Anda di halaman 1dari 4

OWNER

LSTK

PROJECT: CLIENT: ONGC CONTRACTOR : SAVAIR ENERGY LIMITED. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 A REV. 14/01/2013 DATE ISSUED FOR ENQUITY PURPOSE

DOCUMENT NO.: TAG NO. : S - 907 SHEET NO. : 1 OF 4 DATA SHEET OF GCI STORAGE TANK OPERATING/MECHANICAL DATA

DESCRIPTION CONTENTS WORKING TEMPERATURE, NORMAL WORKING PRESSURE, NORMAL NOR/MIN. VAC. COND. DESIGN TEMPERATURE, UPPER/LOWER DESIGN PRESSURE , INTERNAL/EXTERNAL TEST PRESSURE , HYDROSTATIC/PNEUMATIC OPERATING CONDITIONS , FLOW DENSITY AT WORKG. TEMP. o DENSITY AT 15 C VISCOSITY LENGTH OF TANK WIDTH OF TANK HEIGHT OF TANK JOINT EFFICIENCY, SHELL/HEAD CORROSION ALLOWANCE, TOP COVER SIDE WALLS BOTTOM PLATE SURFACE PREPARATION/PAINTING PLATE THICKNESS, OTTOM / STRUCTURE PLATE JOINTS, SHELL / ROOF BOTTOM FOUNDATION CONE ROOF TOP ANGLE TOTAL VOLUME MAX LIQUID VOLUME WIND PRESSURE EARTH QUAKE FACTOR GENERAL NOTES: " * " INDICATE VENDOR TO ADVICE.

GCI STORAGE TANK GAS CORROSION INHIBITOR AMBIENT ATM 60/ (FULL WATER + 150mm WC) / 50mm WC VACUUM AS PER CODE 1000 1500 3500 1.0/1.0 N/A N/A N/A AS PER FS 2005 * * * * NO N/A * * (NOTE-1) (NOTE-2)

Units C 2 kg/cm g kg/cm2g oC kg/cm2g 2 kg/cm g 3 m /hr 3 kg/m 3 kg/m cP mm mm mm mm mm mm mm mm


0

m3 m3

1) WIND FORCE CALCULATION SHALL BE CARRIED OUT AS PER API RP 2A WSD (MAX WIND SPEED191 Km/hr). 2) EARTHQUAKE FACTOR SHALL BE AS PER SECTION 3.4.6.1 OF "3.4 STRUCTURAL DESIGN CRITERIA PART-I REV-3" 3) PAINTING SHALL BE AS PER CLIENT "SPEC.2005", REV.3 PROTECTIVE COATING FOR OFFSHORE STRUCTURES AND FACILITIES. 4) REINFORCING PADS SHALL HAVE A MINIMUM WIDTH OF 50 mm OR THREE TIMES THE PAD THICK NESS, WHICHEVER IS GREATER. EACH PAD SHALL CONTAIN AT LEAST ONE 1/2" NPT TAPPED TELL TALEHOLE. 5) ALL RECTANGULAR REINFORCING PADS WHEN USED FOR EXTERNAL OR INTERNAL ATTACHMENTS SHALL HAVE 25 mm MINIMUM RADIUS AT CORNERS. 6) THE NOZZLE ELEVATION, PROJECTION AND ORIENTATION WILL BE FINALIZED DURING DETAILED ENGINEERING. 7) NOZZLE PROJECTION SHALL BE A MINIMUM OF 200mm FOR SIZES LESS THAN OR EQUAL TO 12" AND 250 mm FOR SIZES GREATER THAN 12" FROM OUTER MOST LAYER OF SHELL OR INSULATION WHICHEVER IS APPLICABLE. 8) HATCH AND CLEANOUT OPENINNG SHALL BE PROVIDED AS PER API 12F. 9) ALL ALLOY STEEL STUD BOLTS AND NUTS SHALL BE HOT DIP GALVANIZED OR ELECTROGALVANIZED WITH MINIMUM COATING AS PER SPEC 2005,FS FOR PROTECTIVE COATING.

