1. PEKERJAAN PERSIAPAN
1 m' Pengukuran dan pemasangan bouwplank
1.2.1
0.012
0.020
0.007
Bahan
M
Kg
M
Kayu 5/7
Paku biasa 2" - 5"
Kayu papan 3/20 meranti
1,947,500.00
20,000.00
0.200
0.400
0.020
0.020
Tenaga
Org
Org
Org
Org
Tukang kayu
Pekerja
Kepala tukang
Mandor
1.2.2
@
@
@
Rp
Rp
Rp
Rp
6,355,000.00
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
23,370.00
400.00
44,485.00
68,255.00
45,000.00
32,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
9,000.00
12,800.00
1,000.00
1,100.00
23,900.00
Rp
92,155.00
Bahan
M
Kg
Kg
M
M
Lbr
Kayu
Paku biasa
Semen Portland
Pasir beton
Koral beton
Seng gelombang bljs 32
2.000
1.000
0.200
0.050
Tenaga
Org
Org
Org
Org
Tukang kayu
Pekerja
Kepala tukang
Mandor
1.3.2
@
@
@
@
@
@
@
@
Rp
Rp
Rp
Rp
Rp
Rp
1,947,500.00
20,000.00
1,500.00
99,000.00
195,000.00
112,000.00
Jumlah (1)
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
408,975.00
6,000.00
15,750.00
2,970.00
9,750.00
168,000.00
611,445.00
Rp
Rp
Rp
Rp
45,000.00
32,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
90,000.00
32,000.00
10,000.00
2,750.00
134,750.00
Rp
746,195.00
=
=
=
Rp
Rp
Rp
3,200.00
2,750.00
5,950.00
Tenaga
0.100
Org
0.050
Org
Pekerja
Mandor
@
@
Rp
Rp
32,000.00
55,000.00
Jumlah
2. PEKERJAAN TANAH
1 m Galian tanah biasa sedalam 1 meter
2.1.1
0.750
0.000
0.000
0.025
Tenaga
Org
Org
Org
Org
Pekerja
Tukang gali
Kepala tukang
Mandor
@
@
@
@
Rp
Rp
Rp
Rp
32,000.00
40,000.00
45,000.00
55,000.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
24,000.00
1,375.00
25,375.00
32,000.00
=
=
=
=
=
Rp
8,000.00
Rp
Rp
1,045.00
9,045.00
Jumlah
1 m Urugan kembali
2.4.1
0.250
Tenaga
Org
0.019
Org
Pekerja
Tukang gali
Kepala tukang
Mandor
Rp
Rp
55,000.00
Jumlah
1 m Urugan pasir
2.6.1
1.250
Bahan
M
0.300
Tenaga
Org
2.6.2
0.010
Org
Pasir urug
Rp
71,500.00
Jumlah (1)
=
=
Rp
Rp
89,375.00
89,375.00
Pekerja
Tukang gali
Kepala tukang
Mandor
Rp
32,000.00
Rp
9,600.00
Rp
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
550.00
10,150.00
Rp
99,525.00
3. PEKERJAAN PONDASI
1 m Pasang pondasi batu kali, 1 Pc : 5 Ps
4.1.1
Bahan
1.200
M
Batu belah 15/20 cm
136.000
Kg Semen portland
0.544
M
Pasir pasang
4.1.2
Tenaga
1.500 Org
0.750 Org
0.075 Org
0.075 Org
Pekerja
Tukang batu
Kepala tukang
Mandor
@
@
@
@
@
@
@
Rp
Rp
Rp
132,000.00
1,500.00
93,500.00
Jumlah (1)
=
=
=
Rp
Rp
Rp
Rp
158,400.00
204,000.00
50,864.00
413,264.00
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
48,000.00
33,750.00
3,750.00
4,125.00
89,625.00
Rp
592,514.00
4. PEKERJAAN BETON
1 m Membuat beton bertulang 1 Pc : 1 1/2 Ps : 2 1/2 Kr (K300)
12.3.1
Bahan
413.00 Kg Semen portland
@
Rp
0.49
M Pasir beton
@
Rp
0.76
M Koral beton
@
Rp
12.3.2
2.000
0.350
0.035
1.000
Tenaga
Org
Org
Org
Org
Pekerja
Tukang batu
Kepala tukang
Mandor
Tenaga
Org
Org
Org
Org
Pekerja
Tukang besi
Kepala tukang
Mandor
Tenaga
0.660 Org
0.330 Org
0.033 Org
0.033 Org
Pekerja
Tukang kayu
Kepala tukang
Mandor
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
1,500.00
99,000.00
195,000.00
Jumlah (1)
=
=
=
Rp
Rp
Rp
Rp
619,500.00
48,156.43
147,477.78
815,134.21
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
64,000.00
15,750.00
1,750.00
55,000.00
136,500.00
Rp
951,634.21
Rp
Rp
Rp
Rp
Rp
Rp
10,000.00
18,150.00
Jumlah (1)
=
=
Rp
Rp
Rp
10,500.00
272.25
10,772.25
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
224.00
315.00
35.00
16.50
590.50
Rp
11,362.75
Rp
Rp
Rp
Rp
Rp
1,947,500.00
20,000.00
7,200.00
1,947,500.00
