DAFTAR :

ANALISA HARGA SATUAN


TAHUN 2011 KABUPATEN KARAWANG
No.

KODE
ANALISA

URAIAN

KOEFISIEN

A.001
a.
b.
c.

A.002
a.
b.
c.
d.

A.003
a.
b.
c.
d.
e.
f.
g.
h.

A.004
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.005.1
a.
b.
c.
d.
e.
f.
g.

1 M2 PEK. PENGUKURAN KEMBALI (SITE)


Tukang Batu
Pekerja
Peralatan
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PEK. PASANGAN BOUWPLANK
Kayu Kuat Kelas II (Maranti)
Paku 5 - 7
Ongkos Pasang
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 LOS KERJA / GUDANG
Kayu Kuat Kelas II (Maranti)
Paku 5 - 7
Seng Gelombang BJLS 30
Triplek 3 mm
PC (50 Kg)
Peralatan
Ongkos Pasang
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PEK. KANTOR DIREKSI
Kayu Kuat Kelas II (Maranti)
Paku 5 - 7
Seng Gelombang BJLS 28 (80 x 180 cm)
Triplek 3 mm
PC 50 Kg
Pasir Pasang
Bata Merah
Peralatan
Ongkos Pasang
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAPAN NAMA KEGIATAN
Kayu Kuat Kelas II (Maranti)
Triplek 3 mm
Paku 5 - 7 Cm
Cat Minyak
Penulisan
Ongkos Pasang
Upah Angkut

0.0100
0.0200
0.5000
=

10.0000

0.0100
0.0380
0.1550
0.0000
=

10.0000

0.1000
0.2500
1.1000
0.5000
0.1000
0.0250
0.1250
0.0000
=

10.0000

0.1000
0.2500
1.1000
0.5000
0.1000
0.2500
70.0000
0.0200
0.1500
0.0000
=

10.0000

0.0060
0.3472
0.2500
1.0000
0.2000
0.3000
0.0000

Sub Jumlah
Papan Nama Uk. 1,2 m x 0,8 m
Kaso 4/6 Kuat Kelas II (Maranti) (Tiang Penyangga)
Sub Jumlah
Keuntungan Max.

0.9600
0.0140
=

10.0000

Jumlah
Dibulatkan

A.006
a.
b.
c.
d.
e.
f.

A.007
a.
b.

A.008
a.
b.

A.009
a.
b.

10

A.010
a.
b.

11

A.011
a.
b.

12

A.012
a.
b.

1 M2 PAGAR PENGAMAN PROYEK


Seng Gelombang BJLS 28 (80 x 180 cm)
1.4300
Kayu Kuat Kelas II (Maranti)
0.0360
Paku 5 - 7
0.2000
Pengecatan Cat Minyak 2x Bag. Luar
1.8000
Ongkos Pasang
0.2000
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1 M'
Pekerja
0.7500
Mandor
0.0250
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 2 M'
Pekerja
0.9000
Mandor
0.0450
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 3 M'
Pekerja
1.0500
Mandor
0.0670
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. GALIAN TANAH BERBATU/TANAH KERAS MAX. KEDALAMAN 1 M'
Pekerja
1.0000
Mandor
0.0320
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. GALIAN TANAH CADAS MAX. KEDALAMAN 1 M'
Pekerja
1.5000
Mandor
0.0600
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. GALIAN TANAH LUMPUR MAX. KEDALAMAN 1 M'
Pekerja
1.2000
Mandor
0.0450
Jumlah
Keuntungan Max.
=
10.0000

13

A.013
a.
b.

14

A.014
a.
b.

15

A.015
a.
b.

16

A.016
a.
b.

17

A.022
a.
b.
c.

18

A.024
a.
b.
c.
d.

19

A.025
a.
b.
c.
d.
e.
f.
g.
h.
i.

Jumlah
Dibulatkan
1 M2 PEK. STRIPING TEBING SETINGGI 1 M', TEBAL = 20 CM
Pekerja
0.0500
Mandor
0.0050
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. PEMBUANGAN DALAM RADIUS 30 METER
Pekerja
0.3300
Mandor
0.0100
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 URUGAN TANAH KEMBALI
Pekerja
0.2500
Mandor
0.0083
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. PEMADATAN TANAH SETIAP 20 CM
Pekerja
0.5000
Mandor
0.0500
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PEK. GALIAN TANAH SUMURAN MAX. KEDALAMAN 10 M'
Pekerja
1.1500
Mandor
0.0250
Alat Bantu
0.2000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 URUGAN PASIR URUG
Pasir Urug
1.2000
Pekerja
0.3000
Mandor
0.0100
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 LANTAI KERJA BETON MUTU fc=7,4 Mpa (K 100), slump (3-6) cm, w/c=0,87
Semen PC (1 Zak 50 Kg)
4.6000
Split Pecah Mesin 2/3
0.9300
Pasir Beton
0.5500
Air
200.0000
Pekerja
1.2000
Tukang Batu
0.2000
Kepala Tukang Batu
0.0200
Mandor
0.0600
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan

20

A.026
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.

21

A.027
a.
b.
c.
d.
e.
f.
g.
h.
i.

22

A.028
a.
b.
c.
d.
e.
f.
g.
h.
i.

23

A.029
a.
b.
c.
d.
e.
f.
g.
h.
i.

24

A.030
a.
b.

1 M3 PAS. PONDASI CYCLOOF, 60 % BETON CAMPURAN 1PC : 2PB :3KR DAN 40 %


Batu Belah 15/20 cm (40 %)
0.4800
Semen PC (1 Zak 50 Kg)
3.8800
Psir Beton
0.3120
KR (Split 2/3)
0.4680
Besi Beton
126.0000
Kawat Beton
1.8000
Pekerja
3.4000
Tukang Batu
0.8500
Kepala Tukang Batu
0.0850
Mandor
0.1700
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 BETON MUTU fc=14,5 Mpa (K 175), slump (122) cm, w/c=0,66
Semen PC (1 Zak 50 Kg)
6.5200
Split Pecah Mesin 2/3
0.8300
Pasir Beton
0.5400
Air
215.0000
Pekerja
1.6500
Tukang Batu
0.2750
Kepala Tukang Batu
0.0280
Mandor
0.0830
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 BETON MUTU fc=19,3 Mpa (K 225), slump (122) cm, w/c=0,58
Semen PC (1 Zak 50 Kg)
7.4200
Split Pecah Mesin 2/3
0.8100
Pasir Beton
0.4900
Air
215.0000
Pekerja
1.6500
Tukang Batu
0.2750
Kepala Tukang Batu
0.0280
Mandor
0.0830
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
10.0000
Jumlah
Dibulatkan
1 M3 BETON MUTU fc=26,4 Mpa (K 300), slump (122) cm, w/c=0,52
Semen PC (1 Zak 50 Kg)
8.2600
Split Pecah Mesin 2/3
0.8100
Pasir Beton
0.4900
Air
215.0000
Pekerja
1.6500
Tukang Batu
0.2750
Kepala Tukang Batu
0.0280
Mandor
0.0830
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 COR BETON K - 175 READY MIX MIN. 6 M3 BERIKUT SLANG
Adukan K-175 Ready Mix
1.0000
Pekerja
2.5000

c.
d.
e.
f.
g.

25

A.031
a.
b.
c.
d.
e.
f.
g.

26

A.031.1
a.
b.
c.
d.
e.
f.
g.

27

A.032
a.
b.
c.
d.
e.
f.
g.

28

A.032.1
a.
b.
c.
d.
e.
f.
g.

29

A.033
a.
b.

Tukang Batu
0.2500
Kepala Tukang Batu
0.1000
Mandor
0.0100
Alat Bantu (Slang + Tes Lab)
0.0450
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 COR BETON K - 225 READY MIX MIN. 6 M3 BERIKUT SLANG
Adukan K-225 Ready Mix
1.0000
Pekerja
2.5000
Tukang Batu
0.2500
Kepala Tukang Batu
0.1000
Mandor
0.0100
Alat Bantu (Slang + Tes Lab)
0.0450
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 COR BETON K - 250 READY MIX MIN. 6 M3 BERIKUT SLANG
Adukan K-225 Ready Mix
1.0000
Pekerja
2.5000
Tukang Batu
0.2500
Kepala Tukang Batu
0.1000
Mandor
0.0100
Alat Bantu (Slang + Tes Lab)
0.0450
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 COR BETON K - 300 READY MIX MIN. 6 M3 BERIKUT SLANG
Adukan K-300 Ready Mix
1.0000
Pekerja
2.5000
Tukang Batu
0.2500
Kepala Tukang Batu
0.1000
Mandor
0.0100
Alat Bantu (Slang + Tes Lab)
0.0450
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 COR BETON K - 350 READY MIX MIN. 6 M3 BERIKUT SLANG
Adukan K-350 Ready Mix
1.0000
Pekerja
2.5000
Tukang Batu
0.2500
Kepala Tukang Batu
0.1000
Mandor
0.0100
Alat Bantu (Slang + Tes Lab)
0.0450
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 KG BESI BETON TERPASANG POLOS
UNTUK 10 KG
Besi Beton Polos
10.5000
Kawat Beton
0.1500

c.
d.
e.
f.
g.

30

A.033.1
a.
b.
c.
d.
e.
f.
g.

31

32

33

A.034
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.

A.035
a.
b.
c.
d.
e.
f.

A.036
a.
b.
c.
d.
e.
f.

Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
Upah Angkut
Jumlah
Untuk 1 Kg Besi Beton terpasang
Keuntungan Max.
Jumlah
Dibulatkan
1 KG BESI BETON TERPASANG U-39 (URIL)
UNTUK 10 KG
Besi Beton rata-rata (U-39/Uril)
Kawat Beton
Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
Upah Angkut
Jumlah
Untuk 1 Kg Besi Beton terpasang
Keuntungan Max.
Jumlah
Dibulatkan
1 KG PEK. ERECTION KONSTRUKSI KUDA-KUDA BESI
Pekerja
Tukang Besi Profil
Kepala Tukang Besi Profil
Mandor
Operator Alat Besar
Pembantu Operator
Sewa Alat
Bahan Bakar Solar
Pelumas
Alat Bantu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 KG PEKERJAAN BAJA IWF EX DN
Besi Baja IWF Ex DN SII
Pekerja
Tukang Besi Profill/ Tukang Las
Kepala Tukang Besi Profil
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 KG PEK. KONSTRUKSI BESI SIKU/PROFIL EX DN
Besi Profil/ Besi Siku Ex. DN
Pekerja
Tukang Besi Profil/ Tukang Las
Kepala Tukang Besi Profil
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah

0.0700
0.0700
0.0070
0.0040
0.0000

10.0000

10.5000
0.1500
0.0700
0.0700
0.0070
0.0040
0.0000

10.0000

0.0010
0.0010
0.0002
0.0001
0.0002
0.0200
0.0002
0.0100
0.0010
0.0002
0.0000
=

10.0000

1.1500
0.0600
0.0600
0.0060
0.0030
0.0000
=

10.0000

1.1500
0.0600
0.0600
0.0060
0.0030
0.0000
=

10.0000

34

A.037
a.
b.
c.
d.
e.
f.
g.
h.
i.

35

A.038
a.
b.
c.
d.
e.
f.

36

A.039
a.
b.
c.
d.
e.
f.
g.

37

A.040
a.
b.
c.
d.
e.
f.

38

A.041
a.
b.
c.
d.
e.
f.
g.
h.

Dibulatkan
1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM
UNTUK 10 CM
Kawat Las listrik
0.4000
Bahan Bakar Solar
0.3000
Pelumas
0.0400
Pekerja
0.0400
Tukang Besi Profil
0.0200
Kepala Tukang Besi Profil
0.0020
Mandor
0.0020
Sewa Alat (Mesin Las Listrik)
0.1700
Upah Angkut
0.0000
Jumlah
Untuk 1 Cm Pengelasan
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 TITIK MELUBANGI KONSTRUKSI BESI DENGAN BOR
Pekerja
0.0500
Tukang Besi Profil
0.0200
Kepala Tukang Besi Profil
0.0030
Mandor
0.0010
Alat Bantu (Mesin Bor Listrik)
0.2500
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PEKERJAAN BONDEK
Bondek
1.0100
Kawat Las
0.1000
Pekerja Terampil
0.0500
Tukang Besi Profil
0.0300
Mandor
0.0100
Shear Connector
1.0000
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PEKERJAAN WIREMESH M8
Wiremesh M8
1.0100
Kawat Las
0.1000
Pekerja
0.1000
Tukang Besi Profil
0.0750
Mandor
0.0100
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 BEKISTING DENGAN PAPAN
Kaso 5/7 Kayu Kuat Kelas II (Maranti) (2x pakai) 50%
0.0170
Papan/Kayu Rawa (Albasiah) (2 X Pakai) 75 %
0.0240
Paku
0.4000
Pekerja
0.1200
Tukang Kayu
0.2700
Kepala Tukang Kayu
0.1500
Mandor
0.0500
Upah Angkut
0.0000
Jumlah

39

40

41

42

43

A.042
a.
b.
c.
d.
e.
f.
g.
h.

A.043
a.
b.
c.
d.
e.
f.
g.
h.

A.044
a.
b.
c.
d.
e.
f.
g.
h.

A.045
a.
b.
c.
d.
e.
f.
g.

A.046
a.
b.

Jumlah untuk 1 M2
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 BEKISTING MULTIPLEX 9 MM
Kaso 5/7 Kayu Kuat Kelas II (Maranti) (2x pakai) 50%
MultIplek 9 mm (2 X Pakai) 75 %
Paku
Pekerja
Tukang Kayu Terampil
Kepala Tukang Kayu
Mandor
Upah Angkut
Jumlah
Jumlah untuk 1 M2
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 BEKISTING MULTIPLEX 12 MM
Kaso 5/7 Kayu Kuat Kelas II (Maranti) (2x pakai) 50%
Multiplek 12 mm (2x Pakai) 75 %
Paku
Pekerja
Tukang Kayu Terampil
Kepala Tukang Kayu
Mandor
Upah Angkut
Jumlah
Jumlah untuk 1 M2
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PASANGAN STOOT WERK
Kayu Stoot (Dinding 2x Pakai) 50%
Papan/Kayu Rawa (Albasiah) (2 X Pakai)
Paku
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Upah Angkut
Jumlah
Jumlah untuk 1 M2
Keuntungan Max.
Jumlah
Dibulatkan
1 M3 PASANGAN BATU KOSONG (AANSTAMPING)
Batu Belah 15 Cm/ 20 Cm
Pasir Urug
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M3 PASANGAN BATU BRONJONG
Batu Kali (Batu Bulat) Bronjol
Kawat Bronjong

10.0000

0.0170
0.3470
0.4000
0.1200
0.2700
0.1500
0.0500
0.0000

10.0000

0.0170
0.3470
0.4000
0.1200
0.2700
0.1500
0.0500
0.0000

10.0000

0.0864
0.0032
0.5000
0.1500
0.2000
0.2000
0.0170
0.0000

10.0000

1.2000
0.4320
0.7800
0.3900
0.0390
0.0390
0.0000
=

10.0000

1.2000
3.5000

c.
d.
e.
f.

44

A.049
a.
b.
c.
d.
e.
f.
g.
h.

45

A.050
a.
b.
c.
d.
e.
f.
g.
h.

46

A.051
a.
b.
c.
d.
e.
f.
g.
h.

47

A.052
a.
b.
c.
d.
e.
f.
g.
h.

48

A.053

Pekerja
1.5000
Pekerja Terampil
0.2000
Mandor
0.0200
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PASANGAN BATU BELAH CAMP. 1 PC : 6 PP
Batu Belah 15 Cm/ 20 Cm
1.2000
Semen PC (1 Zak 50 Kg)
2.3400
Pasir Pasang
0.5610
Pekerja
1.5000
Tukang Batu
0.7500
Kepala Tukang Batu
0.0750
Mandor
0.0750
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PASANGAN BATU BELAH, CAMP. 1 PC : 5 PP
Batu Belah 15 Cm/ 20 Cm
1.2000
Semen PC (1 Zak 50 Kg)
2.7200
Pasir Pasang
0.5440
Pekerja
1.5000
Tukang Batu
0.7500
Kepala Tukang Batu
0.0750
Mandor
0.0750
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PASANGAN BATU BELAH, CAMP. 1 PC : 4 PP
Batu Belah 15 Cm/ 20 Cm
1.2000
Semen PC (1 Zak 50 Kg)
3.2600
Pasir Pasang
0.5200
Pekerja
1.5000
Tukang Batu
0.7500
Kepala Tukang Batu
0.0750
Mandor
0.0750
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PASANGAN BATU BELAH, CAMP. 1 PC : 3 PP
Batu Belah 15 Cm/ 20 Cm
1.2000
Semen PC (1 Zak 50 Kg)
4.0400
Pasir Pasang
0.4850
Pekerja
1.5000
Tukang Batu
0.7500
Kepala Tukang Batu
0.0750
Mandor
0.0750
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 PASANGAN BATU BELAH 1 : 4 PAKAI MUKA BATU SEGI ENAM + SIARAN

a.
b.
c.
d.
e.
f.
g.
h.

49

50

51

52
1.06

A.054
a.
b.
c.
d.
e.
f.
g.
h.

A.055
a.
b.
c.
d.
e.
f.
g.
h.
i.

A.055.1
a.
b.
c.
d.
e.
f.
g.
h.
i.

A.056
a.
b.
c.
d.
e.
f.
g.

Batu Belah
Semen PC (1 Zak 50 Kg)
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 PASANGAN BATU TEMPEL HITAM
Batu Tempel Hitam
Semen PC (1 Zak 50 Kg)
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 DINDING KERAMIK UKURAN 10x20 CM (PUTIH POLOS)
Keramik KW 1 DN
Semen PC (1 Zak 50 Kg)
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 DINDING KERAMIK UKURAN 10x20 CM (WARNA)
Keramik KW 1 DN
Semen PC (1 Zak 50 Kg)
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 DINDING KERAMIK UKURAN 20x20 CM (PUTIH POLOS)
Keramik KW 1 DN (Putih Polos)
Semen PC (1 Zak 50 Kg)
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kepala Tukang Batu

1.5000
1.2500
0.3480
1.2500
1.1250
0.1125
0.0169
0.0000
10.0000

1.1000
0.2350
0.0350
0.7000
0.3500
0.0350
0.0350
0.0000
10.0000

1.0600
0.1860
0.0180
2.7500
0.9000
0.4500
0.0450
0.0450
0.0000
10.0000

1.0600
0.1860
0.0180
2.7500
0.9000
0.4500
0.0450
0.0450
0.0000
10.0000

1.0600
0.1860
0.0180
1.9400
0.9000
0.4500
0.0450

h.
i.

26.5
25
1.06

53

A.056.2
a.
b.
c.
d.
e.
f.
g.
h.
i.

54

A.058
a.
b.
c.
d.
e.
f.
g.
h.
i.

55

A.059
a.
b.
c.
d.
e.
f.
g.
h.
i.

56

A.060
a.
b.
c.
d.
e.
f.
g.
h.
i.

1.0683

11
11.11111111
1.0683

Mandor
0.0450
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 DINDING KERAMIK 10x20 / 20x20 CM DN BERCORAK
Keramik KW 1 DN (Putih Polos)
1.0600
Semen PC (1 Zak 50 Kg)
0.1860
Pasir Pasang
0.0180
Semen Warna
1.9400
Pekerja
0.9000
Tukang Batu
0.4500
Kepala Tukang Batu
0.0450
Mandor
0.0450
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 LANTAI KERAMIK UKURAN 20 X 20 CM CORAK/ ANTI SLIP
Keramik 20/20 KW 1 DN Corak/ Anti Slip
1.0600
Semen PC (1 Zak 50 Kg)
0.2080
Pasir Pasang
0.0450
Semen Warna
1.6200
Pekerja
0.7000
Tukang Batu
0.3500
Kepala Tukang Batu
0.0350
Mandor
0.0350
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 LANTAI KERAMIK 30 x 30 CM DN PUTIH POLOS
Keramik KW 1 DN Putih Polos
1.0683
Semen PC (1 Zak 50 Kg)
0.2000
Pasir Pasang
0.0450
Semen Warna
1.5000
Pekerja
0.7000
Tukang Batu
0.3500
Kepala Tukang Batu
0.0350
Mandor
0.0350
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 LANTAI KERAMIK 30/30 DN BERCORAK/ BERWARNA
Keramik KW 1 DN Bercorak/ Berwarna
1.0683
Semen PC (@ 50 Kg/Zak)
0.2000
Pasir Pasang
0.0450
Semen Warna
1.5000
Pekerja
0.7000
Tukang Batu
0.3500
Kepala Tukang Batu
0.0350
Mandor
0.0350
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah

57

A.060
a.
b.
c.
d.
e.
f.
g.
h.
i.

58

A.082
a.
b.
c.
d.
e.
f.
g.
h.

59

A.083
a.
b.
c.
d.
e.
f.
g.
h.

60

A.084
a.
b.
c.
d.
e.
f.
g.
h.

61

A.086
a.
b.
c.
d.
e.
f.

