2.00
ISO INCLUYE
ANILLOS
430.48
2.00
215.24
SUMINISTRO E INSTALACION DE CODO DE FF DE 110mm x 45
UND
C/ EMBONE4.00
ISO INCLUYE
ANILLOS
700.96
4.00
175.24
SUMINISTRO E INSTALACION DE CODO DE FF DE 200mm x 22.5
UNDC/ EMBONE
3.00
ISO INCLUYE
3.00
245.16ANILLOS 735.48
SUMINISTRO E INSTALACION DE CODO DE FF DE 110mm x 22.5
UNDC/ EMBONE
6.00
ISO INCLUYE
6.00
195.24ANILLOS 1,171.44
SUMINISTRO E INSTALACION DE CODO DE FF DE 63mm x 90UND
C/ EMBONE ISO
2.00INCLUYE
ANILLOS
250.00
0.00
125.00
SUMINISTRO E INSTALACION DE CODO DE FF DE 63mm x 22.5
UND
C/ EMBONE3.00
ISO INCLUYE
ANILLOS
375.00
0.00
125.00
SUMINISTRO E INSTALACION DE TAPON UR 110MM
UND
1.00
99.20
1.00
99.20
SUMI. E INS. HIDRANTE CONTRA INCENDIO DE POSTE SECO DEUND
150mm DE DOS
4.00BOCAS
C/ CODO DE INGRESO
6,589.96DE 110mm
0.00
-ISO
1,647.49
SUMINISTRO E INSTALACION DE VALVULA DE COMPUERTA FFUND
DE 110mm ISO
4.00
2,111.56
4.00
527.89
SUMINISTRO E INSTALACION DE VALVULA DE PURGA DE FF DE
UND
110mm ISO2.00 1,454.25
2,908.50
1.00
SUMINISTRO E INSTALACION DE VALVULA DE AIRE DE FF DE 110mm
UND ISO 1.00 1,454.25
1,454.25
1.00
PRUEBA HIDRAULICA TUBERIA PVC (TUBERIA DN 110mm Y LINEA
MDE ADUCCION)
5,040.92
56,256.67
4,580.65
11.16
DADOS DE CONCRETO F'C=140 KG/CM2 (TUBERIA DN 110mm UND
Y LINEA DE 106.00
ADUCCION) 37.60
3,985.60
106.00

VALORIZACION N05 DE RED DE AGUA POTABLE - DEL 05 DE MARZO AL 04 DE ABRIL DEL 2013
OBRA:

"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"

FORMULA: 02 RED DE AGUA POTABLE


CONTRATISTA: SAVIA S.A
CONSTRUCTOR: PROYECTOS DEL NORTE SAC

SUPERVISOR: ING. LUIS RAMOS TIMANA


RESIDENTE DE OBRA: ING. CRUZ ENRIQUE PEREZ GONZALES.
PLAZO: 105 D.C.
Departamento
PIURA

Item

Provincia

TALARA

Descripcin

Distrito

TALARA

Unidad

Metrado

Precio

3.05.00.00
3.05.01.00
3.05.02.00
3.05.03.00
3.05.04.00
3.05.05.00
3.05.06.00

CONEXIONES DOMICILIARIAS
EXCAVACION MANUAL T. NORMAL P/TUBO PVC DN = 15mm Hprom.=0.60m
M
4,195.25
10.96
REFINE Y NIVELACION FONDO DE ZANJA P/TUBO DN 15 mm
M
4,195.25
0.80
CAMA DE ARENA MANUAL ZANJA P/ AGUA e=0.05 m DN = 15 mm
M A= 0.60
4,195.25
m
4.62
CONEXION DOMICILIARIA P/ RED DE AGUA DN = 160mm, L = 5.50
UNDm
882.00
255.59
PRUEBA HIDRAULICA TUBERIA PVC
M
4,195.25
11.16
RELLENO COMPACTADO C/ MATERIAL PROPIO DE ZANJA - DN=15mm
M
H=0.60m
4,195.25PVC
2.22

