NO

JENIS PEKERJAAN

BAHAN
Kayu papan borneo
Paku 2" - 5"

BAHAN
Tanah urug

Org
0.1000
Org
0.0500
TOTAL UPAH

30,000.00
50,000.00

3,000.00
2,500.00
5,500.00

5,500.00

Org
Org
Org
Org
TOTAL UPAH

0.0300
0.0900
0.0090
0.0020

m3
0.0100
kg
0.0100
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

900.00
3,600.00
450.00
100.00
5,050.00

5,050.00

30,000.00
50,000.00

300.00
500.00
800.00

800.00

Org
0.7500
Org
0.0250
TOTAL UPAH

30,000.00
50,000.00

22,500.00
1,250.00
23,750.00

23,750.00

Org
0.3000
Org
0.0100
TOTAL UPAH

30,000.00
50,000.00

9,000.00
500.00
9,500.00

9,500.00

m3
1.2000
TOTAL BAHAN

55,000.00

66,000.00
66,000.00

66,000.00

9,000.00
500.00
9,500.00

9,500.00

78,000.00
78,000.00

78,000.00

PEKERJAAN URUGAN PASIR / M3


UPAH
Pekerja
Mandor

BAHAN
Pasir urug

TOTAL

PEKERJAAN URUGAN TANAH / M3


UPAH
Pekerja
Mandor

JUMLAH
HARGA

PEKERJAAN GALIAN TANAH BIASA / M3


UPAH
Pekerja
Mandor

HARGA

PEKERJAAN PENGUKURAN DAN PEMASANGAN BOUWPLANK / M'


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

KOEFISIEN

PEKERJAAN PEMBERSIHAN LAHAN (LOKASI PEKERJAAN) / M 2


UPAH
Pekerja
Mandor

SATUAN

Org
0.3000
Org
0.0100
TOTAL UPAH

30,000.00
50,000.00

m3
1.2000
TOTAL BAHAN

65,000.00

PEKERJAAN PASANGAN BATU KALI 1:4 / M3


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

Org
Org
Org
Org

3.6000
1.2000
0.1200
0.1800

30,000.00
40,000.00
50,000.00
50,000.00

108,000.00
48,000.00
6,000.00
9,000.00

TOTAL UPAH
BAHAN
Batu belah
Semen 50 kg
Pasir pasang

BAHAN
Batu bata
Pasir pasang
Semen 50 kg

BAHAN
Batu bata
Pasir pasang
Semen 50 kg

#REF!
135,408.00
39,150.00
#REF!

#REF!

Org
Org
Org
Org
TOTAL UPAH

4.5000
1.5000
0.1500
0.2250

bh
450.0000
m3
0.4220
Zak
2.1040
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

300.00
75,000.00
42,000.00

135,000.00
60,000.00
7,500.00
11,250.00
213,750.00

213,750.00

135,000.00
31,650.00
88,368.00
255,018.00

255,018.00

Org
Org
Org
Org
TOTAL UPAH

7.5000
2.5000
0.2500
0.3750

bh
450.0000
m3
0.4220
Zak
2.1040
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

225,000.00
100,000.00
12,500.00
18,750.00
356,250.00

356,250.00

300.00
75,000.00
42,000.00

135,000.00
31,650.00
88,368.00
255,018.00

255,018.00

12,000.00
8,000.00
1,000.00
1,000.00
22,000.00

22,000.00

1,567.50
5,443.20
7,010.70

7,010.70

19,980.00
13,320.00
1,650.00
1,650.00
36,600.00

36,600.00

PEKERJAAN PLESTERAN 1:4 < 5 M / M2


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Pasir pasang
Semen 50 kg

10

#REF!
42,000.00
75,000.00

PEKERJAAN PASANGAN BATA 1:4 > 5 M / M3


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

m3
1.2000
sak
3.2240
m3
0.5220
TOTAL BAHAN

171,000.00

PEKERJAAN PASANGAN BATA 1:4 < 5 M / M3


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

171,000.00

Org
Org
Org
Org
TOTAL UPAH

0.4000
0.2000
0.0200
0.0200

m3
0.0209
Zak
0.1296
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

75,000.00
42,000.00

PEKERJAAN PLESTERAN 1:4 > 5 M / M2


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Pasir pasang
Semen 50 kg

Org
Org
Org
Org
TOTAL UPAH

m3
Zak

0.6660
0.3330
0.0330
0.0330

0.0209
0.1296

30,000.00
40,000.00
50,000.00
50,000.00

75,000.00
42,000.00

1,567.50
5,443.20

TOTAL BAHAN
11

BAHAN
Roster 20 x 20 cm
Pasir pasang
Semen 50 kg

BAHAN
Kayu papan borneo
Paku 2" - 5"

BAHAN
Besi beton
Kawat beton

bh
25.0000
m3
0.0210
Zak
0.1620
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

15,000.00
10,000.00
1,250.00
1,250.00
27,500.00

27,500.00

#REF!
75,000.00
42,000.00

#REF!
1,575.00
6,804.00
#REF!

