Dwg 22.05.2013 Podium Excavation Area inside Shore Piles Soil Profile Excess Soil Filling Material Filling Greyish Clay Yellowish Brownish Clay / Murrum
535.2 Sqm
Above 0.00 0.00 to 1.77 1.77 to 3.50 3.50 to 5.50 5.50 to 15.0
0.60 Gr. Floor Level 0.60 Gr. Floor Level 0.00 Gr. Level 0.00 Gr. Level -8.40 2nd Basement Level (Floor-8.40 Finish) 2nd Basement Level (Floor Finish) -8.50 -8.65 -8.88 -9.18 -10.68 -10.83 -11.06 5.56 11.96 Tremix - 100mm -8.50 Tremix - 100mm PCC - 150mm -8.65 PCC - 150mm Soling - 230mm -8.88 Soling - 230mm Filling - 300mm -10.08 Filling - 1200mm Raft - 1500mm (Bldg Foot -10.68 Print) Raft - 600mm (Podium Area) Raft PCC - 150mm (Bldg -10.83 Foot Print) Raft PCC- 150mm (Podium Area) Raft Soling - 230mm (Bldg -11.06 Foot Print) Raft Soling - 230mm (Podium Area) Depth of Excavation 11.96 Depth of Excavation 0.78 1.68 No. Length Width Height Quantity Quantity 2,676
Stubb Columns Sr. No. A Description Excavation 1 Excavation in Filling, Soil, Greyish Clay, Yellowish Brownish Clay From 0.0 to 5.0m Depth Podium Area 2 Excavation in Filling, Soil, Greyish Clay, Yellowish Brownish Clay From 5.0 to 7.0m Depth Podium Area 3 Excavation in Yellowish Brownish Rock From 5.0 to 7.0m Depth Podium Area 4 Excavation in Yellowish Brownish Rock From 7.0 to 9.0m Depth Podium Area 5 Excavation in Yellowish Brownish Rock From 9.0 to 11.0m Depth Podium Area 6 Excavation in Yellowish Brownish Rock From 11.0 to 13.0m Depth Podium Area Car Pits Car Lift Pits Lift Pits Lift Pits 7 Excavation in Yellowish Brownish Rock From 13.0 to 15.0m Depth Car Pits
Unit
Cum
535.16
5.00
2,675.81 749
Cum
535.16
1.40
749.23 321
Cum
535.16
0.60
321.10 1,070
Cum
535.16
2.00
1,070.32 1,070
Cum
535.16
2.00
1,070.32 778
1 1 1 1 1 1
Cum Cum
1 1
15.49 6.50
7.45 4.30
1.46 1.46
6,874 Cum.
EXCAVATION - TOTAL IN CFT = EXCAVATION - TOTAL IN BRASS = EXCAVATION WITH 20% BULKAGE (FOR ROYALTY) - TOTAL IN BRASS = B Backfilling Between Shore Pile & Retaining Wall Podium Excavation Retaining Wall Area
Cum Cum
1 -1
535.161 452.231
11.060 11.060
917 Cum.