Owner: Emily Urfilla Rentee: Sharon Tan Expenses: Bathroom Pipe Sewer Change Description/ Item Quantity Buhangin P Tube S. Cement LED Elbow 2pcs P Trap 1pc W Sand 1 sack Cement 10kls Pipe 1pc Expenses: Connecting Pipe Change (Underground Leak) Description/ Item Quantity Cement 7kls White Cement 2kls Bistay 3 logs Blue Pipe 1/2 4pcs Elbow 1/2 7pcs Comping 1/2 5pcs S-B Elbow 1/2 11pcs S-B Tee Truded 1/2 1pc S-B Gatte Volve 1/2 plastick 1pc S-B Cup Plug 1/2 1pc S-B Female Adapter 1/2 1pc T Cupling Top 3pcs G-I Plug 1/2 2pcs Neltex Solvent Cement Cement 5kls Bistay 2 logs
Price 50.00 50.00 70.00 50.00 50.00 65.00 80.00 100.00 195.00
Total
Miscellaneous Description/ Item Labor Man 1 Labor Man 2
PhP 710.00
Total
PhP1,300.00
Total
Other Expenses c/o Sharon Description/ Item Price Lunch PhP70.00 Cigarettes PhP30.00 Transpo (Sidecar) PhP50.00 Miscellaneous Description/ Item Labor Man 1 Labor Man 2
Total
PhP150.00
Total
Other Expenses c/o Sharon Description/ Item Lunch Cigarettes
PhP2,000.00
PhP710.00 PhP1,300.00
Total
Pipe Change Miscellaneous
PhP125.00
PhP943.00 PhP2,000.00
PhP2,943.00
Expenses Combined PhP Bathroom Expenses Water Pipe Change Expenses PhP Grand Total
round Leak) Price PhP70.00 PhP60.00 PhP105.00 PhP200.00 PhP70.00 PhP50.00 PhP88.00 PhP9.00 PhP55.00 PhP7.00 PhP16.00 PhP45.00 PhP24.00 PhP24.00 PhP50.00 PhP70.00 PhP943.00