Dibulatkan
1 M2 LANTAI KERAMIK 30/30 ANTI SLIP
Keramik KW 1 DN Bercorak/ Berwarna
1.0683
Semen PC (@ 50 Kg/Zak)
0.2000
Pasir Pasang
0.0450
Semen Warna
1.5000
Pekerja
0.7000
Tukang Batu
0.3500
Kepala Tukang Batu
0.0350
Mandor
0.0350
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PASANGAN DINDING BATA MERAH 1 PC : 3 PP, TEBAL 1/2 BATA
Bata Merah (5x11x22 Cm)
70.0000
Semen PC (1 Zak 50 Kg)
0.2874
Pasir Pasang
0.0400
Pekerja
0.3000
Tukang Batu
0.1000
Kepala Tukang Batu
0.0100
Mandor
0.0150
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PASANGAN DINDING BATA MERAH 1 PC : 4 PP, TEBAL 1/2 BATA
Bata Merah (5x11x22 Cm)
70.0000
Semen PC
0.2300
Pasir Pasang
0.0430
Pekerja
0.3000
Tukang Batu
0.1000
Kepala Tukang Batu
0.0100
Mandor
0.0150
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PASANGAN DINDING BATA MERAH 1 PC : 5 PP, TEBAL 1/2 BATA
Bata Merah (5x11x22 Cm)
70.0000
Semen PC
0.1936
Pasir Pasang
0.0450
Pekerja
0.3000
Tukang Batu
0.1000
Kepala Tukang Batu
0.0100
Mandor
0.0150
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PLESTERAN 1 PC ; 3 PP, TEBAL15 MM
Semen PC
0.15552
Pasir Pasang
0.0230
Pekerja
0.2000
Tukang Batu
0.1500
Kepala Tukang Batu
0.0150
Mandor
0.0100

g.

62

A.087
a.
b.
c.
d.
e.
f.
g.

63

A.088
a.
b.
c.
d.
e.
f.
g.

64

A.089
a.
b.
c.
d.
e.
f.

65

A.091
a.
b.
c.
d.
e.

f.
g.
h.
i.
j.
k.
l.
m.
n.

Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PLESTERAN 1 PC ; 4 PP, TEBAL 15 MM
Semen PC
0.1248
Pasir Pasang
0.0240
Pekerja
0.2000
Tukang Batu
0.1500
Kepala Tukang Batu
0.0150
Mandor
0.0100
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PLESTERAN 1 PC ; 5 PP, TEBAL 15 MM
Semen PC
0.10368
Pasir Pasang
0.0260
Pekerja
0.2000
Tukang Batu
0.1500
Kepala Tukang Batu
0.0150
Mandor
0.0100
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 ACIAN PC
Semen PC
0.0650
Pekerja
0.1500
Tukang Batu
0.1000
Kepala Tukang Batu
0.0100
Mandor
0.0080
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 UNIT SEPTICTANK 4 x 2,1 x 2,1 m + REMBESANNYA (UNTUK KANTOR TYPE KECI
Galian Tanah
26.6990
Pasir Urug
2.4000
Lantai Kerja t = 10 Cm
0.9600
Pas. Bata 1PC : 3PS + Plesteran
5.0240
Plat Beton Penutup dan Cor Beton Septic Tank
6.1025
Besi Beton Polos terpasang
318.4312
Pas. Bekisting dengan papan
40.7630
Pipa PVC 4" Jenis AW + Sambungan
6.4000
1/2
1.3500
Pipa GIP 1 "
Galian Tanah untuk Rembesan
11.6100
Pas. Injuk
5.8800
Urugan Kerikil 3,5 cm
1.0500
Pipa PVC 4" Berlubang Jenis AW
10.8000
Urugan Kembali Perataan Tanah
1.1250
Tambahan Upah
0.0920
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan

66

67

68

69

70

A.093
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.094
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.095
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.096
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.097

1 M2 PENGECATAN BETON ICI ESKTERIOR


Cat Tembok ICI
Alkali ICI sebelum pengecatan
Rol Cat
Ampelas
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Steger Werk
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 PENGECATAN PLAFOND DAN DINDING INTERIOR ICI
Cat Tembok ICI
Cat Dasar sebelum pengecatan
Rol Cat
Ampelas
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Steger Werk
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 PENGECATAN DINDING VINILEX (3x)
Cat Tembok Vinilex
Plamir Tembok
Rol Cat
Ampelas
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Steger Werk
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 PENGECATAN PLAFOND VINILEX (3x)
Cat Tembok Vinilex
Plamir Tembok
Rol Cat
Ampelas
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Steger Werk
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 PENGECATAN DINDING SANLEX (3x)

0.2500
0.1250
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0250
0.0000
10.0000

0.2500
0.1250
0.0100
0.5000
0.2000
0.3000
0.0300
0.0100
0.0250
0.0000
10.0000

0.1750
0.1600
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0450
0.0000
10.0000

0.2000
0.1600
0.0100
0.5000
0.2000
0.2800
0.0300
0.0100
0.0425
0.0000
10.0000

a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

71

72

73

74

A.098
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.097.1
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.098.1
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.099
a.

Cat Tembok Sanlex


Plamir Tembok
Rol Cat
Ampelas
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Steger Werk
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PENGECATAN PLAFOND SANLEX (3x)
Cat Tembok Sanlex
Plamir Tembok
Rol Cat
Ampelas
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Steger Werk
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PENGECATAN DINDING ROMATEX (3x)
Cat Tembok Romatex
Plamir Tembok
Rol Cat
Ampelas
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Steger Werk
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PENGECATAN PLAFOND ROMATEX (3x)
Cat Tembok Romatex
Plamir Tembok
Rol Cat
Ampelas
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Steger Werk
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PENGECATAN KAYU (3x) BERIKUT MENI
Meni Kayu

0.1750
0.1600
0.0100
0.5000
0.1040
0.1820
0.0195
0.0100
0.0450
0.0000
=

10.0000

0.2000
0.1600
0.0100
0.5000
0.1040
0.1820
0.0195
0.0100
0.0425
0.0000
=

10.0000

0.1750
0.1600
0.0100
0.5000
0.1040
0.1820
0.0195
0.0100
0.0450
0.0000
=

10.0000

0.2000
0.1600
0.0100
0.5000
0.1040
0.1820
0.0195
0.0100
0.0425
0.0000
=

10.0000

0.1670

b.
c.
d.
e.
f.
g.
h.
i.
j.
k.

75

76

77

A.100
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.101
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.

A.102
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.

Plamir Kayu
Cat Kayu Setara Merk AVIAN
Ampelas Kayu
Minyak Cat Terpentin
Kwas 3"
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PENGECATAN BESI (3x)
Meni Besi
Cat Besi Setara Merk AVIAN
Ampelas Besi
Minyak Cat (Tinner B)
Kwas 3"
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PLITURAN BANGUNAN (BIASA)
Dempul Plitur (Dempul Dasar)
Wood Filler (INFRA)
Oker Putih
Oker Warna
Batu Apung (gosok)
Sirlak ex India
Kwas 3"
Spirtus
Ampelas Kayu
Pekerja
Tukang Cat/ Plitur
Kepala Tukang Cat/ Plitur
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PLITURAN MEUBELAIR
Dempul Plitur (Dempul Dasar)
Wood Filler (INFRA)
Melamik
Oker Putih
Oker Warna
Batu Apung (gosok)
Sirlak ex India
Kwas 3"
Spirtus
Ampelas Kayu
Pekerja
Tukang Cat/ Plitur

0.0830
0.2000
0.4000
0.1500
0.0500
0.2000
0.3000
0.0300
0.0100
0.0000
=

10.0000

0.1670
0.2000
0.4000
0.1500
0.0500
0.2000
0.3000
0.0300
0.0100
0.0000
=

10.0000

0.0300
0.2000
0.0200
0.0100
0.1000
0.2000
0.0100
0.2000
0.1000
0.2500
0.2850
0.0400
0.0200
0.0000
=

10.0000

0.0300
0.2000
0.3500
0.0200
0.0100
0.1000
0.2000
0.0100
0.2000
0.1000
0.2500
0.2850

m.
n.
o.

78

A.103
a.
b.
c.
d.
e.
f.
g.

79

A.104
a.
b.
c.
d.
e.
f.
g.

80

A.106
a.
b.
c.
d.
e.
f.
g.

81
brkt strimin+cotting

A.107
a.
b.
c.
d.
e.
f.
g.

82

A.107.1
a.
b.
c.
d.
e.

Kepala Tukang Cat/ Plitur


0.0400
Mandor
0.0200
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PAS. RANGKA PLAFOND (50 x 100 CM) KAYU MAHONI
Kaso 5/7 Kamper Mahoni
0.0154
Paku 7 cm - 10 cm
0.2000
Pekerja
0.1500
Tukang Kayu
0.3000
Kepala Tukang Kayu
0.0300
Mandor
0.0750
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PAS. RANGKA PLAFOND (50 x 100 cm), KAYU MARANTI
Kaso 5/7 Maranti
0.0154
Paku 7 cm - 10 cm
0.2000
Pekerja
0.1500
Tukang Kayu
0.3000
Kepala Tukang Kayu
0.0300
Mandor
0.0750
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PAS. BAHAN PLAFOND TRIPLEK 4 MM PENUTUP PADA RANGKANYA
Triplek 4 mm (120 x 240 Cm)
0.3750
Paku Triplek
0.0300
Pekerja
0.1000
Tukang Kayu
0.1000
Kepala Tukang Kayu
0.0100
Mandor
0.0050
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PAS. BAHAN PLAFOND GYFSUM 9 MM PENUTUP PADA RANGKANYA
Gyfsum 9 mm (uk. 120 x 240 cm)
0.3640
Paku Sekrup
0.1100
Pekerja
0.1000
Tukang Kayu
0.0500
Kepala Tukang Kayu
0.0050
Mandor
0.0050
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PAS. BAHAN PLAFOND GRC 4 mm
GRC Plat 4 mm
0.3640
Paku
0.0100
Pekerja
0.0300
Tukang Kayu
0.0700
Kepala Tukang Kayu
0.0070

f.
g.

83

A.108
a.
b.
c.
d.
e.
f.
g.

84

A.109
a.
b.
c.
d.
e.
f.
g.

K KT KLS II MAHONI
85 3/30A.110
a.
b.
c.
d.
e.
f.
g.

idem atas

86

K KT KLS II MAHONI
87

A.111
a.
b.
c.
d.
e.
f.
g.

A.112
a.
b.
c.
d.
e.
f.

Mandor
0.0040
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PAS. BAHAN PLAFOND ASBES SEMEN 5MM PENUTUP PADA RANGKANYA
Asbes Semen 5 mm
1.1000
Paku Tripleks
0.0100
Pekerja
0.0300
Tukang Kayu
0.0700
Kepala Tukang Kayu
0.0070
Mandor
0.0040
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PAS. BAHAN PLAFOND ETERNIT 4 mm ( 1 X 1) PADA RANGKANYA
Eternit 4 mm (1 x 1)
1.1000
Paku Triplek
0.0100
Pekerja
0.0300
Tukang Kayu
0.0700
Kepala Tukang Kayu
0.0070
Mandor
0.0040
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M' PEK. LISTPLANK KAYU PAPAN MAHONI 3/30
Kayu Papan 3 x 30 Cm Papan Mahoni
0.0110
Paku 5 - 7 Cm
0.0500
Pekerja
0.1000
Tukang Kayu
0.2000
Kepala Tukang Kayu
0.0200
Mandor
0.0050
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M' PEK. LISTPLANK KAYU PAPAN MAHONI 3/20
Kayu Papan 3x20 Cm Papan Mahoni
0.0108
Paku 5 - 7 Cm
0.1000
Pekerja
0.1000
Tukang Kayu
0.2000
Kepala Tukang Kayu
0.0200
Mandor
0.0040
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 KUSEN KAYU MAHONI
Kayu Mahoni
1.2000
Paku 10 Cm
1.2500
Lem Putih (FOX)
1.0000
Pekerja
6.0000
Tukang Kayu
18.0000
Kepala Tukang Kayu
1.8000

g.
h.

ky kls II mahoni 88

mahoni

89

A.118
a.
b.
c.
d.
e.
f.
g.
h.
i.

90

A.108.1
a.
b.
c.
d.
e.
f.
g.
h.
i.

3 mm

GA ADA

A.116
a.
b.
c.
d.
e.
f.
g.

91
KY KT KLS II MAHONI
3mm
t=0,02 mm (uk. Pintu)

A.120
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.

Mandor
0.3000
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 DAUN PINTU PANIL KAYU PAPAN MAHONI
Papan Kayu Papan mahoni
0.0400
Lem Putih (FOX)
0.5000
Pekerja
1.0000
Tukang Kayu
3.0000
Kepala Tukang Kayu
0.3000
Mandor
0.0500
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 DAUN PINTU DOUBLE TEAKWOOD RANGKA KAYU PAPAN MAHONI
Rangka Papan Kayu Papan mahoni
0.0250
Teakwood 4 mm uk. Pintu (90x220 cm)
2.0000
Lem Putih (FOX)
0.3000
Paku Triplek (1 - 2.5 Cm)
0.0300
Pekerja
0.0800
Tukang Kayu
2.4000
Kepala Tukang Kayu
0.2400
Mandor
0.0400
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 DAUN PINTU PANIL TRIPLEK 9 MM (RANGKA KAYU KUAT KELAS II (MAHONI))
Papan Kayu Kuat Kelas II (Mahoni)
0.0250
Multiplek 9 mm
0.5000
Lem Putih (FOX)
0.0500
List Kayu Profil
4.0000
Pekerja
0.3000
Tukang Kayu
1.5000
Kepala Tukang Kayu
0.2000
Mandor
0.0200
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 DAUN PINTU TRIPLEK UKURAN PINTU LAPIS ALUMUNIUM (KM/WC)
Rangka Papan Kayu Kuat Kelas II (Mahoni)
0.0250
Triplek 4 mm (Ukuran Pintu)
1.0000
Teakwood 3 mm (ukuran pintu)
1.0000
Alumunium Sheet 0,3 mm
1.0000
Paku Triplek
0.0300
Lem Putih ( FOX )
0.8000
Pekerja
0.8500
Tukang Kayu
2.5500
Kepala Tukang Kayu
0.2550
Mandor
0.0430
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah

92
ky kt klsII mahoni

A.121
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.

ky kt kls II mahoni93
idem atas

A.123
a.
b.
c.
d.
e.
f.
g.

KY KT KLS II MAHONI
94

A.124
a.
b.
c.
d.
e.
f.
g.

GA ADA

95

A.125.1
a.
b.
c.
d.
e.
f.
g.

ky kt II mahoni

96

A.126
a.
b.
c.
d.
e.
f.
g.

Dibulatkan
1 M2 DAUN PINTU TRIPLEK UKURAN PINTU LAPIS FORMIKA (KM/WC) KAYU PAPAN
Rangka Papan Kayu Kuat Kelas II (Mahoni)
0.0250
Tripleks 4 mm (uk. Pintu)
1.0000
Teakwood 3 mm (ukuran pintu)
1.0000
Formika
1.0000
Paku Triplek (1-2.5 Cm)
0.0300
Lem Putih (FOX)
0.8000
Pekerja
0.8500
Tukang Kayu
2.5500
Kepala Tukang Kayu
0.2550
Mandor
0.0430
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 DAUN JENDELA KACA (TANPA KACA) KAYU PAPAN MAHONI
Rangka Papan Kayu Kuat Kelas II (Mahoni)
0.0240
Lem Putih (FOX)
0.3000
Pekerja
0.8000
Tukang Kayu
2.4000
Kepala Tukang Kayu
0.2400
Mandor
0.0400
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 DAUN PINTU KACA (TANPA KACA) KAYU MAHONI
Rangka Papan Kayu Kuat Kelas II (Mahoni)
0.0240
Lem Putih (FOX)
0.3000
Pekerja
0.8000
Tukang Kayu
2.4000
Kepala Tukang Kayu
0.2400
Mandor
0.0400
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 JALUSI MATI KAYU KUAT KELAS II (MARANTI)
Papan Kayu Kuat Kelas II (Maranti)
0.0300
Paku 5 - 7 Cm
0.1500
Pekerja
0.7000
Tukang Kayu
1.8000
Kepala Tukang Kayu
0.2800
Mandor
0.0150
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 KUDA-KUDA OVERSTEK/KONSOL KAYU MAHONI (EXSPOSE)
Rangka Kayu Kuat Kelas II (Mahoni)
1.2000
Besi Strip tebal 5 cm
15.0000
Paku 8 - 12 Cm
5.6000
Pekerja
6.7000
Tukang Kayu
20.1000
Kepala Tukang Kayu
2.0100
Mandor
0.3350

h.

ky kt kls ii maranti97

GA ADA

98

ky kt kls ii meranti99

GA ADA

100

KT KLS II MAHONI
101

A.127
a.
b.
c.
d.
e.
f.
g.
h.

A.127.1
a.
b.
c.
d.
e.
f.
g.
h.

A.128
a.
b.
c.
d.
e.
f.
g.
h.

A.128.1
a.
b.
c.
d.
e.
f.
g.
h.

A.129
a.
b.
c.

Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 KUDA-KUDA KAYU MARANTI
Kayu Balok Maranti
1.1000
Besi Strip tebal 5 cm
15.0000
Paku 8 - 12 Cm
5.6000
Pekerja
4.0000
Tukang Kayu
12.0000
Kepala Tukang Kayu
1.2000
Mandor
0.2000
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 KUDA-KUDA KAYU KUAT KELAS II (MAHONI)
Kayu Kuat Kelas II (Mahoni)
1.2000
Besi Strip tebal 5 cm
15.0000
Paku 8 - 12 Cm
5.6000
Pekerja
6.7000
Tukang Kayu
20.1000
Kepala Tukang Kayu
2.0100
Mandor
0.3350
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 KONSTRUKSI GORDING KAYU MARANTI
Kayu Kuat Kelas II (Maranti)
1.1000
Besi Strip tebal 5 cm
15.0000
Paku 8 - 12 Cm
3.0000
Pekerja
2.4000
Tukang Kayu
7.2000
Kepala Tukang Kayu
0.7200
Mandor
0.1200
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 KONSTRUKSI GORDING KAYU KUAT KELAS II (MAHONI)
Kayu Kuat Kelas II (Mahoni)
1.1000
Besi Strip tebal 5 cm
15.0000
Paku 8 - 12 Cm
3.0000
Pekerja
2.4000
Tukang Kayu
7.2000
Kepala Tukang Kayu
0.7200
Mandor
0.1200
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 RANGKA ATAP GENTENG BETON/KERAMIK KAYU MAHONI (HANYA RANGKAN
Kayu Kaso 5/7 Kayu Kuat Kelas II (Mahoni)
0.0140
Reng Kayu 3/4 Kayu Kuat Kelas II (Mahoni)
0.0072
Paku 5 - 10 Cm
0.2500

d.
e.
f.
g.
h.

Pekerja
0.1000
Tukang Kayu
0.1000
Kepala Tukang Kayu
0.0100
Mandor
0.0050
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
GA ADA
102
A.129.1
1 M2 RANGKA ATAP GENTENG BETON/KERAMIK KAYU KUAT KELAS II (MARANTI)
a.
Kayu Kaso 5/7 Kuat Kelas II (Maranti)
0.0140
b.
Kayu Reng 3/4 Kuat Kelas II (Maranti)
0.0072
c.
Paku 5 - 10 Cm
0.2500
d.
Pekerja
0.1000
e.
Tukang Kayu
0.1000
f.
Kepala Tukang Kayu
0.0100
g.
Mandor
0.0050
h.
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
KT KLS II MARANTI
103
A.130
1 M2 RANGKA ATAP GENTENG PLENTONG MARANTI (HANYA RANGKA)
a.
Kayu Kaso 5/7 Kuat Kelas II (Maranti)
0.0140
b.
Kayu Reng 2/3 Kuat Kelas II (Maranti)
0.0036
c.
Paku 5 - 7 Cm
0.2500
d.
Pekerja
0.1000
e.
Tukang Kayu
0.1000
f.
Kepala Tukang Kayu
0.0100
g.
Mandor
0.0050
h.
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
GA ADA
104
A.130.1
1 M2 RANGKA ATAP GENTENG PLENTONG KAYU KUAT KELAS II (MAHONI) (HANYA
a.
Kayu Kaso 5/7 Kayu Kuat Kelas II (Mahoni)
0.0140
b.
Kayu Reng 2/3 Kayu Kuat Kelas II (Mahoni)
0.0036
c.
Paku 5 - 7 Cm
0.2500
d.
Pekerja
0.1000
e.
Tukang Kayu
0.1000
f.
Kepala Tukang Kayu
0.0100
g.
Mandor
0.0050
h.
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
PLNTONG PRESS(JT
PLERED)
105 WG
A.132
1 M' PEKERJAAN BUBUNGAN ATAP GENTENG EX JATIWANGI/PRERED
a.
Bubungan Genteng Ex Jatiwangi
4.0000
b.
PC (50 Kg)
0.1304
c.
Pasir Pasang
0.2100
d.
Pekerja
0.1500
e.
Tukang Batu
0.2000
f.
Kepala Tukang Batu
0.0100
g.
Mandor
0.0050
h.
Peralatan
0.0650
i.
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah

GA ADA

106

107

GA ADA

108

109

DIRUBAH ====>>

110

111

A.132.1
(460.01)
a.
b.
c.
d.
e.
f.

A.133
a.
b.
c.
d.
e.
f.
g.
h.
i.

A.133.1
(460.01)
a.
b.
c.
d.
e.
f.
g.

A.145
a.
b.
c.
d.
e.

A.146
a.
b.
c.
d.
e.

