MUNICIPALIDAD PROVINCIAL DE CHINCHA

RESUMEN DE METRADOS
PONTON 6.60M

CODIGO

NOMBRE DE LA PARTIDA

UNIDAD

METRADO

01.00.00

OBRAS PROVISIONALES

01.01.00

CARTEL DE OBRA

Und

1.00

01.02.00

ALMACN DE OBRA

Glb

1.00

01.03.00

MOVILIZACION DE MAQUINARIA, EQUIPOS Y HERRAMIENTAS A OBRA

Glb

1.00

02.00.00

TRABAJOS PRELIMINARES

02.01.00

RETIRO DE DESECHOS

M3

60.00

02.02.00

LIMPIEZA DE TERRENO MANUAL

M2

60.00

02.03.00

TRAZO Y REPLANTEO

M2

56.22

03.00.00

MOVIMIENTO DE TIERRAS

03.01.00

EXCAVACION PARA CIMIENTOS TERRENO NORMAL

M3

161.55

03.02.00

RELLENO COMPACTADO CON MATERIAL PROPIO

M3

64.50

03.03.00

ELIMINACIN DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

137.43

04.00.00

OBRAS DE CONCRETO SIMPLE


SUBESTRUCTURA ( CIMIENTO, ESTRIBO Y ALAS ESTRIBO)

04.01.00

CONCRETO F'C 100 KG/CM2.PARA SOLADOS E=0.10M

M3

4.10

04.02.00

CONCRETO CICLPEO F'C 140 KG/CM2.PARA CIMIENTO

M3

38.39

04.03.00

CONCRETO CICLPEO F'C 140 KG/CM2.PARA ESTRIBO

M3

28.32

04.04.00

CONCRETO CICLPEO F'C 140 KG/CM2.PARA ALAS ESTRIBO

M3

3.92

04.05.00

ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTO

M2

55.24

04.06.00

ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRIBO

M2

92.30

04.07.00

ENCOFRADO Y DESENCOFRADO NORMAL PARA ALA ESTRIBO

M2

32.88

05.00.00

OBRAS DE CONCRETO ARMADO


16.63

SUPERESTRUCTURA (LOSAS Y VIGAS)


05.01.00

CONCRETO F'C 280 KG/CM2. PARA LOSAS

M3

05.02.00

CONCRETO F'C 280 KG/CM2. PARA VIGAS SARDINEL

M3

7.11

05.03.00

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS

M2

50.40

05.04.00

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS SARDINEL

M2

22.17

05.05.00

ACERO GRADO 60 FY = 4,200KG/CM2. PARA LOSAS

Kg

1,557.36

05.06.00

ACERO GRADO 60 FY = 4,200KG/CM2. PARA VIGAS SARDINEL

Kg

1,707.84

06.00.00

APOYO MOVIL

06.01.00

NEOPRENO D60 150X300X15MM

Und

52.00

07.00.00

VARIOS

07.01.00

BARANDA DE HIERRO H=1.00M (SEGN DISEO)

Ml

13.20

07.02.00

JUNTAS ASFALTICAS E=1"

Ml

26.00

MUNICIPALIDAD PROVINCIAL DE CHINCHA

PLANILLA DE METRADOS
CONSTRUCCION DEL PONTON EL SECTOR DOS PUENTES
OBRA : CHINCHA ALTA
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE CHINCHA
LUGAR : CHINCHA ALTA
FECHA : 15/09/2013
ITEM

DESCRIPCION

UNIDAD

01.00.00

OBRAS PROVISIONALES

01.01.00

CARTEL DE OBRA

Und

01.02.00

ALMACN DE OBRA

Glb

01.03.00

MOVILIZACION DE MAQUINARIA, EQUIPOS Y HERRAMIENTAS A OBRA

PARCIAL

TOTAL

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

TRABAJOS PRELIMINARES

02.01.00

RETIRO DE DESECHOS

M3

02.02.00

LIMPIEZA DE TERRENO MANUAL

M2

TRAZO Y REPLANTEO

03.00.00

MOVIMIENTO DE TIERRAS

03.01.00

EXCAVACION PARA CIMIENTOS TERRENO NORMAL

LARGO

ANCHO

ALTURA

Glb

02.00.00

02.03.00

DIMENSIONES

N
VECES

1.00

10.00

6.00

60.00

60.00

1.00

10.00

6.00

1.00

60.00

60.00

1.00

28.11

2.00

56.22

M2

Solado

2.00

28.11

0.10

5.62

Cimiento, Estribo

2.00

28.11

1.75

98.39

Aletas

4.00

8.22

1.75

57.54

2.00

32.25

1.00

64.50

03.02.00

RELLENO COMPACTADO CON MATERIAL PROPIO

03.03.00

ELIMINACIN DE MATERIAL EXCEDENTE CON MAQUINARIA

04.00.00

OBRAS DE CONCRETO SIMPLE

64.50

M3

Cimiento, Estribo y Alas

56.22
161.55

M3

137.43

M3

1.00

137.43

137.43

2.00

2.05

4.10

SUBESTRUCTURA ( CIMIENTO, ESTRIBO Y ALAS ESTRIBO)


