No
Capacity
(m^3)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
500
1000
1500
2000
2000
2500
2500
5000
5000
7500
10000
10000
15000
15000
20000
20000
TOTAL
Material
TOTAL
Biaya Aplikasi
375.39
691.48
1185.77
1449.48
1741.89
1994.38
1611.07
3395.59
5049.44
6315.51
15283.45
9248.73
11002.82
13828.07
15630.89
18020.00
454.45
811.62
1209.12
1583.3
1721.36
2121.14
1858.97
3764.65
4301.54
6005.98
11490.14
8387.52
11380.08
12302.09
15377.77
16158.8
Tinngi
(m)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
7.32
10.97
10.97
10.97
9.14
10.97
9.14
10.97
9.14
10.97
10.97
12.80
10.97
12.80
12.80
10.97
500
1000
1500
2000
2000
2500
2500
5000
5000
7500
10000
10000
15000
15000
20000
20000
9.70
11.64
13.58
15.52
17.46
17.46
19.40
25.23
27.17
31.05
34.93
32.99
42.69
38.81
44.63
48.51
Catatan
1m=
3.28084 feet
Pelat Dasar, Dinding, Atap
- 7.0 material pound per SF
- USD 0.09 material cost per pound
Struktur Atap
- 8.0 material pound per SF
- USD 0.09 material cost per pound
811.69
1168.83
1590.91
2077.93
2629.88
2629.88
3246.76
5487.03
6363.65
8311.71
10519.51
9383.14
15714.32
12987.04
17175.37
20292.26
795.77
1145.92
1559.72
2037.18
2578.31
2578.31
3183.10
5379.44
6238.87
8148.73
10313.24
9199.16
15406.20
12732.40
16838.59
19894.37
Jika 1 USD =
481.72
550.23
631.54
714.46
931.34
931.34
1005.46
1519.12
2828.80
3166.36
3555.24
3366.62
6835.26
5872.67
7093.13
8269.53
Rp 9000
31905.98
50845.10
62386.71
74841.43
81707.99
89267.99
95052.71
153738.17
169648.05
221194.01
264991.18
256969.07
383405.74
344617.41
430082.78
473462.61
Biaya Material
(USD)
Biaya Material
(Rp)
2871.54
4576.06
5614.80
6735.73
7353.72
8034.12
8554.74
13836.44
15268.32
19907.46
23849.21
23127.22
34506.52
31015.57
38707.45
42611.64
25,843,845.58
41,184,528.08
50,533,233.78
60,621,559.27
66,183,472.84
72,307,073.23
76,992,692.27
124,527,917.20
137,414,924.52
179,167,146.85
214,642,857.84
208,144,946.95
310,558,650.08
279,140,104.50
348,367,053.12
383,504,715.25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
9.70
11.64
13.58
15.52
17.46
17.46
19.40
25.23
27.17
31.05
34.93
32.99
42.69
38.81
44.63
48.51
7.32
10.97
10.97
10.97
9.14
10.97
9.14
10.97
9.14
10.97
10.97
12.80
10.97
12.80
12.80
10.97
Luas Dinding
1 sisi (feet^2)
2400
4320
5040
5760
5400
6480
6000
9360
8400
11520
12960
14280
15840
16800
19320
18000
Catatan
1m=
3.28084 feet
Primer Coat
- 300 material coverage SF/gallon
- Material cost per galloon USD
Primer Coat
Material
Biaya Material
(Gallon)
(USD)
8.00
144.00
14.40
259.20
16.80
302.40
19.20
345.60
18.00
324.00
21.60
388.80
20.00
360.00
31.20
561.60
28.00
504.00
38.40
691.20
43.20
777.60
47.60
856.80
52.80
950.40
56.00
1008.00
64.40
1159.20
60.00
1080.00
Jika 1 USD =
18.00
Intermediate coat
'- 325 material coverage SF/gallon
- Material cost per galloon USD
18.80
Top Coat
- 313 material coverage SF/gallon
- Material cost per galloon USD
42.00
Intermediate Coat
Material
Biaya Material
(Gallon)
(USD)
7.38
138.83
13.29
249.90
15.51
291.54
17.72
333.19
16.62
312.37
19.94
374.84
18.46
347.08
28.80
541.44
25.85
485.91
35.45
666.39
39.88
749.69
43.94
826.04
48.74
916.28
51.69
971.82