3.06.00.00
3.06.01.00
3.06.03.00
3.06.05.00
3.06.07.00
3.06.10.00

VARIOS
ROTURA DE PAVIMENTO DE ASFALTO
M2
REPOSICION DE PAVIMENTO DE ASFALTO EN FRIO
M2
DEMOLICION DE LOSA DE CONCRETO DE E=0.10 m
M2
RETIRO DE ADOQUIN (20 x 10 x 8 cm)
M2
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3

915.43
915.43
2,470.86
688.97
250.00

3.07.00.00
3.07.01.00
3.07.02.00
3.07.03.00

DEMOLICION Y REPOSICION DE VEREDA PARA CAJA PORTAMEDIDOR DE AGUA


DEMOLICION DE VEREDA Eprom= 0.15 M.
M2
530.00
CONCRETO F'C=175kg/cm2 PARA VEREDAS E=0.10m INC. CURADO
M2
402.80
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE Dprom. 1KM
M3
99.38

4.00.00.00
4.01.00.00
4.02.00.00
4.03.00.00
4.04.00.00
4.05.00.00
4.06.00.00
4.07.00.00

Parcial

ACUMULADO ANTERIOR
Monto
%
S/.

Metrado

Metrado

ACTUAL
Monto
S/.

Metrado

ACUMULADO
Monto
S/.

Metrado

SALDO
Monto
S/.

350,281.03
45,979.94
3,356.20
19,382.06
225,430.38
46,818.99
9,313.46

4,195.25
4,195.25
4,195.25
882.00
4,195.25
4,195.25

45,979.94
3,356.20
19,382.06
225,430.38
46,818.99
9,313.46

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

4195.25
4195.25
4195.25
882.00
4195.25
4195.25

45979.94
3356.20
19382.06
225430.38
46818.99
9313.46

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

4.20
42.00
4.98
28.28
14.43

77,689.32
3,844.81
38,448.06
12,304.88
19,484.07
3,607.50

915.43
0.00
2,470.86
688.97
250.00

3,844.81
0.00
12,304.88
19,484.07
3,607.50

100.00%
0.00%
100.00%
100.00%
100.00%

0.00
915.43
0.00
0.00
0.00

0.00
38,448.06
0.00
0.00
0.00

0.00%
100.00%
0.00%
0.00%
0.00%

915.43
915.43
2470.86
688.97
250.00

3,844.81
38,448.06
12,304.88
19,484.07
3,607.50

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

9.96
37.28
14.43

21,729.23
5,278.80
15,016.38
1,434.05

530.00
402.80
99.38

5,278.80
15,016.38
1,434.05

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

530.00
402.80
99.38

5,278.80
15,016.38
1,434.05

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

MITIGACION DE IMPACTO AMBIENTAL Y SEGURIDAD


ACONDICIONAMIENTO DE BOTADEROS
GLB
1.00 1,000.00
BOTIQUIN DE PRIMEROS AUXILIOS
GLB
1.00 1,000.00
SEGURIDAD DE OBRA
GLB
1.00 45,808.73
IMPLEM. DE SEGURIDAD EN OBRA, CASCOS, GUANTES, Y CHALECOS
GLB ( NO INC.
1.00
UNIFORME)
8,000.00
SERVICIOS DE RESPONDE
GLB
1.00 70,000.00
SERVICIOS DE ING. LUIS RAMOS TIMANA
GLB
1.00 60,000.00
LIMPIEZA FINAL DE OBRA
GLB
1.00 2,000.00
COSTO DIRECTO
GASTOS GENERALES VARIABLES9.46%
GASTOS GENERALES FIJOS
0.540%
UTILIDAD
10.00%
SUB TOTAL
I.G.V.
18.00%
TOTAL PRESUPUESTO

187,808.73
1,000.00
1,000.00
45,808.73
8,000.00
70,000.00
60,000.00
2,000.00
1,138,806.04
107,731.05
6149.55
113880.6
1,366,567.24
245982.1
1,612,549.34

1.00
1.00
1.00
1.00
1.00
1.00
0.00

1,000.00
1,000.00
45,808.73
8,000.00
70,000.00
60,000.00
0.00
1,073,684.95
101,570.60
5,797.90
107,368.50
1,288,421.95
231,915.95
1,520,337.90

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
1.00

0.00
0.00
0.00
0.00
0.00
0.00
2,000.00
65,121.09
6,160.46
351.65
6,512.11
78,145.31
14,066.16
92,211.47

