Anda di halaman 1dari 2

CRONOGRAMA VALORIZADO

Obra

CONSTRUCCIN Y REHABILITACIN DE LA AV. ANDRS AVELINO CCERES TRAMO CARRETERA CENTRAL AV. JOSE CARLOS MARIATEGUI HUAYCAN ETAPA II

Subpresupuesto
Cliente

TRAMO 2: CALLE 1 - CARRETERA CENTRAL


MUNICIPALIDAD DE LIMA - PGRLM
LIMA
08/07/2011

Departamento
Costo al

Item

01
01.01
01.02
01.03
01.04
01.05
01.06
02
02.01
02.02
03
03.01
03.02
03.03
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
06
06.01
06.02
06.03
06.04
06.05
07
07.01
07.01.01
07.01.02
07.01.03
07.01.04
07.02
07.02.01
07.02.02
07.02.03
07.02.04
08
08.01
08.01.01
08.01.02
08.01.03
08.01.04
08.02
08.02.01
08.02.02
08.03
08.03.01
08.03.02
08.03.03

Descripcin

OBRAS PRELIMINARES
INSTALACIONES PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
IMPLEMENTACION DEL PLAN DE DESVIOS/MANTENIMIENTO DE TRANSITO
CARTEL DE OBRA DE 7.00M * 4.00M
DEMOLICIONES
DEMOLICION DE VEREDAS C/EQUIPO INCL. SARDINEL DE BORDE
DEMOLICION DE SEPARADOR CENTRAL CON EQUIPO
MOVIMIENTO DE TIERRAS
CORTE A NIVEL DE SUB RASANTE C/EQUIPO
RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE PROVENIENTE DE LOS CORTES Y DEMOLICION
PAVIMENTOS
FLEXIBLES
CONFORMACION, PERFILADO Y COMPACTADO DE LA SUB RASANTE C/ EQUIPO
BASE GRANULAR E=0.25 M C/EQUIPO
IMPRIMACION ASFALTICA
CARPETA ASFALTICA EN CALIENTE DE 3"
CARPETA ASFALTICA EN CALIENTE DE 2.5"
BERMAS, VEREDAS,SARDINELES Y RAMPAS
VEREDAS Y RAMPAS
REFINE, ESCARIFICADO Y COMPACTACION DE LA SUBRASANTE C/PL
VEREDA DE CONCRETO F'C= 175 KG/CM2.E=0.10M,INCL. BASE
RAMPA DE CONCRETO PARA MINUSVALIDOS
CRUCERO PEATONAL, INCL. BRUADO
NIVELACIN DE BERMA
SARDINELES
EXCAVACION DE ZANJA P/SARDINELES
ELIMINACION MATERIAL EXCEDENTE
SARDINEL DE BORDE DE ACERAS (0.15m x 0.35m)
SARDINEL PERALTADO (0.15m x 0.60m)
SARDINEL SUMERGIDO (0.15M x 0.40)
MURO DE TIERRA MECANICAMENTE ESTABILIZADA
CONCRETO EN LOSAS NIVELACION F'C=210 KG/CM2
BLOQUE MESA ESTANDAR
GEOMALLA UX 1400MSE (46 ROLLOS DE 1.33x76.2M C/U)
RELLENO CON MATERIAL GRANULAR DE FILTRO
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO C/EQUIPO
SEALIZACION
SEALIZACION HORIZONTAL
PINTADO DE LINEAS CONTINUAS
PINTADO DE LINEAS DISCONTINUAS
PINTADO DE SIMBOLOS Y LETRAS
PINTADO DE SARDINELES PERALTADOS
SEALIZACION VERTICAL
SEALES PREVENTIVAS
SEALES REGULADORAS
SEALES INFORMATIVAS
SUMINISTRO E INSTALACION DE TACHAS REFLECTIVAS
SEMAFORIZACION
CANALIZACION
CANALIZACION EN PISTA A DUCTO 1 VA
CANALIZACION EN VEREDA DUCTO DE 1 VA
CANALIZACION EN TIERRA O JARDIN, DUCTO DE 1 VA
CANALIZACION EN TIERRA O JARDIN, DUCTO DE 1 VA INTERCONEXION
CAJAS DE PASO (EXCAVACION Y RESANE)
CAJA DE PASE TIPO C.E. - 2
CAJA DE PASE TIPO C.E. - 1
POSTES (SUMINISTRO E INSTALACION)
SEMIPORTICO - PARA ADOSADO VEHICULAR
PEDESTAL - PARA SEMAFORO PEATONAL
PEDESTAL- PARA CONTROLADOR DE TRAFICO