#REF!

Org
Org
Org
Org
TOTAL UPAH

0.2000
0.5000
0.0500
0.0100

m3
0.0400
kg
0.4000
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

3,000,000.00
10,000.00

6,000.00
20,000.00
2,500.00
500.00
29,000.00

29,000.00

120,000.00
4,000.00
124,000.00

124,000.00

Org
0.0660
TOTAL UPAH

40,000.00

2,640.00
2,640.00

2,640.00

kg
1.1000
kg
0.0200
TOTAL BAHAN

7,000.00
10,000.00

7,700.00
200.00
7,900.00

7,900.00

180,000.00
20,000.00
2,500.00
15,000.00
217,500.00

217,500.00

PEKERJAAN COR BETON 1 pc : 3 ps : 5 split / M3


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Semen 50 kg
Pasir beton
Split 2/3 cm

15

0.5000
0.2500
0.0250
0.0250

PEKERJAAN STEL BESI BETON / KG


UPAH
Tukang besi

14

Org
Org
Org
Org
TOTAL UPAH

PEKERJAAN BEKISTING BETON / M2


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

13

7,010.70

PEKERJAAN PASANG ROSTER / M2


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

12

7,010.70

Org
Org
Org
Org
TOTAL UPAH

6.0000
0.5000
0.0500
0.3000

sak
4.5400
m3
0.5400
m3
0.9100
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

42,000.00
75,000.00
160,000.00

190,680.00
145,600.00
336,280.00

PEKERJAAN COR BETON 1 pc : 2 ps : 3 split / M3


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

Org
Org
Org
Org

6.0000
1.0000
0.1000
0.3000

30,000.00
40,000.00
50,000.00
50,000.00

180,000.00
40,000.00
5,000.00
15,000.00

336,280.00

TOTAL UPAH
BAHAN
Semen 50 kg
Pasir beton
Split 2/3 cm

16

BAHAN
Kayu dolken 10 cm @ 4 m
Paku 2" - 5"

BAHAN
Kayu dolken 10 cm @ 4 m
Paku 2" - 5"

129,600.00
415,200.00

415,200.00

Org
0.4000
TOTAL UPAH

30,000.00

12,000.00
12,000.00

12,000.00

Org
8.0000
Org
24.0000
Org
2.4000
Org
0.4000
TOTAL UPAH

30,000.00
40,000.00
50,000.00
50,000.00

240,000.00
960,000.00
120,000.00
20,000.00
1,340,000.00

1,340,000.00

m3
1.1000
kg
2.5000
TOTAL BAHAN

#REF!
10,000.00

#REF!
#REF!

#REF!

Org
5.0000
Org
15.0000
Org
1.5000
Org
0.2500
TOTAL UPAH

30,000.00
40,000.00
50,000.00
50,000.00

m3
1.1000
kg
2.5000
TOTAL BAHAN

#REF!
10,000.00

150,000.00
600,000.00
75,000.00
12,500.00
837,500.00

837,500.00

#REF!
#REF!

#REF!

PEKERJAAN MEMBUAT DAN PASANG KUSEN KAYU JATI JAWA BARAT / M3


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Kayu balok jati Jabar
Paku 2" - 5"

20

285,600.00

PEKERJAAN STEL GORDING KAYU DOLKEN 5 CM / M3


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

19

42,000.00
75,000.00
160,000.00

PEKERJAAN STEL KUDA-KUDA KAYU DOLKEN 10 CM BENTANG 5 - 7 M / M3


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

18

sak
6.8000
m3
0.5400
m3
0.8100
TOTAL BAHAN

240,000.00

PEKERJAAN BONGKAR BEKISTING / M3


UPAH
Pekerja

17

240,000.00

Org
12.0000
Org
36.0000
Org
3.6000
Org
0.6000
TOTAL UPAH

30,000.00
40,000.00
50,000.00
50,000.00

m3
1.1000
kg
0.2000
TOTAL BAHAN

#REF!
10,000.00

360,000.00
1,440,000.00
180,000.00
30,000.00
2,010,000.00

2,010,000.00

#REF!
#REF!

#REF!

