JALAN
No.
Revision/Issue
Date
Approved by
7.20 10.00
-0.60 -0.60
Halaman Bermain Anak Cor Beton 1 : 3 : 5 tebal 7 cm Tempat Wudhu Wanita Laki-Laki
Ihsan Kurniawan, ST
direktur utama
Approved by
6.00
-0.60
Cor Beton
R. Gharim
+0.00 +0.00
Mihrab
+0.00
Gudang
JALAN
civil engineer
-0.05
Teras
-0.05
PT ARCIVID REALTY
-0.70
10.00
Cor Beton t. 7 cm
-0.60
Teras
-0.05
Cor Beton t. 7 cm
-0.60
8.00
JALAN
Penyelesaian Pekerjaan Musholla Baitul Arafah Komplek Palm Griya Indah II, Kel. Korong Gadang, Kec. Kuranji, Kota Padang
No
Sheet
01/MBA/I/2013
SITE PLAN
Date
Skala 1 : 200
01 JANUARI 2013
Scale
1/3
1 : 200