Provincia:

Und.Metrado

LIMA

Distrito:

Precio (S/.) Parcial (S/.)

GLB
GLB
m2
m2
est
und

1.00
1.00
74,998.00
74,998.00
1.00
5.00

15,819.16
8,697.96
0.58
0.93
34,054.90
1,548.39

m2
m

78.49
512.45

12.86
13.46

m3
m3
m3

23,274.10
6,291.70
20,454.44

6.86
21.99
28.17

m2
m2
m2
m2
m2

38,975.42
38,975.42
38,975.42
28,997.67
9,977.75

3.54
17.51
3.50
33.89
28.45

m2
m2
m2
m2
m2

11,782.03
10,226.49
83.16
170.89
7,349.07

11.92
67.61
81.59
73.89
3.54

m3
m3
m
m
m

650.19
812.74
3,355.85
5,669.80
2,360.62

28.56
28.68
30.38
39.67
24.45

m3
und
m2
m3
m3

38.63
5,737.00
2,800.00
172.00
1,720.50

261.83
13.50
17.75
40.09
39.86

m
m
m2
m

396.00
1,939.00
1,094.07
5,669.80

19.70
20.09
33.31
22.63

und
und
und
und

18.00
31.00
6.00
126.00

765.19
728.08
861.98
19.23

259.00
163.00
139.00
1,466.44

215.05
206.67
124.60
124.60

und
und

36.00
34.00

861.26
611.53

und
und
und

16.00
24.00
3.00

7,789.31
2,667.18
2,611.53

m
m
m
m

179,560.95
15,819.16
8,697.96
43,498.84
69,748.14
34,054.90
7,741.95
7,906.96
1,009.38
6,897.58
874,216.38
159,660.33
138,354.48
576,201.57
2,223,444.58
2,223,444.58
137,972.99
682,459.60
136,413.97
982,731.04
283,866.99
1,303,750.24
877,282.58
140,441.80
691,412.99
6,785.02
12,627.06
26,015.71
426,467.66
18,569.43
23,309.38
101,950.72
224,920.97
57,717.16
212,738.60
10,114.49
77,449.50
49,700.00
6,895.48
68,579.13
255,445.52
211,506.76
7,801.20
38,954.51
36,443.47
128,307.57
43,938.76
13,773.42
22,570.48
5,171.88
2,422.98
916,195.52
289,422.98
55,697.95
33,687.21
17,319.40
182,718.42
51,797.38
31,005.36
20,792.02
232,236.11
124,628.96
64,012.32
7,834.59

MES 01

15,819.16
8,697.96
43,498.84
13,949.63
6,810.98
7,741.95

ATE VITARTE

MES 02

13,949.63
6,810.98

MES 03

13,949.63
6,810.98

MES 04

13,949.63
6,810.98

MES 05

13,949.63
6,810.98

1,009.38
6,897.58
159,660.33
83,012.69
576,201.57

10,114.49
30,979.80

TOTAL

15,819.16
8,697.96
43,498.84
69,748.14
34,054.90
7,741.95
1,009.38
6,897.58
159,660.33
138,354.48
576,201.57