PEKERJAAN MEMBUAT DAN PASANG DAUN PINTU RANGKA KAYU BALAU LAPIS TEAKWOOD DOUBLE /
M2
UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

Org
Org
Org
Org

0.7800
2.4000
0.2400
0.0390

30,000.00
40,000.00
50,000.00
50,000.00

23,400.00
96,000.00
12,000.00
1,950.00

TOTAL UPAH
BAHAN
Kayu papan balau
Lem Fox
Teakwood lebar 90 cm

21

BAHAN
Kayu papan jati Jabar

BAHAN
Kayu papan balau
Lem Fox

BAHAN
Kayu papan balau
Paku 2" - 5"

Org
Org
Org
Org
TOTAL UPAH

2.0000
6.0000
0.6000
0.1000

30,000.00
40,000.00
50,000.00
50,000.00

m3
0.0440
TOTAL BAHAN

60,000.00
240,000.00
30,000.00
5,000.00
335,000.00

335,000.00

Org
Org
Org
Org
TOTAL UPAH

0.6667
2.0000
0.2000
0.0333

30,000.00
40,000.00
50,000.00
50,000.00

m3
0.0330
Kg
0.1000
TOTAL BAHAN

20,000.00
80,000.00
10,000.00
1,666.67
111,666.67

111,666.67

Org
Org
Org
Org
TOTAL UPAH

0.2800
0.8000
0.0800
0.0140

30,000.00
40,000.00
50,000.00
50,000.00

m3
0.0360
kg
0.1000
TOTAL BAHAN

8,400.00
32,000.00
4,000.00
700.00
45,100.00

45,100.00

PEKERJAAN MEMBUAT RANGKA PLAFOND / M2


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Kayu borneo balok
Paku 2" - 5"

25

PEKERJAAN MEMBUAT DAN PASANG LISPLANK / M2


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

24

PEKERJAAN MEMBUAT DAN PASANG DAUN JENDELA KACA / M2


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

23

m3
0.0135
Kg
0.2500
Lb
1.2500
TOTAL BAHAN

133,350.00

PEKERJAAN MEMBUAT DAN PASANG DAUN PINTU PANEL KAYU JATI JAWA BARAT / M2
UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

22

133,350.00

Org
Org
Org
Org
TOTAL UPAH

0.1000
0.3000
0.0300
0.0050

m3
0.0130
kg
0.2500
TOTAL BAHAN

PEKERJAAN PASANG LAPISAN PLAFOND / M2

30,000.00
40,000.00
50,000.00
50,000.00

3,000.00
12,000.00
1,500.00
250.00
16,750.00

16,750.00

UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
GRC t. 4 mm
Paku 2" - 5"

26

Org
Org
Org
Org
TOTAL UPAH

0.0420
0.1200
0.0120
0.0021

30,000.00
40,000.00
50,000.00
50,000.00

m2
1.0000
kg
0.0200
TOTAL BAHAN

1,260.00
4,800.00
600.00
105.00
6,765.00

6,765.00

PEKERJAAN PASANG ATAP GENTENG / M2


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
GRC t. 4 mm
Paku 2" - 5"

Org
Org
Org
Org
TOTAL UPAH

0.0420
0.1200
0.0120
0.0021

m2
1.0000
kg
0.0200
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

1,260.00
4,800.00
600.00
105.00
6,765.00

6,765.00

BONGKAR TAMAN
Bongkar pasangan bata
Samping tangga
=

0.35

3.60

2.00

6.00 =

15.12 m2

17.00

1.00

1.00 =

5.95 m2

7.00

1.00

1.00 =

2.45 m2

20.00

1.00

1.00 =

8.00 m2

15.00

1.00

1.00 =

6.00 m2

Dekat kolam anak (besar)


=

0.35

Dekat kolam anak (kecil)