123,000.00
Jumlah (1)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
77,900.00
8,000.00
1,440.00
29,212.50
43,050.00
159,602.50
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
21,120.00
14,850.00
1,650.00
1,815.00
39,435.00
199,037.50
Jumlah (2)
Jumlah (1) + (2)
Tenaga
Org
Org
Org
Org
Pekerja
Tukang kayu
Kepala tukang
Mandor
@
@
@
@
@
@
@
Rp
Rp
Rp
1,947,500.00
20,000.00
7,200.00
Jumlah (1)
=
=
=
Rp
Rp
Rp
Rp
87,637.50
6,000.00
720.00
94,357.50
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
9,600.00
11,700.00
1,300.00
275.00
22,875.00
=
=
Rp
Rp
117,232.50
39,077.50
Jumlah (2)
Tenaga
Org
Org
Org
Org
Pekerja
Tukang kayu
Kepala tukang
Mandor
@
@
@
@
@
@
@
@
@
@
Rp
Rp
Rp
Rp
Rp
Rp
1,947,500.00
20,000.00
7,200.00
1,947,500.00
163,350.00
1,947,500.00
Jumlah (1)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
77,900.00
8,000.00
1,440.00
29,212.50
57,172.50
54,530.00
228,255.00
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
9,600.00
14,850.00
1,650.00
330.00
26,430.00
=
=
Rp
Rp
254,685.00
63,671.25
Jumlah (2)
Jumlah (1) + (2)
Untuk 4xpakai
1 m Pasang bekisting untuk balok
12.8.1
Bahan
0.040
M
Kayu terentang
0.400
Kg
Paku biasa 2" - 5"
0.200
Lt
Minyak bekisting
0.018
M
Balok kayu borneo
0.350
Lbr
Plywood tebal 9 mm
0.028
M
Kaso 5/7x400 m
12.38.2
0.320
0.330
0.033
0.006
Tenaga
Org
Org
Org
Org
Pekerja
Tukang kayu
Kepala tukang
Mandor
@
@
@
@
@
@
@
@
@
@
Rp
Rp
Rp
Rp
Rp
Rp
1,947,500.00
20,000.00
7,200.00
1,947,500.00
163,350.00
1,947,500.00
Jumlah (1)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
77,900.00
8,000.00
1,440.00
35,055.00
57,172.50
54,530.00
234,097.50
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
10,240.00
14,850.00
1,650.00
330.00
27,070.00
=
=
Rp
Rp
261,167.50
65,291.88
Jumlah (2)
Jumlah (1) + (2)
Untuk 4xpakai
Bahan
Bh
Kg
M
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang
0.220
0.100
0.010
0.015
Tenaga
Org
Org
Org
Org
Pekerja
Tukang batu
Kepala tukang
Mandor
3.3.2
@
@
@
@
@
Rp
Rp
Rp
550.00
1,500.00
93,500.00
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
38,500.00
21,555.00
3,740.00
63,795.00
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
7,040.00
4,500.00
500.00
825.00
12,865.00
Rp
76,660.00
Bahan
Bh
Kg
M
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang
0.300
0.100
0.010
0.015
Tenaga
Org
Org
Org
Org
Pekerja
Tukang batu
Kepala tukang
Mandor
3.4.2
@
@
@
@
@
Rp
Rp
Rp
550.00
1,500.00
93,500.00
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
38,500.00
17,250.00
4,020.50
59,770.50
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
9,600.00
4,500.00
500.00
825.00
15,425.00
Rp
75,195.50
Bahan
Kg
M
Semen portland
Pasir pasang
0.200
0.150
0.015
0.010
Tenaga
Org
Org
Org
Org
Pekerja
Tukang batu
Kepala tukang
Mandor
7.1.2
@
@
@
Rp
Rp
1,500.00
93,500.00
Jumlah (1)
=
=
=
Rp
Rp
Rp
7,776.00
2,431.00
10,207.00
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
6,400.00
6,750.00
750.00
550.00
14,450.00
Rp
24,657.00
Bahan
Kg
M
Semen portland
Pasir pasang
0.200
0.150
0.015
0.010
Tenaga
Org
Org
Org
Org
Pekerja
Tukang batu
Kepala tukang
Mandor
7.2.2
@
@
@
Rp
Rp
1,500.00
93,500.00
Jumlah (1)
=
=
=
Rp
Rp
Rp
15,336.00
1,870.00
17,206.00
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
6,400.00
6,750.00
750.00
550.00
14,450.00
Rp
31,656.00
Rp
1,500.00
Rp
1,500.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
1,600.00
2,250.00
1,500.00
1,100.00
6,450.00
Rp
