MEG PROJECT SN 1 DETAIL ACTIVITY Excavation EQUIPMENT / TOOLS Hand tools: shovels, picks Power handtools: Jack hammer

air compressor Mechanical excavator Backhoe, Payloader Dump truck/s Dewatering pump RISK INVOLVE 1. Injury due to defective tools 2. Injury due to incompetence of worker 3. Injury due to wrong use of tool 4. Injury due to collapse of excavation or cave-in. 5. Injury due to fall of personnel into excavation. 6. Injury due to scattered materials 7. Breakdown of equipment. 8. Injury due to fall of dump truck and . other heavy equipments into excavation 9. Injury due to accidental hit by back-tracking equipment 10. Injury due to incompetence of driver, operator. 11.Injury to personnel and damage to vehicle due to traffic confusion 12. Injury due to inhalation of fumes from air compressor. 13. Injury due to ignorance of personnel in operating the air compressor and jack hammer. PREVENTIVE MEASURE 1. All hand tools shall be kept in good condition. They must be kept clean and stored properly. Handles shall be inspected frequently for damages and shall remain tightly secured. Defective tools shall be removed from service and repaired or disposed. 2. Train the personnel on how to handle and operate the equipments or tools properly. 3. Provide adequate shoring and bracing system to protect the wall from collapsing.Wall shall be sloped when excavating in an open area. 4.Provide hard barricades around the excavation site and bar any unwanted personnel, provide ladder for access in and out of the excavation. Ladder shall be extended min.1m. above ground level.Provide handrail at least on one side of the ladder. 5. Daily house keeping shall be done. 6. Conduct regular check of equipments to maintain good operating condition and avoid breakdown during operation. 7. Barricades the excavation site. Assign one trained person to lookout and give signal to operator/driver. 8. Backhoe, dump truck/s payloader, shall be provided with RESPONSIBLE PERSON Safety Supervisor Site Supervisor

Submitted by : Nasser S.Al-Hajri Corp.

Page 1 of 10

MEG PROJECT SN DETAIL ACTIVITY EQUIPMENT / TOOLS RISK INVOLVE PREVENTIVE MEASURE back tracking alarm or signal to alert personnel on site. 9. Only licenced and certified driver/ operator shall be allowed to handle and operate or drive. 10.Assign one personnel wearing an orange reflectorized vest to direct traffic among equipments and other vehicles. 11. Conduct regular check up and maintain good working condition of the air compressor. Use proper PPE by all personnel at the location. 12. Personnel must be trained about the proper usage and handling of tools. 2 Operation of Dewatering system Diesel powered dewatering pump 1. injury due to fire. 2. Injury due to inhalation of fumes and noise pollution. 1. Check the engine for fuel leaks. Repair and keep good maintenance. 2. Use dust mask and ear plugs when working close to the pump. 1. Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. 2. Scaffold and component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it. 3. Guys, ties, and braces shall be installed at the closest horiontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 26 ft. or less thereafter. 4. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 from the top. Such guy, tie and Safety Supervisor Site Supervisor RESPONSIBLE PERSON

Scaffolding work

scaffolding materials : pipes clamps wooden planks spanners

1. Injury due to collapse of scaffolding due to everloading 2. Injury due to sway and fall of scaffolding 3. Injury due to fall of personnel 4. Injury due to fall of any material from the top of the scaffolding over personnel on the ground. 5. Injury due to unsafe scaffolds.

Safety Supervisor Site Supervisor Scaffold foreman

Submitted by : Nasser S.Al-Hajri Corp.