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%

1.00
1.00
1.00
1.00
1.00
1.00
1.00

1,000.00
1,000.00
45,808.73
8,000.00
70,000.00
60,000.00
2,000.00
1,138,806.04
107,731.05
6,149.55
113,880.60
1,366,567.24
245,982.10
1,612,549.34

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

94.28%

5.72%

100.00%

0.00%

VALORIZACION N05 DE RED DE AGUA POTABLE - DEL 05 DE MARZO AL 04 DE ABRIL DEL 2013
OBRA:

"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"

FORMULA: 02 RED DE AGUA POTABLE


CONTRATISTA: SAVIA S.A
CONSTRUCTOR: PROYECTOS DEL NORTE SAC

SUPERVISOR: ING. LUIS RAMOS TIMANA


RESIDENTE DE OBRA: ING. CRUZ ENRIQUE PEREZ GONZALES.
PLAZO: 105 D.C.
Departamento
PIURA

Item

Provincia

TALARA

Descripcin

Distrito

TALARA

Unidad

Metrado

Precio

Parcial

ACUMULADO ANTERIOR
Monto
%
S/.

Metrado

Metrado

ACTUAL
Monto
S/.

Metrado

ACUMULADO
Monto
S/.

Metrado

SALDO
Monto
S/.

VALORIZACION N 05
DEL 05 DE MARZO AL 04 DE ABRIL DE 2013
OBRA: "MEJORAMIENTO DEL SISTEMA DE AGUA POTAB Y ALCANTARILLADO CONDOMINIAL DEL A.H SAN PEDRO"
CONTRATISTA: SAVIA S.A
CONSTRUCTOR: PROYECTOS DEL NORTE SAC
SUPERVISOR: ING. LUIS RAMOS TIMANA
RESIDENTE DE OBRA: ING. CRUZ ENRIQUE PEREZ GONZALES
CONCEPTO

IGV

TOTAL

MONTO CONTRATADO (C) =

2,046,361.80

368,345.12

2,414,706.92

ADELANTO DIRECTO (AD) =

818,544.72

147,338.05

965,882.77

SUB TOTAL

CUADRO DE AMORTIZACIONES POR EL ADELANTO DIRECTO


IMPORTE NETO
AMORTIZADO

DETALLE VALORIZACION

FECHA

MONTO VALORIZADO

TOTAL
IGV

AMORTIZACION

MONTO

INCLUIDO IGV

01

VALORIZACION N01

312,237.06

124,894.82

22,481.07

147,375.89

02

VALORIZACION N02

478,429.21

191,371.68

34,446.90

225,818.58

03

VALORIZACION N03

912,653.78

365,061.51

65,711.07

430,772.58

04

VALORIZACION N04

98,255.35

137,216.71

24,699.01

161,915.72

05

VALORIZACION N05

0.00

0.00

0.00

0.00

818,544.72

147,338.05

965,882.77

0.00

0.00

0.00

TOTAL AMORTIZADO
Saldos pendientes en funcin al adelanto total

CURVA "S"
CRONOGRAMA REAL vs. CRONOGRAMA PROGRAMADO
OBRA

"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN


PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"

ENTIDAD

:MUNICIPALIDAD PROVINCIAL DE TALARA

CONTRATISTA

:SAVIA SA

CONSTRUCTOR

:PROYECTOS DEL NORTE S.A.C.

INICIO DE OBRA

13/11/2012

PLAZO CONTRACTUAL

:105 DC

TERMINO DE OBRA

2/25/2013
PROGRAMADO

Item

Descripcion

Presupuesto

"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE


AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN
PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"

2,414,706.92

VALORIZACIONES PROGRAMADAS
MES 1

MES 2

MES 3

MES 4

227,939.41

683,983.63

876,059.04

626,724.84

9.44
9.44

28.33
37.77

36.28
74.05

25.95
100.00

% AVANCE DE OBRA PROGRAMADO (Mensual)


% AVANCE DE OBRA PROGRAMADO (Acumulado)

REAL
VALORIZACIONES REALES
Item

Presupuesto

"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE


AGUA POTABLE Y ALCANTARILLADO EN EL A.H. SAN
PEDRO CONO NORTE TALARA, PROVINCIA DE TALARA"