=

0.35

Dekat stopkran
=

0.40

Dekat kolam dewasa


=

0.40

Jumlah

37.52 m2

BONGKAR SHOWER
Bongkar pasangan bata
Batas keliling
=

0.25

9.00

1.00

1.00 =

2.25 m2

2.60

0.22

0.22

0.12 =

1.05 m2

Tiang
=

Jumlah

3.30 m2

BONGKAR BANGKU BETON


Bongkar pasangan bata
Kecil
=
=

2.00
0.30

x
x

0.60
0.60

x
x

0.10
0.15

x
x

4.00 =
12.00 =

0.48 m3
0.32 m3

3.00
0.30

x
x

0.60
0.60

x
x

0.10
0.15

x
x

2.00 =
6.00 =
Jumlah

0.36 m3
0.16 m3
1.33 m3

Besar
=
=

BONGKAR TEMBOK KELILING KURANGI KETINGGIAN


Bongkar pasangan bata
=

136.00

0.40

54.40 m2

0.30
1.40
1.40

=
=
=
=

40.80
10.50
16.80
68.10

Bongkar keramik
=
=
=

136.00
7.50
12.00

x
x
x

Jumlah

m2
m2
m2
m2

BONGKAR PARIT KELILING


Bongkar pasangan bata
=

135.00

0.20

2.00

1.00 =
Jumlah

54.00 m2
54.00 m2

0.05

1.00 =
Jumlah

3.38 m3
3.38 m3

=
=

38.43 m2
38.43 m2

5.00 =

0.12 m3

0.12 =

0.72 m3

Bongkar beton penutup parit


=

135.00

0.50

BONGKAR TANGGA
Bongkar keramik (7 unit)
= {(0.63+0.075)*2+3.4*1.2}*7
Jumlah
Bongkar cor lantai (6 unit)
=

0.40

1.20

Jumlah

0.05

6x

Bongkar pasangan bata (6 unit)


=
=
=
=
=

1.035
0.250
0.300
0.550
0.250

x
x
x
x
x

2.00
1.20
1.20
1.20
1.20

=
=
=
=
=
Jumlah

Jumlah

6x

3.69 =

2.07
0.30
0.36
0.66
0.30
3.69

m2
m2
m2
m2
m2
m2

22.14 m2

Bongkar pasangan bata (6 unit)(asumsi semuanya dari pasangan bata)


=

1.035

1.20

0.12
Jumlah

=
=

10.35 m2
10.35 m2

Jumlah

6x

10.35 =

62.10 m2

617.68 m2

BONGKAR KERAMIK
=
=
=
=
=
=
=
=

1,100.00
389.00
38.00
12.6
55.4
7.4
2.5
2.78

m2
m2
m2
m2
m2
m2
m2
m2

(luas seluruh area)


(luas kolam dewasa)
(luas kolam anak)
(luas tangga)
(luas taman dalam)
(samping parit kolam dewasa)
(samping parit kolam anak)
(papan loncat)
Jumlah (a-b-c-d-e+f+g)

Bongkar Cor untuk dudukan pipa 4"

(a)
(b)
(c )
(d)
(e)
(f)
(g)
(h)

CIPING LANTAI & DINDING


(a) (luas luar kolam dewasa)
(b) (luas dalam kolam dewasa)
(c) (bagian dalam kolam dewasa)
(d) (luas luar kolam anak)
(e) (luas dalam kolam anak)
(f) (bagian dalam kolam anak)
(g) (tembok keliling)
=
136.00 x
0.30
=
7.50 x
1.40
=
12.00 x
1.40
Jumlah (a-b+c+d-e+f+g)

=
=
=
=
=
=
=
=
=
=
=

425.00
389.00
7.40
50.00
38.00
2.50

m2
m2
m2
m2
m2
m2

40.80
10.50
16.80
126.00

m2
m2
m2
m2

URUGAN TANAH
=
=
Jumlah
URUGAN PASIR
=
1100 x
=
50 x
=
465 x

COR LANTAI 1:3:5


=
1100 x
=
50 x
=
465 x

4.4 m3
2.75 m3
7.15 m3

0.1 (seluruh lantai)


0.1 (luas kolam anak + parit)
0.1 (luas kolam dewasa + parit)
Jumlah

=
=
=

110
5
46.5
161.50

m3
m3
m3
m3

0.05 (seluruh lantai)


0.05 (luas kolam anak + parit)
0.05 (luas kolam dewasa + parit)
Jumlah

=
=
=

55
2.5
23.25
80.75

m3
m3
m3
m3

54.40 m2

PASANGAN BATA 1:4


=

136.00

0.40

PASANG KERAMIK LANTAI


(a) (luas seluruh area)
(b) (luas kolam dewasa)
(c ) (luas kolam anak)
Jumlah

=
=
=
=

1,100.00 m2
389.00 m2
38.00 m2
673.00 m2

PASANG KERAMIK DINDING


a
b
c
d
=
=
=
e
=
=

(samping parit kolam dewasa)


(samping parit kolam anak)
(papan loncat)
Dinding samping
136.00 x
0.40
7.50 x
1.40
12.00 x
1.40
Tangga
47 x
1.20
1.20 x
2.00
Jumlah

=
=
=

11.1 m2
3.75 m2
2.78 m2

=
=
=

54.40 m2
10.50 m2
16.80 m2

=
=
=

56.40 m2
2.40 m2
158.13 m2

DAFTAR HARGA UPAH PEKERJA


NO
1
2
3
4
5
6
7
8

JENIS PEKERJA
Pekerja
Tukang
Kepala Tukang
Mandor
Tk.las
Pekerja Las
Sewa mesin las potong
Sewa mesin las sambung