Page 2 of 10

MEG PROJECT SN DETAIL ACTIVITY EQUIPMENT / TOOLS RISK INVOLVE PREVENTIVE MEASURE bracessall be installed at each end of of the scaffold and at horizontal intervals not to exceed 30 ft. 5. Fall protection shall be provided for employees erecting or dismantling scaffolds. 6. A safe means of acces shall be provided, such as properly fixed ladders, shall be provided for employees erecting or dismantling scaffolds. 7. 100% fall protection to be used when working 6 ft. or more from an unprotected elevtion. 8. Full body harness with two 6 ft. shock absorbing lanyards shall be provided for employees working on top of scaffoldings. 9. Document monthly inspections on fall protection equipment and system. Conduct visual inspection prior touse. Ensure that the equipments are in good condition at all times. 10.Make sure that lanyard anchorage shall be capable of supporting 5000 lbs. 11.Horizontal lifelines shall be designed, installed and used under the supervision of a qualified person. 12.Each platform on all working levels of scaffold shallbe fully planked or decked between the the uprights and the guard supports. 13. Barricade shall be provided around the area where scaffolding work is going on or where people are working on elevated platform at any level of the scaffolding. 14. Warning signs shall be posted to caution unwary personnel from entering the barricaded area. 15. Scaffolds shall be erected, moved, dismantled or altered only under the suRESPONSIBLE PERSON

Submitted by : Nasser S.Al-Hajri Corp.

Page 3 of 10

MEG PROJECT SN DETAIL ACTIVITY EQUIPMENT / TOOLS RISK INVOLVE PREVENTIVE MEASURE pervision and direction of a competent person qualified inscaffold erection, moving, dismantling or alteration. Such activities shallbe performed only by experienced and trained personnel. 16. Footings shall be levelled, sound, rigid and capable of supporting the loaded scaffold without setting or displacement. 17. Scaffold and its component shall be pected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. released to proper personnel for use. 4 Rebar work Lifting manual handtool: knipper / wire cutter bar cutter power supplied equipment: bar bending machine bar cuting machine equipment: crane ( if necessary ) 1. Injury due to defective tools 2. Injury due to incompetence of worker 3. Injury due to wrong use of tool 4. Injury due to fall of personnel working above 1 meter height 5. Injury due to tripping over rebar 6. Injury due to protruding rebar ends. 7. Injury due to mechnical failure. 8. Injury due to overloading. 9. Injury due to crane tripping. 10. Injury due to confusion of signal to operator. 11. Injury due to fall of suspended loads. 1. All hand tools shall be kept in good condition. They must be kept clean and stored properly. Handles shall be inspected frequently for damages and shall remain tightly secured. Defective tools shall be removed from service and repaired or destroyed. 2. Personnel must be trained about the proper usage and handling of tools. 3. All hand tools must be used only for the intended purpose. 4. Provide scaffolding for every work above 1 meter in height. Scaffolding shall pass SSA safety inspection prior to its use. 5. Personal protection equipment shall be issued and used properly by personel. 6. Use ladder in ascending and descending the scaffolding platform. Ladders shall be extended 3 ft. and be secured. 7. Arrange and pile rebar in order in a manner that would give free access of personnel in the worksite. Access shall Safety Supervisor Site Supervisor Rebar Foreman Rigger RESPONSIBLE PERSON

Submitted by : Nasser S.Al-Hajri Corp.

Page 4 of 10

MEG PROJECT SN DETAIL ACTIVITY EQUIPMENT / TOOLS RISK INVOLVE PREVENTIVE MEASURE not be obstructed. 8. All protruding rebar ends shall be protected. Bent bars should be arranged where the ends are pointed to the ground 9. Crane must be inspected by client prior to use. 10. Confirm load weights and crane configuration. 11. Out riggers are to be fully extended, in the down position and on pads when on unstable ground. Level crane. 12.Qualified rigger to signal crane operator using standard hand signals. 13. No one is permitted under loads 14. Tag lines( rope) are to be used to control loads from swinging. 15. Maintain housekeeping for both Site and Fabrication shop. 5 Formworks Form removal Manual hand tools: hammer handsaw Power handtools: Jigsaw hand drill 1. Injury due to defective tools 2. Injury due to loose electical cable 3. Injury due to exposed wirings 4. Injury due to incompetence of worker 5. Injury due to wrong use of tool 6. Injury due to fall of personnel working above 1 meter height 7. Injury due to fall of form 8. Tripping hazard 9. Injury due to scattered materials 1. All hand tools shall be kept in good condition. They must be kept clean and stored properly. Handles shall be inspected frequently for damages and shall remain tightly secured. Defective tools shall be removed from service and repaired or destroyed. 2. All power equipment and their extension cords shall be inspected prior to use and color-coded monthly. 3. Cords shall be protected from damage. Any exposed wiring shall be taped and insulated adequately. 4. All guards, mechanical and protective devices shall remain devices shall remain attached and in proper working condition. 5. Personnel must be trained about the proper usage and handling of tools. RESPONSIBLE PERSON