A.147

Dibulatkan
1 M2 PEKERJAAN PENUTUP ATAP GENTENG PLENTONG PRES (JATIWANGI/PLERE
Genteng Plentong Pres (Jatiwangi/Plered)
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M' PEKERJAAN BUBUNGAN ATAP GENTENG BETON
Genteng Bubungan Genteng Beton
PC (50 Kg)
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Peralatan
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 PEKERJAAN PENUTUP ATAP GENTENG BETON

25.0000
0.1200
0.0600
0.0060
0.0060
0.0000

Genteng Beton
Paku 5 - 7 Cm
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M' SALURAN GRAVEL BETON 1/2 20 CM + PASANGAN
Galian Tanah
Gravel Beton 20 Cm
Pas. Bata + Plesteran 1 : 3
Upah Kerja
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' SALURAN GRAVEL BETON 1/2 30 CM + PASANGAN
Galian Tanah
Gravel Beton 30 Cm
Pas. Bata + Plesteran 1 : 3
Upah Kerja
Upah Angkut
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 M2 PASANGAN PAVING BLOCK WARNA 6 CM

10.0000
0.1000
0.1500
0.0750
0.0080
0.0080
0.0000

10.0000

3.0000
0.1304
0.2100
0.1500
0.2000
0.0100
0.0050
0.0950
0.0000
10.0000

10.0000

0.1500
1.0000
0.8000
0.1500
0.0000
10.0000

0.2000
1.0000
0.8000
0.1500
0.0000
10.0000

a.
b.
c.
d.
e.
f.
g.
h.

112

A.149
a.
b.
c.
d.
e.
f.
g.
h.

113

A.151
a.
b.

114

A.152
a.
b.

115

A.153
a.
b.

116

A.154
a.
b.

117

A.155
a.
b.

Paving Block Warna 6 cm


1.0100
Pasir Beton
0.1000
Pekerja
0.2500
Tukang Batu
0.5000
Kepala Tukang Batu
0.0250
Mandor
0.0030
Peralatan
1.0000
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PASANGAN PAVING BLOCK NATURAL 6 CM
Paving Block Natural 6 cm
1.0100
Pasir Beton
0.1000
Pekerja
0.2500
Tukang Batu
0.5000
Kepala Tukang Batu
0.0250
Mandor
0.0030
Peralatan
1.0000
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 MEMBONGKAR DINDING BATA (JIKA BONGKARAN DIPAKAI LAGI)
Pekerja
2.0000
Mandor
0.0900
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 MEMBONGKAR DINDING BATA
(JIKA BONGKARAN TIDAK DIPAKAI LAGI)
Pekerja
1.0000
Mandor
0.0900
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 MEMBONGKAR PLESTERAN DINDING
Pekerja
0.0500
Mandor
0.0250
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 MEMBONGKAR GENTENG/SIRAP
(JIKA BONGKARAN TIDAK DIPAKAI LAGI)
Pekerja
0.0200
Mandor
0.0100
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 MEMBONGKAR GENTENG/SIRAP
(JIKA BONGKARAN DIPAKAI LAGI)
Pekerja
0.4000
Mandor
0.1000
Jumlah
Keuntungan Max.
=
10.0000

118

A.156
a.
b.
c.
d.

119

A.157
a.
b.
c.
d.

120

A.158
a.
b.
c.
d.

121

A.159
a.
b.
c.

122

A.160
a.
b.
c.
d.

SAMPAI SINI AZ123


SLESAI A.161
a.
b.

124

200.08.1
a.

Jumlah
Dibulatkan
1 M2 MEMBONGKAR RANGKA ATAP/RENG KASO
(JIKA BONGKARAN TIDAK DIPAKAI LAGI)
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 MEMBONGKAR RANGKA ATAP/RENG KASO
(JIKA BONGKARAN DIPAKAI LAGI)
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK
(JIKA BONGKARAN DIPAKAI LAGI)
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK
(JIKA BONGKARAN TIDAK DIPAKAI LAGI)
Pekerja
Tukang Kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 MEMBONGKAR PLAFOND
(JIKA BONGKARAN DIPAKAI LAGI)
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 MEMBONGKAR PLAFOND
(JIKA BONGKARAN TIDAK DIPAKAI LAGI)
Pekerja
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M3 URUGAN TANAH SETEMPAT DIRATAKAN
Tanah Setempat

0.1000
0.0250
0.0025
0.0050
=

10.0000

0.2000
0.0500
0.0050
0.0100
=

10.0000

4.0000
6.0000
0.6000
0.2000
=

10.0000

4.0000
3.0000
0.2000
=

10.0000

0.1000
0.2500
0.0025
0.0050
=

10.0000

0.1250
0.0050
=

10.0000

1.2000

b.
c.
d.

125

200.08.2
a.
b.
c.
d.

126

350.28
a.
b.
c.
d.
e.
f.
g.
h.

127

360.36
a.
b.
c.
d.
e.
f.
g.

128

450.41
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

129

460.08
a.
b.
c.
d.

Pekerja
0.5600
Mandor
0.0150
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M3 URUGAN TANAH MERAH DIRATAKAN
Tanah Merah
1.2000
Pekerja
0.5600
Mandor
0.0150
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PAS. DINDING ROSTER/KRAWANG
Roster/Krawang
25.0000
PC 50 Kg/Zak (Tiga Roda)
0.2560
Pasir Pasang
0.0350
Pekerja
0.3000
Tukang Batu
0.1000
Kepala Tukang Batu
0.0100
Mandor
0.0150
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PLESTERAN SIAR AD. 1 : 2
PC 50 Kg/Zak (Tiga Roda)
0.1080
Pasir Pasang
0.0085
Pekerja
0.1500
Tukang Batu
0.0700
Kepala Tukang Batu
0.0070
Mandor
0.0080
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 DINDING PEMISAH DOUBLE TEAKWOOD (RANGKA KAYU KUAT KELAS II (MAH
Kayu Kuat Kelas II (Mahoni)
0.0195
Papan Kayu Kuat Kelas II (Mahoni)
0.0070
Teakwood 3 mm (ukuran pintu)
1.0000
Lem Putih (FOX)
0.5000
Paku 1 - 3 Cm
0.2000
Pekerja
0.2000
Tukang Kayu
0.6000
Kepala Tukang Kayu
0.0600
Mandor
0.0100
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M2 PAS. ATAP ASBES 1,8 x 1,05 x 4 mm
Asbes Gelombang
0.5000
Paku Sumbat
2.0000
Pekerja
0.1500
Tukang Kayu
0.0750

e.
f.
g.

130

131

132

133

134

460.08.R
a.
b.
c.
d.
e.
f.
g.

460.21.R
a.
b.
c.
d.
e.
f.
g.

550.03.R
a.
b.
c.
d.
e.
f.
g.
h.
i.

550.07
a.
b.
c.
d.
e.
f.

550.08.R
a.
b.
c.
d.

Kepala Tukang Kayu


Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PAS. ATAP ASBES MOTIF GENTENG
Asbes Motif Genteng
Paku Sumbat
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. BUBUNGAN ASBES
Bubungan Asbes
Paku Sumbat
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. CLOSET JONGKOK INA
Closet Jongkok INA
Bata Merah
PC 50 Kg/Zak (Tiga Roda)
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. BAK MANDI FIBERGLASS KAP. 0,3 M3
Bak Fiberglass
Perlengkapan (18 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. BAK MANDI BATU BATA KAP. 0,3 M3
Bata Merah
PC 50 Kg/Zak (Tiga Roda)
Pasir Pasang
Keramik 20x20

0.0075
0.0080
0.0000
=

10.0000

1.1000
2.0000
0.1500
0.0750
0.0075
0.0080
0.0000
=

10.0000

1.0000
2.0000
0.1000
0.1500
0.0150
0.0050
0.0000
=

10.0000

1.0000
7.0000
0.2000
0.0100
0.1000
0.1500
0.0300
0.0110
0.0000
=

10.0000

1.0000
1.0000
0.1800
0.2700
0.0540
0.0000
=

10.0000

70.0000
2.4000
0.3000
4.4000

e.
f.
g.
h.
i.

135

136

137

138

139

550.25
a.
b.
c.
d.
e.
f.
g.

550.26
a.
b.
c.
d.
e.
f.
g.

550.27
a.
b.
c.
d.
e.
f.
g.

550.27.1
a.
b.
c.
d.
e.
f.
g.

550.28
a.
b.
c.

Semen warna
Pekerja
Tukang Batu
Kepala Tukang Batu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 1/2"
Pipa PVC 1/2"
Perlengkapan (35 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 3/4"
Pipa PVC 3/4"
Perlengkapan (35 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 1"
Pipa PVC 1"
Perlengkapan (35 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 1 1/4"
Pipa PVC 1 1/4"
Perlengkapan (35 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 1 1/2"
Pipa PVC 1 1/2"
Perlengkapan (35 %)
Pekerja

6.0000
0.6000
0.3000
0.0300
0.0000
=

10.0000

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018
0.0000
=

10.0000

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018
0.0000
=

10.0000

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018
0.0000
=

10.0000

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018
0.0000
=

10.0000

1.2000
1.0000
0.0360

d.
e.
f.
g.

140

550.29
a.
b.
c.
d.
e.
f.
g.

141

550.30
a.
b.
c.
d.
e.
f.
g.

142

550.31
a.
b.
c.
d.
e.
f.
g.

143

550.31.1
a.
b.
c.
d.
e.
f.
g.

144

550.32
a.
b.
c.
d.

Tukang Batu
0.0600
Kepala Tukang Batu
0.0060
Mandor
0.0018
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 2"
Pipa PVC 2"
1.2000
Perlengkapan (35 %)
1.0000
Pekerja
0.0360
Tukang Batu
0.0600
Kepala Tukang Batu
0.0060
Mandor
0.0018
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 2 1/2"
Pipa PVC 2 1/2"
1.2000
Perlengkapan (35 %)
1.0000
Pekerja
0.0360
Tukang Batu
0.0600
Kepala Tukang Batu
0.0060
Mandor
0.0018
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE D 3" UNTUK PEMBUANGAN KM/WC
Pipa PVC D 3"
1.2000
Perlengkapan (35 %)
1.0000
Pekerja
0.0360
Tukang Batu
0.0600
Kepala Tukang Batu
0.0060
Mandor
0.0018
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 3"
Pipa PVC AW 3"
1.2000
Perlengkapan (35 %)
1.0000
Pekerja
0.0360
Tukang Batu
0.0600
Kepala Tukang Batu
0.0060
Mandor
0.0018
Upah Angkut
0.0000
Jumlah
Keuntungan Max.
=
10.0000
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE D 4" UNTUK PEMBUANGAN KM/WC
Pipa PVC D 4"
1.2000
Perlengkapan (35 %)
1.0000
Pekerja
0.0360
Tukang Batu
0.0600

e.
f.
g.

145

146

147

148

149

150

151

550.32.1
a.
b.
c.
d.
e.
f.
g.

850.01
a.
b.
c.

850.02.1
a.
b.
c.

850.02.2
a.
b.
c.

850.03
a.
b.
c.

850.05
a.
b.
c.

850.06
a.

Kepala Tukang Batu


Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. PIPA PVC TYPE AW 4"
Pipa PVC AW 4"
Perlengkapan (35 %)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. KUNCI TANAM ANTIK
Kunci Tanam Antik
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. KUNCI TANAM
Kunci Tanam
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. KUNCI TANAM BIASA
Kunci Tanam Kecil
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. KUNCI TANAM KM/WC
Kunci Tanam KM/WC
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. ENGSEL PINTU
Engsel Pintu
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. ENGSEL JENDELA
Engsel Jendela

0.0060
0.0018
0.0000
=

10.0000

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018
0.0000
=

10.0000

1.0000
0.6000
0.0000
=

10.0000

1.0000
0.5000
0.0000
=

10.0000

1.0000
0.5000
0.0000
=

10.0000

1.0000
0.5000
0.0000
=

10.0000

1.0000
0.1500
0.0000
=

10.0000

1.0000

b.
c.

152

153

154

155

156

157

158

850.07
a.
b.
c.

850.09
a.
b.
c.

850.09.1
a.
b.
c.

850.12
a.
b.
c.

850.14
a.
b.
c.

850.16
a.
b.
c.
d.

850.17
a.
b.
c.
d.

Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. ENGSEL ANGIN
Engsel Angin
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. KAIT ANGIN
Kait Angin
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. SLOT/GRENDEL JENDELA/PARTISI
Slot
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. PEGANGAN PINTU
Pegangan Pintu
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 BH PAS. REL PINTU DORONG
Rel Pintu Dorong
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PAS. KACA POLOS TEBAL 3 MM
Kaca Polos 3 mm
Pekerja
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PAS. KACA POLOS TEBAL 5 MM
Kaca Polos 5 mm
Pekerja
Tukang Kayu
Upah Angkut
Jumlah

0.1000
0.0000
=

10.0000

1.0000
0.2000
0.0000
=

10.0000

1.0000
0.1000
0.0000
=

10.0000

1.0000
0.1000
0.0000
=

10.0000

1.0000
0.5000
0.0000
=

10.0000

1.0000
0.6000
0.0000
=

10.0000

1.1000
0.1500
0.1500
0.0000
=

10.0000

1.1000
0.1500
0.1500
0.0000

159

160

161

162

163

850.24.1
a.
b.
c.
d.

850.24
a.
b.
c.
d.

900.18
a.
b.
c.
d.
e.
f.
g.
h.

900.19
a.
b.
c.
d.
e.
f.
g.
h.

950.11+
950.13
a.
b.
c.
d.
e.
f.
g.
h.

Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PAS. KACA BURAM 3 MM
Kaca buram 3 mm
Pekerja
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PAS. KACA BURAM 5 MM
Kaca buram 5 mm
Pekerja
Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. TALANG DATAR SENG
Seng BJLS 32
Paku 5 - 7 Cm
Papan Kayu Kuat Kelas II (Maranti)
Flingcoat
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M' PAS. TALANG MIRING
Seng BJLS 32
Paku 5 - 7 Cm
Papan Kuat Kelas II (Maranti)
Flingcoat
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 MELABUR DENGAN PLITUR JADI
Plitur Jadi
Vernis
Dempul Lilin
Ampelas Kayu
Kwas 3"
Tukang Cat
Kepala Tukang Cat
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

10.0000

1.1000
0.1500
0.1500
0.0000
=

10.0000

1.1000
0.1500
0.1500
0.0000
=

10.0000

1.0000
0.0150
0.0096
0.2500
0.1500
0.4000
0.0250
0.0000
=

10.0000

1.0000
0.0150
0.0190
0.3000
0.1500
0.4000
0.0250
0.0000
=

10.0000

0.3720
0.1500
0.0500
0.1000
0.0100
0.1600
0.0160
0.0000
=

10.0000

164

165

166
0.1750
0.1600
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0450
0.0000

167
0.2000
0.1600
0.0100
0.5000
0.2000
0.2800
0.0300
0.0100
0.0425
0.0000

168

950.12
a.
b.
c.
d.

1 M2 MELABUR RANGKA ATAP DENGAN RESIDU


Residu
Pekerja
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
K.815-BM 1 M3 PASANG BRONJONG PENAHAN
a.
Batu Belah
b.
Kawat Bronjong
c.
Pekerja
d.
Tukang Batu
e.
Mandor
f.
Alat Bantu
g.
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
A.095.1
1 M2 PENGECATAN ULANG DINDING VINILEX
a.
Cat Tembok Vinilex
b.
Plamir Tembok
c.
Rol Cat
d.
Ampelas
e.
Pekerja
f.
Tukang Cat
g.
Kepala Tukang Cat
h.
Mandor
i.
Steger Werk
j.
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
A.096.1
1 M2 PENGECATAN ULANG PLAFOND VINILEX
a.
Cat Tembok Vinilex
b.
Plamir Tembok
c.
Rol Cat
d.
Ampelas
e.
Pekerja
f.
Tukang Cat
g.
Kepala Tukang Cat
h.
Mandor
i.
Steger Werk
j.
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
A.097.1
1 M2 PENGECATAN ULANG DINDING SANLEX
a.
Cat Tembok Sanlex
b.
Plamir Tembok
c.
Rol Cat
d.
Ampelas
e.
Pekerja
f.
Tukang Cat
g.
Kepala Tukang Cat
h.
Mandor
i.
Steger Werk

0.3500
0.1000
0.0060
0.0000
=

10.0000

1.2000
8.0000
3.2000
0.1600
0.0800
1.0000
0.0000
=

10.0000

0.1313
0.1200
0.0075
0.3750
0.1200
0.2100
0.0225
0.0075
0.0338
0.0000
=

10.0000

0.1500
0.1200
0.0075
0.3750
0.1500
0.2100
0.0225
0.0075
0.0319
0.0000
=

10.0000

0.1313
0.1200
0.0075
0.3750
0.0780
0.1365
0.0146
0.0075
0.0338

j.

169

170

171

172

A.098.1
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.097.2
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.098.2
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

A.099.1
a.
b.
c.
d.
e.
f.
g.
h.
i.

Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PENGECATAN ULANG PLAFOND SANLEX
Cat Tembok Sanlex
Plamir Tembok
Rol Cat
Ampelas
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Steger Werk
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PENGECATAN ULANG DINDING ROMATEX (3x)
Cat Tembok Romatex
Plamir Tembok
Rol Cat
Ampelas
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Steger Werk
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PENGECATAN ULANG PLAFOND ROMATEX (3x)
Cat Tembok Romatex
Plamir Tembok
Rol Cat
Ampelas
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Steger Werk
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PENGECATAN ULANG KAYU (3x) BERIKUT MENI
Meni Kayu
Plamir Kayu
Cat Kayu Setara Merk Avian
Ampelas Kayu
Minyak Cat Terpentin
Kwas 3"
Pekerja
Tukang Cat
Kepala Tukang Cat

0.0000
=

10.0000

0.1500
0.1200
0.0075
0.3750
0.0780
0.1365
0.0146
0.0075
0.0319
0.0000
=

10.0000

0.1313
0.1200
0.0075
0.3750
0.0780
0.1365
0.0146
0.0075
0.0338
0.0000
=

10.0000

0.1500
0.1200
0.0075
0.3750
0.0780
0.1365
0.0146
0.0075
0.0319
0.0000
=

10.0000

0.1253
0.0623
0.1500
0.3000
0.1125
0.0375
0.1500
0.2250
0.0225

j.
k.

173

174

175

176

g.
h.

Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PENGECATAN ULANG BESI (3x)
Meni Besi
Cat Besi Setara Merk Avian
Ampelas Besi
Minyak Cat (Tinner B)
Kwas 3"
Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 UNIT SEPTICTANK + REMBESAN (STANDAR "SD")
1 UNIT SEPTIKTANK
Galian Tanah untuk Septictank
Pas. Pasir Urug
Pas. Bata ad. 1 : 3
Plesteran ad. 1 : 3 + Acian
Plat Beton Penutup
Pas. Besi Beton
Pas. Bekisting dengan papan
Pipa PVC 3" Jenis AW + Sambungan
Pipa PVC 1" Lengkap untuk Pent

B.
a.
b.
c.
d.
e.
f.

1 UNIT REMBESAN
Galian Tanah untuk Rembesan
Pipa PVC 4" berlubang Lengkap
Pas. Injuk
Pasir Urug
Urugan Kerikil 3,5 cm
Upah Pasang

A.100.1
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

TTS.8
A.
a.
b.
c.
d.
e.
f.

TTS.8
a.
b.
c.
d.
e.
f.

DCK.01
a.
b.
c.
d.

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 UNIT REMBESAN (STANDAR "SD")
Galian Tanah untuk Rembesan
Pipa PVC 4" berlubang Lengkap
Pas. Injuk
Pasir Beton
Urugan Kerikil 3,5 cm
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PASANG RUCUK BAMBU (KEDALAMAN 1 M')
Bambu
Alat Bantu (5 %)
Upah Kerja (20 %)
Upah Angkut

0.0075
0.0000
=

10.0000

0.1253
0.1500
0.3000
0.1125
0.0375
0.1500
0.2250
0.0225
0.0075
0.0000
=

10.0000

9.2395
0.4400
1.5040
2.5840
2.6336
152.3300
17.5921
5.4000
1.5000

9.6000
10.8000
11.4000
0.4000
0.4000
1.0000

10.0000

1.8000
8.0000
5.4000
0.4000
0.4000
1.0000
=

10.0000

1.5000
1.0000
3.2000
0.0000

177

350.21
a.
b.
c.
d.
e.
f.
g.
h.
i.

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M2 PASANGAN BATACO
Bataco
PC 50 Kg/Zak (Tiga Roda)
Pasir Pasang
Besi Beton rata-rata (U-24)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Upah Angkut
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

10.0000

12.5000
0.1500
0.0270
1.9500
0.3200
0.1000
0.0100
0.0150
0.0000
=

10.0000

AN
RAWANG
SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
[4 x 6]
(Rp.)