13/NOV AL
13/DIC/12

14/DIC AL
12/ENE/13

MES 3

MES 4

2,414,706.92

% AVANCE DE OBRA REAL (Mensual)

15.26

23.38

44.60

16.76

% AVANCE DE OBRA REAL (Acumulado)

15.26

38.64

83.24

100.00

AVANCE DE OBRA REAL ACUMULADO


AVANCE DE OBRA PROGRAMADO ACUMULADO

100.00%

100
VALORIZACION ACUMULADA (%)

Descripcion

90
80
70
60

AVANCE PROGRAMADO

50
40

AVANCE REAL

30
20
10
0
VALORIZACIONES

OB SERVACION

OB RA CULMINADA

CRONOGRAMA DE AVANCE DE OBRA VALORIZADO


MEJORAMIENTO DEL SISTEMA DE AGUA POTAB Y ALCANTARILLADO CONDOMINIAL DEL A.H SAN PEDRO
Obra : MEJORAMIENTO DEL SISTEMA DE AGUA POTAB Y ALCANTARILLADO CONDOMINIAL DE SAN PEDRO.
Entidad : MUNICIPALIDAD PROVINCIAL DE TALARA.
Lugar : AH. SAN PEDRO.
FECHA INICIO : 13 DE NOVIEMBRE DEL 2012.
FECHA TERMINO : 25 DE FEBRERO DEL 2013.

ITEM

COSTO
DIRECTO

DESCRIPCION
MEJORAMIENTO DEL SISTEMA DE AGUA POTAB Y
ALC CONDOMINIAL DE SAN PEDRO

NOVIEMBRE DICIEMBRE
13

30 1

30 1

ENERO

FEBRERO

30 1

25

1,715,451.25

1.00.00

OBRAS PROVISIONALES

2.00.00

ALCANTARILLADO

2.01.00

TRABAJOS PRELIMINARES

70,700.23

2.02.00

MOVIMIENTO DE TIERRAS

77,047.05

2.03.00

SUMINSITRO E INSTALACION DE TUBERIA PVC ALCANTARILLADO

66,025.94

2.04.00

BUZONES

165,912.54

2.05.00

CONEXIONES DOMICILIARIAS

211,171.22

2.01.06

VARIOS

3.00.00

AGUA POTABLE

3.01.00

TRABAJOS PRELIMINARES

19,333.53

3.02.00

MOVIMIENTO DE TIERRAS

239,251.93

3.03.00

SUMINISTRO E INSTALACION DE TUBERIA

234,639.27

3.04.00

ACCESORIOS (Tuberia DN110mm y Linea de Aduccion)

142,039.58

3.05.00

CONEXIONES DOMICILIARIAS

383,797.24

3.06.00

VARIOS

41,202.67

3.07.00

DEMOLICIN Y REPOSICIN DE VEREDA PARA CAJA


PORTAMEDIDOR DE AGUA

22,815.00

4.00.00

MITIGACION DE IMPACTO AMBIENTAL Y SEGURIDAD

6,500.00

6,306.40

7,883.02

9,459.62

35,350.12

21,210.07

14,140.04

23,114.11

26,966.47

26,966.47

19,807.78

23,109.08

23,109.08

74,660.64

58,069.39

33,182.51

73,909.93

73,909.93

7,883.02

31,532.06

1,393.20

63,351.36

2,089.79

3,482.99

19,333.53

95,700.77

143,551.16

82,123.74

105,587.67

46,927.86

63,917.81

56,815.83

21,305.94

95,949.31

287,847.93

10,300.67

1,300.00

COSTO DIRECTO

1,715,451.25

% DE AVANCE DE OBRA
GASTOS GENERALES VARIABLES

8.80%

161,932.25

30,902.00

6,844.50

15,970.50

1,300.00

1,950.00

1,950.00

485,914.27

622,368.12

445,236.61

100.00%

9.44%

28.33%

36.28%

25.95%

150,959.71

14,250.04

42,760.46

54,768.39

39,180.82

GASTOS GENERALES FIJOS

0.49%

8,405.71

793.47

2,380.98

3,049.60

2,181.66

UTILIDADES

10.00%

171,545.13

16,193.23

48,591.43

62,236.81

44,523.66

2,046,361.80

193,168.99

579,647.14

742,422.92

531,122.75

368,345.12

34,770.42

104,336.49

133,636.12

95,602.09

2,414,706.92

227,939.41

683,983.63

876,059.04

626,724.84

SUB-TOTAL
I.G.V.
TOTAL

18.00%

"MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y


ALCANTARILLADO EN EL A.H. SAN PEDRO CONO NORTE TALARA, PROVINCIA DE
TALARA"

OBRA

MONTO CONTRATADO S/.