04.01.00

CONCRETO F'C 100 KG/CM2.PARA SOLADOS E=0.10M

M3

04.02.00

CONCRETO CICLPEO F'C 140 KG/CM2.PARA CIMIENTO

M3

04.03.00

CONCRETO CICLPEO F'C 140 KG/CM2.PARA ESTRIBO

M3

04.04.00

CONCRETO CICLPEO F'C 140 KG/CM2.PARA ALAS ESTRIBO

M3

04.05.00

ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTO

M2

04.06.00

ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRIBO

M2

04.07.00

ENCOFRADO Y DESENCOFRADO NORMAL PARA ALA ESTRIBO

05.00.00

OBRAS DE CONCRETO ARMADO

4.10
38.39
1.00

38.39

38.39

2.00

14.16

28.32

4.00

0.98

3.92

28.32
3.92
55.24
1.00

55.24

55.24

2.00

46.15

92.30

4.00

8.22

32.88

92.30
32.88

M2

SUPERESTRUCTURA (LOSAS Y VIGAS)


05.01.00

CONCRETO F'C 280 KG/CM2. PARA LOSAS

M3

05.02.00

CONCRETO F'C 280 KG/CM2. PARA VIGAS SARDINEL

M3

05.03.00

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS

M2

05.04.00

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS SARDINEL

M2

05.05.00

ACERO GRADO 60 FY = 4,200KG/CM2. PARA LOSAS

Kg

05.06.00

ACERO GRADO 60 FY = 4,200KG/CM2. PARA VIGAS SARDINEL

Kg

06.00.00

APOYO MOVIL

06.01.00

NEOPRENO D60 150X300X15MM

07.00.00

VARIOS

07.01.00

BARANDA DE HIERRO H=1.00M (SEGN DISEO)

Ml

07.02.00

JUNTAS ASFALTICAS E=1"

Ml

16.63
1.00

6.60

7.20

0.35

16.63
7.11

7.11

1.00

7.11
50.40

1.00

50.40

50.40

1.00

22.17

22.17

22.17
1557.36
1.00

1557.36

1.00

1707.84

1.00

52.00

1707.84

52.00

Und

13.20
1.00

13.20

13.20

1.00

26.00

26.00

26.00

HOJA DE METRADOS ACERO DE REFUERZO


PONTON L = 6.60 m.
REFUERZO EN LA LOSA
TIPO

DESCRIPCION

L1

LONG/PIEZA

BARRA/PIEZA

CANTIDAD

0.20

5/8"

9.30

1.03

60

0.15

3/8"

9.20

1.02

58

0.15

1/2"

6.80

0.76

33

0.15

3/8"

6.80

0.76

26

1/2"

1.82

2/9

62

3/8"

1.36

1/6

64

3/8"

13.4

1 3/6

28

LONG/PIEZA

BARRA/PIEZA

CANTIDAD

3/4"

7.54

0.84

20

3/4"

6.94

0.77

12

1/2"

6.94

0.77

1/2"

6.94

0.77

RESTO

8.90
8.90
L2

L3
6.50
6.50
L4

0.79
L5

0.39

0.39

0.25

L6

0.39
0.19
13.40

L7

REFUERZO EN VIGAS SARDINEL


TIPO

DESCRIPCION
6.02
0.40

V1
Traslape 0.36 m
Acero de traslape : 0.36x2=0.72m
6.02
V2
Traslape 0.36 m
Acero de traslape : 0.36x2=0.72m
6.02
V3
Traslape 0.36 m
Acero de traslape : 0.36x2=0.72m
6.02
V4
Traslape 0.36 m
Acero de traslape : 0.36x2=0.72m

RESTO

6.02
0.40

V5

1/2"

8.34

0.93

3/8"

1.66

0.18

168

3/8"
0.56
84.00
168.00
252.00
1270.08

1/2"
1.00
33.00
24.00
57.00
513.00

5/8"
1.55
60.00

3/4"
2.24

60.00
837.00

32.00
645.12

Traslape 0.36 m
Acero de traslape : 0.36x2=0.72m
0.10
V6

0.48
0.25

RESUMEN DE ARMADURA
DESCRIPCION
Peso (Kg/m)
LOSA
VIGA SARDINEL
TOTAL VARILLAS
KG

TOTAL

32.00

3,265.20

TOTAL EN KG.
POR ELEMENTO
1557.36
1707.84

kg

HOJA DE METRADOS encofrado y desencofrado


PONTON L = 6.60 m.
FIGURA
.05

0.85

DESCRIPCION

LONG. 1

LONG. 2

LONG. PROM.