OH
OH
Lot
%

45,000.00
32,000.00
1,090.00
x

M3
Kg
Ls
Lot
%

2,750,000.00
13,000.00
27,994.00
27,994.00
x

M3
Kg
Lbr
Lbr
Zak
Lot
Ls
Lot
%

M3
Kg
Lbr
Lbr
Zak
M3
Bh
Lot
Ls
Lot

400,999.22

2,750,000.00
13,000.00
40,000.00
40,000.00
55,000.00
150,000.00
380.00
411,850.00
420,087.00
420,087.00
x

M3
Lbr
Kg
M2
Ls
Ls
Lot

32,333.07

2,750,000.00
13,000.00
40,000.00
40,000.00
55,000.00
347,750.00
356,443.75
356,443.75
x

1,635.00

483,100.05

2,750,000.00
40,000.00
13,000.00
33,723.00
67,361.00
80,833.20
80,833.20

450.00
640.00
545.00
1,635.00
163.50
1,798.50
1,798.00

1,897.00

27,500.00
494.00
4,339.07
32,333.07
3,233.31
35,566.38
35,566.00

21,000.00
608.00
3,349.24
24,957.24
2,495.72
27,452.96
27,452.00

275,000.00
3,250.00
44,000.00
20,000.00
5,500.00
8,693.75
44,555.47
400,999.22
40,099.92
441,099.14
441,099.00

210,000.00
4,000.00
44,000.00
20,000.00
5,000.00
7,075.00
36,259.38
326,334.38
32,633.44
358,967.81
358,967.00

NAIK

275,000.00
3,250.00
44,000.00
20,000.00
5,500.00
37,500.00
26,600.00
8,237.00
63,013.05
483,100.05
48,310.01
531,410.06
531,410.00

210,000.00
4,000.00
44,000.00
20,000.00
5,000.00
35,000.00
23,100.00
6,822.00
52,188.30
400,110.30
40,011.03
440,121.33
440,121.00

NAIK

16,500.00
13,888.00
3,250.00
33,723.00
13,472.20
24,249.96
-

12,600.00
13,888.00
4,000.00
31,171.75
7,707.47
8,670.90
-

TURUN

NAIK

Seng Gelombang BJLS 28 (80 x 180 cm)

11,377.50
12,455.80
2,220.00
28,236.52
6,786.23
7,634.51

M2
M3
%

100,879.83
2,750,000.00
x

Lbr
M3
Kg
M2
Ls
Lot
%

40,000.00
2,750,000.00
13,000.00
23,322.33
200,780.20
200,780.20
x

OH
OH
%

OH
OH

OH
OH

EDALAMAN 1 M'
OH
OH

OH
OH

34,176.00

32,000.00
68,000.00
x

OH
OH
%

38,156.00

32,000.00
68,000.00
x

31,860.00

32,000.00
68,000.00
x

25,700.00

32,000.00
68,000.00
x

240,936.24

32,000.00
68,000.00
x

135,344.64

52,080.00

32,000.00
68,000.00
x

41,460.00

105,083.16
96,844.64
38,500.00
135,344.64
13,534.46

78,038.12
71,919.93
29,400.00
101,319.93
10,131.99

68,710.56

148,879.10

111,451.93

148,879.00

111,451.00

NAIK

57,200.00
99,000.00
2,600.00
41,980.20
40,156.04
240,936.24
24,093.62
265,029.86
265,029.00

57,200.00
75,600.00
3,200.00
39,513.30
35,102.66
210,615.96
21,061.60
231,677.56
231,677.00

NAIK

24,000.00
1,700.00
25,700.00
2,570.00
28,270.00
28,270.00

14,000.00
2,320.00
17,136.00
1,713.60
18,849.60
18,849.00

28,800.00
3,060.00
31,860.00
3,186.00
35,046.00
35,046.00

18,410.00
3,016.00
22,497.30
2,249.73
24,747.03
24,747.00

NAIK

33,600.00
4,556.00
38,156.00
3,815.60
41,971.60
41,971.00

25,725.00
4,234.00
31,456.95
3,145.70
34,602.65
34,602.00

NAIK

32,000.00
2,176.00
34,176.00
3,417.60
37,593.60
37,593.00

21,875.00
7,250.00
36,406.25
3,640.63
40,046.88
40,046.00

TURUN

48,000.00
4,080.00
52,080.00
5,208.00
57,288.00
57,288.00

26,250.00
7,250.00
41,875.00
4,187.50
46,062.50
46,062.00

NAIK

38,400.00
3,060.00
41,460.00
4,146.00

18,375.00
7,250.00
32,031.25
3,203.13

Pekerja

NAIK
Pekerja

OH
OH
%

32,000.00
68,000.00
x

OH
OH
%

32,000.00
68,000.00
x

OH
OH
%

OH
OH

OH
OH
Lot
x

46,200.00

120,000.00
32,000.00
68,000.00
144,000.00
x

p (3-6) cm, w/c=0,87


Zak
M3
M3
Liter
OH
OH
OH
OH
Lot
%

19,400.00

32,000.00
68,000.00
38,500.00

M3
OH
OH
Lot
%

8,564.40

32,000.00
68,000.00
x

11,240.00

32,000.00
68,000.00
x

1,940.00

154,280.00

55,000.00
165,000.00
161,500.00
100.00
32,000.00
45,000.00
60,000.00
68,000.00
495,275.00
567,955.00

45,606.00
45,606.00

35,234.38
35,234.00

1,600.00
340.00
1,940.00
194.00
2,134.00
2,134.00

1,750.00
290.00
2,754.00
275.40
3,029.40
3,029.00

TURUN

10,560.00
680.00
11,240.00
1,124.00
12,364.00
12,364.00

8,750.00
2,900.00
12,815.00
1,281.50
14,096.50
14,096.00

TURUN

8,000.00
564.40
8,564.40
856.44
9,420.84
9,420.00

6,720.00
1,102.00
8,604.20
860.42
9,464.62
9,464.00

TURUN

16,000.00
3,400.00
19,400.00
1,940.00
21,340.00
21,340.00

17,500.00
2,900.00
22,950.00
2,295.00
25,245.00
25,245.00

TURUN

36,800.00
1,700.00
7,700.00
46,200.00
4,620.00
50,820.00
50,820.00

40,250.00
1,450.00
8,340.00
50,040.00
5,004.00
55,044.00
55,044.00

TURUN

144,000.00
9,600.00
680.00
154,280.00
15,428.00
169,708.00
169,708.00

120,000.00
3,750.00
580.00
124,330.00
12,433.00
136,763.00
136,763.00

253,000.00
153,450.00
88,825.00
20,000.00
38,400.00
9,000.00
1,200.00
4,080.00
567,955.00
56,795.50
624,750.50
624,750.00

197,800.00
148,800.00
85,250.00
50,000.00
17,500.00
2,550.00
580.00
540,166.00
54,016.60
594,182.60
594,182.00

NAIK

NAIK

1027
893

NAIK

C : 2PB :3KR DAN 40 % BATU BELAH


M3
150,000.00
Zak
55,000.00
M3
161,500.00
M3
165,000.00
Kg
8,860.00
Kg
15,000.00
OH
32,000.00
OH
45,000.00
OH
60,000.00
OH
68,000.00
Lot
1,720,078.00
%

Zak
M3
M3
Liter
OH
OH
OH
OH
Lot
%

55,000.00
165,000.00
161,500.00
100.00
32,000.00
45,000.00
60,000.00
68,000.00
582,760.00
x

Zak
M3
M3
Liter
OH
OH
OH
OH
Lot
%

Zak
M3
M3
Liter
OH
OH
OH
OH
Lot

714,884.00

55,000.00
165,000.00
161,500.00
100.00
32,000.00
45,000.00
60,000.00
68,000.00
667,085.00
x

M3
OH

676,759.00

55,000.00
165,000.00
161,500.00
100.00
32,000.00
45,000.00
60,000.00
68,000.00
620,885.00
x

1,720,078.00

761,084.00

630,000.00
32,000.00

72,000.00
213,400.00
50,388.00
77,220.00
1,116,360.00
27,000.00
108,800.00
38,250.00
5,100.00
11,560.00
1,720,078.00
172,007.80
1,892,085.80
1,892,085.00

64,800.00

477,768.16
47,776.82
525,544.97
525,544.00

358,600.00
136,950.00
87,210.00
21,500.00
52,800.00
12,375.00
1,680.00
5,644.00
676,759.00
67,675.90
744,434.90
744,434.00

340,000.00
132,800.00
83,700.00

408,100.00
133,650.00
79,135.00
21,500.00
52,800.00
12,375.00
1,680.00
5,644.00
714,884.00
71,488.40
786,372.40
786,372.00

394,800.00
129,600.00
75,950.00

454,300.00
133,650.00
79,135.00
21,500.00
52,800.00
12,375.00
1,680.00
5,644.00
761,084.00
76,108.40
837,192.40
837,192.00

434,800.00
129,600.00
75,950.00

630,000.00
80,000.00

535,000.00
62,500.00

37,500.00
17,500.00
2,550.00
580.00
657,654.10
65,765.41
723,419.51
723,419.00

37,500.00
17,500.00
2,550.00
580.00
704,573.60
70,457.36
775,030.96
775,030.00

37,500.00
17,500.00
2,550.00
580.00
747,373.60
74,737.36
822,110.96
822,110.00

NAIK

NAIK

NAIK

NAIK

OH
OH
OH
Lot
Lot
%

45,000.00
60,000.00
68,000.00
727,930.00
662,756.85
x

M3
OH
OH
OH
OH
Lot
Lot
%

650,000.00
32,000.00
45,000.00
60,000.00
68,000.00
747,930.00
683,656.85
x

M3
OH
OH
OH
OH
Lot
Lot
%

M3
OH
OH
OH
OH
Lot
Lot

M3
OH
OH
OH
OH
Lot
Lot

812,936.85

700,000.00
32,000.00
45,000.00
60,000.00
68,000.00
797,930.00
735,906.85
x

Kg
Kg

792,036.85

680,000.00
32,000.00
45,000.00
60,000.00
68,000.00
777,930.00
715,006.85
x

781,586.85

660,000.00
32,000.00
45,000.00
60,000.00
68,000.00
757,930.00
694,106.85
x

760,686.85

833,836.85

8,860.00
15,000.00

11,250.00
6,000.00
680.00
32,756.85
760,686.85
76,068.69
836,755.54
836,755.00

8,750.00
5,100.00
580.00
27,536.85
639,466.85
63,946.69
703,413.54
703,413.00

NAIK

650,000.00
80,000.00
11,250.00
6,000.00
680.00
33,656.85
781,586.85
78,158.69
859,745.54
859,745.00

565,000.00
62,500.00
8,750.00
5,100.00
580.00
28,886.85
670,816.85
67,081.69
737,898.54
737,898.00

NAIK

660,000.00
80,000.00
11,250.00
6,000.00
680.00
34,106.85
792,036.85
79,203.69
871,240.54
871,240.00

565,000.00
62,500.00
8,750.00
5,100.00
580.00
28,886.85
670,816.85
67,081.69
737,898.54
737,898.00

NAIK

680,000.00
80,000.00
11,250.00
6,000.00
680.00
35,006.85
812,936.85
81,293.69
894,230.54
894,230.00

605,000.00
62,500.00
8,750.00
5,100.00
580.00
30,686.85
712,616.85
71,261.69
783,878.54
783,878.00

NAIK

700,000.00
80,000.00
11,250.00
6,000.00
680.00
35,906.85
833,836.85
83,383.69
917,220.54
917,220.00

93,030.00
2,250.00

10,834.95
180.00

OH
OH
OH
OH
Lot

32,000.00
45,000.00
60,000.00
68,000.00
95,280.00

Kg
Kg
OH
OH
OH
OH
Lot

9,215.00
15,000.00
32,000.00
45,000.00
60,000.00
68,000.00
99,007.50

OH
OH
OH
OH
OH
OH
Ls
Ltr
Ltr
Lot
Lot
%

Kg
OH
OH
OH
OH
Lot

850.47

9,190.00
32,000.00
45,000.00
60,000.00
68,000.00
10,568.50
x

Kg
OH
OH
OH
OH
Lot
%

10,508.95

32,000.00
45,000.00
60,000.00
68,000.00
60,000.00
33,000.00
47,500.00
4,500.00
28,000.00
850.30
82.67
x

10,136.20

15,752.50

9,190.00
32,000.00
45,000.00
60,000.00
68,000.00
10,568.50
x

15,752.50

2,240.00
3,150.00
420.00
272.00
101,362.00
10,136.20
1,013.62
11,149.82
11,149.00

875.00
675.00
510.00
290.00
13,632.25

96,757.50
2,250.00
2,240.00
3,150.00
420.00
272.00
105,089.50
10,508.95
1,050.90
11,559.85
11,559.00

11,523.75
180.00
1,260.00
720.00
561.00
290.00
290.70
14,825.45

32.00
45.00
12.00
6.80
12.00
660.00
9.50
45.00
28.00
0.17
850.47
85.05
935.52
935.00

35.00
45.00
10.20
5.80
10.20
580.00
9.50
55.00
28.00
0.16
778.86
77.89
856.74
856.00

10,568.50
1,920.00
2,700.00
360.00
204.00
15,752.50
1,575.25
17,327.75
17,327.00

11,736.90
2,100.00
180.00
51.00
11.60
15,839.44
1,583.94
17,423.38
17,423.00

10,568.50
1,920.00
2,700.00
360.00
204.00
15,752.50
1,575.25
17,327.75

11,736.90
2,100.00
180.00
51.00
11.60
15,839.44
1,583.94
17,423.38

1,363.22
14,995.47
14,995.00

1,482.54
16,307.99
16,307.00

TURUN

TURUN

NAIK

TURUN

Kg
Ltr
Ltr
OH
OH
OH
OH
Lot
Lot

18,000.00
4,500.00
28,000.00
32,000.00
45,000.00
60,000.00
68,000.00
12,106.00
11,728.02

OH
OH
OH
OH
Lot
Lot
%

32,000.00
45,000.00
60,000.00
68,000.00
2,748.00
687.00
x

M2
Kg
OH
OH
OH
Ls
Lot
%

M2
Kg
OH
OH
OH
Lot

171,512.00

38,500.00
18,000.00
32,000.00
45,000.00
68,000.00
40,685.00
x

M3
M3
Kg
OH
OH
OH
OH
Lot

3,435.00

149,000.00
18,000.00
32,000.00
45,000.00
68,000.00
15,592.00
167,882.00
x

1,416.40

47,940.00

2,750,000.00
750,000.00
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
69,950.00

17,327.00

17,423.00

7,200.00
1,350.00
1,120.00
1,280.00
900.00
120.00
136.00
2,058.02
14,164.02
1,416.40
141.64
1,558.04
1,558.00

600.00
165.00
112.00
140.00
90.00
102.00
58.00
316.75
1,583.75
158.38
1,742.13
1,742.00

TURUN

1,600.00
900.00
180.00
68.00
687.00
3,435.00
343.50
3,778.50
3,778.00

1,750.00
900.00
153.00
58.00
715.25
3,576.25
357.63
3,933.88
3,933.00

TURUN

150,490.00
1,800.00
1,600.00
1,350.00
680.00
15,592.00
171,512.00
17,151.20
188,663.20
188,663.00

149,985.00
1,500.00
1,750.00
1,050.00
580.00
15,486.50
170,351.50
17,035.15
187,386.65
187,386.00

NAIK

38,885.00
1,800.00
3,200.00
3,375.00
680.00
47,940.00
4,794.00
52,734.00
52,734.00

38,885.00
1,500.00
3,500.00
2,625.00
580.00
47,090.00
4,709.00
51,799.00
51,799.00

NAIK

46,750.00
18,000.00
5,200.00
3,840.00
12,150.00
9,000.00
3,400.00
98,340.00

18,000.00
6,400.00
3,000.00
6,750.00
7,650.00
2,900.00
4,200.00
84,600.00

TURUN

M3
Lbr
Kg
OH
OH
OH
OH
Lot

2,750,000.00
110,000.00
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
90,120.00

M3
Lbr
Kg
OH
OH
OH
OH
Lot

M3
M3
Kg
OH
OH
OH
OH
Lot

M3
M3
OH
OH
OH
OH
Lot

136,728.00

150,000.00
120,000.00
32,000.00
45,000.00
60,000.00
68,000.00
231,840.00
x

M3
Kg

65,327.50

2,750,000.00
750,000.00
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
237,600.00

59,255.00

2,750,000.00
145,000.00
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
102,265.00

49,170.00

279,342.00

150,000.00
35,000.00

49,170.00
4,917.00
54,087.00
54,087.00

42,300.00
4,230.00
46,530.00
46,530.00

NAIK

46,750.00
38,170.00
5,200.00
3,840.00
12,150.00
9,000.00
3,400.00
118,510.00
59,255.00
5,925.50
65,180.50
65,180.00

35,700.00
34,700.00
6,400.00
3,000.00
6,750.00
7,650.00
2,900.00
4,200.00
101,300.00
50,650.00
5,065.00
55,715.00
55,715.00

NAIK

46,750.00
50,315.00
5,200.00
3,840.00
12,150.00
9,000.00
3,400.00
130,655.00
65,327.50
6,532.75
71,860.25
71,860.00

35,700.00
48,580.00
6,400.00
3,000.00
6,750.00
7,650.00
2,900.00
4,200.00
115,180.00
57,590.00
5,759.00
63,349.00
63,349.00

NAIK

237,600.00
2,400.00
6,500.00
4,800.00
9,000.00
12,000.00
1,156.00
273,456.00
136,728.00
13,672.80
150,400.80
150,400.00

181,440.00

8,000.00
3,750.00
9,000.00
10,200.00
986.00
225,376.00
112,688.00
11,268.80
123,956.80
123,956.00

NAIK

180,000.00
51,840.00
24,960.00
17,550.00
2,340.00
2,652.00
279,342.00
27,934.20
307,276.20
307,276.00

162,000.00
10,000.00
12,500.00
19,687.50
3,825.00
3,265.40
211,277.90
21,127.79
232,405.69
232,405.00

NAIK

180,000.00
122,500.00

144,000.00
52,500.00

OH
OH
OH
Lot
%

32,000.00
45,000.00
68,000.00
302,500.00
x

M3
Zak
M3
OH
OH
OH
OH
Lot
%

150,000.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
392,850.00
x

M3
Zak
M3
OH
OH
OH
OH
Lot
%

M3
Zak
M3
OH
OH
OH
OH
Lot

M3
Zak
M3
OH
OH
OH
OH
Lot

I ENAM + SIARAN

502,550.00

150,000.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
437,300.00
x

484,200.00

150,000.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
411,200.00
x

360,860.00

528,650.00

150,000.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
474,950.00
x

566,300.00

48,000.00
9,000.00
1,360.00
360,860.00
36,086.00
396,946.00
396,946.00

37,500.00
7,000.00
1,160.00
242,160.00
24,216.00
266,376.00
266,376.00

NAIK

180,000.00
128,700.00
84,150.00
48,000.00
33,750.00
4,500.00
5,100.00
484,200.00
48,420.00
532,620.00
532,620.00

162,000.00
47,200.00
60,200.00
31,250.00
17,500.00
5,737.50
980.20
324,867.70
32,486.77
357,354.47
357,354.00

NAIK

180,000.00
149,600.00
81,600.00
48,000.00
33,750.00
4,500.00
5,100.00
502,550.00
50,255.00
552,805.00
552,805.00

162,000.00
54,000.00
61,600.00
31,250.00
17,500.00
5,737.50
980.20
333,067.70
33,306.77
366,374.47
366,374.00

NAIK

180,000.00
179,300.00
78,000.00
48,000.00
33,750.00
4,500.00
5,100.00
528,650.00
52,865.00
581,515.00
581,515.00

162,000.00
62,500.00
58,800.00
31,250.00
17,500.00
5,737.50
980.20
338,767.70
33,876.77
372,644.47
372,644.00

NAIK

180,000.00
222,200.00
72,750.00
48,000.00
33,750.00
4,500.00
5,100.00
566,300.00
56,630.00
622,930.00
622,930.00

162,000.00
71,000.00
56,000.00
31,250.00
17,500.00
5,737.50
980.20
344,467.70
34,446.77
378,914.47
378,914.00

NAIK

M3
Zak
M3
OH
OH
OH
OH
Lot
%

150,000.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
345,950.00
x

M2
Zak
M3
OH
OH
OH
OH
Lot
%

63,000.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
87,475.00
x

Dus
Zak
M3
Kg
OH
OH
OH
OH
Lot
%

Dus
Zak
M3
Kg
OH
OH
OH
OH
Lot

118,590.00

37,500.00
55,000.00
150,000.00
5,000.00
32,000.00
45,000.00
60,000.00
68,000.00
66,430.00
x

Dus
Zak
M3
Kg
OH
OH
OH

130,105.00

35,000.00
55,000.00
150,000.00
5,000.00
32,000.00
45,000.00
60,000.00
68,000.00
63,780.00
x

444,474.20

121,240.00

35,000.00
55,000.00
150,000.00
5,000.00
32,000.00
45,000.00
60,000.00

225,000.00
68,750.00
52,200.00
40,000.00
50,625.00
6,750.00
1,149.20
444,474.20
44,447.42
488,921.62
488,921.00
69,300.00
12,925.00
5,250.00
22,400.00
15,750.00
2,100.00
2,380.00
130,105.00
13,010.50
143,115.50
143,115.00
37,100.00
10,230.00
2,700.00
13,750.00
28,800.00
20,250.00
2,700.00
3,060.00
118,590.00
11,859.00
130,449.00
130,449.00
39,750.00
10,230.00
2,700.00
13,750.00
28,800.00
20,250.00
2,700.00
3,060.00
121,240.00
12,124.00
133,364.00
133,364.00
37,100.00
10,230.00
2,700.00
9,700.00
28,800.00
20,250.00
2,700.00

202,500.00
62,500.00
48,720.00
43,750.00
50,625.00
5,737.50
980.20
414,812.70
41,481.27
456,293.97
456,293.00
ROBAHANAN
60,500.00
6,000.00
4,340.00
6,562.50
10,125.00
1,912.50
1,960.40
93,685.41
9,368.54
103,053.95
103,053.00
ROBAHANAN
27,270.00
8,000.00
4,200.00
46.80
6,562.50
16,875.00
3,825.00
1,090.40
67,869.70
6,786.97
74,656.67
74,656.00
ROBAHANAN
27,270.00
8,000.00
4,200.00
46.80
6,562.50
16,875.00
3,825.00
1,090.40
67,869.70
6,786.97
74,656.67
74,656.00
ROBAHANAN
27,270.00
8,000.00
4,200.00
46.80
6,562.50
16,875.00
3,825.00

