Gambar 5.

4
MULAI

INVENTARISASI DATA PETA TOPO SKALA 1:50.000

SURVEY TOPOGRAFI : - POLIGON - WATERPASS SITUASI

SURVEY LINGKUNGAN

PETA TOPOGRAFI SKALA 1 : 2000 PETA DASAR UNTUK ]PRA LAY OUT/LAY OUT

BAGIAN GEOLOGI MENENTUKAN LOKASI - TEST PIT - HAND BOR SONDIR LABORATORIUM

BAGIAN SURVEY & PENGUKURAN CHECKING

PELAKSANAAN - TEST PIT - HAND BOR SONDIR LABORATORIUM

BAGIAN PERENCANAAN DI CEK RUMUS-RUMUS PERHITUNGAN DAN PERSYARATANNYA

RENCANA PRA LAY OUT SKALA 1 : 2000 SESUAI PERSYARATAN

LAPORAN HASIL GEOLOGI TEKNIK DAN MEKANIKA TANAH PENGGAMBARAN DISAIN SALURAN DAN BANGUNAN AIR DISAIN SALURAN JARINGAN DRAINASE

BAGIAN PERENCANAAN DIPERIKSA/DIDISUSIKA N /LAPANGAN MEMBUAT ANALISIS HIDROLOGI FINAL LAY OUT

BAGIAN TEKNIK PERIKSA DENGAN TELITI

BAGIAN PERENCANAAN DI CEK RUMUS-RUMUS PERHITUNGAN DAN PERSYARATANNYA

FINAL DISAIN PRINT DAN PENGGANDAAN

BAGIAN PERENCANAAN PERIKSA SEMUA PERSYARATAN

DISAIN BANGUNAN AIR JARINGAN DRAINASE BILL OF QUANTITY VOLUME PEKERJAAN (DETAIL) ANALISA HARGA SATUAN EARTWORK BALANCE MATERIAL TEMPAT AMBIL BUANG TANAH BAGIAN PERENCANAAN PERIKSA/CEK SEMUA
KEBENARANNYA

ANALISIS HIDROLOGI SELESAI

STRIP SURVEY JARINGAN DRAINASE DAN PENGUKURAN SITUASI TAPAK BANGUNAN

BAGIAN PERENCANAAN PERIKSA / CEK KESELURUHAN DAN KEBENARANNYA

DESIGN NOTE PEMBAGIAN PAKET

BAGIAN SURVEY & PENGUKURAN CHECKING RENCANAKAN KETINGGIAN ELEVASI SALURAN

SPESIFIKASI TEKNIK MEMUAT : PERSYARATAN UMUM ADMINISTRASI TEKNIK

PRODUK YANG HARUS DISERAHKAN

BAGIAN PERENCANAAN CEK ELEVASI SALURAN

HITUNG ELEVASI MA DI SALURAN

RD SIAP DIKONSTRUKSI Catatan : = Arus Urutan kerja

BAGIAN PERENCANAAN CEK PERHITUNGAN DAN ELEVASI MA

PRODUK ELEVASI MA SELESAI

= Tugas Konsultan SID = Tugas Pemeriksaan dari Bagian Perencanaan/Staft Direksi = Tugas pemeriksaan dari Bagian Survey & Pengukuran