AC PRPD BY

MK CHKD BY

MK APPRD BY

OWNER

LSTK

PROJECT: CLIENT: ONGC CONTRACTOR : SAVAIR ENERGY LIMITED. 1 2 3 4 5 6 7 8 9 10 11 12 PARAMETER 13 GROSS CAPACITY 14 SPECIAL SERVICE 15 CODE STAMP 16 JOINT EFFICIENCY, SHELL/HEAD 17 RADIOGRAPHY 18 ULTRASONIC 19 MAGNETIC PARTICLE 20 DYE PENETRANT 21 POST WELD HEAT TREATMENT 22 INSULATION 23 24 25 FIRE-PROOFING 26 PAINTING 27 CERTIFYING AUTHORITY 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 A REV - THICKNESS - TYPE mm mm DESIGN DATA UNITS m3 * NO NO 1/1 100% AS PER CODE AS PER CODE AS PER CODE AS PER CODE NO N/A N/A N/A (NOTE - 3) CLIENT/TPI MANUFACTURER SERVICE ORIENTATION LOCATION DESIGN CODE SPECIFICATIONS CONSTRUCTION CATEGORY QUANTITY * GAS CORROSION INHIBITOR RECTANGULAR OFF SHORE, MUMBAI API 12F 5601 N/A 1

DOCUMENT NO.: TAG NO. : S - 907 SHEET NO. : 2 OF 4 DATA SHEET OF GCI STORAGE TANK 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 TYPE OF HEADS PLATFORM/LADDER/PIPE CLIPS INSULATION SUPPORTS HATCH & CLEANOUT EARTHING BOSS LIFTING LUGS NAME PLATE EMPTY WEIGHT, kg OPERATING WEIGHT, kg TEST WEIGHT, kg O'ALL DIMENSIONS OF TANK, mm GASKETS INTERNAL BOLTS NUTS MATERIAL IMPACT TEST REQUIRED SIDES REINFORCING PAD NOZZLE NECK PLATE NOZZLE NECK PIPE FORGED NOZZLES FORGED FLANGES WELDING ELBOWS INTERNAL COATING NOZZLE PIPE-EXTERNAL SUPPORT SADDLES WRAPPER PLATES STIFFENING RINGS BASE PLATE EXTERNAL ATTACHMENTS INTERNAL ATTACHMENTS BOLTED INTERNALS EXTERNAL BOLTS NUTS SERIAL No. PART TOP / BOTTOM COVER * No. OF: 1 CONSTRUCTION MATERIALS MATERIAL SPECIFICATION SA 240 Gr.316L SA 240 Gr.316L SA 240 Gr.316L (NOTE - 4 & 5) SA 240 Gr.316L SA 312 TP 316L SA 182 F316L SA 182 F316L SA 403 Gr.316L AS PER FS 2005 SA 312 TP 316L SS 316L / SA 516 Gr 70 N N/A N/A N/A N/A SS 316L SS 316L SS 316L ASTM A193 Gr.B7 (NOTE - 9) ASTM A194 Gr.2H (NOTE - 9) (NOTE - 10) SS 316L (NOTE - 9) SS 316L (NOTE - 9) AS PER CODE

CERTIFIED ELEVATED TEMP. TESTS REQD. NO CONSTRUCTION N/A YES N/A YES YES ( 2 NO.) (NOTE - 11) YES (NOTE - 12) YES - SS 316 (NOTE - 13) WEIGHTS AND OVERALL DIMENSIONS * * * 1000(L) x 1500(W) x 3500(H)

GENERAL NOTES:(CONT.) 10) GASKETS FOR FLANGES SHALL BE ASME B 16.21, FLAT RING,1.58mm, CNAF. 11) VESSEL SHALL BE PROVIDED WITH MINIMUM OF TWO EARTHING BOSSES. 12) ALL VESSEL SHALL BE FURNISHED WITH A MINIMUM OF TWO LIFTING LUGS, WHICH SHALL BE DESIGNED FOR A LOAD EQUAL TO TWO 13) 14) 15) 16) 17) 18) 19) TIMES THE SHIPPING WEIGHT. NAME PLATE SHALL BE IN ACCORDANCE WITH API OR FUNC. SPECIFICATION "5601-UNFIRED-PRESSURE-VESSEL", Rev. 2. NECESSARY CONSIDERATION SHALL BE FOLLOWED TO AVOID GALVANIC CORROSION OF STUD AND NUT. TANK SHALL BE DESIGNED FOR A DESIGN LIFE OF 25 YEARS. WELDING AND NDT SHALL BE AS PER SPEC 2009F, "FUNCTIONAL SPECIFICATION FOR WELDING AND NDT". "*" VENDOR TO CONFIRM FLANGE FACE SHALL BE SETRATED FINISH TYPE. NOZZLE SIZES TO BE CONFIRMED BY VENDOR. 16/01/2013 DATE ISSUED FOR ENQUIRY PURPOSE AC PRPD BY MK CHKD BY MK APPD BY

