WORKS DESCRIPTION QTY 1 1 2 6 6 1 1 1 1 1 1 UNIT Ls. Ls. Ls. Ls. Ls. Ls. Ls. Ls. Ls. Ls. Ls. UNIT PRICE (Rp.) 2,500,000.00 3,000,000.00 1,500,000.00 750,000.00 150,000.00 500,000.00 2,500,000.00 3,000,000.00 2,500,000.00 4,000,000.00 1,000,000.00 TOTAL: Say in words : Twenty Seven million Four Hundred Thousand IDR Notes : 1 The above Total cost is excluded VAT 10 % 2 The survey report will be submitted within 10 days after start site survey or after Contract amandement approved. 3 This additional works will be amended to the original contract of Infrastructure works. SUB-TOTAL (Rp.) 2,500,000.00 3,000,000.00 3,000,000.00 4,500,000.00 900,000.00 500,000.00 2,500,000.00 3,000,000.00 2,500,000.00 4,000,000.00 1,000,000.00 27,400,000.00
1 Preparation works 2 Miscellaneous site tool for survey 3 Installation/construction of Benchmark PVC 4" 4 5 6 7 8 9 10 11 Transportation personnel and survey equipments (Jakarta - Alam Sutera) Local labour /helper for survey works Telecommunication and site documentation Polygon and traverse survey Leveling measurement - pipe culvert invert level at each joints and ground leveling Detail situation/area and cross section survey every 10m Analysis data survey , drawings and reporting Photograph inside of pipe culvert at each joints and ground
Page 1/1