HARGA UPAH
Rp
30,000
Rp
40,000
Rp
50,000
Rp
50,000
Rp
50,000
Rp
40,000
Rp
30,000
Rp
85,000

SATUAN
hari
hari
hari
hari
hari
hari
hari
hari

HARGA BAHAN
Rp 3,000,000
Rp 3,000,000
Rp
10,000
Rp
42,000
Rp
65,000
Rp
65,000
Rp
75,000
Rp
75,000
Rp
55,000
Rp
160,000
Rp
7,000
Rp
10,000
Rp
300
Rp
10,000
Rp
35,000
Rp
21,000
Rp
45,000
Rp
6,000
Rp
95,000
Rp
15,000
Rp
7,000
Rp
240,000
Rp
2,000
Rp
15,000
Rp
140,000
Rp
14,000
Rp
2,000
Rp
5,000
Rp
34,000
Rp
12,000
Rp
2,500
Rp
30,000
Rp
7,000
Rp
7,600
Rp
15,000

SATUAN
m3
m3
kg
sak
sak
m3
m3
m3
m3
m3
kg
kg
bh
m3
m3
kg
m'
bh
m'
bh
bh
bh
bh
bh
bh
m'
bh
bh
kg
ltr
bh
bh
kg
kg
bh

DAFTAR HARGA BAHAN BANGUNAN


NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

JENIS BAHAN BANGUNAN


Kayu papan borneo
Kayu borneo balok
Paku 2" - 5"
Semen 50 kg
Semen putih
Pasir urug
Pasir pasang
Pasir beton
Tanah urug
Split 2/3
Besi beton
Kawat beton
Bata merah
O2
Acetylene
Kawat Las RB
Pipa pvc 4"
Sambungan pvc 4"
Pipa pvc 6"
Sambungan pvc 6"
Lem
Shower S361C san'ei
Siltip
Sambungan
Saringan H-51
Pip.galv. 1/2"
Siltip
Sambungan 1/2"
Cat F-Talit
Thinner
Keramik 20/20
Gembok Globe
L 50.50.5
Besi pelat t. 5 mm
Engsel

60000/24

NO
1

JENIS PEKERJAAN

SATUAN

16,800.00

Org
0.0300
Org
0.0500
TOTAL UPAH

30,000.00
50,000.00

900.00
2,500.00
3,400.00

3,400.00

Org
0.1000
Org
0.0100
TOTAL UPAH

30,000.00
50,000.00

3,000.00
500.00
3,500.00

3,500.00

Org
0.2000
Org
0.0200
TOTAL UPAH

30,000.00
50,000.00

6,000.00
1,000.00
7,000.00

7,000.00

Org
2.0000
Org
0.2000
TOTAL UPAH

30,000.00
50,000.00

60,000.00
10,000.00
70,000.00

70,000.00

Org
Org
Org
Org
Org
TOTAL UPAH

4.2000
3.0000
2.4750
0.3000
0.2000

30,000.00
40,000.00
40,000.00
50,000.00
50,000.00

126,000.00
120,000.00
99,000.00
15,000.00
10,000.00
370,000.00

370,000.00

4,500.00
375.00
4,875.00

4,875.00

600.00
200.00
800.00

800.00

PEKERJAAN MEMBERSIHKAN LANTAI BEKAS BONGKARAN / M2


UPAH
Pekerja
Mandor

14,400.00
2,400.00
16,800.00

PEKERJAAN BONGKAR BETON BERTULANG / M3


UPAH
Pekerja
Tukang I
Tukang besi I
Kepala Tukang
Mandor

30,000.00
50,000.00

PEKERJAAN BONGKAR LANTAI BETON / M3


UPAH
Pekerja
Mandor

Org
0.4800
Org
0.0480
TOTAL UPAH

PEKERJAAN CIPING LANTAI & DINDING / M2


UPAH
Pekerja
Mandor

TOTAL

PEKERJAAN BONGKAR LANTAI KERAMIK/ M2


UPAH
Pekerja
Mandor

JUMLAH
HARGA

PEKERJAAN BONGKAR PIPA AIR / M'