55,341.79

55,189.19
68,245.96
13,641.40

82,783.79
409,475.76
81,848.38

42,132.54
207,423.90

56,176.71
276,565.20

42,132.54
207,423.90
6,785.02
12,627.06
26,015.71

140,441.79
691,412.99
6,785.02
12,627.06
26,015.71

18,569.43
23,309.38
30,585.22

40,780.29

30,585.22
224,920.97
57,717.16

18,569.43
23,309.38
101,950.72
224,920.97
57,717.16

204,737.88
40,924.19
393,092.41
283,866.99

589,638.62

137,972.99
682,459.60
136,413.97
982,731.04
283,866.99

10,114.49
77,449.50
49,700.00
6,895.48
68,579.13

46,469.70
49,700.00
6,895.48
68,579.13

33,418.77
20,212.33
17,319.40
73,087.37

7,801.20
38,954.51
36,443.47
128,307.57

7,801.20
38,954.51
36,443.47
128,307.57

13,773.42
22,570.48
5,171.88
2,422.98

13,773.42
22,570.48
5,171.88
2,422.98

22,279.18
13,474.88
109,631.05

55,697.95
33,687.21
17,319.40
182,718.42

31,005.36
20,792.02

31,005.36
20,792.02
124,628.96
64,012.32
7,834.59

124,628.96
64,012.32
7,834.59
1/2

CRONOGRAMA VALORIZADO
Obra

CONSTRUCCIN Y REHABILITACIN DE LA AV. ANDRS AVELINO CCERES TRAMO CARRETERA CENTRAL AV. JOSE CARLOS MARIATEGUI HUAYCAN ETAPA II

Subpresupuesto
Cliente

TRAMO 2: CALLE 1 - CARRETERA CENTRAL


MUNICIPALIDAD DE LIMA - PGRLM
LIMA
08/07/2011

Departamento
Costo al

Provincia:

Item

Descripcin

Und.Metrado

08.03.04
08.03.05
08.03.06
08.03.07
08.03.08
08.03.09
08.03.10
08.04
08.04.01
08.04.02
08.04.03
08.04.04
08.05
08.05.01
08.05.02
08.06
08.06.01
08.07
08.07.01
08.07.02
08.07.03
08.08
08.08.01
09
09.01
09.01.01
09.01.02
09.01.03
09.01.04
09.02
09.02.01
09.03
09.03.01
09.03.02
09.04
09.04.01
09.05
09.05.01

INSTALACION DE SEMIPORTICOS O BANDERAS (INCLUYE TRANSPORTE)


INSTALACION DE PEDESTAL (INCLUYE TRANSPORTE)
ESTRUCTURA METALICA DE ZAPATA PARA SEMIPORTICO O BANDERA
ESTRUCTURA METALICA DE ZAPATA PARA PEDESTAL
CONCRETO PREMEZCLADO PARA ZAPATA f'c=175 kg/cm2 PARA PEDESTAL
CONCRETO PREMEZCLADO PARA ZAPATA f'c=210 kg/cm2 PARA SEMIPORTICO O BANDERA
ENCOFRADO Y DESENCOFRADO DE PEDESTAL
CABLES (SUMINISTRO E INSTALACION)
CABLE DE CONTROL (4 x N 16 AWG)
CABLE DE CONTROL (3 x N 16 AWG)
CABLE DE ACOMETIDA (2 x N 12 AWG)
CABLE ELECTRICO (1x6 mm-TW)
SEMAFOROS
SEMAFORO VEHICULAR SUSPENDIDO DE 1C-3L
SEMAFORO PEATONAL PEDESTAL 1C-2L
CONTROL DE TRAFICO (SUMINISTRO E INSTALACION)
CONTROLADOR DE TRAFICO (inteligente, electronico, estado solido 4 grupos, c/sincronizacion)
SUMINISTRO EE.EE (CON MURETE)
MURETE PORTAMEDIDOR Y TABLERO GENERAL
SUMINISTRO DE ENERGA ELCTRICA DE 200 V, 3 KW MONOFSICA
POZO A TIERRA EN SISTEMA C/CONCETOR, GEL, VARILLA DE COBRE
INSTALACIONES Y PROGRAMACIN
INSTALACIN Y PROGRAMACIN
VARIOS
CANAL DE RIEGO
EXCAVACION
CONCRETO FC=210 KG/CM2 - PREMEZCLADO
ACERO CORRUGADO FY= 4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
PAISAJISMO
CONFORMACION DE AREA VERDE
MISCELANEOS
NIVELACION DE BUZONES EN GENERAL
NIVELACION DE TAPAS DE VALVULAS
MANEJO AMBIENTAL
MEDIDAS DE MITIGACION
MOBILIARIO URBANO
MODULO DE PARADERO SEGUN DISEO
Costo Directo
GASTOS GENERALES (12.98%)
UTILIDAD (10%)