NAIK

NAIK

NAIK

NAIK

OH
Lot
%

68,000.00
59,730.00
x

Dus
Zak
M3
Kg
OH
OH
OH
OH
Lot
%

37,500.00
55,000.00
150,000.00
5,000.00
32,000.00
45,000.00
60,000.00
68,000.00
62,380.00
x

Dus
Zak
M3
Kg
OH
OH
OH
OH
Lot
%

Dus
Zak
M3
Kg
OH
OH
OH
OH
Lot

108,670.00

30,000.00
55,000.00
150,000.00
5,000.00
32,000.00
45,000.00
60,000.00
68,000.00
57,299.00
x

Dus
Zak
M3
Kg
OH
OH
OH
OH
Lot
%

117,190.00

37,500.00
55,000.00
150,000.00
5,000.00
32,000.00
45,000.00
60,000.00
68,000.00
66,040.00
x

114,540.00

99,929.00

37,500.00
55,000.00
150,000.00
5,000.00
32,000.00
45,000.00
60,000.00
68,000.00
65,311.25
x

107,941.25

3,060.00
114,540.00
11,454.00
125,994.00
125,994.00
39,750.00
10,230.00
2,700.00
9,700.00
28,800.00
20,250.00
2,700.00
3,060.00
117,190.00
11,719.00
128,909.00
128,909.00
39,750.00
11,440.00
6,750.00
8,100.00
22,400.00
15,750.00
2,100.00
2,380.00
108,670.00
10,867.00
119,537.00
119,537.00
32,049.00
11,000.00
6,750.00
7,500.00
22,400.00
15,750.00
2,100.00
2,380.00
99,929.00
9,992.90
109,921.90
109,921.00
40,061.25
11,000.00
6,750.00
7,500.00
22,400.00
15,750.00
2,100.00
2,380.00
107,941.25
10,794.13
118,735.38

1,090.40
67,869.70
6,786.97
74,656.67
74,656.00
ROBAHANAN
32,825.00
8,000.00
4,200.00
46.80
6,562.50
16,875.00
3,825.00
1,090.40
73,424.70
7,342.47
80,767.17
80,767.00
ROBAHANAN
32,825.00
12,000.00
4,200.00
46.80
6,562.50
16,875.00
5,737.50
1,635.60
79,882.40
7,988.24
87,870.64
87,870.00
ROBAHANAN
27,270.00
8,000.00
4,200.00
46.80
6,562.50
16,875.00
3,825.00
1,090.40
67,869.70
6,786.97
74,656.67
74,656.00
ROBAHANAN
32,825.00
8,000.00
4,200.00
46.80
6,562.50
16,875.00
3,825.00
1,090.40
73,424.70
7,342.47
80,767.17

NAIK

NAIK

NAIK

NAIK

118,735.00
Dus
Zak
M3
Kg
OH
OH
OH
OH
Lot
%

36,000.00
55,000.00
150,000.00
5,000.00
32,000.00
45,000.00
60,000.00
68,000.00
63,708.80
x

Bh
Zak
M3
OH
OH
OH
OH
Lot
%

380.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
48,407.00
x

Bh
Zak
M3
OH
OH
OH
OH
Lot
%

Bh
Zak
M3
OH
OH
OH
OH
Lot

61,420.00

380.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
43,998.00
x

Zak
M3
OH
OH
OH
OH

64,127.00

380.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
45,700.00
x

106,338.80

59,718.00

55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00

38,458.80
11,000.00
6,750.00
7,500.00
22,400.00
15,750.00
2,100.00
2,380.00
106,338.80
10,633.88
116,972.68
116,972.00

80,767.00
ROBAHANAN
32,825.00
8,000.00
4,200.00
46.80
6,562.50
16,875.00
3,825.00
1,090.40
73,424.70
7,342.47
80,767.17
80,767.00

NAIK

26,600.00
15,807.00
6,000.00
9,600.00
4,500.00
600.00
1,020.00
64,127.00
6,412.70
70,539.70
70,539.00

23,100.00
21,000.00
7,560.00
13,728.00
7,490.00
1,071.00
638.00
74,587.00
7,458.70
82,045.70
82,045.00

TURUN

26,600.00
12,650.00
6,450.00
9,600.00
4,500.00
600.00
1,020.00
61,420.00
6,142.00
67,562.00
67,562.00

23,100.00
16,770.00
8,120.00
10,297.60
6,317.50
805.80
481.40
65,892.30
6,589.23
72,481.53
72,481.00

TURUN

26,600.00
10,648.00
6,750.00
9,600.00
4,500.00
600.00
1,020.00
59,718.00
5,971.80
65,689.80
65,689.00

23,100.00
10,370.00
8,120.00
10,297.60
6,317.50
805.80
481.40
59,492.30
5,949.23
65,441.53
65,441.00

NAIK

8,553.60
3,450.00
6,400.00
6,750.00
900.00
680.00

8,000.00
2,660.00
9,152.00
7,490.00
1,071.00
1,160.00

NAIK

Lot
%

12,003.60
x

Zak
M3
OH
OH
OH
OH
Lot
%

55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
10,464.00
x

Zak
M3
OH
OH
OH
OH
Lot
%

25,194.00

55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
9,602.40
x

Zak
OH
OH
OH
OH
Lot
%

26,733.60

24,332.40

55,000.00
32,000.00
45,000.00
60,000.00
68,000.00
3,575.00
x

14,019.00

UK KANTOR TYPE KECIL)


M3
31,860.00
M3
154,280.00
567,955.00
M2
2
90,860.60
M
M3
676,759.00
Kg
10,136.20
M2
49,170.00
M'
41,146.90
btg
14,796.90
M3
31,860.00
Kg
10,000.00
M3
160,000.00
M'
41,146.90
M3
8,564.40
Ls
12,918,575.48
Lot
12,918,575.48
%

14,107,084.42

26,733.60
2,673.36
29,406.96
29,406.00

29,533.00
2,953.30
32,486.30
32,486.00

6,864.00
3,600.00
6,400.00
6,750.00
900.00
680.00
25,194.00
2,519.40
27,713.40
27,713.00

7,020.00
2,660.00
9,152.00
7,490.00
1,071.00
1,160.00
28,553.00
2,855.30
31,408.30
31,408.00

TURUN

5,702.40
3,900.00
6,400.00
6,750.00
900.00
680.00
24,332.40
2,433.24
26,765.64
26,765.00

5,000.00
2,660.00
9,152.00
7,490.00
1,071.00
1,160.00
26,533.00
2,653.30
29,186.30
29,186.00

TURUN

3,575.00
4,800.00
4,500.00
600.00
544.00
14,019.00
1,401.90
15,420.90
15,420.00

4,000.00
4,576.00
3,745.00
535.50
580.00
13,436.50
1,343.65
14,780.15
14,780.00

NAIK

850,630.14
370,272.00
545,236.80
456,483.65
4,129,921.80
3,227,682.33
2,004,316.71
263,340.16
19,975.82
369,894.60
58,800.00
168,000.00
444,386.52
9,634.95
1,188,508.94
14,107,084.42
1,410,708.44
15,517,792.86
15,517,792.00

101,237.85
26,631.49
121,537.35
1,561,800.00
708,505.57

200,879.46
17,204.88
75,928.39
43,200.00
162,750.00
334,799.10
9,679.73
309,502.15
3,673,655.96
367,365.60
4,041,021.55
4,041,021.00

TURUN
44,826.00

NAIK

LTR
LTR
Bh
Lbr
OH
OH
OH
OH
Lot
Lot
%

80,000.00
47,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
47,297.50
28,279.94
x

LTR
LTR
Bh
Lbr
OH
OH
OH
OH
Lot
Lot
%

58,000.00
47,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
43,977.50
22,696.94
x

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot
Lot
%

45,076.94

17,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
25,375.00
6,316.88
x

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot
Lot
%

48,479.94

26,516.88

17,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
27,080.00
6,750.90
x

28,230.90

20,000.00
5,937.50
160.00
1,000.00
5,120.00
12,600.00
1,800.00
680.00
1,182.44
48,479.94
4,847.99
53,327.93
53,327.00

16,000.00
3,850.00
125.00
1,050.00
5,120.00
9,800.00
1,530.00
580.00
951.38
39,006.38
3,900.64
42,907.01
42,907.00

NAIK

14,500.00
5,937.50
160.00
1,000.00
6,400.00
13,500.00
1,800.00
680.00
1,099.44
45,076.94
4,507.69
49,584.63
49,584.00

11,000.00
3,850.00
125.00
1,050.00
6,400.00
10,500.00
1,530.00
580.00
875.88
35,910.88
3,591.09
39,501.96
39,501.00

NAIK

2,975.00
1,040.00
160.00
1,000.00
5,120.00
12,600.00
1,800.00
680.00
1,141.88
26,516.88
2,651.69
29,168.56
29,168.00

2,100.00
880.00
125.00
1,050.00
5,120.00
9,800.00
1,530.00
580.00
953.33
22,138.33
2,213.83
24,352.16
24,352.00

NAIK

3,400.00
1,040.00
160.00
1,000.00
6,400.00
12,600.00
1,800.00
680.00
1,150.90
28,230.90
2,823.09
31,053.99
31,053.00

2,400.00
880.00
125.00
1,050.00
6,400.00
9,800.00
1,530.00
580.00
967.51
23,732.51
2,373.25
26,105.76
26,105.00

NAIK

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot
Lot
%

15,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
18,193.00
5,643.69
x

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot
Lot
%

15,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
18,568.00
5,989.14
x

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot
Lot
%

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot
Lot

18,097.31

10,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
17,568.00
4,946.64
x

Kg

19,357.14

10,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
17,318.00
4,729.31
x

19,011.69

18,314.64

10,500.00

2,625.00
1,040.00
160.00
1,000.00
3,328.00
8,190.00
1,170.00
680.00
818.69
19,011.69
1,901.17
20,912.85
20,912.00

2,100.00
984.00
125.00
1,050.00
3,328.00
6,370.00
994.50
580.00
698.92
16,230.42
1,623.04
17,853.46
17,853.00

NAIK

3,000.00
1,040.00
160.00
1,000.00
3,328.00
8,190.00
1,170.00
680.00
789.14
19,357.14
1,935.71
21,292.85
21,292.00

2,400.00
984.00
125.00
3,509.00
1,050.00
3,328.00
6,370.00
994.50
580.00
19,340.50
1,934.05
21,274.55
21,274.00

NAIK

1,750.00
1,040.00
160.00
1,000.00
3,328.00
8,190.00
1,170.00
680.00
779.31
18,097.31
1,809.73
19,907.04
19,907.00

1,260.00
880.00
125.00
1,050.00
3,328.00
6,370.00
994.50
580.00
656.44
15,243.94
1,524.39
16,768.33
16,768.00

NAIK

2,000.00
1,040.00
160.00
1,000.00
3,328.00
8,190.00
1,170.00
680.00
746.64
18,314.64
1,831.46
20,146.10
20,146.00

1,440.00
880.00
125.00
2,445.00
1,050.00
3,328.00
6,370.00
994.50
580.00
17,212.50
1,721.25
18,933.75
18,933.00

NAIK

1,753.50

1,377.75

Kg
Kg
Lbr
Ltr
Bh
OH
OH
OH
OH
Lot
%

6,500.00
36,000.00
2,000.00
5,000.00
6,000.00
32,000.00
45,000.00
60,000.00
68,000.00
11,343.00
x

Kg
Kg
Lbr
Ltr
Bh
OH
OH
OH
OH
Lot
%

10,500.00
37,500.00
2,000.00
15,000.00
6,000.00
32,000.00
45,000.00
60,000.00
68,000.00
12,603.50
x

Kg
Kg
Kg
Kg
Kg
Kg
Bh
Ltr
Lbr
OH
OH
OH
OH
Lot
%

34,983.50

20,000.00
30,000.00
5,000.00
5,000.00
5,000.00
80,000.00
6,000.00
7,500.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
25,010.00
x

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Ltr
Lbr
OH
OH

33,723.00

49,595.00

20,000.00
30,000.00
37,500.00
5,000.00
5,000.00
5,000.00
80,000.00
6,000.00
7,500.00
2,000.00
32,000.00
45,000.00

539.50
7,200.00
800.00
750.00
300.00
6,400.00
13,500.00
1,800.00
680.00
33,723.00
3,372.30
37,095.30
37,095.00

456.50
5,600.00
840.00
637.50
250.00
6,400.00
13,500.00
1,530.00
580.00
31,171.75
3,117.18
34,288.93
34,288.00

NAIK

1,753.50
7,500.00
800.00
2,250.00
300.00
6,400.00
13,500.00
1,800.00
680.00
34,983.50
3,498.35
38,481.85
38,481.00

1,377.75
5,600.00
840.00
2,250.00
250.00
7,000.00
13,500.00
1,530.00
580.00
32,927.75
3,292.78
36,220.53
36,220.00

NAIK

600.00
6,000.00
100.00
50.00
500.00
16,000.00
60.00
1,500.00
200.00
8,000.00
12,825.00
2,400.00
1,360.00
49,595.00
4,959.50
54,554.50
54,554.00

1,500.00
4,800.00
72.00
36.00
360.00
15,000.00
50.00
1,500.00
210.00
8,000.00
9,975.00
2,040.00
1,160.00
44,703.00
4,470.30
49,173.30
49,173.00

NAIK

600.00
6,000.00
13,125.00
100.00
50.00
500.00
16,000.00
60.00
1,500.00
200.00
8,000.00
12,825.00

1,500.00
4,800.00
12,250.00
72.00
36.00
360.00
15,000.00
50.00
1,500.00
210.00
8,750.00
12,825.00

OH
OH
Lot
%

60,000.00
68,000.00
38,135.00
x

M3
Kg
OH
OH
OH
OH
Lot
%

2,500,000.00
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
41,100.00
x

M3
Kg
OH
OH
OH
OH
Lot
%

62,720.00

66,300.00

2,750,000.00
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
44,950.00
x

70,150.00

2,400.00
1,360.00
62,720.00
6,272.00
68,992.00
68,992.00

2,040.00
1,160.00
60,553.00
6,055.30
66,608.30
66,608.00

NAIK

38,500.00
2,600.00
4,800.00
13,500.00
1,800.00
5,100.00
66,300.00
6,630.00
72,930.00
72,930.00

29,400.00
3,520.00
8,000.00
4,500.00
2,550.00
812.00
57,509.75
5,750.98
63,260.73
63,260.00

NAIK

42,350.00
2,600.00
4,800.00
13,500.00
1,800.00
5,100.00
70,150.00
7,015.00
77,165.00
77,165.00

29,400.00
7,350.00
3,520.00
6,000.00
4,500.00
1,912.50
609.00
53,291.50
5,329.15
58,620.65
58,620.00

NAIK

18,750.00
540.00
3,200.00
4,500.00
600.00
340.00
27,930.00
2,793.00
30,723.00
30,723.00

17,360.00
400.00
1,513.60
5,062.50
499.80
174.00
27,135.74
2,713.57
29,849.32
29,849.00

NAIK

24,115.00
1,980.00
3,200.00
2,250.00
300.00
340.00
32,185.00
3,218.50
35,403.50
35,403.00

16,492.00
320.00
2,312.50
10,500.00
2,167.50
203.00
35,245.00
3,524.50
38,769.50
38,769.00

TURUN

16,380.00
180.00
960.00
3,150.00
420.00

13,888.00
400.00
1,182.50
3,937.50
499.80

RANGKANYA
Lbr
Kg
OH
OH
OH
OH
Lot
%

50,000.00
18,000.00
32,000.00
45,000.00
60,000.00
68,000.00
19,290.00
x

27,930.00

A RANGKANYA
Lbr
Kg
OH
OH
OH
OH
Lot
%

66,250.00
18,000.00
32,000.00
45,000.00
60,000.00
68,000.00
24,115.00
x

Lbr
Kg
OH
OH
OH

32,185.00

45,000.00
18,000.00
32,000.00
45,000.00
60,000.00

OH
Lot
%

68,000.00
16,560.00
x

PADA RANGKANYA
Lbr
Kg
OH
OH
OH
OH
Lot
%

21,362.00

14,000.00
18,000.00
32,000.00
45,000.00
60,000.00
68,000.00
15,580.00
20,382.00

272.00
21,362.00
2,136.20
23,498.20
23,498.00

174.00
21,788.75
2,178.88
23,967.63
23,967.00

TURUN

15,400.00
180.00
960.00
3,150.00
420.00
272.00
20,382.00
2,038.20
22,420.20
22,420.00

13,888.00
400.00
1,182.50
3,937.50
499.80
174.00
21,788.75
2,178.88
23,967.63
23,967.00

TURUN

15,180.00
180.00
960.00
3,150.00
420.00
272.00
20,162.00
2,016.20
22,178.20
22,178.00

10,450.00
400.00
1,513.60
5,062.50
499.80
174.00
19,638.39
1,963.84
21,602.23
21,602.00

NAIK

30,250.00
650.00
3,200.00
9,000.00
1,200.00
340.00
44,640.00
4,464.00
49,104.00
49,104.00

22,500.00
160.00
2,450.00
7,000.00
1,020.00
232.00
33,362.00
3,336.20
36,698.20
36,698.00

NAIK

29,700.00
1,300.00
3,200.00
9,000.00
1,200.00
272.00
44,672.00
4,467.20
49,139.20
49,139.00

15,750.00
160.00
2,450.00
7,000.00
1,020.00
232.00
26,612.00
2,661.20
29,273.20
29,273.00

NAIK

3,000,000.00
16,250.00
20,000.00
192,000.00
810,000.00
108,000.00

2,310,000.00
20,000.00
20,000.00
140,000.00
697,500.00
137,700.00

ANGKANYA
M2
Kg
OH
OH
OH
OH
Lot
%

13,800.00
18,000.00
32,000.00
45,000.00
60,000.00
68,000.00
15,360.00
x

M3
Kg
OH
OH
OH
OH
Lot
%

2,750,000.00
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
30,900.00
x

M3
Kg
OH
OH
OH
OH
Lot
%

44,640.00

2,750,000.00
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
31,000.00
x

M3
Kg
Kg
OH
OH
OH

20,162.00

44,672.00

2,500,000.00
13,000.00
20,000.00
32,000.00
45,000.00
60,000.00

OH
Lot
%

68,000.00
3,036,250.00
x

M3
Kg
OH
OH
OH
OH
Lot
%

4,166,650.00

2,750,000.00
20,000.00
32,000.00
45,000.00
60,000.00
68,000.00
120,000.00
x

308,400.00

20,400.00
4,166,650.00
416,665.00
4,583,315.00
4,583,315.00

29,000.00
3,354,200.00
335,420.00
3,689,620.00
3,689,620.00

NAIK

110,000.00
10,000.00
32,000.00
135,000.00
18,000.00
3,400.00
308,400.00
30,840.00
339,240.00
339,240.00

112,500.00
15,000.00
21,000.00
91,000.00
13,260.00
1,508.00
260,268.00
26,026.80
286,294.80
286,294.00

NAIK

68,750.00
130,000.00
6,000.00
540.00
2,560.00
108,000.00
14,400.00
2,720.00
332,970.00
33,297.00
366,267.00
366,267.00

33,750.00
120,000.00
100.00
4,000.00
10,500.00
52,500.00
10,200.00
1,160.00
232,210.00
23,221.00
255,431.00
255,431.00

NAIK

68,750.00
55,000.00
1,000.00
6,000.00
9,600.00
67,500.00
12,000.00
1,360.00
221,210.00
22,121.00
243,331.00
243,331.00

45,000.00
50,000.00
1,000.00
6,000.00
14,000.00
49,000.00
7,140.00
812.00
172,952.00
17,295.20
190,247.20
190,247.00

NAIK

68,750.00
35,000.00
65,000.00
40,000.00
540.00
16,000.00
27,200.00
114,750.00
15,300.00
2,924.00
385,464.00
38,546.40
424,010.40

33,750.00
30,000.00
60,000.00
30,000.00
4,000.00
10,000.00
9,600.00
58,500.00
6,630.00
754.00
243,234.00
24,323.40
267,557.40

PAN MAHONI
M3
Lbr
Kg
Kg
OH
OH
OH
OH
Lot
%

2,750,000.00
65,000.00
20,000.00
18,000.00
32,000.00
45,000.00
60,000.00
68,000.00
205,290.00
x

AT KELAS II (MAHONI))
M3
Lbr
Kg
M'
OH
OH
OH
OH
Lot
%

332,970.00

2,750,000.00
110,000.00
20,000.00
1,500.00
32,000.00
45,000.00
60,000.00
68,000.00
130,750.00
221,210.00

IUM (KM/WC)
M3
Lbr
Lbr
Lbr
Kg
Kg
OH
OH
OH
OH
Lot
%

2,750,000.00
35,000.00
65,000.00
40,000.00
18,000.00
20,000.00
32,000.00
45,000.00
60,000.00
68,000.00
225,290.00
x

385,464.00

0.01
0.30
(0.17)
(0.07)
1.65
0.14
0.03
-

A (KM/WC) KAYU PAPAN MAHONI


M3
2,750,000.00
Lbr
35,000.00
Lbr
65,000.00
Lbr
42,000.00
Kg
18,000.00
Kg
20,000.00
OH
32,000.00
OH
45,000.00
OH
60,000.00
OH
68,000.00
Lot
192,290.00
%

