TYPE TESTING LABORATORY

Test Report
Test Report No Test completed date Date Specimen No :0267/04/13 :20-04-13 : 0481/04/13 & 0482/04/13

Test Witnessed by :Power grid corporation of India ltd Particulars of Test Specimen : Product name :MKP 2P 220S Relay

Ratings/program no

:Rated voltage Rated current No of Poles Coil Voltage

:220 V DC : 5A (Resistive Load) :2(NO & NC) :220V DC : 02

No of samples to be tested Reason for Testing

: To check the electrical performance of the sample

Particulars of Tests : Tests Requested : Test Parameters

1)Electrical Endurance
Test Voltage Standards Referred: BS EN 61810-1:2008 Test Current Contacts Tested

Electrical Endurance 220V DC 5A(Resistive Load) Both N/O & N/C 1,00,000 cycles 220V DC 1 Sec /1 Sec 3600 Operations

No of cycles to be tested Coil Voltage On /Off sec Opearting frequency / hour

Result/Conclusion :

For Sp:No:482
Result : NO Pole Passes 1,00,000 Cycles Connected to counter for counting purpose NC pole passes 1,00,000 Cycles connected to 5A resistive load
Name of the test Test Complience parameters 220V DC @ 5A 1,00,000 Cycle Electrical Endurance 1,00,000 Cycle Performance level No Abnormality (Contact opening (Or)welding) was observed Lab observation Analysis about tested product

For Sp:No:481
Result : NO Pole Passes 1,00,000 Cycles connected to 5A resistive load NC pole passes upto 91,650 Cycles connected to Counter for counting purpose
Name of the test Test Complience parameters Performance level For NO pole: 1,00,000 Cycle 220V DC @ 5A 1,00,000 Cycle No Abnormality (Contact opening (Or)welding) was observed Lab observation Analysis about tested product

Electrical Endurance

For NC pole: 91,650 Cycle

After 91,650 Cycles contact opening was observed.

Verified By: Mr S.Asokan, Sr.Manager R&D

Test Report No Test completed Date Specimen No

:0267/04/13 :20-04-13 : 0482/04/13

Electrical Endurance test


MKP 2P Relay: 1 Test Date Test parameters Test voltage Test current Coil Voltage Contacts Tested NC pole NO pole No.of.Poles 220V DC 5A(Resistive load) 220V DC Both N/O & N/C 5A load Digital Counter 2 No Abnormality (Contact opening (Or)welding) was observed Behavior of the specimen after the test

18-04-13 to 20-04-13

On time Off time Opearting frequency

1 sec 1 sec 3600 operations/hour (or) 1800 Cycles / hour

No of Cycles to be tested No of cycles Tested in NC Pole No of cycles Tested in NO Pole

100,000 100,000 100,000

Note:For referance see circuit diagram

Tested By: P.Parthasarathi Sr. Engineer -Testing

Witness By: Mr CS Jayachandran Chief Manager Power Grid Corporation of India Ltd Karumathampatti, Coimbatore.

Test Report No Test completed Date Specimen No

:0267/04/13 :20-04-13 : 0481/04/13

Electrical Endurance test


MKP 2P Relay: 2 Test Date Test parameters Test voltage Test current Coil Voltage Contacts Tested NO pole NC pole No.of.Poles 220V DC 5A(Resistive load) 220V DC Both N/O & N/C 5A load Digital Counter For NO pole: 2 No Abnormality (Contact opening (Or)welding) was observed Behavior of the specimen after the test

18-04-13 to 20-04-13

On time Off time Opearting frequency

1 sec For NC pole: After 91,650 Cycles contact opening was observed. 3600 operations/hour (or) 1800 Cycles / hour 1 sec

No of Cycles to be tested No of cycles Tested in NO Pole No of cycles Tested in NC Pole

100,000 100,000 91,650

Note:For referance see circuit diagram

Tested By: P.Parthasarathi Sr Engineer -Testing

Witness By: Mr CS Jayachandran Chief Manager Power Grid Corporation of India Ltd Karumathampatti, Coimbatore.