Safety Supervisor Site Supervisor Rebar Foreman Rigger

Safety Supervisor Site Supervisor Carpenter Foreman

Submitted by : Nasser S.Al-Hajri Corp.

Page 5 of 10

MEG PROJECT SN DETAIL ACTIVITY EQUIPMENT / TOOLS RISK INVOLVE PREVENTIVE MEASURE 6. All hand tools must be used only for the intended purpose. 7. Provide scaffolding for every work above 1 meter in height. Scaffolding shall pass SSA safety inspection prior to its use. Use fall protection when above 6 ft. high. 8. Personal protection equipment shall be issued and used properly by personel. 9. Forms shall be inspected to ensure adequate support and bracing is provided. 10. Use ladder in ascending and descending the scaffolding platform. Ladders shall be extended 3 ft. and be secured. 11. Arrange forms in order in a manner that would give free access of personnel in the worksite. Access shall not be obstructed. Keep all materials in order. 12. Housekeeping shall be done. 6 Concrete pouring Concrete mixer truck concrete pump truck concrete vibrator engine 1.Injury due to fall of concrete truck and pump truck into the excavation 4. Injury due to accidental hit by back-tracking equipment 5. Injury due to incompetence of driver, operator 6. Injury to personnel and damage to vehicle due to traffic confusion 7. Breakdown of equipment 8. Injury due to negligence of driver 9. Injury due to fall of personnel working above 1 meter height 10.Injury due to inhalation of fumes from concrete vibrator 11. Injury due to ignorance of personnel in operating the vibrator engine 1. Provide barricades around the excavation site. Assign one personnel to look out and give signal to operator/ driver of the edge of an excavation. 2. Concrete and pump trucks shall be provided with back tracking alarm or signal to alert personnel on site. 3. Only licensed and certified operator and driver shall be allowed to handle and operate or drive. 4. Assign one personnel wearing an orange reflectorized vest for visibility to direct traffic among equipments and other vehicle at excavation site. 5. Conduct regular check of equipment to maintain good operating condition and avoid breakdown during operation. 6. Concrete trucks should not be permitSafety Supervisor Site Supervisor Mason Foreman RESPONSIBLE PERSON

Submitted by : Nasser S.Al-Hajri Corp.

Page 6 of 10

MEG PROJECT SN DETAIL ACTIVITY EQUIPMENT / TOOLS RISK INVOLVE PREVENTIVE MEASURE ted to travel with chute gates attached. 7. Provide scaffolding for every work above 1 meter in height. Scaffolding shall pass SSA safety inspection prior to its use. 8. Personal protection equipment shall be issued and used properly by personel. 9. Use ladder in ascending and descending the scaffolding platform. Ladders shall be extended 3 ft. and be secured. 10. Conduct regular chech up and maintain good working condition of the concrete vibrator engine. 11. Use personal protection equipment such as dust/gas mask, helmet, gloves, goggles,safety harness, earmuffs , etc. 12. Train the personnel on how to handle and operate the equipment properly. 7 Application of concrete protection Paintbrush Polyurethane coating mat'l. 1. Health risk due to mishandling of coating material 1. Only skilled and properly trained personnel shall be allowed to do the application of the material. 2. Materials shall be stored properly and released to proper personnel for use. 3.The Material Safety Data Sheet shall be displayed and available to the site where the application is going on. 4. Proper cleaning and disposal of waste and residue shall be followed as recommended by the manufacturer. 5.Application of material shall be as manufacturer's recommendation. 6.Use proper personal protection equipment when using the material such as gloves, dust/gas mask, goggles, etc. 1. Only licensed and certified operator Safety Supervisor Site Supervisor Mason Foreman RESPONSIBLE PERSON