2,414,706.92

INCL. IGV

ENTIDAD

:MUNICIPALIDAD PROVINCIAL DE TALARA

CONTRATISTA

:SAVIA SA

CONSTRUCTOR

:PROYECTOS DEL NORTE S.A.C.

SUPERVISOR

:ING. LUIS RAMOS TIMANA

RESIDENTE DE OBRA :ING. CRUZ ENRIQUE PEREZ GONZALES


INICIO DE OBRA

13/11/2012

PLAZO CONTRACTUAL :105 DC


TERMINO DE OBRA

2/25/2013

RESUMEN DE PRESUPUESTOS
CONTRATADO, ADICIONAL, DEDUCTIVO, Y MAYORES G.G.
S/IGV
A

MONTOS CONTRACTUALES (V)


PTTO.CONTRATADO

2,046,361.80

2,046,361.80
B

ADICIONAL DE OBRA N 01
AGUA POTABLE

36,157.42

C MAYORES GASTOS GENERALES

0.00

POR CONCEPTO DE AMPLIACIONES DE PLAZO,


Y SE REGULAIZARA CON LA RESOLUCION MUNIPAL(PENDIENTE).
C DEDUCTIVO DE OBRA N 01
39,882.22
D MONTOS A PAGAR AL CONTRATISTA
S/.
G TOTAL COMPROMISO A SOLICITAR

NOTA: Ahora el Monto Real = 2'410,311.66

2,042,637.00
2,042,637.00

E AGUA POTABLE Y
TE TALARA, PROVINCIA DE

C/IGV
(18.00%)

2,414,706.92

2,414,706.92

42,665.76

0.00

47,061.02

2,410,311.66
2,410,311.66

VALORIZACION N 05
DEL 05 DE MARZO AL 04 DE ABRIL DEL 2013
OBRA:

"MEJORAMIENTO DEL SISTEMA DE AGUA POTAB Y ALCANTARILLADO CONDOMINIAL DEL A.H SAN
PEDRO"

CONTRATISTA: SAVIA S.A


CONSTRUCTOR: PROYECTOS DEL NORTE SAC
SUPERVISOR: ING. LUIS RAMOS TIMANA
RESIDENTE DE OBRA: ING. CRUZ ENRIQUE PEREZ GONZALES

CUADRO DE PAGOS DE SAVIA HACIA PROYECTOS DEL NORTE SAC

DETALLE VALORIZACION

MONTO
VALORIZADO

DESCRIPCION

MONTO Inc. IGV


(18.00%)

01

VALORIZACION N01

312,237.06

02

VALORIZACION N02

478,429.21

564,546.47

03

VALORIZACION N03

912,653.78

1,076,931.46

04

VALORIZACION N04

244,786.40

TOTAL CANCELADO

1,948,106.45

CONCEPTO

368,439.73

288,847.95
2,298,765.61

IGV

TOTAL

MONTO REAL (R) =

2,042,637.00

367,674.66

2,410,311.66

MONTO CANCELADO (C) =

1,948,106.45

350,659.16

2,298,765.61

SUB TOTAL

111,546.05
PAGO FINAL

(F)

R- C

S/.

111,546.05

NOTA: LA SUMA TOTAL A PAGAR A PROYECTOS DEL NORTE SAC ES CIENTO ONCE MIL QUINIENTOS
CUARENTA Y SEIS CON 05/100 NUEVOS SOLES.
CONCEPTO

SUB TOTAL

IGV

TOTAL

VALORIZACION N 05

98,255.35

17,685.96

115,941.31

PAGO FINAL ( F )

94,530.55

17,015.50

111,546.05
4,395.26

NOTA: A FAVOR DE LA ENTIDAD =

4,395.26

Anda mungkin juga menyukai