UPAH
Pekerja
Mandor

HARGA

PEKERJAAN BONGKAR PASANGAN BATA / M2


UPAH
Pekerja
Mandor

KOEFISIEN

Org
0.1500
Org
0.0075
TOTAL UPAH

30,000.00
50,000.00

Org
0.0200
Org
0.0050
TOTAL UPAH

30,000.00
40,000.00

PEKERJAAN SETEL BESI / KG


UPAH
Pekerja
Tukang

BAHAN
Besi siku

BAHAN
Besi pelat

BAHAN
O2
1

BAHAN
Kawat Las RB

BAHAN
Tanah urug

8,360.00
8,360.00

8,360.00

Org
0.2500
Org
0.1250
Org
0.1250
TOTAL UPAH

30,000.00
40,000.00
30,000.00

7,500.00
5,000.00
3,750.00
16,250.00

16,250.00

m3
0.4760
m3
0.1600
TOTAL BAHAN

10,000.00
35,000.00

4,760.00
5,600.00
10,360.00

10,360.00

Org
0.2500
Org
0.1250
Org
0.1250
TOTAL UPAH

30,000.00
40,000.00
30,000.00

7,500.00
5,000.00
3,750.00
16,250.00

16,250.00

kg
0.3000
TOTAL BAHAN

21,000.00

6,300.00
6,300.00

6,300.00

Org
0.3000
Org
0.0100
TOTAL UPAH

30,000.00
50,000.00

9,000.00
500.00
9,500.00

9,500.00

m3
1.2000
TOTAL BAHAN

55,000.00

66,000.00
66,000.00

66,000.00

9,000.00
500.00
9,500.00

9,500.00

78,000.00
78,000.00

78,000.00

135,000.00
60,000.00
7,500.00
11,250.00
213,750.00

213,750.00

PEKERJAAN URUGAN PASIR / M3


UPAH
Pekerja
Mandor

BAHAN
Pasir urug

13

7,600.00

7,700.00

PEKERJAAN URUGAN TANAH / M3


UPAH
Pekerja
Mandor

12

kg
1.1000
TOTAL BAHAN

7,700.00
7,700.00

PEKERJAAN LAS SAMBUNG / M'


UPAH
Pekerja
Tukang
Sewa las sambung

11

7,000.00

PEKERJAAN LAS POTONG / M'


UPAH
Pekerja
Tukang
Sewa las potong

10

kg
1.1000
TOTAL BAHAN

Org
0.3000
Org
0.0100
TOTAL UPAH

30,000.00
50,000.00

m3
1.2000
TOTAL BAHAN

65,000.00

PEKERJAAN PASANGAN BATA 1:4 < 5 M / M3


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

Org
Org
Org
Org
TOTAL UPAH

4.5000
1.5000
0.1500
0.2250

30,000.00
40,000.00
50,000.00
50,000.00

BAHAN
Batu bata
Pasir pasang
Semen 50 kg

14

BAHAN
Pasir pasang
Bata merah
Semen
split 2/3 cm.
Besi beton
Kawat beton
Kayu terentang
Paku

135,000.00
30,450.00
105,504.00
270,954.00

270,954.00

Org
Org
Org
Org
TOTAL UPAH

1.8500
0.7710
0.1055
0.0810

m3
0.1110
bh
105.0000
zak
1.1900
m3
0.1110
kg
2.0000
kg
0.0360
m3
0.0072
kg
0.0720
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

55,500.00
30,840.00
5,277.00
4,050.00
95,667.00

95,667.00

75,000.00
300.00
42,000.00
160,000.00
7,000.00
10,000.00
3,000,000.00
10,000.00

8,325.00
31,500.00
49,980.00
17,760.00
14,000.00
360.00
21,600.00
720.00
144,245.00

144,245.00

1,125.00
2,500.00
315.00
85.00
4,025.00

4,025.00

45,000.00
1,750.00
1,500.00
48,250.00

48,250.00

95,000.00
1,750.00
3,750.00
100,500.00

100,500.00

3,000.00
4,000.00
7,000.00

7,000.00

240,000.00
200.00
15,000.00
255,200.00

255,200.00

PEKERJAAN PASANG PIPA PVC / M'


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Pipa pvc 4"
Lem
Sambungan pvc 4"

BAHAN
Pipa pvc 6"
Lem
Sambungan pvc 6"

16

300.00
75,000.00
42,000.00

PEKERJAAN PEMBUATAN BAK KONTROL / BH


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

15

bh
450.0000
m3
0.4060
Zak
2.5120
TOTAL BAHAN

Org
Org
Org
Org
TOTAL UPAH

0.0375
0.0625
0.0063
0.0017

30,000.00
40,000.00
50,000.00
50,000.00

m'
1.0000
bh
0.2500
bh
0.2500
TOTAL BAHAN

45000.0000
7000.0000
6000.0000

m'
1.0000
bh
0.2500
bh
0.2500
TOTAL BAHAN

95000.0000
7000.0000
15000.0000

PEKERJAAN SANITARY / BH
UPAH
Pekerja
Tukang

BAHAN
Shower S361C san'ei
Siltip
Sambungan

Org
0.1000
Org
0.1000
TOTAL UPAH

30,000.00
40,000.00

bh
1.0000
bh
0.1000
bh
1.0000
TOTAL BAHAN

240,000.00
2,000.00
15,000.00

BAHAN
Saringan H-51
Siltip
Sambungan

17

BAHAN
Pip.galv. 1/2"
Siltip
Sambungan 1/2"