Backfilling work

Payloader

1. Injury due to incompetence of driver,

Safety Supervisor

Submitted by : Nasser S.Al-Hajri Corp.

Page 7 of 10

MEG PROJECT SN DETAIL ACTIVITY EQUIPMENT / TOOLS Excavator Dump truck Bobcat plate compactor Water Tanker RISK INVOLVE operator 2. Injury to personnel and damage to equipment due to traffic confusion 2. 3. Breakdown of equipment 4. Injury due to accidental hit by back-tracking equipment 5. Injury due to incompetence of compac-3. tor operator. 6. Injury due to fall of compactor when bringing down and up the excavation. 4. PREVENTIVE MEASURE and driver shall be allowed to handle and operate or drive. Assign one personnel wearing an orange reflectorized vest for visibility to direct traffic among equipments and other vehicle at excavation site. Conduct regular check of equipment to maintain good operating condition and avoid breakdown during operation. Train the personnel on how to handle and operate the equipment properly. 5. Use personal protection equipment such as dust/gas mask, helmet, gloves, goggles,safety harness, earmuffs , etc. 6. Small compacting equipment shall be lifted in and out of excavations by means of approved rigging techniques. RESPONSIBLE PERSON Site Supervisor Earthwork Foreman

Submitted by : Nasser S.Al-Hajri Corp.

Page 8 of 10

MEG PROJECT SN 1 2
DETAIL ACTIVITY

EQUIPMENT / TOOLS

RISK INVOLVE 1. Injury due to defective tools 2. Injury due to loose electical cable 3. Injury due to exposed wirings 4. Injury due to incompetence of worker 5. Injury due to wrong use of tool 6. Injury due to fall of personnel working above 1 meter height 7. Injury due to fall of form 8. Tripping hazard 9. Injury due to scattered materials

PREVENTIVE MEASURE

RESPONSIBLE PERSON

Building FinishesManual hand tools: Scaffoldings Hammer Handsaw Power handtools: Tile Cutter Hand Drill Block Cutter Riveter

Safety Supervisor 1. All hand tools shall be kept in good condition. They must be kept clean Site Supervisor and stored properly. Handles shall be inspected frequently for damages and shall remain tightly secured. Defective tools shall be removed from service and repaired or destroyed. 2. All power equipment and their extension cords shall be inspected prior to use and color-coded monthly. 3. Cords shall be protected from damage. Any exposed wiring shall be taped and insulated adequately. 4. All guards, mechanical and protective devices shallattached remain and in devices shall remain proper working condition. 5. Personnel must be trained about the proper usage and handling of tools. 6. All hand tools must be used only for the intended purpose. 7. Provide scaffolding for every work above 1 meter in height. Scaffolding shall pass safety inspection prior to its use. 6 ft. Use fall protection when above high. 8. Personal protection equipment shall be issued and used properly by personel. 9. Forms shall be inspected to ensure adequate support and bracing is provided. 10. Use ladder in ascending and

Page 9 of 10

MEG PROJECT SN
DETAIL ACTIVITY

EQUIPMENT / TOOLS

RISK INVOLVE

PREVENTIVE MEASURE descending the scaffolding platform. Ladders shall be extended 3 ft. and be secured. 11. Arrange forms in order in a manner that would give free access of personnel in the worksite. Access shall not be obstructed. Keep all materials in order. 12. Housekeeping shall be done.