Obra
CONSTRUCCIN Y REHABILITACIN DE LA AV. ANDRS AVELINO CCERES TRAMO CARRETERA CENTRAL AV. JOSE CARLOS MARIATEGUI HUAYCAN ETAPA II
Subpresupuesto
Cliente
Departamento
Costo al
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
02
02.01
02.02
03
03.01
03.02
03.03
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
06
06.01
06.02
06.03
06.04
06.05
07
07.01
07.01.01
07.01.02
07.01.03
07.01.04
07.02
07.02.01
07.02.02
07.02.03
07.02.04
08
08.01
08.01.01
08.01.02
08.01.03
08.01.04
08.02
08.02.01
08.02.02
08.03
08.03.01
08.03.02
08.03.03
Descripcin
OBRAS PRELIMINARES
INSTALACIONES PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
IMPLEMENTACION DEL PLAN DE DESVIOS/MANTENIMIENTO DE TRANSITO
CARTEL DE OBRA DE 7.00M * 4.00M
DEMOLICIONES
DEMOLICION DE VEREDAS C/EQUIPO INCL. SARDINEL DE BORDE
DEMOLICION DE SEPARADOR CENTRAL CON EQUIPO
MOVIMIENTO DE TIERRAS
CORTE A NIVEL DE SUB RASANTE C/EQUIPO
RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE PROVENIENTE DE LOS CORTES Y DEMOLICION
PAVIMENTOS
FLEXIBLES
CONFORMACION, PERFILADO Y COMPACTADO DE LA SUB RASANTE C/ EQUIPO
BASE GRANULAR E=0.25 M C/EQUIPO
IMPRIMACION ASFALTICA
CARPETA ASFALTICA EN CALIENTE DE 3"
CARPETA ASFALTICA EN CALIENTE DE 2.5"
BERMAS, VEREDAS,SARDINELES Y RAMPAS
VEREDAS Y RAMPAS
REFINE, ESCARIFICADO Y COMPACTACION DE LA SUBRASANTE C/PL
VEREDA DE CONCRETO F'C= 175 KG/CM2.E=0.10M,INCL. BASE
RAMPA DE CONCRETO PARA MINUSVALIDOS
CRUCERO PEATONAL, INCL. BRUADO
NIVELACIN DE BERMA
SARDINELES
EXCAVACION DE ZANJA P/SARDINELES
ELIMINACION MATERIAL EXCEDENTE
SARDINEL DE BORDE DE ACERAS (0.15m x 0.35m)
SARDINEL PERALTADO (0.15m x 0.60m)
SARDINEL SUMERGIDO (0.15M x 0.40)
MURO DE TIERRA MECANICAMENTE ESTABILIZADA
CONCRETO EN LOSAS NIVELACION F'C=210 KG/CM2
BLOQUE MESA ESTANDAR
GEOMALLA UX 1400MSE (46 ROLLOS DE 1.33x76.2M C/U)
RELLENO CON MATERIAL GRANULAR DE FILTRO
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO C/EQUIPO
SEALIZACION
SEALIZACION HORIZONTAL
PINTADO DE LINEAS CONTINUAS
PINTADO DE LINEAS DISCONTINUAS
PINTADO DE SIMBOLOS Y LETRAS
PINTADO DE SARDINELES PERALTADOS
SEALIZACION VERTICAL
SEALES PREVENTIVAS
SEALES REGULADORAS
SEALES INFORMATIVAS
SUMINISTRO E INSTALACION DE TACHAS REFLECTIVAS
SEMAFORIZACION
CANALIZACION
CANALIZACION EN PISTA A DUCTO 1 VA
CANALIZACION EN VEREDA DUCTO DE 1 VA
CANALIZACION EN TIERRA O JARDIN, DUCTO DE 1 VA
CANALIZACION EN TIERRA O JARDIN, DUCTO DE 1 VA INTERCONEXION
CAJAS DE PASO (EXCAVACION Y RESANE)
CAJA DE PASE TIPO C.E. - 2
CAJA DE PASE TIPO C.E. - 1
POSTES (SUMINISTRO E INSTALACION)
SEMIPORTICO - PARA ADOSADO VEHICULAR
PEDESTAL - PARA SEMAFORO PEATONAL
PEDESTAL- PARA CONTROLADOR DE TRAFICO
Provincia:
Und.Metrado
LIMA
Distrito:
GLB
GLB
m2
m2
est
und
1.00
1.00
74,998.00
74,998.00
1.00
5.00
15,819.16
8,697.96
0.58
0.93
34,054.90
1,548.39
m2
m