59.45
1117.59
55.38
1041.23
Rp 9000
Top Coat
Material
Biaya Material
(Gallon)
(USD)
7.67
322.04
13.80
579.68
16.10
676.29
18.40
772.91
17.25
724.60
20.70
869.52
19.17
805.11
29.90
1255.97
26.84
1127.16
36.81
1545.81
41.41
1739.04
45.62
1916.17
50.61
2125.50
53.67
2254.31
61.73
2592.46
57.51
2415.34
Total Biaya
(USD)
Biaya Material
1 (Rp)
604.88
1088.78
1270.24
1451.70
1360.97
1633.16
1512.19
2359.01
2117.06
2903.40
3266.33
3599.01
3992.18
4234.13
4869.25
4536.57
5,443,879.83
9,798,983.69
11,432,147.64
13,065,311.59
12,248,729.61
14,698,475.53
13,609,699.57
21,231,131.33
19,053,579.40
26,130,623.17
29,396,951.07
32,391,084.97
35,929,606.86
38,107,158.79
43,823,232.61
40,829,098.71
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
9.70
11.64
13.58
15.52
17.46
17.46
19.40
25.23
27.17
31.05
34.93
32.99
42.69
38.81
44.63
48.51
7.32
10.97
10.97
10.97
9.14
10.97
9.14
10.97
9.14
10.97
10.97
12.80
10.97
12.80
12.80
10.97
600
720
840
960
1080
1080
1200
1560
1680
1920
2160
2040
2640
2400
2760
3000
Catatan
1m=
3.28084 feet
Primer Coat
- 188 material coverage SF/gallon
- Material cost per galloon USD
Primer Coat
Material
Biaya Material
(Gallon)
(USD)
3.19
96.06
3.83
115.28
4.47
134.49
5.11
153.70
5.74
172.91
5.74
172.91
6.38
192.13
8.30
249.77
8.94
268.98
10.21
307.40
11.49
345.83
10.85
326.62
14.04
422.68
12.77
384.26
14.68
441.89
15.96
480.32
Jika 1 USD =
30.10
Intermediate coat
'- 288 material coverage SF/gallon
- Material cost per galloon USD
30.10
Top Coat
- 338material coverage SF/gallon
- Material cost per galloon USD
30.10
Intermediate Coat
Material
Biaya Material
(Gallon)
(USD)
2.08
62.71
2.50
75.25
2.92
87.79
3.33
100.33
3.75
112.88
3.75
112.88
4.17
125.42
5.42
163.04
5.83
175.58
6.67
200.67
7.50
225.75
7.08
213.21
9.17
275.92
8.33
250.83
9.58
288.46
10.42
313.54
Rp 9000
Top Coat
Material
Biaya Material
(Gallon)
(USD)
1.78
53.43
2.13
64.12
2.49
74.80
2.84
85.49
3.20
96.18
3.20
96.18
3.55
106.86
4.62
138.92
4.97
149.61
5.68
170.98
6.39
192.36
6.04
181.67
7.81
235.10
7.10
213.73
8.17
245.79
8.88
267.16
Total Biaya
(USD)
Biaya Material
2 (Rp)
212.20
254.64
297.09
339.53
381.97
381.97
424.41
551.73
594.17
679.05
763.93
721.49
933.70
848.82
976.14
1061.02
1,909,837.10
2,291,804.52
2,673,771.94
3,055,739.37
3,437,706.79
3,437,706.79
3,819,674.21
4,965,576.47
5,347,543.89
6,111,478.73
6,875,413.57
6,493,446.15
8,403,283.25
7,639,348.41
8,785,250.67
9,549,185.52
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
9.70
11.64
13.58
15.52
17.46
17.46
19.40
25.23
27.17
31.05
34.93
32.99
42.69
38.81
44.63
48.51
7.32
10.97
10.97
10.97
9.14
10.97
9.14
10.97
9.14
10.97
10.97
12.80
10.97
12.80
12.80
10.97
1,909,837.10
2,291,804.52
2,673,771.94
3,055,739.37
3,437,706.79
3,437,706.79
3,819,674.21
4,965,576.47
5,347,543.89
6,111,478.73
6,875,413.57
6,493,446.15
8,403,283.25
7,639,348.41
8,785,250.67
9,549,185.52
Total Biaya
Material (Rp)
7,353,716.93
12,090,788.21
14,105,919.58
16,121,050.95
15,686,436.40
18,136,182.32
17,429,373.77
26,196,707.80
24,401,123.28
32,242,101.90
36,272,364.64
38,884,531.12
44,332,890.11
45,746,507.20
52,608,483.29
50,378,284.22
Luas Atap
