PAVIMENTO LA FE CRA 19A CON CLL.5B Y CRA 24 juen jose peredt loper gertudi
CONDICIONES CONTRACTUALES VIGENTES ITEM DESCRIPCION ACTIVIDADES PRELIMINARES 1 CIMIENTOS 1 Excavacion comn pavimento Replanteo M2 425.0 1,150.0 488,750 0 UND CANT Vr. UNITARIO SUBTOTAL
M3
158.0
9,500.0
1,501,000 0
2 VIAS 1
Retiro sobrante
Relleno seleccionado manual Balasto Pavimento en concreto e=0,15cm 3000PSI Bordillos en concreto 15x45 3000PSI Pavimento en concreto e=0,15cm 500 PSI FLEXION OTRAS OBRAS
M3
75.0
24,100.0
1,807,500
M2
345.0
44,955.0
15,509,475
ML
150.0
21,000.0
3,150,000
M2
56,667.0
0 0
Construccion manholes
de UND 520,000.0 0
24,339,725
VALOR TOTAL COSTOS INDIRECTOS DEL CONVENIO VALOR TOTAL DEL CONVENIO VALOR MODIFICACIONES DE OBRAS INCREMENTO EN PORCENTAJE COSTO TOTAL
6,084,931 30,424,656
INTERVENTOR
IMENTO LA FE
ON CLL.5B Y CRA 24
442.0
508,300.0 0.0
131.2
1,246,400.0 0.0
131.2
1,312,000.0 0.0
75.0
1,807,500.0
0.0
150.0
3,150,000.0
338.5
19,181,779.5 0.0
1.0
520,000.0
CONTRATISTA DE OBRAS
RA EJECUTADA ACUMULADO SUBTOTAL CANT 0.0 442.0 0.0 SUBTOTAL 0.0 508,300.0 0.0 0.00% 0.00% 0.00%
TA PRESENTE
0.0
0.0 0.0
0.00%
0.0 0.0
0.0 0.0
0.00% 0.00%
0.0
0.0
0.00%
0.0
0.0
0 0
DE OBRAS