BAHAN
Cat F-Talit
Thinner

15,000.00
155,000.00

155,000.00

Org
Org
Org
Org
TOTAL UPAH

0.1500
0.2500
0.0250
0.0066

m'
1.0000
bh
0.1000
bh
1.0000
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

4,500.00
10,000.00
1,250.00
330.00
16,080.00

16,080.00

14,000.00
2,000.00
5,000.00

14,000.00
200.00
5,000.00
19,200.00

19,200.00

Org
Org
Org
Org
TOTAL UPAH

0.1000
0.1500
0.0150
0.0050

kg
0.0625
ltr
0.0060
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

3,000.00
6,000.00
750.00
250.00
10,000.00

10,000.00

34,000.00
12,000.00

2,125.00
72.00
2,197.00

2,197.00

2,500.00
2,500.00

2,500.00

30,000.00
30,000.00

30,000.00

15,000.00
15,000.00

15,000.00

15,000.00
10,000.00
1,250.00
1,250.00
27,500.00

27,500.00

PEKERJAAN PASANG GEMBOK / BH


UPAH
Tukang

BAHAN
Gembok Globe

BAHAN
Engsel

20

140,000.00

PEKERJAAN CAT BESI / M2


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

19

140,000.00
2,000.00
15,000.00

PEKERJAAN PASANG PIPA PVC / M'


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

18

bh
1.0000
bh
0.1000
bh
1.0000
TOTAL BAHAN

Org
0.0625
TOTAL UPAH

40,000.00

bh
1.0000
TOTAL BAHAN

30,000.00

bh
1.0000
TOTAL BAHAN

15,000.00

PEKERJAAN PASANG KERAMIK LANTAI / M2


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Keramik 20x20 roman
Semen 50 kg
Pasir pasang
Semen putih

Org
Org
Org
Org
TOTAL UPAH

bh
Zak
m3
Zak

0.5000
0.2500
0.0250
0.0250

25.0000
0.2000
0.0330
0.0200

30,000.00
40,000.00
50,000.00
50,000.00

2,500.00
42,000.00
75,000.00
65,000.00

62,500.00
8,400.00
2,475.00
1,300.00

TOTAL BAHAN
21

74,675.00

18,750.00
12,500.00
1,562.50
1,562.50
34,375.00

34,375.00

62,500.00
8,400.00
2,475.00
1,300.00
74,675.00

74,675.00

180,000.00
20,000.00
2,500.00
15,000.00
217,500.00

217,500.00

PEKERJAAN PASANG KERAMIK DINDING / M2


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Keramik 20x20 roman
Semen 50 kg
Pasir pasang
Semen putih

22

74,675.00

Org
Org
Org
Org
TOTAL UPAH

0.6250
0.3125
0.0313
0.0313

bh
25.0000
Zak
0.2000
m3
0.0330
Zak
0.0200
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

2,500.00
42,000.00
75,000.00
65,000.00

PEKERJAAN COR BETON 1 pc : 3 ps : 5 split / M3


UPAH
Pekerja
Tukang
Kepala Tukang
Mandor

BAHAN
Semen 50 kg
Pasir beton
Split 2/3 cm

Org
Org
Org
Org
TOTAL UPAH

6.0000
0.5000
0.0500
0.3000

sak
4.5400
m3
0.5400
m3
0.9100
TOTAL BAHAN

30,000.00
40,000.00
50,000.00
50,000.00

42,000.00
75,000.00
160,000.00

190,680.00
145,600.00
336,280.00

336,280.00

RENCANA ANGGARAN BIAYA


RENOVASI KOLAM RENANG PATRA JASA
CIREBON

NO

URAIAN PEKERJAAN

PEKERJAAN BONGKARAN

10

Bongkar taman bagian dalam


a. Bongkar pasangan bata
b. Bongkar tanaman dan tanah
Bongkar fasilitas kolam (tangga besi, dll)
Bongkar shower
a. Bongkar pasangan bata
b. Bongkar sanitary
Bongkar bangku beton
Bongkar beton penutup parit
Bongkar parit eksisting
a. Bongkar tutup beton
b. Bongkar pasangan bata
Bongkar tangga
a. Bongkar keramik
b. Bongkar rabat beton
c. Bongkar pasangan bata
Bongkar keramik seluruh lantai
Bongkar tembok keliling kurangi ketinggian.
a. Bongkar pasangan bata.
b. Bongkar keramik bagian bawah.
Bongkar beton untuk dudukan pipa 4"