ANCHO

ALTURA

No. VECES

TOTAL

VIGA SARDINEL

0.25

LADO EXTERIOR

6.60

1.50

2.00

LADO INTERIOR

6.60

0.05

2.00

0.48

0.90

4.00

TAPAS

0.35

0.60

0.35

19.80
0.66
1.71

0.35

22.17

LOSA
FONDO

6.60

LATERAL

7.20

7.20

1.00
0.20

47.52

2.00

2.88
50.40

CIMIENTO
8.90

1.00

2.00

17.80

8.20

1.00

2.00

16.40

2.82

1.00

4.00

11.28

1.89

1.00

4.00

1.10

1.00

2.00

7.56
2.20
55.24

0.40

0.20
ESTRIBO M.I.

2.01

2.40

0.40

L1

9.00

2.4000

1.00

L2

9.00

0.4000

1.00

3.60

L3

9.00

2.0100

1.00

18.09

L4

0.40

0.2000

2.00

0.16

0.68

2.0000

2.00

L5

0.60

0.75

21.60

2.70
46.15

ESTRIBO M.D.

0.35

1.00

0.90

L1

9.00

2.4000

1.00

L2

9.00

0.4000

1.00

3.60

L3

9.00

2.0100

1.00

18.09

L4

0.40

0.2000

2.00

0.16

0.68

2.0000

2.00

L5

0.60

0.75

ALA

0.88
0.27

DESCRIPCION

17

1.38

2.20

1.

ANCHO1

ANCHO2

PROMEDIO

ALTO

1.71

1.38

N DE VECES N DE ELMENTOS
2.00

4.00

TOTAL
18.88

1.71

0.88

1.30

0.82

2.00

4.00

8.50

0.20

0.29

0.25

1.17

1.00

4.00

1.15

0.20

1.38

1.00

4.00

1.10

0.37

2.20

1.00

4.00

1.71

3.26
32.88

0.37

0.88
0.20

2.70
46.15

2.00

1.17

21.60

RESUMEN DE METRADOS - ENCOFRADOS


ENCOFRADO

CANTIDAD
M2

VIGA SARDINEL
LOSA
CIMIENTO
ESTRIBO M.I.
ESTRIBO M.D.
ALA (MI Y MD)

Encofrado total

22.17
50.40
55.24
46.15
46.15
32.88
252.99

HOJA DE METRADOS excavacion para estructuras


PONTON L = 6.60 m.
DESCRIPCION

BASE1

BASE2

BASE PROM.

ANCHO

No. Veces

AREA

ALTO

VOLUMEN

MARGEN IZQUIERDA
A1

8.20

9.80

A2
A3

9.00

2.00

1.00

18.00

1.75

2.15

0.38

2.00

1.61

1.75

31.50
2.82

1.10

1.78

1.44

2.95

2.00

8.50

1.75

14.87

8.20

9.80

9.00

2.00

1.00

18.00

1.75

31.50

1.78

2.15
1.44

0.38
2.95

2.00
2.00

1.61
8.50

1.75
1.75

2.82
14.87

MARGEN DERECHA
A1
A2
A3

1.10

98.38

HOJA DE METRADOS relleno de estructuras


PONTON L = 6.60 m.
DESCRIPCION

LARGO 1

LARGO 2

LARGO PROM.