7,950.00
1 m acian
7.3.1
0.020
Bahan
Kg
Semen portland
Rp
1,500.00
Jumlah (1)
7.3.2
0.050
0.050
0.030
0.0200
Tenaga
Org
Org
Org
Org
Pekerja
Tukang batu
Kepala tukang
Mandor
@
@
@
@
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
1 m1 Pekerjaan benangan
7.4.1
0.160
0.009
Bahan
Kg
M
Semen portland
Pasir pasang
0.060
0.003
0.001
0.0220
Tenaga
Org
Org
Org
Org
Pekerja
Tukang batu
Kepala tukang
Mandor
7.4.2
@
@
@
Rp
Rp
1,500.00
93,500.00
Jumlah (1)
=
=
=
Rp
Rp
Rp
240.00
841.50
1,081.50
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
1,920.00
135.00
50.00
1,210.00
3,315.00
Rp
4,396.50
5.2.2
Bahan
1.200
M
Tenaga
6.000 Org
20.000 Org
2.000 Org
0.300 Org
Rp
9,737,500.00
Jumlah (1)
=
=
Rp
Rp
11,685,000.00
11,685,000.00
Pekerja
Tukang kayu
Kepala tukang
Mandor
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
192,000.00
900,000.00
100,000.00
16,500.00
1,208,500.00
Rp
12,893,500.00
@
@
@
Bahan
M
Rp
29,212,500.00
Jumlah (1)
=
=
Rp
Rp
1,168,500.00
1,168,500.00
1.000
2.500
0.250
0.050
Tenaga
Org
Org
Org
Org
Pekerja
Tukang kayu
Kepala tukang
Mandor
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
32,000.00
112,500.00
12,500.00
2,750.00
159,750.00
Rp
1,328,250.00
6.7.2
@
@
@
5.9.2
Bahan
0.035
M
Rp
29,212,500.00
Jumlah (1)
=
=
Rp
Rp
1,022,437.50
1,022,437.50
Tenaga
0.800 Org
2.000 Org
0.200 Org
0.040 Org
Pekerja
Tukang kayu
Kepala tukang
Mandor
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
25,600.00
90,000.00
10,000.00
2,200.00
127,800.00
Rp
1,150,237.50
@
@
@
Bahan
m1
Rp
136,000.00
Rp
761,600.00
Rp
761,600.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
16,000.00
90,000.00
10,000.00
1,375.00
117,375.00
Rp
878,975.00
Jumlah (1)
5.16.2
0.500
2.000
0.200
0.025
Tenaga
Org
Org
Org
Org
Pekerja
Tukang kayu
Kepala tukang
Mandor
Rp
Rp
Rp
Rp
@
@
@
@
32,000.00
45,000.00
50,000.00
55,000.00
Bahan
M
Kg
0.100
0.100
0.010
0.005
Tenaga
Org
Org
Org
Org
Pekerja
Tukang kayu
Kepala tukang
Mandor
5.34.2
10.1.2
Tenaga
0.006 Org
0.060 Org
0.006 Org
0.0003 Org
Pekerja
Tukang besi
Kepala tukang
Mandor
@
@
@
@
@
@
@
@
@
Rp
Rp
5,230,000.00
20,000.00
Jumlah (1)
=
=
=
Rp
Rp
Rp
73,220.00
3,000.00
76,220.00
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
3,200.00
4,500.00
500.00
275.00
8,475.00
Rp
84,695.00
Rp
Rp
13,750.00
21,000.00
Jumlah (1)
=
=
Rp
Rp
Rp
15,125.00
1,680.00
16,805.00
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
192.00
2,700.00
300.00
16.50
3,208.50
Rp
20,013.50
Bahan
M
Kg
0.100
0.200
0.025
0.005
Tenaga
Org
Org
Org
Org
Pekerja
Tukang kayu
Kepala tukang
Mandor
5.47.2
@
@
@
Rp
Rp
29,212,500.00
20,000.00
Jumlah (1)
=
=
=
Rp
Rp
Rp
210,330.00
1,000.00
211,330.00
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
3,200.00
9,000.00
1,250.00
275.00
13,725.00
Rp
225,055.00
8.7.2
0.070
0.100
0.010
0.0035
Tenaga
Org
Org
Org
Org
@
@
Pekerja
Tukang kayu
Kepala tukang
Mandor
@
@
@
@
Rp
Rp
75,350.00
20,000.00
Jumlah (1)
=
=
=
Rp
Rp
Rp
28,256.25
600.00
28,856.25
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
2,240.00
4,500.00
500.00
192.50
7,432.50
Rp
36,288.75
Bahan
M
Kg
0.100
0.100
0.025
0.015
Tenaga
Org
Org
Org
Org
Pekerja
Tukang kayu
Kepala tukang
Mandor
5.40.2
@
@
@
Rp
Rp
5,945,000.00
20,000.00
Jumlah (1)
=
=
=
Rp
Rp
Rp
71,340.00
2,000.00
73,340.00
Rp
Rp
Rp
Rp
32,000.00
45,000.00
50,000.00
55,000.00
Jumlah (2)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
3,200.00
4,500.00
1,250.00
825.00
9,775.00
Rp
83,115.00