78.49
512.45
12.86
13.46
m3
m3
m3
23,274.10
6,291.70
20,454.44
6.86
21.99
28.17
m2
m2
m2
m2
m2
38,975.42
38,975.42
38,975.42
28,997.67
9,977.75
3.54
17.51
3.50
33.89
28.45
m2
m2
m2
m2
m2
11,782.03
10,226.49
83.16
170.89
7,349.07
11.92
67.61
81.59
73.89
3.54
m3
m3
m
m
m
650.19
812.74
3,355.85
5,669.80
2,360.62
28.56
28.68
30.38
39.67
24.45
m3
und
m2
m3
m3
38.63
5,737.00
2,800.00
172.00
1,720.50
261.83
13.50
17.75
40.09
39.86
m
m
m2
m
396.00
1,939.00
1,094.07
5,669.80
19.70
20.09
33.31
22.63
und
und
und
und
18.00
31.00
6.00
126.00
765.19
728.08
861.98
19.23
259.00
163.00
139.00
1,466.44
215.05
206.67
124.60
124.60
und
und
36.00
34.00
861.26
611.53
und
und
und
16.00
24.00
3.00
7,789.31
2,667.18
2,611.53
m
m
m
m
179,560.95
15,819.16
8,697.96
43,498.84
69,748.14
34,054.90
7,741.95
7,906.96
1,009.38
6,897.58
874,216.38
159,660.33
138,354.48
576,201.57
2,223,444.58
2,223,444.58
137,972.99
682,459.60
136,413.97
982,731.04
283,866.99
1,303,750.24
877,282.58
140,441.80
691,412.99
6,785.02
12,627.06
26,015.71
426,467.66
18,569.43
23,309.38
101,950.72
224,920.97
57,717.16
212,738.60
10,114.49
77,449.50
49,700.00
6,895.48
68,579.13
255,445.52
211,506.76
7,801.20
38,954.51
36,443.47
128,307.57
43,938.76
13,773.42
22,570.48
5,171.88
2,422.98
916,195.52
289,422.98
55,697.95
33,687.21
17,319.40
182,718.42
51,797.38
31,005.36
20,792.02
232,236.11
124,628.96
64,012.32
7,834.59
MES 01
15,819.16
8,697.96
43,498.84
13,949.63
6,810.98
7,741.95
ATE VITARTE
MES 02
13,949.63
6,810.98
MES 03
13,949.63
6,810.98
MES 04
13,949.63
6,810.98
MES 05
13,949.63
6,810.98
1,009.38
6,897.58
159,660.33
83,012.69
576,201.57
10,114.49
30,979.80
TOTAL
15,819.16
8,697.96
43,498.84
69,748.14
34,054.90
7,741.95
1,009.38
6,897.58
159,660.33
138,354.48
576,201.57
55,341.79
55,189.19
68,245.96
13,641.40
82,783.79
409,475.76
81,848.38
42,132.54
207,423.90
56,176.71
276,565.20
42,132.54
207,423.90
6,785.02
12,627.06
26,015.71
140,441.79
691,412.99
6,785.02
12,627.06
26,015.71
18,569.43
23,309.38
30,585.22
40,780.29
30,585.22
224,920.97
57,717.16
18,569.43
23,309.38
101,950.72
224,920.97
57,717.16
204,737.88
40,924.19
393,092.41
283,866.99
589,638.62
137,972.99
682,459.60
136,413.97
982,731.04
283,866.99
10,114.49
77,449.50
49,700.00
6,895.48
68,579.13
46,469.70
49,700.00
6,895.48
68,579.13
33,418.77
20,212.33
17,319.40
73,087.37
7,801.20
38,954.51
36,443.47
128,307.57
7,801.20
38,954.51
36,443.47
128,307.57
13,773.42
22,570.48
5,171.88
2,422.98
13,773.42
22,570.48
5,171.88
2,422.98
22,279.18
13,474.88
109,631.05
55,697.95
33,687.21
17,319.40
182,718.42
31,005.36
20,792.02
31,005.36
20,792.02
124,628.96
64,012.32
7,834.59
124,628.96
64,012.32
7,834.59
1/2
CRONOGRAMA VALORIZADO
Obra
CONSTRUCCIN Y REHABILITACIN DE LA AV. ANDRS AVELINO CCERES TRAMO CARRETERA CENTRAL AV. JOSE CARLOS MARIATEGUI HUAYCAN ETAPA II