(feet^2)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
811.69
1168.83
1590.91
2077.93
2629.88
2629.88
3246.76
5487.03
6363.65
8311.71
10519.51
9383.14
15714.32
12987.04
17175.37
20292.26
500
1000
1500
2000
2000
2500
2500
5000
5000
7500
10000
10000
15000
15000
20000
20000
9.70
11.64
13.58
15.52
17.46
17.46
19.40
25.23
27.17
31.05
34.93
32.99
42.69
38.81
44.63
48.51
7.32
10.97
10.97
10.97
9.14
10.97
9.14
10.97
9.14
10.97
10.97
12.80
10.97
12.80
12.80
10.97
Catatan
1m=
3.28084 feet
Primer Coat
- 300 material coverage SF/gallon
- Material cost per galloon USD
Primer Coat
Material
Biaya Material
(Gallon)
(USD)
2.71
48.70
3.90
70.13
5.30
95.45
6.93
124.68
8.77
157.79
8.77
157.79
10.82
194.81
18.29
329.22
21.21
381.82
27.71
498.70
35.07
631.17
31.28
562.99
52.38
942.86
43.29
779.22
57.25
1030.52
67.64
1217.54
Jika 1 USD =
18.00
Intermediate coat
'- 275 material coverage SF/gallon
- Material cost per galloon USD
18.80
Top Coat
- 313 material coverage SF/gallon
- Material cost per galloon USD
42.00
Intermediate Coat
Material Biaya Material
(Gallon)
(USD)
2.95
55.49
4.25
79.91
5.79
108.76
7.56
142.05
9.56
179.79
9.56
179.79
11.81
221.96
19.95
375.11
23.14
435.04
30.22
568.22
38.25
719.15
34.12
641.47
57.14
1074.29
47.23
887.84
62.46
1174.17
73.79
1387.25
Rp 9000
Top Coat
Material Biaya Material
(Gallon)
(USD)
2.59
108.92
3.73
156.84
5.08
213.48
6.64
278.83
8.40
352.89
8.40
352.89
10.37
435.67
17.53
736.28
20.33
853.91
26.55
1115.31
33.61
1411.56
29.98
1259.08
50.21
2108.63
41.49
1742.67
54.87
2304.68
64.83
2722.92
Total Biaya
(USD)
Biaya Material
(Rp)
213.11
306.88
417.69
545.56
690.47
690.47
852.43
1440.61
1670.77
2182.23
2761.89
2463.53
4125.78
3409.73
4509.37
5327.71
1,917,975.76
2,761,885.09
3,759,232.49
4,910,017.94
6,214,241.46
6,214,241.46
7,671,903.04
12,965,516.13
15,036,929.95
19,640,071.78
24,856,965.84
22,171,799.78
37,132,010.70
30,687,612.15
40,584,367.07
47,949,393.99
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
9.70
11.64
13.58
15.52
17.46
17.46
19.40
25.23
27.17
31.05
34.93
32.99
42.69
38.81
44.63
48.51
7.32
10.97
10.97
10.97
9.14
10.97
9.14
10.97
9.14
10.97
10.97
12.80
10.97
12.80
12.80
10.97
Luas Dasar
(feet^2)
795.77
1145.92
1559.72
2037.18
2578.31
2578.31
3183.10
5379.44
6238.87
8148.73
10313.24
9199.16
15406.20
12732.40
16838.59
19894.37
Catatan
1m=
3.28084 feet
Primer Coat
- 188 material coverage SF/gallon
- Material cost per galloon USD 30.10
Intermediate coat
'- 288 material coverage SF/gallon
- Material cost per galloon USD 30.10
Top Coat
- 338material coverage SF/gallon
- Material cost per galloon USD 30.10
Primer Coat
Material Biaya Material
(Gallon)
(USD)
4.23
127.41
6.10
183.47
8.30
249.72
10.84
326.17
13.71
412.80
13.71
412.80
16.93
509.63
28.61
861.28
33.19
998.88
43.34
1304.66
54.86
1651.22
48.93
1472.84
81.95
2466.63
67.73
2038.54
89.57
2695.97
105.82
3185.22
Jika 1 USD =
Intermediate Coat
Material Biaya Material
(Gallon)
(USD)
2.76
83.17
3.98
119.76
5.42
163.01
7.07
212.91
8.95
269.47
8.95
269.47
11.05
332.68
18.68
562.23
21.66
652.05
28.29
851.66
35.81
1077.88
31.94
961.44
53.49
1610.16
44.21
1330.71