M3
Kg
OH
OH
OH
OH
Lot
%

2,750,000.00
20,000.00
32,000.00
45,000.00
60,000.00
68,000.00
72,000.00
x

M3
Kg
OH
OH
OH
OH
Lot
%

M3
Kg
OH
OH
OH
OH
Lot

222,720.00

2,850,000.00
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
87,450.00
x

M3
Kg
Kg
OH
OH
OH
OH

222,720.00

2,750,000.00
20,000.00
32,000.00
45,000.00
60,000.00
68,000.00
72,000.00
x

387,464.00

208,670.00

2,500,000.00
15,752.50
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00

424,010.00

267,557.00

68,750.00
35,000.00
65,000.00
42,000.00
540.00
16,000.00
27,200.00
114,750.00
15,300.00
2,924.00
387,464.00
38,746.40
426,210.40
426,210.00

33,750.00
60,000.00
85,000.00
4,000.00
10,000.00
9,600.00
58,500.00
6,630.00
754.00
268,234.00
26,823.40
295,057.40
295,057.00

NAIK

66,000.00
6,000.00
25,600.00
108,000.00
14,400.00
2,720.00
222,720.00
22,272.00
244,992.00
244,992.00

38,250.00
6,000.00
9,600.00
54,000.00
6,120.00
1,160.00
121,130.00
12,113.00
133,243.00
133,243.00

NAIK

66,000.00
6,000.00
25,600.00
108,000.00
14,400.00
2,720.00
222,720.00
22,272.00
244,992.00
244,992.00

45,000.00
12,000.00
12,800.00
63,000.00
7,140.00
812.00
146,752.00
14,675.20
161,427.20
161,427.00

NAIK

85,500.00
1,950.00
22,400.00
81,000.00
16,800.00
1,020.00
208,670.00
20,867.00
229,537.00
229,537.00

67,500.00
2,400.00
22,400.00
81,000.00
14,280.00
870.00
188,450.00
18,845.00
207,295.00
207,295.00

NAIK

3,000,000.00
236,287.50
72,800.00
214,400.00
904,500.00
120,600.00
22,780.00

2,520,000.00
92,800.00
96,000.00
315,000.00
153,000.00
29,000.00

NAIK

Lot
%

3,072,800.00
x

M3
Kg
Kg
OH
OH
OH
OH
Lot
%

2,750,000.00
15,752.50
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
3,097,800.00
x

M3
Kg
Kg
OH
OH
OH
OH
Lot
%

M3
Kg
Kg
OH
OH
OH
OH
Lot

4,571,367.50

2,750,000.00
15,752.50
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
3,064,000.00
x

M3
Kg
Kg
OH
OH
OH
OH
Lot
%

4,087,687.50

2,500,000.00
15,752.50
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
3,072,800.00
x

4,571,367.50

3,752,447.50

2,500,000.00
15,752.50
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
2,789,000.00
x

3,477,447.50

HONI (HANYA RANGKANYA)


M3
2,500,000.00
M3
2,500,000.00
Kg
13,000.00

4,571,367.50
457,136.75
5,028,504.25
5,028,504.00

3,205,800.00
320,580.00
3,526,380.00
3,526,380.00

3,025,000.00
236,287.50
72,800.00
128,000.00
540,000.00
72,000.00
13,600.00
4,087,687.50
408,768.75
4,496,456.25
4,496,456.00

2,310,000.00

3,000,000.00
236,287.50
72,800.00
214,400.00
904,500.00
120,600.00
22,780.00
4,571,367.50
457,136.75
5,028,504.25
5,028,504.00

2,310,000.00

3,025,000.00
236,287.50
39,000.00
76,800.00
324,000.00
43,200.00
8,160.00
3,752,447.50
375,244.75
4,127,692.25
4,127,692.00

2,310,000.00

2,750,000.00
236,287.50
39,000.00
76,800.00
324,000.00
43,200.00
8,160.00
3,477,447.50
347,744.75
3,825,192.25
3,825,192.00

2,310,000.00

35,000.00
18,000.00
3,250.00

35,280.00
10,080.00
4,000.00

NAIK

92,800.00
96,000.00
175,000.00
102,000.00
2,775,800.00
277,580.00
3,053,380.00
3,053,380.00

92,800.00
96,000.00
175,000.00
102,000.00
23,200.00
2,799,000.00
279,900.00
3,078,900.00
3,078,900.00

NAIK

NAIK

92,800.00
96,000.00
175,000.00
102,000.00
2,775,800.00
277,580.00
3,053,380.00
3,053,380.00

92,800.00
96,000.00
175,000.00
102,000.00
23,200.00
2,799,000.00
279,900.00
3,078,900.00
3,078,900.00

NAIK

OH
OH
OH
OH
Lot
%

32,000.00
45,000.00
60,000.00
68,000.00
56,250.00
x

64,890.00

AT KELAS II (MARANTI) (HANYA RANGKA)


M3
2,750,000.00
M3
2,750,000.00
Kg
13,000.00
OH
32,000.00
OH
45,000.00
OH
60,000.00
OH
68,000.00
Lot
61,550.00
%

70,190.00

3,200.00
4,500.00
600.00
340.00
64,890.00
6,489.00
71,379.00
71,379.00

4,800.00
6,750.00
510.00
290.00
61,710.00
6,171.00
67,881.00
67,881.00

NAIK

38,500.00
19,800.00
3,250.00
3,200.00
4,500.00
600.00
340.00
70,190.00
7,019.00
77,209.00
77,209.00

35,280.00
10,080.00
4,000.00
4,800.00
6,750.00
510.00
290.00
61,710.00
6,171.00
67,881.00
67,881.00

NAIK

38,500.00
9,900.00
3,250.00
3,200.00
4,500.00
600.00
340.00
60,290.00
6,029.00
66,319.00
66,319.00

35,280.00
5,040.00
4,000.00
4,800.00
6,750.00
510.00
290.00
56,670.00
5,667.00
62,337.00
62,337.00

NAIK

35,000.00
9,000.00
3,250.00
3,200.00
4,500.00
600.00
340.00
55,890.00
5,589.00
61,479.00
61,479.00

35,280.00
5,040.00
4,000.00
4,800.00
6,750.00
510.00
290.00
56,670.00
5,667.00
62,337.00
62,337.00

TURUN

12,000.00
7,172.00
31,500.00
4,800.00
9,000.00
600.00
340.00
4,251.78
69,663.78
6,966.38
76,630.16

10,000.00
6,520.00
29,400.00
4,800.00
9,000.00
510.00
290.00
3,933.80
64,453.80
6,445.38
70,899.18

A RANGKA)
M3
M3
Kg
OH
OH
OH
OH
Lot
%

2,750,000.00
2,750,000.00
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
51,650.00
x

60,290.00

LAS II (MAHONI) (HANYA RANGKA)


M3
2,500,000.00
M3
2,500,000.00
Kg
13,000.00
OH
32,000.00
OH
45,000.00
OH
60,000.00
OH
68,000.00
Lot
47,250.00
%

55,890.00

GI/PRERED
Bh
Zak
M3
OH
OH
OH
OH
Lot
Lot
%

3,000.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
65,412.00
54,923.78
x

69,663.78

76,630.00

70,899.00

NAIK

25,000.00
3,840.00
2,700.00
360.00
408.00
32,308.00
3,230.80
35,538.80
35,538.00

18,125.00
3,840.00
2,700.00
306.00
348.00
25,319.00
2,531.90
27,850.90
27,850.00

NAIK

18,000.00
7,172.00
31,500.00
4,800.00
9,000.00
600.00
340.00
6,784.14
78,196.14
7,819.61
86,015.75
86,015.00

15,000.00
6,520.00
29,400.00
4,800.00
9,000.00
510.00
290.00
6,224.40
71,744.40
7,174.44
78,918.84
78,918.00

NAIK

40,000.00
1,300.00
4,800.00
3,375.00
480.00
544.00
50,499.00
5,049.90
55,548.90
55,548.00

25,000.00
1,600.00
4,800.00
3,375.00
408.00
464.00
35,647.00
3,564.70
39,211.70
39,211.00

3,855.00
20,000.00
67,240.32
3,578.25
94,673.57
9,467.36
104,140.93
104,140.00

2,570.40
19,000.00
68,820.24
3,235.56
93,626.20
9,362.62
102,988.82
102,988.00

NAIK

5,140.00
25,000.00
67,240.32
4,521.00
101,901.32
10,190.13
112,091.45
112,091.00

3,427.20
21,000.00
68,820.24
3,664.08
96,911.52
9,691.15
106,602.67
106,602.00

NAIK

RES (JATIWANGI/PLERED)
Bh
OH
OH
OH
OH
Lot
%

1,000.00
32,000.00
45,000.00
60,000.00
68,000.00
25,000.00
x

Bh
Zak
M3
OH
OH
OH
OH
Lot
Lot
%

6,000.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
71,412.00
63,456.14
x

Bh
Kg
OH
OH
OH
OH
Lot
%

M3
Bh

50,499.00

25,700.00
20,000.00
84,050.40
23,855.00
91,095.32

M1
Ls
Lot
x

M3
Bh

94,673.57

25,700.00
25,000.00
84,050.40
30,140.00
97,380.32

M1
Ls
Lot
%

78,196.14

4,000.00
13,000.00
32,000.00
45,000.00
60,000.00
68,000.00
41,300.00
x

32,308.00

101,901.32

M3
M3
OH
OH
OH
OH
Ls
Lot
%

40,000.00
161,500.00
32,000.00
45,000.00
60,000.00
68,000.00
8,875.40
65,425.40
x

M3
M3
OH
OH
OH
OH
Ls
Lot
%

97,629.40

35,000.00
161,500.00
32,000.00
45,000.00
60,000.00
68,000.00
8,370.40
59,870.40
x

92,074.40

40,400.00
16,150.00
8,000.00
22,500.00
1,500.00
204.00
8,875.40
97,629.40
9,762.94
107,392.34
107,392.00

33,330.00
15,500.00
8,000.00
17,500.00
1,275.00
174.00
7,577.90
83,356.90
8,335.69
91,692.59
91,692.00

NAIK

35,350.00
16,150.00
8,000.00
22,500.00
1,500.00
204.00
8,370.40
92,074.40
9,207.44
101,281.84
101,281.00

30,300.00
15,500.00
8,000.00
17,500.00
1,275.00
174.00
7,274.90
80,023.90
8,002.39
88,026.29
88,026.00

NAIK

64,000.00
6,120.00
70,120.00
7,012.00
77,132.00
77,132.00

64,000.00
5,220.00
69,220.00
6,922.00
76,142.00
76,142.00

NAIK

32,000.00
6,120.00
38,120.00
3,812.00
41,932.00
41,932.00

32,000.00
5,220.00
37,220.00
3,722.00
40,942.00
40,942.00

NAIK

1,600.00
1,700.00
3,300.00
330.00
3,630.00
3,630.00

1,600.00
1,450.00
3,050.00
305.00
3,355.00
3,355.00

NAIK

640.00
680.00
1,320.00
132.00
1,452.00
1,452.00

640.00
580.00
1,220.00
122.00
1,342.00
1,342.00

NAIK

12,800.00
6,800.00
19,600.00
1,960.00

12,800.00
5,800.00
18,600.00
1,860.00

AKAI LAGI)
OH
OH
%

32,000.00
68,000.00
x

OH
OH
%

32,000.00
68,000.00
x

OH
OH
%

OH
OH

3,300.00

32,000.00
68,000.00
x

OH
OH
%

38,120.00

32,000.00
68,000.00
x

70,120.00

1,320.00

32,000.00
68,000.00
x

19,600.00

OH
OH
OH
OH
%

32,000.00
45,000.00
60,000.00
68,000.00
x

OH
OH
OH
OH
%

32,000.00
45,000.00
60,000.00
68,000.00
x

OH
OH
OH
OH
%

OH
OH
OH

OH
OH
OH
OH

OH
OH

14,940.00

32,000.00
68,000.00
x

M3

276,600.00

32,000.00
45,000.00
60,000.00
68,000.00
x

447,600.00

32,000.00
45,000.00
68,000.00
x

9,630.00

32,000.00
45,000.00
60,000.00
68,000.00
x

4,815.00

4,340.00

42,405.00

21,560.00
21,560.00

20,460.00
20,460.00

NAIK

3,200.00
1,125.00
150.00
340.00
4,815.00
481.50
5,296.50
5,296.00

3,200.00
875.00
127.50
290.00
4,492.50
449.25
4,941.75
4,941.00

NAIK

6,400.00
2,250.00
300.00
680.00
9,630.00
963.00
10,593.00
10,593.00

6,400.00
1,750.00
255.00
580.00
8,985.00
898.50
9,883.50
9,883.00

NAIK

128,000.00
270,000.00
36,000.00
13,600.00
447,600.00
44,760.00
492,360.00
492,360.00

128,000.00
210,000.00
30,600.00
11,600.00
380,200.00
38,020.00
418,220.00
418,220.00

NAIK

128,000.00
135,000.00
13,600.00
276,600.00
27,660.00
304,260.00
304,260.00

100,000.00
105,000.00
11,600.00
216,600.00
21,660.00
238,260.00
238,260.00

NAIK

3,200.00
11,250.00
150.00
340.00
14,940.00
1,494.00
16,434.00
16,434.00

3,200.00
8,750.00
127.50
290.00
12,367.50
1,236.75
13,604.25
13,604.00

NAIK

4,000.00
340.00
4,340.00
434.00
4,774.00
4,774.00

3,125.00
290.00
3,415.00
341.50
3,756.50
3,756.00

NAIK

50,886.00

33,927.60

OH
OH
Lot
%

32,000.00
68,000.00
50,886.00
x

M3
OH
OH
Lot
%

60,000.00
32,000.00
68,000.00
72,000.00
x

Bh
Zak
M3
OH
OH
OH
OH
Lot
%

90,940.00

4,000.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
119,330.00
x

Zak
M3
OH
OH
OH
OH
Lot
%

69,826.00

135,050.00

55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
7,215.00
x

16,129.00

YU KUAT KELAS II (MAHONI))


M3
2,500,000.00
M3
2,750,000.00
Lbr
65,000.00
Kg
20,000.00
Kg
18,000.00
OH
32,000.00
OH
45,000.00
OH
60,000.00
OH
68,000.00
Lot
146,600.00
%

Lbr
Bh
OH
OH

184,280.00

38,000.00
100.00
32,000.00
45,000.00

17,920.00
1,020.00
69,826.00
6,982.60
76,808.60
76,808.00

14,000.00
870.00
48,797.60
4,879.76
53,677.36
53,677.00

72,000.00
17,920.00
1,020.00
90,940.00
9,094.00
100,034.00
100,034.00

60,000.00
14,000.00
870.00
74,870.00
7,487.00
82,357.00
82,357.00

100,000.00
14,080.00
5,250.00
9,600.00
4,500.00
600.00
1,020.00
135,050.00
13,505.00
148,555.00
148,555.00

62,500.00
12,800.00
4,900.00
10,500.00
4,500.00
510.00
870.00
96,580.00
9,658.00
106,238.00
106,238.00

5,940.00
1,275.00
4,800.00
3,150.00
420.00
544.00
16,129.00
1,612.90
17,741.90
17,741.00

5,400.00
1,190.00
5,250.00
3,150.00
357.00
464.00
15,811.00
1,581.10
17,392.10
17,392.00

48,750.00
19,250.00
65,000.00
10,000.00
3,600.00
6,400.00
27,000.00
3,600.00
680.00
184,280.00
18,428.00
202,708.00
202,708.00

40,950.00
15,750.00
60,000.00
10,000.00
4,000.00
6,400.00
21,000.00
3,060.00
580.00
161,740.00
16,174.00
177,914.00
177,914.00

19,000.00
200.00
4,800.00
3,375.00

15,000.00
200.00
4,800.00
3,375.00

OH
OH
Lot
%

60,000.00
68,000.00
19,200.00
x

Lbr
Bh
OH
OH
OH
OH
Lot
%

27,500.00
100.00
32,000.00
45,000.00
60,000.00
68,000.00
30,450.00
x

Bh
Bh
OH
OH
OH
OH
Lot
%

Bh
Bh
Zak
M3
OH
OH
OH
OH
Lot

Bh
Set
OH
OH
OH
Lot

102,658.00

180,000.00
32,400.00
32,000.00
45,000.00
60,000.00
212,400.00
x

Bh
Zak
M3
M2

38,890.00

75,000.00
380.00
55,000.00
150,000.00
32,000.00
45,000.00
60,000.00
68,000.00
90,160.00
x

39,619.00

27,500.00
100.00
32,000.00
45,000.00
60,000.00
68,000.00
27,700.00
x

28,369.00

233,550.00

380.00
55,000.00
150,000.00
35,000.00

450.00
544.00
28,369.00
2,836.90
31,205.90
31,205.00

382.50
464.00
24,221.50
2,422.15
26,643.65
26,643.00

30,250.00
200.00
4,800.00
3,375.00
450.00
544.00
39,619.00
3,961.90
43,580.90
43,580.00

22,000.00
200.00
4,800.00
3,375.00
382.50
464.00
31,221.50
3,122.15
34,343.65
34,343.00

27,500.00
200.00
3,200.00
6,750.00
900.00
340.00
38,890.00
3,889.00
42,779.00
42,779.00

21,000.00
200.00
3,200.00
6,750.00
765.00
290.00
32,205.00
3,220.50
35,425.50
35,425.00

75,000.00
2,660.00
11,000.00
1,500.00
3,200.00
6,750.00
1,800.00
748.00
102,658.00
10,265.80
112,923.80
112,923.00

90,000.00
2,310.00
10,000.00
1,400.00
3,200.00
6,750.00
1,530.00
638.00
115,828.00
11,582.80
127,410.80
127,410.00

180,000.00
32,400.00
5,760.00
12,150.00
3,240.00
233,550.00
23,355.00
256,905.00
256,905.00

170,000.00
30,600.00
5,760.00
12,150.00
2,754.00
221,264.00
22,126.40
243,390.40
243,390.00

26,600.00
132,000.00
45,000.00
154,000.00

23,100.00
120,000.00
42,000.00
118,800.00

Kg
OH
OH
OH
Lot
%

5,000.00
32,000.00
45,000.00
60,000.00
387,600.00
x

M'
Set
OH
OH
OH
OH
Lot
%

3,750.00
1,312.50
32,000.00
45,000.00
60,000.00
68,000.00
5,812.50
x

M'
Set
OH
OH
OH
OH
Lot
%

M'
Set
OH
OH
OH
OH
Lot

M'
Set
OH
OH
OH
OH
Lot

14,796.90

10,000.00
3,500.00
32,000.00
45,000.00
60,000.00
68,000.00
15,500.00
x

M'
Set
OH

12,084.40

6,750.00
2,362.50
32,000.00
45,000.00
60,000.00
68,000.00
10,462.50
x

10,146.90

5,000.00
1,750.00
32,000.00
45,000.00
60,000.00
68,000.00
7,750.00
x

422,100.00

19,834.40

11,250.00
3,937.50
32,000.00

30,000.00
19,200.00
13,500.00
1,800.00
422,100.00
42,210.00
464,310.00
464,310.00

21,600.00
19,200.00
13,500.00
1,530.00
359,730.00
35,973.00
395,703.00
395,703.00

4,500.00
1,312.50
1,152.00
2,700.00
360.00
122.40
10,146.90
1,014.69
11,161.59
11,161.00

3,900.00
1,137.50
1,152.00
2,700.00
306.00
104.40
9,299.90
929.99
10,229.89
10,229.00

6,000.00
1,750.00
1,152.00
2,700.00
360.00
122.40
12,084.40
1,208.44
13,292.84
13,292.00

5,700.00
1,662.50
1,152.00
2,700.00
306.00
104.40
11,624.90
1,162.49
12,787.39
12,787.00

8,100.00
2,362.50
1,152.00
2,700.00
360.00
122.40
14,796.90
1,479.69
16,276.59
16,276.00

7,800.00
2,275.00
1,152.00
2,700.00
306.00
104.40
14,337.40
1,433.74
15,771.14
15,771.00

12,000.00
3,500.00
1,152.00
2,700.00
360.00
122.40
19,834.40
1,983.44
21,817.84
21,817.00

12,000.00
3,500.00
1,152.00
2,700.00
306.00
104.40
19,762.40
1,976.24
21,738.64
21,738.00

13,500.00
3,937.50
1,152.00

12,000.00
3,500.00
1,152.00

OH
OH
OH
Lot
%

45,000.00
60,000.00
68,000.00
17,437.50
x

M'
Set
OH
OH
OH
OH
Lot
%

14,250.00
4,987.50
32,000.00
45,000.00
60,000.00
68,000.00
22,087.50
x

M'
Set
OH
OH
OH
OH
Lot
%

M'
Set
OH
OH
OH
OH
Lot

M'
Set
OH
OH
OH
OH
Lot

27,584.40

27,500.00
9,625.00
32,000.00
45,000.00
60,000.00
68,000.00
42,625.00
x

M'
Set
OH
OH

37,271.90

15,000.00
5,250.00
32,000.00
45,000.00
60,000.00
68,000.00
23,250.00
x

26,421.90

21,250.00
7,437.50
32,000.00
45,000.00
60,000.00
68,000.00
32,937.50
x

21,771.90

46,959.40

23,750.00
8,312.50
32,000.00
45,000.00

2,700.00
360.00
122.40
21,771.90
2,177.19
23,949.09
23,949.00

2,700.00
306.00
104.40
19,762.40
1,976.24
21,738.64
21,738.00

17,100.00
4,987.50
1,152.00
2,700.00
360.00
122.40
26,421.90
2,642.19
29,064.09
29,064.00

16,200.00
4,725.00
1,152.00
2,700.00
306.00
104.40
25,187.40
2,518.74
27,706.14
27,706.00