ANCHO

No. Veces

AREA

ALTO

VOLUMEN

MARGEN IZQUIERDA
Z1

8.20

9.80

9.00

2.00

1.00

18.00

1.75

31.50

Volumen Zapata

8.20

9.80

9.00

2.00

-1.00

-18.00

1.00

-18.00

Volumen Estribo

0.75

0.69

-4.86

0.72

0.75

-1.00

-0.54

9.00

Z2

2.15

0.38

2.00

1.61

3.20

5.16

Volumen Zapata

2.15

0.38

-2.00

-1.61

1.00

-1.61

Volumen Ala

0.29

0.37

0.33

0.88

-2.00

-0.58

2.20

-1.28

Z3

1.10

1.78

1.44

1.87

2.00

5.39

3.20

17.23

Volumen Zapata

1.10

1.78

1.44

1.87

-2.00

-5.39

1.00

-5.39

Volumen Ala

0.20

0.29

0.25

1.17

-2.00

-0.57

2.20

-1.26
21.50

MARGEN DERECHA
Z1

8.20

9.80

9.00

2.00

1.00

18.00

1.75

31.50

Volumen Zapata

8.20

9.80

9.00

2.00

-1.00

-18.00

1.00

-18.00

Volumen Estribo

0.75

0.69

-4.86

0.72

0.75

-1.00

-0.54

9.00

Z2

2.15

0.38

2.00

1.61

3.20

5.16

Volumen Zapata

2.15

0.38

-2.00

-1.61

1.00

-1.61

Volumen Ala

0.29

0.37

0.33

0.88

-2.00

-0.58

2.20

-1.28

Z3

1.10

1.78

1.44

1.87

2.00

5.39

3.20

17.23

Volumen Zapata

1.10

1.78

1.44

1.87

-2.00

-5.39

1.00

-5.39

Volumen Ala

0.20

0.29

0.25

1.17

-2.00

-0.57

2.20

-1.26
64.49

HOJA DE METRADOS CONCRETO


PONTN CONCRETO L = 6.60 m.

LOSA Y VIGA SARDINEL


0.85

.05
VIGA SARDINEL
ALTO
ANCHO
0.60
0.90
0.05
0.03

0.25
0.35

LOSA
ALTO
0.35

ANCHO
7.20

ALA DE ESTRIBO

LARGO
6.60
6.60

LONGITUD VOLUMEN No. VECES VOLUMEN


6.60
16.63
1.00
16.63
16.63

SOLADO CIMIENTO
ESPESOR ANCHO1
0.100
2.00
0.100
2.15
0.100
1.78

0.88
0.27

17

1.38

2.20

1.

CIMIENTO
ALTURA
1.00
1.00
1.00

VOLUMEN No. VECES VOLUMEN


3.56
2.00
7.13
0.01
-2.00
-0.02
7.11

ANCHO1
2.00
2.15
1.78

ANCHO2 PROMEDIO LONGITUD VOLUMEN No. VECES VOLUMEN


2.00
2.00
8.20
1.64
2.00
3.28
0.75
1.45
0.15
2.00
0.29
1.10
1.44
1.87
0.27
2.00
0.54
2.05
Total
4.11

ANCHO2 PROMEDIO LONGITUD VOLUMEN No. VECES VOLUMEN


2.00
2.00
8.20
16.40
2.00
32.80
0.75
1.45
1.45
2.00
2.90
1.10
1.44
1.87
2.69
1.00
2.69
Total
38.39

1.71

1.17

0.37

0.20

0.88

ALAS ESTRIBO
ALTO
ANCHO1
1.38
1.71
0.82
1.71

ANCHO2 PROMEDIO LONGITUD VOLUMEN No. VECES VOLUMEN


1.71
1.71
0.29
0.67
4.00
2.69
0.88
1.30
0.29
0.30
4.00
1.21
0.98
Total
3.90

CIMIENTO Y ESTRIBO

0.20

0.40

ESTRIBO
ALTO
0.400
2.000

ANCHO1
0.200
0.600

ANCHO2 PROMEDIO LONGITUD VOLUMEN No. VECES VOLUMEN


0.200
0.2000
9.90
0.79
2.00
1.58
0.750
0.6750
9.90
13.37
2.00
26.73
14.16
Total
28.31

2.01

2.40

0.40

0.35

1.00

0.90

2.00

RESUMEN
DESCRIPCION
(Kg/cm2)
VIGA SARDINEL
LOSA
SOLADO ZAPATA
ZAPATA
ALAS ESTRIBO
ESTRIBO
CONCRETO

f'c=
280
7.11
16.63

23.74

f'c=
100

4.11
38.39
3.90
28.31
74.72

M3

HOJA DE METRADOS BARANDAS METALICAS


PONTON L = 6.60 m.
DESCRIPCION
1.00 PONTON

LONGITUD
ML

ANCHO

ALTURA

6.60

2.00

TOTAL ML
TUBOS DE FoGo d=4"
TUBOS DE FoGo d=3"
PLACHA DE Fo e=1/2" 270MM x 220MM
Pernos d=1"
PLANCHA DE Fo e=3/8" A=120 MM

ML
ML
M2
Und
ML

86.00
43.00
1.66
112.00
29.40

No. VECES

TOTAL
13.20

13.20