Earth Testing @ New CCE Office STF Area.

Location
Generator 053 Generator 054 MTS Diesel Tank For Generator Fire Water Pump Portable Water Pump Disconnect Switch For Pumps DP-1 Building Frame East Side 1 Building Frame East Side 2 Building Frame West Side 1 Building Frame West Side 2 PB-1 PB-2 PB-3 PB-6 PB-7 PB-8

Result
2.5 2.5 2.4 2.5 2.5 2.5 2.5 2.5 2.4 2.5 2.5 2.5 2.4 2.5 2.5 2.5 2.4 2.5

Note: PB-4 & 5 are connected from DP-1