25,500.00
7,437.50
1,152.00
2,700.00
360.00
122.40
37,271.90
3,727.19
40,999.09
40,999.00

21,450.00
6,256.25
1,152.00
2,700.00
306.00
104.40
31,968.65
3,196.87
35,165.52
35,165.00

18,000.00
5,250.00
1,152.00
2,700.00
360.00
122.40
27,584.40
2,758.44
30,342.84
30,342.00

17,850.00
5,206.25
1,152.00
2,700.00
306.00
104.40
27,318.65
2,731.87
30,050.52
30,050.00

33,000.00
9,625.00
1,152.00
2,700.00
360.00
122.40
46,959.40
4,695.94
51,655.34
51,655.00

28,350.00
8,268.75
1,152.00
2,700.00
306.00
104.40
40,881.15
4,088.12
44,969.27
44,969.00

28,500.00
8,312.50
1,152.00
2,700.00

25,500.00
7,437.50
1,152.00
2,700.00

OH
OH
Lot
%

60,000.00
68,000.00
36,812.50
x

M'
Set
OH
OH
OH
OH
Lot
%

46,250.00
16,187.50
32,000.00
45,000.00
60,000.00
68,000.00
71,687.50
x

Bh
OH
Lot
%

Bh
OH
Lot

Bh
OH
Lot

Bh
OH
Lot

Bh
OH
Lot

52,500.00

10,000.00
45,000.00
10,000.00
x

Bh

62,500.00

30,000.00
45,000.00
30,000.00
x

82,500.00

40,000.00
45,000.00
40,000.00
x

252,000.00

60,000.00
45,000.00
60,000.00
x

76,021.90

225,000.00
45,000.00
225,000.00
x

41,146.90

16,750.00

6,000.00

360.00
122.40
41,146.90
4,114.69
45,261.59
45,261.00

306.00
104.40
37,199.90
3,719.99
40,919.89
40,919.00

55,500.00
16,187.50
1,152.00
2,700.00
360.00
122.40
76,021.90
7,602.19
83,624.09
83,624.00

46,500.00
13,562.50
1,152.00
2,700.00
306.00
104.40
64,324.90
6,432.49
70,757.39
70,757.00

225,000.00
27,000.00
252,000.00
25,200.00
277,200.00
277,200.00

225,000.00
27,000.00
252,000.00
25,200.00
277,200.00
277,200.00

60,000.00
22,500.00
82,500.00
8,250.00
90,750.00
90,750.00

50,000.00
22,500.00
72,500.00
7,250.00
79,750.00
79,750.00

40,000.00
22,500.00
62,500.00
6,250.00
68,750.00
68,750.00

30,000.00
22,500.00
52,500.00
5,250.00
57,750.00
57,750.00

30,000.00
22,500.00
52,500.00
5,250.00
57,750.00
57,750.00

35,000.00
22,500.00
57,500.00
5,750.00
63,250.00
63,250.00

10,000.00
6,750.00
16,750.00
1,675.00
18,425.00
18,425.00

7,500.00
6,750.00
14,250.00
1,425.00
15,675.00
15,675.00

6,000.00

6,000.00

OH
Lot
%

45,000.00
6,000.00
x

Bh
OH
Lot
%

25,000.00
45,000.00
25,000.00
x

Bh
OH
Lot
%

Bh
OH
Lot

Bh
OH
Lot

Bh
OH
Lot

M2
OH
OH
Lot

132,000.00

50,000.00
32,000.00
45,000.00
55,000.00
x

M2
OH
OH
Lot

97,500.00

105,000.00
45,000.00
105,000.00
x

8,000.00

75,000.00
45,000.00
75,000.00
x

14,500.00

3,500.00
45,000.00
3,500.00
x

34,000.00

10,000.00
45,000.00
10,000.00
x

10,500.00

66,550.00

70,000.00
32,000.00
45,000.00
77,000.00

4,500.00
10,500.00
1,050.00
11,550.00
11,550.00

4,500.00
10,500.00
1,050.00
11,550.00
11,550.00

25,000.00
9,000.00
34,000.00
3,400.00
37,400.00
37,400.00

25,000.00
9,000.00
34,000.00
3,400.00
37,400.00
37,400.00

10,000.00
4,500.00
14,500.00
1,450.00
15,950.00
15,950.00

7,500.00
4,500.00
12,000.00
1,200.00
13,200.00
13,200.00

3,500.00
4,500.00
8,000.00
800.00
8,800.00
8,800.00

7,500.00
4,500.00
12,000.00
1,200.00
13,200.00
13,200.00

75,000.00
22,500.00
97,500.00
9,750.00
107,250.00
107,250.00

75,000.00
22,500.00
97,500.00
9,750.00
107,250.00
107,250.00

105,000.00
27,000.00
132,000.00
13,200.00
145,200.00
145,200.00

75,000.00
27,000.00
102,000.00
10,200.00
112,200.00
112,200.00

55,000.00
4,800.00
6,750.00
66,550.00
6,655.00
73,205.00
73,205.00

39,600.00
4,800.00
6,750.00
51,150.00
5,115.00
56,265.00
56,265.00

77,000.00
4,800.00
6,750.00
88,550.00

63,800.00
4,800.00
6,750.00
75,350.00

M2
OH
OH
Lot
%

M2
OH
OH
Lot
%

M'
Kg
M3
Ltr
OH
OH
OH
Lot

M'
Kg
M3
Ltr
OH
OH
OH
Lot

60,000.00
32,000.00
45,000.00
66,000.00

66,000.00
4,800.00
6,750.00
77,550.00
7,755.00
85,305.00
85,305.00

55,000.00
4,800.00
6,750.00
66,550.00
6,655.00
73,205.00
73,205.00

82,500.00
4,800.00
6,750.00
94,050.00
9,405.00
103,455.00
103,455.00

77,000.00
4,800.00
6,750.00
88,550.00
8,855.00
97,405.00
97,405.00

22,000.00
195.00
27,360.00
2,625.00
4,800.00
18,000.00
1,500.00
76,480.00
7,648.00
84,128.00
84,128.00

20,000.00
240.00
21,600.00
2,250.00
4,800.00
18,000.00
1,275.00
68,165.00
6,816.50
74,981.50
74,981.00

22,000.00
195.00
54,150.00
3,150.00
4,800.00
18,000.00
1,500.00
103,795.00
10,379.50
114,174.50
114,174.00

20,000.00
240.00
42,750.00
2,700.00
4,800.00
18,000.00
1,275.00
89,765.00
8,976.50
98,741.50
98,741.00

7,440.00
2,400.00
1,000.00
200.00
60.00
7,200.00
960.00
19,260.00
1,926.00
21,186.00
21,186.00

6,510.00
1,950.00
875.00
210.00
50.00
7,200.00
816.00
17,611.00
1,761.10
19,372.10
19,372.00

77,550.00

94,050.00

76,480.00

22,000.00
13,000.00
2,850,000.00
10,500.00
32,000.00
45,000.00
60,000.00
79,495.00
x

Ltr
Ltr
Kg
Lbr
Bh
OH
OH
Lot
%

7,535.00
82,885.00
82,885.00

22,000.00
13,000.00
2,850,000.00
10,500.00
32,000.00
45,000.00
60,000.00
52,180.00
x

8,855.00
97,405.00
97,405.00

75,000.00
32,000.00
45,000.00
82,500.00
x

88,550.00

103,795.00

20,000.00
16,000.00
20,000.00
2,000.00
6,000.00
45,000.00
60,000.00
11,100.00
x

19,260.00

Ltr
OH
OH
Lot
%

2,142.86
32,000.00
68,000.00
750.00
x

M3
Kg
OH
OH
OH
Ls
Lot
%

150,000.00
35,000.00
32,000.00
45,000.00
68,000.00
3,490.00
463,490.00
x

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot
Lot
%

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot
Lot

19,673.55

17,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
20,310.00
4,847.38
x

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot

578,530.00

17,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
19,031.25
4,523.55
x

4,358.00

20,957.38

15,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
13,644.75

750.00
3,200.00
408.00
4,358.00
435.80
4,793.80
4,793.00

625.10
2,500.00
348.00
3,473.10
347.31
3,820.41
3,820.00

180,000.00
280,000.00
102,400.00
7,200.00
5,440.00
3,490.00
578,530.00
57,853.00
636,383.00
636,383.00

162,000.00
120,000.00
80,000.00
5,600.00
4,640.00
3,490.00
375,730.00
37,573.00
413,303.00
413,303.00

2,231.25
780.00
120.00
750.00
3,840.00
9,450.00
1,350.00
510.00
642.30
19,673.55
1,967.36
21,640.91
21,640.00

2,100.00
880.00
125.00
1,050.00
5,120.00
9,800.00
1,530.00
580.00
953.33
22,138.33
2,213.83
24,352.16
24,352.00

2,550.00
780.00
120.00
750.00
4,800.00
9,450.00
1,350.00
510.00
647.38
20,957.38
2,095.74
23,053.12
23,053.00

2,400.00
880.00
125.00
1,050.00
6,400.00
9,800.00
1,530.00
580.00
967.51
23,732.51
2,373.25
26,105.76
26,105.00

1,968.75
780.00
120.00
750.00
2,496.00
6,142.50
877.50
510.00
460.51

2,100.00
984.00
125.00
1,050.00
3,328.00
6,370.00
994.50
580.00
698.92

0.1313
0.1200
0.0075
0.3750
0.1200
0.2100
0.0225
0.0075
0.0338

TURUN
0.1500
0.1200
0.0075
0.3750
0.1500
0.2100
0.0225
0.0075
0.0319

TURUN

Lot
%

4,079.26
x

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot
Lot
%

15,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
13,926.00
4,343.89
x

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot
Lot
%

14,369.89

10,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
12,988.50
3,400.86
x

Kg
Kg
Bh
Lbr
OH
OH
OH
OH
Lot
Lot
%

14,105.26

13,426.86

10,000.00
6,500.00
16,000.00
2,000.00
32,000.00
45,000.00
60,000.00
68,000.00
13,176.00
3,569.99
x

13,595.99

14,105.26
1,410.53
15,515.79
15,515.00

16,230.42
1,623.04
17,853.46
17,853.00

TURUN

2,250.00
780.00
120.00
750.00
2,496.00
6,142.50
877.50
510.00
443.89
14,369.89
1,436.99
15,806.88
15,806.00

2,400.00
984.00
125.00
3,509.00
1,050.00
3,328.00
6,370.00
994.50
580.00
19,340.50
1,934.05
21,274.55
21,274.00

TURUN

1,312.50
780.00
120.00
750.00
2,496.00
6,142.50
877.50
510.00
438.36
13,426.86
1,342.69
14,769.55
14,769.00

1,260.00
880.00
125.00
1,050.00
3,328.00
6,370.00
994.50
580.00
656.44
15,243.94
1,524.39
16,768.33
16,768.00

TURUN

1,500.00
780.00
120.00
750.00
2,496.00
6,142.50
877.50
510.00
419.99
13,595.99
1,359.60
14,955.58
14,955.00

1,440.00
880.00
125.00
2,445.00
1,050.00
3,328.00
6,370.00
994.50
580.00
17,212.50
1,721.25
18,933.75
18,933.00

TURUN

Kg
Kg
Kg
Lbr
Ltr
Bh
OH
OH

10,500.00
6,500.00
36,000.00
2,000.00
5,000.00
6,000.00
32,000.00
45,000.00

1,315.13
404.63
5,400.00
600.00
562.50
225.00
4,800.00
10,125.00

1,377.75
456.50
5,600.00
840.00
637.50
250.00
6,400.00
13,500.00

OH

60,000.00

1,350.00

1,530.00

OH
Lot
%

68,000.00
8,507.25
x

Kg
Kg
Lbr
Ltr
Bh
OH
OH
OH
OH
Lot
%

25,292.25

10,500.00
37,500.00
2,000.00
15,000.00
6,000.00
32,000.00
45,000.00
60,000.00
68,000.00
9,452.63
x

26,237.63

510.00
25,292.25
2,529.23
27,821.48
27,821.00

580.00
31,171.75
3,117.18
34,288.93
34,288.00

1,315.13
5,625.00
600.00
1,687.50
225.00
4,800.00
10,125.00
1,350.00
510.00
26,237.63
2,623.76
28,861.39
28,861.00

1,377.75
5,600.00
840.00
2,250.00
250.00
7,000.00
13,500.00
1,530.00
580.00
32,927.75
3,292.78
36,220.53
36,220.00
9,870.34
7,957.12
345,706.24
4,104,536.80
878,122.58
480,000.00
1,171,975.00
581,569.92

M3
M3
M2
M2
M3
Kg
M2
M'
M'

31,860.00
154,280.00
64,127.00
26,733.60
676,759.00
10,136.20
49,170.00
27,584.40
14,796.90

294,370.47
67,883.20
96,447.01
69,079.62
1,782,312.50
1,544,047.35
865,003.56
148,955.76
22,195.35
4,890,294.82

M3
M'
Kg
M3
M3
Lot

31,860.00
41,146.90
10,000.00
154,280.00
160,000.00
35,956.00

305,856.00
444,386.52
114,000.00
61,712.00
64,000.00
35,956.00
1,025,910.52
5,916,205.34
591,620.53
6,507,825.87
6,507,825.00

M3
M'
Kg
M3
M3
Ls
%

31,860.00
41,146.90
10,000.00
161,500.00
160,000.00
27,390.00
x

Btg
Ls
OH
Lot

5,916,205.34

596,513.20

6,000.00
450.00
1,890.00
1,890.00

975,000.00
8,554,737.99
855,473.80
9,410,211.79
9,410,211.00
183,425.00
84,144.64
212,815.77
50,000.00
25,000.00
30,000.00
123,940.05
57,685.00
767,010.45
76,701.05
843,711.50
843,711.00

57,348.00
329,175.20
54,000.00
64,600.00
64,000.00
27,390.00
596,513.20
59,651.32
656,164.52
656,164.00

144,331.43
46,002.10
1,481,670.76
644,262.40
243,989.67

9,000.00
450.00
6,048.00
-

6,750.00
337.00
4,534.40
-

TURUN

TURUN

Bh
Zak
M3
Kg
OH
OH
OH
OH
Lot
%

15,498.00

2,300.00
55,000.00
150,000.00
8,860.00
32,000.00
45,000.00
60,000.00
68,000.00
58,327.00
x

74,687.00

15,498.00
1,549.80
17,047.80
17,047.00

11,621.40
1,162.14
12,783.54
12,783.00

28,750.00
8,250.00
4,050.00
17,277.00
10,240.00
4,500.00
600.00
1,020.00
74,687.00
7,468.70
82,155.70

25,000.00
7,500.00
3,780.00
20,122.05
10,240.00
3,500.00
510.00
870.00
71,522.05
7,152.21
78,674.26

82,155.00

78,674.00
[M]

(99.00)

8,114.00

-5%

30%

elombang BJLS 28 (80 x 180 cm)

82,132.00

0.83

23%

0.83

91,289.00

21%

37,428.00

34%

33,352.00

14%

0.25
0.01

9,421.00

50%

10,299.00

42%

7,369.00

21%

(2,453.00)

-6%

11,226.00

24%

10,372.00

29%

(895.00)

-30%

(1,732.00)

-12%

(44.00)

0%

(3,905.00)

-15%

(4,224.00)

-8%

32,945.00

24%

30,568.00

5%

Kg
Kg

1,366,541.00

260%

21,015.00

3%

11,342.00

1%

15,082.00

2%

133,342.00

19%

121,847.00

17%

90.00

7.20
4,314,600.00
5,702,665.32

133,342.00

18%

110,352.00

14%

(3,846.00)

-26%

(4,748.00)

-29%

79.00

9%

(96.00)

-1%

(96.00)

-1%

(184.00)

-11%

(155.00)

-4%

1,277.00

1%

935.00

2%

7,557.00

16%

9,465.00

17%

8,511.00

13%

26,444.00

21%

74,871.00

32%

130,570.00

49%

175,266.00

49%

186,431.00

51%

208,871.00

56%

244,016.00

64%

32,628.00

7%

40,062.00

39%

1.0600

55,793.00

75%

1.06

58,708.00

79%

51,338.00

69%

48,142.00

60%

31,667.00

36%

35,265.00

47%

37,968.00

47%

36,205.00

45%

(11,506.00)

-14%

(4,919.00)

-7%

248.00

0%

(3,080.00)

-9%

(3,695.00)

-12%

(2,421.00)

-8%

640.00

4%

11,476,771.00

284%

10,420.00

24%

10,083.00

26%

4,816.00

20%

4,948.00

19%

3,059.00

17%

18.00

0%

3,139.00

19%

1,213.00

6%

2,807.00

8%

2,261.00

6%

5,381.00

11%

2,384.00

4%

9,670.00

15%

18,545.00

32%

874.00

3%

(3,366.00)

-9%

(469.00)

-2%

(1,547.00)

-6%

576.00

3%

12,406.00

34%

19,866.00

68%

893,695.00

24%

52,946.00

18%

0.0150
2.0000
0.0050
0.2000
0.1500
0.7500
0.1000
0.0100
-

110,836.00

43%

53,084.00

28%

156,453.00

58%

131,153.00

44%

84%
111,749.00
1 M2 DAUN PINTU KACA KAYU KUAT KELAS II (MAHONI) (TANPA KACA)
Papan Kuat Kelas II (Mahoni)
2%
Lem Putih (FOX)
60%
Pekerja Setengah Terampil
40%
Tukang Kayu
140%
Kepala Tukang Kayu
14%
Mandor
1%

83,565.00

52%

11%
22,242.00
1 M3 KUDA-KUDA OVERSTEK/KONSOL KAYU KUAT KELAS II (MAHONI) (EXSPOSE)
Kayu Kuat Kelas II (Mahoni)
1.20
Pekerja Setengah Terampil
Tukang Kayu
Kepala Tukang Kayu
Mandor
Upah Angkut

3.00
9.00
3.00
0.50

43%
1,502,124.00
1 M3 KUDA-KUDA KAYU KUAT KELAS II (MARANTI)
Kayu Kuat Kelas II (Maranti) 110%
Pekerja Setengah Terampil
Tukang Kayu
Kepala Tukang Kayu

1,443,076.00

300%
500%
200%

47%

63%
1,949,604.00
1 M3 KUDA-KUDA KAYU KUAT KELAS II (MARANTI)
Kayu Kuat Kelas II (Maranti) 110%
Pekerja Setengah Terampil
Tukang Kayu
Kepala Tukang Kayu

300%
500%
200%

12.00
7.20
1.67

500%
300%

1,074,312.00

35%

3,498.00

5%

9,328.00

14%

3,982.00

6%

(858.00)

-1%

5,731.00

8%

7,688.00

28%

7,097.00

9%

0.15
1.00
0.80
0.15

1,152.00

1%

5,489.00

5%

25,000,000.00

25607%

15,700.00

17%

13,255.00

15%

990.00

1%

990.00

2%

275.00

8%

110.00

8%

1,100.00

5%

355.00

7%

710.00

7%

74,140.00

18%

66,000.00

28%

2,830.00

21%

1,018.00

27%

0.75

(2,712.00)

-11%

(0.0500)
(0.0400)
(0.0025)
(0.1250)
(0.0500)
(0.0700)
(0.0075)
(0.0025)
(0.0106)

(3,052.00)

-12%

(2,338.00)

-13%

(5,468.00)

-26%

(1,999.00)

-12%

(3,978.00)

-21%

(6,467.00)

-19%

(7,359.00)

-20%

3,886,716.00

PEMERINTAH KABUPATEN KARAWANG

DINAS CIPTA KARYA


Jl. Dewi Sartika No. 1 Tlp. 402117 Karawang

NAMA KEGIATAN

PEMBANGUNAN DAN REHABILITASI GEDUNG TIAP TIAP UPTD TK/SD KECAMATAN


TAHUN ANGGARAN 2012
KABUPATEN KARAWANG

PAKET PEKERJAAN

REHABILITASI GEDUNG/KANTOR UPTD TK, SD

LOKASI KEGIATAN

KECAMATAN TIRTAJAYA

RENCANA ANGGARAN BIAYA


No

URAIAN PEKERJAAN

VOLUME

HARGA
SATUAN
(Rp.)

JUMLAH
BIAYA
(Rp.)

I.
1.
2.
2.
3.

PEKERJAAN PERSIAPAN
Pas. Bouwplank
Pas. Bongkaran Bangunan Atap dan Kusen
Dokumen Rekaman Kegiatan
Pas. Papan Nama Kegiatan

II.

PEKERJAAN TANAH

1.

Galian tanah pondasi

17.10

2.

Arugan tanah kembali

4.28

3.

Arugan pasir urug dibawah pasangan

3.13

III.

PEKERJAAN PASANGAN

1.

Pas. Batu Kosong/Aanstamping

2.51

M3

307,276.00

769,726.38

2.

Pas. Pondasi Batu Belah (ad. 1 : 5)

6.33

M3

552,805.00

3,496,491.63

3.
4.
5.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.