Subpresupuesto
Cliente
Departamento
Costo al
Provincia:
Item
Descripcin
Und.Metrado
08.03.04
08.03.05
08.03.06
08.03.07
08.03.08
08.03.09
08.03.10
08.04
08.04.01
08.04.02
08.04.03
08.04.04
08.05
08.05.01
08.05.02
08.06
08.06.01
08.07
08.07.01
08.07.02
08.07.03
08.08
08.08.01
09
09.01
09.01.01
09.01.02
09.01.03
09.01.04
09.02
09.02.01
09.03
09.03.01
09.03.02
09.04
09.04.01
09.05
09.05.01
und
und
und
und
m3
m3
m2
16.00
27.00
16.00
27.00
7.35
18.50
27.50
m
m
m
m
508.00
524.00
76.00
15.00
und
und
46.00
24.00
und
3.00
und
und
und
3.00
3.00
3.00
GLB
1.00
m3
m3
kg
m2
1,595.99
564.87
27,265.55
3,773.36
m2
14,625.79
und
und
27.00
4.00
est
1.00
und
7.00
SUBTOTAL
IMPUESTO IGV 18%
PRESUPUESTO TOTAL
% AVANCE
% AVANCE ACUMULADO
LIMA
Distrito:
5,379.84
3,617.73
9,292.16
8,008.47
1,772.23
4,831.46
2,858.35
6,337.40
6.93
3,520.44
4.27
2,237.48
6.93
526.68
3.52
52.80
188,144.92
3,371.50
155,089.00
1,377.33
33,055.92
114,858.93
38,286.31
114,858.93
13,397.79
491.71
1,475.13
2,500.00
7,500.00
1,474.22
4,422.66
20,000.00
20,000.00
20,000.00
937,261.40
497,568.22
26.87
42,884.25
342.45
193,439.73
4.49
122,422.32
36.79
138,821.91
290,321.93
19.85
290,321.93
6,107.19
197.21
5,324.67
195.63
782.52
36,678.21
36,678.21
36,678.21
106,585.85
15,226.55
106,585.85
6,910,520.12
0.129765496
896,747.07
691,052.01
-------------------------8,498,319.20
1,529,697.46
=================
10,028,016.65
MES 01
ATE VITARTE
MES 02
MES 03
336.24
133.99
580.76
296.61
241.12
261.16
103.94
MES 04
MES 05
5,379.84
3,617.73
9,292.16
8,008.47
1,772.23
4,831.46
2,858.35
5,379.84
3,617.73
9,292.16
8,008.47
1,772.23
4,831.46
2,858.35
3,520.44
2,237.48
526.68
52.80
3,520.44
2,237.48
526.68
52.80
155,089.00
33,055.92
155,089.00
33,055.92
114,858.93
114,858.93
1,475.13
7,500.00
4,422.66
1,475.13
7,500.00
4,422.66
20,000.00
30,018.98
12,865.28
77,375.89
73,453.39
69,410.96
116,063.84
48,968.93
69,410.96
14,516.10
116,128.77
TOTAL
20,000.00
42,884.25
193,439.73
122,422.32
138,821.91
116,128.77
5,324.67
7,335.64
7,335.64
7,335.64
7,335.64
1,001,748.98
129,992.45
100,174.90
----------------1,231,916.33
221,744.94
=======
1,453,661.27
961,800.98
124,808.58
96,180.10
----------------1,182,789.66
212,902.13
=======
1,395,691.79
1,470,336.74
190,798.98
147,033.67
----------------1,808,169.39
325,470.49
=======
2,133,639.88
2,041,578.20
264,926.41
204,157.82
----------------2,510,662.43
451,919.24
=======
2,962,581.66
14.50%
14.50%
13.92%
28.41%
21.28%
49.69%
29.54%
79.23%
43,548.29
290,321.93
782.52
5,324.67
782.52
7,335.64
36,678.21
106,585.85
106,585.85
1,435,055.24
6,910,520.12
186,220.65
896,747.07
143,505.52
691,052.01
-----------------------------------------1,764,781.41
8,498,319.20
317,660.65
1,529,697.46
======= =================
2,082,442.07
10,028,016.65
20.77%
100.00%
100.00%
2/2