58.47
1759.87
69.08
2079.24
Rp 9000
Top Coat
Total Biaya
Material
Biaya Material
(USD)
(Gallon)
(USD)
2.35
70.87
281.44
3.39
102.05
405.28
4.61
138.90
551.63
6.03
181.42
720.50
7.63
229.61
911.88
7.63
229.61
911.88
9.42
283.47
1125.78
15.92
479.06
1902.56
18.46
555.59
2206.52
24.11
725.67
2881.99
30.51
918.43
3647.52
27.22
819.21
3253.50
45.58
1371.97
5448.76
37.67
1133.86
4503.11
49.82
1499.53
5955.36
58.86
1771.66
7036.11
Biaya Material
(Rp)
2,533,000.21
3,647,520.30
4,964,680.41
6,484,480.54
8,206,920.68
8,206,920.68
10,132,000.84
17,123,081.42
19,858,721.65
25,937,922.15
32,827,682.72
29,281,482.43
49,038,884.06
40,528,003.36
53,598,284.44
63,325,005.25
500
1000
1500
2000
2000
2500
2500
5000
5000
7500
10000
10000
15000
15000
20000
20000
Catatan
1m=
9.70
11.64
13.58
15.52
17.46
17.46
19.40
25.23
27.17
31.05
34.93
32.99
42.69
38.81
44.63
48.51
7.32
10.97
10.97
10.97
9.14
10.97
9.14
10.97
9.14
10.97
10.97
12.80
10.97
12.80
12.80
10.97
5.091
5.837
6.687
7.561
9.931
9.931
10.806
17.175
30.589
34.072
38.253
36.212
81.273
66.952
84.488
102.380
Primer Coat
Material
Biaya Material
(Gallon)
5.60
168.57
6.42
193.25
7.36
221.42
8.32
250.36
10.92
328.80
10.92
328.80
11.89
357.78
18.89
568.65
33.65
1012.81
37.48
1128.12
42.08
1266.57
39.83
1198.97
89.40
2690.94
73.65
2216.79
92.94
2797.40
112.62
3389.80
3.28084 feet
Jika 1 USD =
Primer Coat
- 1.1 material gallon per ton
- Material cost per galloon USD
30.10
Intermediate coat
- 1.0 material gallon per ton
- Material cost per galloon USD
30.10
Top Coat
- 0.9 material gallon per ton
- Material cost per galloon USD
30.10
Intermediate Coat
Material
Biaya Material
(Gallon)
5.09
153.24
5.84
175.68
6.69
201.29
7.56
227.60
9.93
298.91
9.93
298.91
10.81
325.25
17.17
516.96
30.59
920.73
34.07
1025.56
38.25
1151.43
36.21
1089.98
81.27
2446.31
66.95
2015.26
84.49
2543.09
102.38
3081.64
Rp 9000
Top Coat
Material
Biaya Material
(Gallon)
4.58
137.92
5.25
158.11
6.02
181.16
6.81
204.84
8.94
269.02
8.94
269.02
9.73
292.73
15.46
465.26
27.53
828.66
30.66
923.00
34.43
1036.28
32.59
980.98
73.15
2201.68
60.26
1813.74
76.04
2288.78
92.14
2773.47
Total Biaya
(USD)
Biaya Material
(Rp)
459.73
527.04
603.88
682.79
896.74
896.74
975.75
1550.88
2762.20
3076.68
3454.28
3269.93
7338.92
6045.79
7629.27
9244.91
4,137,601.19
4,743,337.55
5,434,907.74
6,145,128.94
8,070,658.09
8,070,658.09
8,781,776.98
13,957,886.60
24,859,773.80
27,690,117.24
31,088,528.61
29,429,356.19
66,050,265.29
54,412,082.29
68,663,469.86
83,204,171.83
Capacity
(m^3)
Diameter
(m)
Height
(m)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
500
1000
1500
2000
2000
2500
2500
5000
5000
7500
10000
10000
15000
15000
20000
20000
9.70
11.64
13.58
15.52
17.46
17.46
19.40
25.23
27.17
31.05
34.93
32.99
42.69
38.81
44.63
48.51
7.32
10.97
10.97
10.97
9.14
10.97
9.14
10.97
9.14
10.97
10.97
12.80
10.97
12.80
12.80
10.97
Panjang
Panjang
Tangga (LF) Handrail (LF)
33.94
50.91
50.91
50.91
42.43
50.91
42.43
50.91
42.43
50.91
50.91
59.40
50.91
59.40
59.40
50.91
Catatan
1m=
3.28084 feet
Primer Coat
- 115 material coverage LF /gallon
- Material cost per galloon USD 29.40
Finish Coat