OWNER

LSTK

PROJECT: CLIENT: ONGC CONTRACTOR : SAVAIR ENERGY LIMITED.

DOCUMENT NO.: TAG NO. : S - 907 SHEET NO. : 3 OF 4

DATA SHEET OF GCI STORAGE TANK NOM FLANGE R.F. PAD SCH / Sl. No MARK No.OFF SERVICE SIZE O/D THK THK RATING TYPE FACE (Inches ) mm mm 1 N1 1 1" 40S/150# SW RF - GCI INLET 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 A REV 16/01/2013 DATE ISSUED FOR ENQUIRY PURPOSE HOLD : TANK SIZE SHALL BE CONFIRMED DURING DETAILED ENGINEERING. Sl.No. 1 2 3 APPLICABLE STANDARD SPECIFICATIONS DESCRIPTION FS-UNFIRED PRESSURE VESSELS FS-PROTECTIVE COATING & ADDENDUM FS-WELDING & NDT DOC. NO. 5601 2005 2009F REV 2 3 6 Sl.No. 1 2 3 4 ASME SEC V FOR NDE ASME SEC-II MATERIAL SPECIFICATIONS API 12F APPLICABLE CODES AND STANDARDS DESCRIPTION ASME B 16.5 FOR PIPE FLANGES N2 N3 V N4 N5 N6 LS LT H CL 1 1 1 1 1 1 2 1 1 1 1" 1" 4" 2" 2" 2" 1" 3" 8" 20" 40S/40S/10S/10S/10S/10S/40S/10S/150# 150# 150# 150# 150# 150# 150# 150# 150# 150# SW SW WN WN WN WN SW WN WN WN RF RF RF RF RF RF RF RF RF RF * * * * * * * * GCI OUTLET PSV CONNECTION VENT C/W GOOSE NECK DRAIN OVER FLOW CONNECTION LEVEL INDICATOR LEVEL SWITCH LEVEL TRANSMITTER HATCH CLEANOUT OPENING

ELEVATION & PROJECTION BLIND FLANGE ORIENTATION FROM C.L (NOTE-6) (NOTE-7)

REFERENCE DOCUMENT / DRAWING LIST SI.No. 1 SPEC. DESCRIPTION P&ID CHEMICAL INJECTION SYSTEM

GENERAL NOTES: 20) HAZARDOUS AREA CLASSIFICATION OF THE EQUIPMENT SHALL BE MIN. CLASS I, DIV 2 / ZONE 2 OR AS PER ELECTRICAL DESIGN CRITERIA VOL II SEC 3.5 . 21) REFER P&ID's LEGENDS FOR NOTES AND DETAILS. 22) PIPE AND PIPING COMPONENT SHALL COMPLY WITH PIPING MATERIAL SPECIFICATION, FS 2008.

AC PRPD BY

MK CHKD BY

MK APPRD BY

OWNER

LSTK

PROJECT: CLIENT: ONGC CONTRACTOR : SAVAIR ENERGY LIMITED. Sl. No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 A REV 16/01/2013 DATE ISSUED FOR ENQUIRY PURPOSE

DOCUMENT NO.: TAG NO. : S - 907 SHEET NO. : 4 OF 4 DATA SHEET OF GCI STORAGE TANK

NOTES 1) ALL NOZZLES ORIENTATION, SIZE, ELEVATION ARE ONLY INDICATIVE AND UNDER HOLD 2) PLATE THICKNESS SHALL BE CALCULATED BY VENDOR AS PER API 12F

AC PRPD BY

MK CHKD BY

MK APPRD BY

Anda mungkin juga menyukai