Corectii
Denumire resursa
Sp.mat
Pret materiale
Sp.man
Pret manopera
Sp.uti
Observatii
Pret utilaj
Pret transport
Liste anexa
Nr.ore/UM
Greutate/UM
MP
360.00
0.00%
0.00
0.00%
2.01
0.00%
0.00
0.00
0.00
0.00
MP
126.00
Reparatii astereala
0.00%
21.07
0.00%
5.85
0.00%
0.00
0.00
0.00
0.00
BUC
235.00
0.00%
3.13
0.00%
0.91
0.00%
0.00
0.00
0.00
0.00
ML
115.00
0.00%
0.00
0.00%
4.18
0.00%
0.00
0.00
0.00
0.00
ML
135.50
0.00%
1.90
0.00%
5.62
0.00%
0.00
0.00
0.00
0.00
6
MP
120.00
Alte reparatii
0.00%
0.00
0.00%
8.90
0.00%
0.00
0.00
0.00
0.00
MP
360.00
Inlocuit tabla
0.00%
0.00
0.00%
6.35
0.00%
0.00
0.00
0.00
0.00
MP
85.00
0.00%
23.35
0.00%
9.05
0.00%
0.00
0.00
0.00
0.00
MP
1,248.00
0.00%
1.45
0.00%
2.35
0.00%
0.00
0.00
0.00
0.00
10
MP
95.00
0.00%
45.95
0.00%
3.95
0.00%
0.00
0.00
0.00
0.00
Total materiale
Total manopera
Total utilaj
Total transport
Total A
Cota aprovizionare
2.00%
C.A.S.
18.65%
Somaj
2.00%
Sanatate
6.00%
ITM+CM+GS
Asigurari de accidente
1.85%
0.279%
5.00%
10.00%
Nota:
Lucrarile se vor executa cu respectarea tuturor normelor in vigoare.
Se va respecta arhitectura cat si culoarea existenta a tablei
Tabla noua pentru acoperis va fi asigurata de beneficiar
24.00%
Val. materiale
Val. manopera
Val. utilaj
Val. transport
TOTAL A
Greutate totala
0.00
723.60
0.00
0.00
723.60
0.00
2,654.82
737.10
0.00
0.00
3,391.92
0.00
735.55
213.85
0.00
0.00
949.40
0.00
0.00
480.70
0.00
0.00
480.70
0.00
257.45
761.51
0.00
0.00
1,018.96
0.00
0.00
1,068.00
0.00
0.00
1,068.00
0.00
0.00
2,286.00
0.00
0.00
2,286.00
0.00
1,984.75
769.25
0.00
0.00
2,754.00
0.00
1,809.60
2,932.80
0.00
0.00
4,742.40
0.00
4,365.25
375.25
0.00
0.00
4,740.50
0.00
11,807.42
10,348.06
0.00
0.00
22,155.48
236.15
1,929.91
206.96
620.88
191.44
28.87
25,369.70
1,268.48
2,536.97
29,175.15
7,002.04
36,177.19