URAIAN
SATUAN
Harga Satuan
( Rp )
d
Kuantitas
Asal
e
Jumlah Harga
Asal (Rp)
f = (dxe)
Pekerjaan Tambah
Bobot (%)
Kuantitas
g = (p-g)
Bobot
(%)
Pekerjaan Kurang
Kuantitas
i = (g-p)
Bobot
(%)
ADD. 01
Kuantitas
k (e+g-i)
DIVISI 1 UMUM
1.2
Mobilisasi
Ls
60,440,000.00
1.00
60,440,000.00
9.91
1.00
1.8
Ls
5,126,699.00
1.00
5,126,699.00
0.84
1.00
DIVISI 2. DRAINASE
DIVISI 3 PEKERJAAN TANAH
3.1 (1)
Galian Biasa
M3
545.00
14,838,715.00
2.43
461.07
12,553,552.89
2.06
3.2 (1)
Timbunan Biasa
M3
99,584.00
145.00
14,439,680.00
2.37
79.99
7,965,724.16
1.31
65.0
3.2 (3)
Timbunan Pilihan
M3
115,069.00
120.00
13,808,280.00
2.26
120.00
13,808,280.00
2.26
0.00
M2
1,531.00
550.00
842,050.00
0.14
550.00
842,050.00
0.14
0.00
3.3
27,227.00
83.93
M3
336,587.00
22.50
7,573,207.50
1.24
22.50
7,573,207.50
1.24
5.1 (2)
M3
326,314.00
30.00
9,789,420.00
1.60
30.00
9,789,420.00
1.60
Liter
9,137.00
105.00
959,385.00
0.16
105.00
959,385.00
0.16
0.00
Liter
9,528.00
99.00
943,272.00
0.15
79.75
759,858.00
0.12
19.25
Ton
339,934.00
39.25
13,342,409.50
2.19
32.17
10,934,317.04
1.79
7.08
339,749.00
49.06
16,668,085.94
2.73
49.06
16,668,085.94
2.73
0.00
0.45
6.3.8
6.3 (5a)
6.3.8
Aspal
Ton
9,350,000.00
2.38
22,253,000.00
3.65
1.93
18,080,169.80
2.96
6.3.9
Kg
38,500.00
7.13
274,505.00
0.04
5.79
222,958.27
0.037
1.34
6.3.10
Kg
1,386.00
883.08
1,223,948.88
0.20
741.40
1,027,580.40
0.17
141.68
1.55
1,495,683.35
0.25
DIVISI 7 STRUKTUR
7.1.(5)
Beton K250
M3
1,224,654.00
97.00
118,791,438.00
19.47
7.1.(6)
Beton K175
M3
964,957.00
5.00
4,824,785.00
0.79
7.1 (8)
Beton K125
M3
859,792.00
6.00
5,158,752.00
0.85
3.32
2,850,210.48
0.47
9.32
7.3 (1)
Kg
13,980.00
225.00
3,145,500.00
0.52
4,939.86
69,059,195.83
11.32
5,164.86
7.3 (3)
Kg
16,573.00
10,670.00
176,833,910.00
28.98
393.55
6,522,261.89
1.07
7.3 (18)
M2
74,325.00
60.00
4,459,500.00
0.73
7.9
Pasangan Batu
M3
551,963.00
142.19
78,483,618.97
12.86
7.13
Sandaran Railing
M1
204,779.00
36.60
7,494,911.40
1.23
7.15(1)
M3
185,048.00
7.50
1,387,860.00
0.23
7.15(2)
Pembongkaran Beton
M3
296,674.00
78.97
23,428,345.78
3.84
203,570.00
18.00
3,664,260.00
610,195,538.97
61,019,553.90
671,215,092.87
0.60
100.00
8.4(1)
A
B
C
D
671,215,000.00
18.80
23,027,169.16
3.77
115.80
11,063.55
3.53
0.44
240,335.73
0.04
62.23
11,515,722.09
1.89
133,162,000.00
1.29
19.84
0.04
56.47
1,761,099.40
0.29
28.00
69.731
55.12
7,841,516.40
121,056,411.58
12,105,641.16
133,162,052.73
262,136.84
142.63
8.60
38.52
3.45
16,352,670.88
2.68
121,056,179.48
12,105,617.95
133,161,797.43
19.84
23.85
56.52
133,161,000.00
ADD. 01
Bobot
Add. 02
(%)
Kuantitas
k (e+g-i)
Bobot
(%)
ADD Final
Kuantitas
k (e+g-i)
Bobot
Keterangan
(%)
60,440,000.00
9.91
1.00
60,440,000.00
9.01
1.00
60,440,000.00
9.01
5,126,699.00
0.84
1.00
5,126,699.00
0.76
1.00
5,126,699.00
0.76
Tetap
Tetap
2,285,162.11
0.37
83.93
2,285,162.11
0.34
83.93
2,285,053.20
0.34
6,473,955.84
1.06
137.69
13,711,453.26
2.04
285.14
28,395,132.80
4.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.60
5,250,757.20
0.78
0.00
0.00
20.80
6,787,331.20
1.01
0.00
78.00
712,686.00
0.11
183,414.00
0.03
19.25
183,414.00
0.03
45.25
431,142.00
0.06
2,408,092.46
0.39
7.08
2,408,092.46
0.36
7.08
2,408,092.46
0.36
0.00
11.96
4,063,398.04
0.61
0.00
0.00
4,172,830.20
0.68
0.45
4,172,830.20
0.62
1.80
16,853,898.60
2.51
51,546.73
0.01
1.34
51,546.73
0.01
5.41
208,195.22
0.03
196,368.48
0.03
141.68
196,368.48
0.03
572.24
793,124.64
0.12
0.00
141,818,607.16
23.24
115.80
141,818,607.16
21.15
115.80
141,818,607.16
21.15
3,329,101.65
0.55
3.45
3,329,101.65
0.50
3.45
3,329,101.65
0.50
8,008,962.48
1.31
9.32
8,008,962.48
1.19
9.32
8,008,962.48
1.19
72,204,695.83
11.83
5,164.86
72,204,695.83
10.77
5,164.86
72,204,695.83
10.77
183,356,171.89
30.05
11,063.55
183,356,170.40
27.34
11,063.55
183,356,171.89
27.34
4,197,363.16
0.69
56.48
4,197,876.00
0.63
56.47
4,197,363.16
0.63
78,723,954.70
12.90
238.85
131,834,050.77
19.66
156.99
86,654,614.28
12.92
5,733,812.00
0.94
28.00
5,733,812.00
0.86
28.00
5,733,812.00
0.86
12,903,582.09
2.11
69.73
12,903,582.09
1.92
69.73
12,903,582.09
1.92
7,075,674.90
1.16
23.85
1.06
23.85
7,075,674.90
1.06
11,505,776.40
610,195,771.07
61,019,577.11
671,215,348.17
1.89
100.00
56.52
7,075,674.90
11,505,776.40
670,543,875.90
67,054,387.59
737,598,263.49
1.72
100.00
56.52
11,505,776.40
670,543,872.19
67,054,387.22
737,598,259.41
1.72
100.00
671,215,000.00
737,598,000.00
737,598,000.00