Pas. Beton Cor (ad. 1 : 2 : 3)/K.175


Pembesian dengan Besi Polos
Pas. Bekisting untuk Beton dengan Papan
Pas. Rollag bata
Pas. Dinding Bata 1/2 Batu (ad. 1 : 3) untuk Trasraam
Pas. Plesteran (ad. 1 : 3) + Acian untuk Trasraam
Pas. Dinding bata 1/2 Batu (ad. 1 : 5)
Pas. Plesteran (ad. 1 : 5) + Acian
Pas. Lantai Keramik 30/30 + Lantai Kerja DN Putih Polos
Pasang keramik dinding motif Batu
Pas. Plint dgn kramik dinding 10cm
Pas. Beton Rabat t. 5 cm (ad. 1 : 3 : 5)
Pek. Saluran Air Hujan (Gravel 1/2 20 cm)

2.73
637.24
65.92
5.90
3.75
7.50
49.27
98.54
139.40

M3
Kg
M2
M2
M2
M2
M2
M2
M2
M2
141.85 M'
2.78 M3
60.05 M'

744,434.00
11,149.00
54,087.00
65,689.00
70,539.00
44,826.00
65,689.00
42,185.00
109,921.00
90,287.00
81,200.00
624,750.00
104,140.00
JUMLAH III.

2,035,729.22
7,104,559.03
3,565,415.04
387,565.10
264,521.25
336,195.00
3,236,497.03
4,156,909.90
15,322,987.40
11,518,220.00
1,735,125.98
6,253,607.00
60,183,549.96

IV.
1.
2.
3.

PEKERJAAN KAYU
Pas. Rangka Plafond Kayu Kuat Kelas II (Mahoni)
Pas. Plafond GRC 4 mm
Pas. List Profil Gypsum 10 cm

192.00 M2
192.00 M2
254.55 M'

72,930.00
23,498.00
17,300.00
JUMLAH IV.

14,002,560.00
4,511,616.00
4,403,715.00
22,917,891.00

V.
1.
2.
3.
4.

PEKERJAAN PENUTUP ATAP


Pas. Rangka Atap Baja Ringan
Pas. Genteng Plentong Press
Pas. Bubungan Genteng Plentong Press
Listplanks GRC 30 cm

238.22
238.22
56.95
60.05

154,000.00
35,538.00
76,630.00
33,556.00
JUMLAH V.

36,686,143.19
8,465,923.09
4,363,839.58
2,015,037.80
51,530,943.67

26.00
1.00
1.00
1.00

M'
Ls
Ls
Ls

35,566.00
2,000,000.00
350,000.00
148,879.00
JUMLAH I.

924,716.00
2,000,000.00
350,000.00
148,879.00
3,423,595.00

M3

28,270.00

483,417.00

M3

9,420.00

40,270.50

M3

169,708.00

530,337.50

JUMLAH II.

M2
M2
M'
M'

1,054,025.00

VI.
1.
2.
3.
4.
5.
6.
7.
8.

PEKERJAAN BESI DAN KACA


Pas. Kuusen Alm Type P1-A
Pas. Kuusen Alm Type P1-B
Pas. Kuusen Alm Type P2
Pas. Kuusen Alm Type P1-J2
Pas. Kuusen Alm Type J2-A
Pas. Kuusen Alm Type J2-B
Pas. Kuusen Alm Type J3
Pas. Kuusen Alm Type BV

VII.
1.
2.
3.
4.

PEKERJAAN PENGECATAN
Pengecatan Listplank dg Cat Kayu setara Avian
Pengecatan Ulang Tembok dg Cat Tembok setara Sanlex
Pengecatan Baru Plafond dg Cat Tembok setara Sanlex
Plitur Daun Pintu

VIII.
1.
2.
3.
4.
5.
6.
7.
8.
9.

PEKERJAAN LISTRIK
Pas. Kabel NYM 3 x 2.5mm
Pas. Kabel NYM 2 x 1.5mm
Pas. MCB
Pas. Titik Lampu
Pas. Stop Kontak
Pas. Saklar Tunggal
Pas. Saklar Double
Pas. Lampu TL 1 x 20 Watt
Pas. Pijar 25 Watt

4.00
2.00
1.00
1.00
1.00
7.00
2.00
3.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

1,531,047.00
1,480,819.00
2,223,214.00
3,106,436.00
2,023,547.00
1,864,232.00
2,192,723.00
337,441.00
JUMLAH VI.

6,124,188.00
2,961,638.00
2,223,214.00
3,106,436.00
2,023,547.00
13,049,624.00
4,385,446.00
1,012,323.00
34,886,416.00

25.82
551.13
192.00
15.75

M2
M2
M2
M2

43,344.00
20,912.00
21,292.00
21,186.00
JUMLAH VII.

1,119,207.10
11,525,126.00
4,088,064.00
333,679.50
17,066,076.60

277,200.00
75,000.00
19,800.00
16,500.00
19,800.00
52,800.00
4,600.00
JUMLAH VIII.

277,200.00
1,650,000.00
138,600.00
148,500.00
19,800.00
739,200.00
4,600.00
2,977,900.00

67.5
60
1.00
22.00
7.00
9.00
1.00
14.00
1.00

M'
M'
Unit
Ttk
Bh
Bh
Bh
Bh
Bh

J U M L A H ...........................................................................................................................................................................
194,040,397.22
DIBULATKAN .......................................................................................................

194,040,000.00
261,726,000.00

PERHITUNGAN VOL
UPTD
I.

A. Badan Bangunan
Panjang
Lebar
B. Teras Bangunan

Panjang
Lebar

C. Bowplank
II.

III.

IV.

Galian tanah pondasi batu kali


pondasi badan
pondasi selasar

Lebar
0.90
0.90

pondasi badan 1x1


pondasi selasar 0,8x0,8
pondasi tangga 0,6x0,6
pondasi tangga 3x0,6

Luas bwh
1.00
0.64
0.36
0.96

Galian tanah pondasi beton

Arugan tanah peninggian lantai

Panjang
badan
teras

V.

Urugan kembali bekas galian pond batu kali

Panjang
pondasi badan
pondasi selasar

Urugan kembali bekas galian pondasi beton


pondasi badan 1x1
pondasi selasar 0,8x0,8
pondasi tangga 0,6x0,6
pondasi tangga 3x0,6

Panjang
-

VI.

VII.

VIII.

IX.

X.

Pondasi batu kali


badan
selasar

Panjang
17.00
2.00

pondasi badan 1x1


pondasi selasar 0,8x0,8
pondasi tangga 0,6x0,6
pondasi tangga 3x0,6

Luas bwh
1.00
0.64
0.36
0.96

Urugan pasir dibwh lantai dan pondasi batu kali


lantai ruangan
teras
pondasi badan
pondasi selasar

Panjang
6.00
17.00
2.00

Urugan pasir dibwh pondasi beton


pondasi badan 1x1
pondasi selasar 0,8x0,8
pondasi tangga 0,6x0,6
pondasi tangga 3x0,6

Luas bwh
1.00
0.64
0.36
1.80

pondasi badan
pondasi selasar

Panjang
17.00
2.00

(MM)
(KG)

6
0.222

Beton

Lebar
0.15
bh
4.00
126.67

Beton

Luas
0.10
bh

Pas. Lantai kerja dibwh pondasi beton

Aanstamping

SLOOF, KOLOM, BALOK, BETON, BEKISTING

BERAT BESI
DIAMETER
BERAT
Sloof 15/20
Besi
a. batang 10
b. Cincin 8-150
Balok Propilan Depan
Besi

a. batang 12
b. Cincin 8-150
Ring Balok 12/12

10.00
33.33
Beton

Lbr
0.12

Besi
a. batang 12
b. Cincin 8-150
Ring Balok 15/30

bh
4.00
200.00
Beton

Lbr
0.12

Besi
a. batang 12
b. Cincin 8-150
Ring Balok 10/10 KUSEN

bh
8.00
33.33
Beton

Lbr
0.10

Besi
a. batang 10
b. Cincin 8-150
Kolom KP 12/12

bh
4.00
303.33
Beton

Lbr
0.12

Besi
a. batang 12
b. Cincin 8-150
Kolom 15/30

bh
4.00
160.00
Beton

Lbr
0.15

Besi
a. batang 12
b. batang 10
c. Cincin 8-150

bh
4.00
2.00
53.33

XI.

PEKERJAAN KUSEN ALUMINIUM

XII.

PEKERJAAN PASANGAN, KERAMIK DAN PLAFOND

A.

Pas. Bata 1 : 3 dinding trasram

B.

C.

badan
dikurangi kusen pintu

Panjang
14.00
1.50

badan

Luas
3.75

Plesteran 1 : 3 dinding trasram

Pas. Bata 1 : 5 dinding

Panjang

badan
dikurangi kusen jendela + pintu
ditambah kongliong teras

D.

Plesteran 1 : 5 dinding
badan

14.00

Luas
49.27

E.

Pengecatan plin luar & dalam

total

F.

Pengecatan tembok luar & dalam

total
tinggi
3.65
1.00
dikurangi luas kusen

G.

Penutup plafond + rangka


badan

H.

Lebar
12.00
2.00

List profil plafond


ruangan
teras bag depan
teras bag samping
total

I.

Lantai keramik 30/30


ruangan
teras
total

I.

Keramik Dinding 30/30

Jmlh
ruangan
total

XV.

PEKERJAAN ATAP

A.

Rangka atap + Penutup atap


belakang bawah
total

B.

Laburan rangka atap

C.

Listplank

total

belakang + depan
total
D.

Pengecatan listplang

E.

Bubungan genteng

total

total
XVI.

PEKERJAAN RABAT DAN GRAVEL

F.

Pas. Sal air hujan/gravel

G.

Pas. Beton rabat

total

total

...THE END..

PERHITUNGAN VOLUME
UPTD
As.1

As.2

As.3

As.4
total

Panjang
17.00
2.00

Tinggi
1.00
1.00

- M'
- M'
total
- M'
- M'

M'

Tinggi
0.90
0.90
0.40
0.40

Lebar

Jmlh

luas 2

17.10 M3

total

- M3

total

- M3

total a

4.28 M3

total b
total a+b

- M3
4.28 M3

M3
M3
M3
M3

Vol

luas 2

luas 1

total
Vol
-

Tinggi

luas 1

Vol
15.30 M3
1.80 M3

- M3
- M3

Vol
15.30 M3
1.80 M3
Vol

M3
M3
M3
M3

Lbr. Ats
0.30
0.25

Tinggi
0.10
0.10
0.10
0.10

Lbr. Bwh
0.70
0.50

Jmlh

Tggi Pond
0.70
0.50

6.33 M3

total b

- M3

total a

3.13 M3

total b
total a+b

- M3
3.13 M3

Vol
-

Lebar
4.85
0.90
0.70

Tebal
0.05
0.10
0.10
0.10

Vol.
1.46
1.53
0.14

Tinggi
0.10
0.10
0.10
0.10

Jmlh

Vol

Tebal
0.15
0.15

Vol.
5.95
0.38
total

Lebar
0.90
0.70

M3
M3
M3
M3

M3
M3
M3
M3

M3
M3
M3
M3

Vol.
2.30 M3
0.21 M3
total

8
0.392

10
0.622

Tinggi
0.20
Pjg
19.00
0.55

Panjang
19.00
Koef.
0.62
0.39

1.00
Pjn

12
0.888

2.51 M3

16
1.580

Vol
0.57 M3
Vol
47.27 kg
27.31 kg

Pjg
Vol
5.00
0.50 M3
Koef.
Vol

Bekisting

Lebar
0.15

Tinggi
0.20

Panjang
19.00

Tinggi
1.00

Panjang
5.00

74.58 kg
Bekisting

Lebar
0.10

5.00
1.75

0.89
0.39

44.40 kg
22.87 kg

67.27 kg

Tgg
0.12
Pjn
30.00
0.35

Pjg
Vol
30.00
0.43 M3
Koef.
Vol
0.89
106.56 kg
0.39
27.44 kg

Bekisting

Tgg
0.12
Pjn
5.00
0.75

Pjg
Vol
5.00
0.07 M3
Koef.
Vol
0.89
35.52 kg
0.39
9.80 kg

Bekisting

Tgg
0.10
Pjn
45.50
0.35

Pjg
Vol
45.50
0.46 M3
Koef.
Vol
0.62
113.20 kg
0.39
41.62 kg

Bekisting

Tgg
0.12
Pjn
24.00
0.35

Pjg
bh
Vol
4.00
6.00
Koef.
Vol
0.89
85.25 kg
0.39
21.95 kg

Tgg
0.30
Pjn
8.00
8.00
0.75

Pjg
bh
4.00
2.00
Koef.
Vol
0.89
28.42
0.62
9.95
0.39
15.68

Tinggi
0.30
0.30

Jumlah
2.00
Tinggi

Lebar
0.12

Tinggi
0.12

Panjang
30.00

Tinggi
0.12

Panjang
5.00

Tinggi
0.10

Panjang
45.50

Lebar
0.12

Tinggi
0.12

Lebar
0.15

Tinggi
0.30

134.00 kg
Lebar
0.12

45.32 kg
Lebar
0.10

154.82 kg
Bekisting
0.35 M3
6.00
107.20 kg

Vol

Bekisting
0.36 M3
2.00

kg
kg
kg

54.05 kg

total

4.20 M2
0.45 M2
3.75 M2

total

7.50 M2

3.38
1.00

2.00

Jumlah
2.00

2.00
total

47.25
1.98
4.00
49.27

M2
M2
M2
M2

total

98.54 M2

M2
M2
pjg

35.00
2.00

jmlh
90.50
2.00

urangi luas kusen


total
275.56

Panjang
16.00
5.00

330.33
2.00
332.33
56.76
275.56
551.13

m2
m2
m2
m2

jmlh
1.00 =
1.00 =
total

Panjang
11.40
15.65
52.65
254.55 M
Panjang

13.40

10.40

Lebar

Jumlah

12.40

Tinggi

Vol

Luas
127.40 M2
12.00 M2

- M2
- M2

Panjag

Lebar

238.22 M2

7.50

23.00

3.05

5.24

1.28

22.02

21.40

28.40

16.40

12.40

192.00 M2
10.00 M2
192.00 M2

60.05

139.40 M2
Panjang

6.00

vol
1.00
1.00

2.00

7.50

Vol
206.30 M2

238.22 M2
Panjang
60.05
60.05 M
25.82 M2
Panjang
4.00
39.19
56.95 M

60.05 M
Panjang
60.05
2.78 M3

2.00
11.76

Vol
10.45 M2

Vol
10.50 M2

Vol
10.80 M2

Vol
1.80 M2

Vol
13.65 M2

Panjang
4.00

Vol
1.92 M2
11.52 M2

Panjang
4.00

Vol
3.60 M2
7.20 M2

3.50

3.00

5.00

90.50
2.00

9.18

4.34

3.85

7.82

56.76

TB A.106 1 BH KUSEN ALUMUNIUM & DAUN PINTU P1 - A


a.
Kusen Aluminium 1 3/4 x 4"
b.
Daun Pintu Double Teakwood Rangka
Kayu Kuat Kelas II (Mahoni)
c.
Sealant
d.
Kunci Tanam
e.
Engsel Pintu
f.
Karet
g.
Kaca Polos 5 mm
h.
Engsel Casemet 16"
i.
Rambuncis
j.
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
TB A.106 1 BH KUSEN ALUMUNIUM & DAUN PINTU P1 - B
a.
Kusen Aluminium 1 3/4 x 4"
b.
Daun Pintu Double Teakwood Rangka
Kayu Kuat Kelas II (Mahoni)
c.
Sealant
d.
Kunci Tanam
e.
Engsel Pintu
f.
Karet
g.
Kaca Polos 5 mm
h.
Engsel Casemet 16"
i.
Rambuncis
j.
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
TB A.106 1 BH KUSEN ALUMUNIUM & DAUN PINTU P2
a.
Kusen Aluminium 1 3/4 x 4"
b.
Daun Pintu Double Teakwood Rangka
Kayu Kuat Kelas II (Mahoni)
c.
Sealant
d.
Kunci Tanam
e.
Engsel Pintu
f.
Karet
g.
Kaca Polos 5 mm
h.
Engsel Casemet 16"
i.
Rambuncis
j.
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

6.7000
1.6800

M'
M2

85,000.00
332,970.00

569,500.00
559,389.60

13.4000
1.0000
3.0000
4.6000
0.3300

M'
Bh
Bh
M'
M2
Ps
Bh
Lot

8,000.00
62,500.00
16,750.00
3,000.00
88,550.00
145,540.00
10,000.00
1,391,861.10

107,200.00
62,500.00
50,250.00
13,800.00
29,221.50
1,391,861.10
139,186.11
1,531,047.21
1,531,047.00

0.0000
10.0000 %

TB A.106 1 BH KUSEN ALUMUNIUM & DAUN PINTU P1 - J2


a.
Kusen Aluminium 1 3/4 x 4"
b.
Daun Pintu Double Teakwood Rangka
Kayu Kuat Kelas II (Mahoni)
c.
Sealant
d.
Kunci Tanam
e.
Engsel Pintu
f.
Daun Jendela Aluminium
g.
Karet
h.
Kaca Polos 5 mm

1,391,861.10

6.6000
1.5750

M'
M2

85,000.00
332,970.00

561,000.00
524,427.75

13.2000
1.0000
3.0000
4.4000
0.3300

M'
Bh
Bh
M'
M2
Ps
Bh
Lot

8,000.00
62,500.00
16,750.00
3,000.00
88,550.00
145,540.00
10,000.00
1,346,199.25

105,600.00
62,500.00
50,250.00
13,200.00
29,221.50
1,346,199.25
134,619.93
1,480,819.18
1,480,819.00

0.0000
10.0000 %

1,346,199.25

7.9000
2.9400

M'
M2

85,000.00
332,970.00

671,500.00
978,931.80

15.8000
1.0000
6.0000
8.2000
0.6400

M'
Bh
Bh
M'
M2
Ps
Bh
Lot

8,000.00
62,500.00
16,750.00
3,000.00
88,550.00
145,540.00
10,000.00
2,021,103.80

126,400.00
62,500.00
100,500.00
24,600.00
56,672.00
2,021,103.80
202,110.38
2,223,214.18
2,223,214.00

0.0000
=

10.0000 %

2,021,103.80

14.8000
1.6800

M'
M2

85,000.00
332,970.00

1,258,000.00
559,389.60

17.6000
1.0000
3.0000
2.0800
28.0400
2.2800

M'
Bh
Bh
M'
M'
M2

8,000.00
62,500.00
16,750.00
75,000.00
3,000.00
88,550.00

140,800.00
62,500.00
50,250.00
156,000.00
84,120.00
201,894.00

i.
j.
k.

TB A. 106
a.
b.
c.
d.
e.
f.
g.
h.

TB A. 106
a.
b.
c.
d.
e.
f.
g.
h.

TB A. 106
a.
b.
c.
d.
e.
f.
g.
h.

TB A. 106
a.
b.
c.
d.
e.

Engsel Casemet 16"


Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

2.0000
2.0000
0.0000
=

1 BH KUSEN ALUMINIUM & DAUN JENDELA J2 - A


Kusen Aluminium 1 3/4 x 4"
Daun Jendela Aluminium
Karet
Sealant
Kaca Polos 5 mm
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN ALUMINIUM & DAUN JENDELA J2 - B
Kusen Aluminium 1 3/4 x 4"
Daun Jendela Aluminium
Karet
Sealant
Kaca Polos 5 mm
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN ALUMINIUM & DAUN JENDELA J3
Kusen Aluminium 1 3/4 x 4"
Daun Jendela Aluminium
Karet
Sealant
Kaca Polos 5 mm
Engsel Casemet 16"
Rambuncis
Upah Pasang
Jumlah
Keuntungan Max.
=
Jumlah
Dibulatkan
1 BH KUSEN ALUMINIUM BV
Kusen Aluminium 1 3/4 x 4"
Karet
Sealant
Kaca Polos 5 mm
Upah Pasang
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

10.0000 %

10.2000
4.1600
23.4400
14.2000
1.8700
2.0000
2.0000
0.0000

10.2000
2.0400
23.4400
14.2000
2.0300
2.0000
2.0000
0.0000

M'
M'
M'
M'
M2
Ps
Bh
Lot

M'
M'
M'
M'
M2
Ps
Bh
Lot

10.0000 %

1,839,588.50

85,000.00
75,000.00
3,000.00
8,000.00
88,550.00
145,540.00
10,000.00
1,694,756.50
x

M'
M'
M'
M'
M2
Ps
Bh
Lot

10.0000 %

2,824,033.60

85,000.00
75,000.00
3,000.00
8,000.00
88,550.00
145,540.00
10,000.00
1,839,588.50
x

10.0000 %

13.1000
1.6800
25.2400
16.0000
2.7000
2.0000
2.0000
0.0000

145,540.00
10,000.00
2,824,033.60
x

10.0000 %

2.6000
4.8000
5.6000
0.3000
0.0000
=

Ps
Bh
Lot

1,694,756.50

85,000.00
75,000.00
3,000.00
8,000.00
88,550.00
145,540.00
10,000.00
1,993,385.00
x

M'
M'
M'
M2
Lot

1,993,385.00

85,000.00
3,000.00
8,000.00
88,550.00
306,765.00
x

306,765.00

291,080.00
20,000.00
2,824,033.60
282,403.36
3,106,436.96
3,106,436.00

867,000.00
312,000.00
70,320.00
113,600.00
165,588.50
291,080.00
20,000.00
1,839,588.50
183,958.85
2,023,547.35
2,023,547.00

867,000.00
153,000.00
70,320.00
113,600.00
179,756.50
291,080.00
20,000.00
1,694,756.50
169,475.65
1,864,232.15
1,864,232.00

1,113,500.00
126,000.00
75,720.00
128,000.00
239,085.00
291,080.00
20,000.00
1,993,385.00
199,338.50
2,192,723.50
2,192,723.00

221,000.00
14,400.00
44,800.00
26,565.00
306,765.00
30,676.50
337,441.50
337,441.00

ada 4 bh

ada 2 bh

ada 1 bh

ada 1 bh

ada 1 bh

ada 7 bh

ada 2 bh

ada 3 bh