und
und
und
und
m3
m3
m2

16.00
27.00
16.00
27.00
7.35
18.50
27.50

m
m
m
m

508.00
524.00
76.00
15.00

und
und

46.00
24.00

und

3.00

und
und
und

3.00
3.00
3.00

GLB

1.00

m3
m3
kg
m2

1,595.99
564.87
27,265.55
3,773.36

m2

14,625.79

und
und

27.00
4.00

est

1.00

und

7.00

SUBTOTAL
IMPUESTO IGV 18%
PRESUPUESTO TOTAL
% AVANCE
% AVANCE ACUMULADO

LIMA

Distrito:

Precio (S/.) Parcial (S/.)

5,379.84
3,617.73
9,292.16
8,008.47
1,772.23
4,831.46
2,858.35
6,337.40
6.93
3,520.44
4.27
2,237.48
6.93
526.68
3.52
52.80
188,144.92
3,371.50
155,089.00
1,377.33
33,055.92
114,858.93
38,286.31
114,858.93
13,397.79
491.71
1,475.13
2,500.00
7,500.00
1,474.22
4,422.66
20,000.00
20,000.00
20,000.00
937,261.40
497,568.22
26.87
42,884.25
342.45
193,439.73
4.49
122,422.32
36.79
138,821.91
290,321.93
19.85
290,321.93
6,107.19
197.21
5,324.67
195.63
782.52
36,678.21
36,678.21
36,678.21
106,585.85
15,226.55
106,585.85
6,910,520.12
0.129765496
896,747.07
691,052.01
-------------------------8,498,319.20
1,529,697.46
=================
10,028,016.65

MES 01

ATE VITARTE

MES 02

MES 03

336.24
133.99
580.76
296.61
241.12
261.16
103.94

MES 04

MES 05

5,379.84
3,617.73
9,292.16
8,008.47
1,772.23
4,831.46
2,858.35

5,379.84
3,617.73
9,292.16
8,008.47
1,772.23
4,831.46
2,858.35
3,520.44
2,237.48
526.68
52.80

3,520.44
2,237.48
526.68
52.80

155,089.00
33,055.92

155,089.00
33,055.92

114,858.93

114,858.93

1,475.13
7,500.00
4,422.66

1,475.13
7,500.00
4,422.66
20,000.00

30,018.98

12,865.28
77,375.89
73,453.39
69,410.96

116,063.84
48,968.93
69,410.96

14,516.10

116,128.77

TOTAL

20,000.00
42,884.25
193,439.73
122,422.32
138,821.91

116,128.77
5,324.67

7,335.64

7,335.64

7,335.64

7,335.64

1,001,748.98
129,992.45
100,174.90
----------------1,231,916.33
221,744.94
=======
1,453,661.27

961,800.98
124,808.58
96,180.10
----------------1,182,789.66
212,902.13
=======
1,395,691.79

1,470,336.74
190,798.98
147,033.67
----------------1,808,169.39
325,470.49
=======
2,133,639.88

2,041,578.20
264,926.41
204,157.82
----------------2,510,662.43
451,919.24
=======
2,962,581.66

14.50%
14.50%

13.92%
28.41%

21.28%
49.69%

29.54%
79.23%

43,548.29

290,321.93

782.52

5,324.67
782.52

7,335.64

36,678.21

106,585.85
106,585.85
1,435,055.24
6,910,520.12
186,220.65
896,747.07
143,505.52
691,052.01
-----------------------------------------1,764,781.41
8,498,319.20
317,660.65
1,529,697.46
======= =================
2,082,442.07
10,028,016.65
20.77%
100.00%

100.00%