HSE WEEKLY REPORT

BNPP Project
REPORT NUMBER: HSE- WR SM-0017 REPORT PERIOD: May 18-23 SAFE MANHOUR: 3,000 Total man hour work without LTI 3,000 Total man hour this week 3,180 Average Manpower Daily 53 No DESCRIPTION 1. 2. 3. 4. 5. 6. 7. 8. 9.
Fatal Accident Lost Time Injury (LTI) Restricted Work Cases (RWC) Medical Treatment Case (MTC) Vehicle/Property/Equipment Damage Accidents First Aid Treatment Cases (FAC) No. of Ill-Health Cases No. of Heat Related Illness /Injury No. of Reported Near Miss(NM)

BNPP TARGET 0 5/ yr. 7/ yr. 23/ yr. 22/ yr.


Actual Actual Actual Actual TBD/wk 12/wk 1/wk 6/wk 1/ wk 1/wk 90% per year

THIS PERIOD 0 0 0 0 0 0 0 0 0 3 0 0 6 0 0 0

ACCUMULATION 0 0 0 0 0 0 0 0 0 19 0 0 60 0 0 0

10. No. of Reported CAR 11. No. of inspection Report (for Daily) 12. No. of Environmental Findings 13. No. of tool box Meeting Conducted 14. No. of Internal HSE Meeting 15. No.
of (Internal) Assisted) Training Conducted

16. No. of Training Percentage (HSJV

ACHIEVEMENTS THIS PERIOD: Achieved 3,180 hours safe work. All workers have attended TBM every morning. No first aid case was reported this week. All managers and workers demonstrated a clear commitment to HSE to established and implemented HSE procedure. No property damage and accidents reported.

Page 1

HSE WEEKLY REPORT


BNPP Project

MEDICAL CONCERNS 1. Advised the workers to drink a lot of fluids as necessary to prevent dehydration. TARGET FOR NEXT WEEK 1. All workers will enhance their safety awareness regarding what type of job in their workplaces. 2. To enhance the knowledge of the workers about HSE procedure. 3. Improvement of housekeeping in area and maintained the cleanliness on the site. 4. Discipline on right waste segregation evading to minimizing health risks to workers and local residents and prevent environmental diseases.

ATTACHMENTS: 1. Tool box meeting 2. Organizational chart