PEKERJAAN RENOVASI

1
2
3
4

Urugan tanah
Urugan pasir
Cor lantai kerja 1:3:5 t. 5 cm
Pasangan bata 1:4 untuk memperbaiki tembok keliling
dan pinggir kolam.
Pasang lantai keramik 20 cm x 20 cm
Pasang dinding keramik 20 cm x 20 cm
Pembuatan tempat shower.
a. Pasangan bata 1:4 untuk pembatas keliling & tiang
b. Urugan pasir t. 10 cm
c. Cor lantai kerja 1:3:5 t. 5 cm.
d. Pasang lantai keramik muka kasar 20 cm x 2 cm
Pembuatan tutup stop kran
a. Buat rangka tutup dari L 50.50.5
b. Pasang pelat tutup t. 5 mm
c. Pasang engsel
c. Las potong
d. Las sambung
e. Pasang gembok Globe
f. Cat Ftalit seluruh permukaan tutup

2
3

4
5
6

8
9

5
6
7

VOLUME

SAT

HARGA
SATUAN

JUMLAH
HARGA
SATUAN

37.52
1.00
1.00

m2
ls
ls

16,800.00
100,000.00
50,000.00

630,336.00
100,000.00
50,000.00

3.30
10.50
1.33
3.38

m2
m'
m3
m3

16,800.00
3,400.00
370,000.00
70,000.00

55,440.00
35,700.00
490,620.00
236,250.00

1.00
54.00

ls
m2

100,000.00
16,800.00

100,000.00
907,200.00

38.43
0.72
22.14
617.68

m2
m3
m2
m2

3,500.00
70,000.00
16,800.00
3,500.00

134,505.00
50,400.00
371,952.00
2,161,880.00

54.40
68.10
0.76

m2
m2
m3

16,800.00
3,500.00
70,000.00
Jumlah

913,920.00
238,350.00
52,920.00
6,529,473.00

7.15
161.50
81.11
22.14

m3
m3
m3
m2

75,500.00
87,500.00
553,780.00
484,704.00

539,825.00
14,131,250.00
44,917,095.80
10,731,346.56

668.19
158.13

m2
m2

102,175.00
109,050.00

68,272,057.81
17,244,076.50

3.30
0.48
0.24
7.51

m2
m3
m3
m2

484,704.00
87,500.00
553,780.00
109,050.00

1,599,523.20
42,109.38
133,253.31
819,238.13

32.52
21.89
2.00
1.98
1.98
1.00
1.98

kg
kg
bh
m'
m'
bh
m2

8,500.00
9,160.00
17,500.00
26,610.00
22,550.00
32,500.00
12,197.00
Jumlah

276,420.00
200,502.32
35,000.00
52,687.80
44,649.00
32,500.00
24,150.06
159,095,684.87

RENCANA ANGGARAN BIAYA


RENOVASI KOLAM RENANG PATRA JASA
CIREBON

NO

URAIAN PEKERJAAN

PEKERJAAN SANITARY

1
2
3
4
5
6

Pembuatan bak kontrol 40 cm x 40 cm x 40 cm


Pasang pipa PVC 4" untuk parit & shower
Pasang pipa PVC 6" untuk parit
Pasang pipa galvanis 1/2".
Pasang shower
Pasang beltraf

PEKERJAAN LAIN-LAIN

1
2

Pembuangan ex bongkaran
Perapihan bekas kerja

VOLUME

31.00
88.00
124.00
78.00
2.00
1.00

1.00
1.00

a
b

HARGA
SATUAN

JUMLAH
HARGA
SATUAN

unit
m'
m'
m'
bh
bh

239,912.00
52,275.00
104,525.00
35,280.00
262,200.00
162,000.00
Jumlah

7,437,272.00
4,600,200.00
12,961,100.00
2,751,840.00
524,400.00
162,000.00
28,436,812.00

ls
ls

##########
500,000.00
Jumlah

2,500,000.00
500,000.00
3,000,000.00

SAT

Jumlah Keseluruhan
Keuntungan dan resiko (15% x a)
Jumlah (a + b)

197,061,969.87
29,559,295.48
226,621,265.35

Dibulatkan

226,621,000.00

Terbilang :
Dua ratus dua puluh enam juta enam ratus dua puluh satu ribu rupiah.