- 130 material coverage LF/gallon
- Material cost per galloon USD 29.70
100
120
140
160
180
180
200
260
280
320
360
340
440
400
460
500
Primer Coat
Material
Biaya Material
(Gallon)
1.16
34.24
1.49
43.69
1.66
48.81
1.83
53.92
1.93
56.86
2.01
59.03
2.11
61.98
2.70
79.49
2.80
82.43
3.23
94.82
3.57
105.05
3.47
102.11
4.27
125.50
3.99
117.45
4.52
132.78
4.79
140.84
Jika 1 USD =
Finish Coat
Material
Biaya Material
(Gallon)
1.03
30.60
1.31
39.05
1.47
43.62
1.62
48.19
1.71
50.82
1.78
52.75
1.86
55.39
2.39
71.03
2.48
73.66
2.85
84.74
3.16
93.88
3.07
91.25
3.78
112.15
3.53
104.95
4.00
118.66
4.24
125.86
Rp 9000
Total Biaya
(USD)
Biaya Material
(Rp)
64.84
82.74
92.42
102.11
107.68
111.79
117.36
150.52
156.09
179.56
198.93
193.35
237.66
222.40
251.45
266.70
583,584.64
744,666.25
831,806.72
918,947.19
969,117.09
1,006,087.66
1,056,257.56
1,354,649.55
1,404,819.45
1,616,070.96
1,790,351.90
1,740,182.00
2,138,913.79
2,001,603.42
2,263,024.83
2,400,335.20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Kapasitas Diameter
(m^3)
(m)
500
1000
1500
2000
2000
2500
2500
5000
5000
7500
10000
10000
15000
15000
20000
20000
9.70
11.64
13.58
15.52
17.46
17.46
19.40
25.23
27.17
31.05
34.93
32.99
42.69
38.81
44.63
48.51
Tinngi
(m)
Biaya Material
Surf Prep (Rp)
7.32
10.97
10.97
10.97
9.14
10.97
9.14
10.97
9.14
10.97
10.97
12.80
10.97
12.80
12.80
10.97
25,843,845.58
41,184,528.08
50,533,233.78
60,621,559.27
66,183,472.84
72,307,073.23
76,992,692.27
124,527,917.20
137,414,924.52
179,167,146.85
214,642,857.84
208,144,946.95
310,558,650.08
279,140,104.50
348,367,053.12
383,504,715.25
Biaya Material
Biaya Material
Biaya Material
Biaya Material
Biaya Material
Total Biaya Material
Coating Atap (Rp) Coating Dinding (Rp)Coating Dasar (Rp)Coating Struktur (Rp)Coating Tangga/Pegangan (Rp) Coating (Rp)
1,917,975.76
2,761,885.09
3,759,232.49
4,910,017.94
6,214,241.46
6,214,241.46
7,671,903.04
12,965,516.13
15,036,929.95
19,640,071.78
24,856,965.84
22,171,799.78
37,132,010.70
30,687,612.15
40,584,367.07
47,949,393.99
7,353,716.93
12,090,788.21
14,105,919.58
16,121,050.95
15,686,436.40
18,136,182.32
17,429,373.77
26,196,707.80
24,401,123.28
32,242,101.90
36,272,364.64
38,884,531.12
44,332,890.11
45,746,507.20
52,608,483.29
50,378,284.22
2,533,000.21
3,647,520.30
4,964,680.41
6,484,480.54
8,206,920.68
8,206,920.68
10,132,000.84
17,123,081.42
19,858,721.65
25,937,922.15
32,827,682.72
29,281,482.43
49,038,884.06
40,528,003.36
53,598,284.44
63,325,005.25
4,137,601.19
4,743,337.55
5,434,907.74
6,145,128.94
8,070,658.09
8,070,658.09
8,781,776.98
13,957,886.60
24,859,773.80
27,690,117.24
31,088,528.61
29,429,356.19
66,050,265.29
54,412,082.29
68,663,469.86
83,204,171.83
583,584.64
744,666.25
831,806.72
918,947.19
969,117.09
1,006,087.66
1,056,257.56
1,354,649.55
1,404,819.45
1,616,070.96
1,790,351.90
1,740,182.00
2,138,913.79
2,001,603.42
2,263,024.83
2,400,335.20
42,369,724.31
65,172,725.49
79,629,780.73
95,201,184.83
105,330,846.56
113,941,163.45
122,064,004.47
196,125,758.70
222,976,292.65
286,293,430.88
341,478,751.56
329,652,298.48
509,251,614.04
452,515,912.92
566,084,682.61
630,761,905.74