four main works viz. Main Dam, Weir, Electrical Power Station and Tunnel.

The requirement of ten-construction materials including cement, steel (six sizes), sand, aggregate etc. needs to be monitored daily Consumption, requirement, resources on site and in depot need to be checked every day. Design an M.I.S. for efficient working suitable data.

INTRODUCTION Scope of work: Construction of Hydro-Project Project:


The above project is divided into four parts i.e.:

1. Main Dam 2. Weir 3. Electric Power station


4. Tunnel

1. MAIN DAM: Normally dams are being constructed with Earth material, Masonry works and concrete works. In accordance with the huge scope of work, amount of material and manpower required for such project is huge. Due to the huge scope of work proper material planning is required. The types of material required for Main dam are basically Murom, rubble for soling & U.C.R., (sand, metal, steel, and cement for R.C.C. work), structural steel etc.

2. WEIR: Normally weir is being constructed inside the dam wall towards the water

catchment area. The structure will be round RCC walls with structural steel for supporting the gates. The gates are being fabricated with structural steel. So the types of material required for the weir is cement, sand, reinforcement, aggregates, structural steel etc.

3. ELECTRIC POWER STATION: Power station consists of main switchyard control building and switchyard. Building required RCC works, U.C.R. Masonry, brick masonry work, plaster, tiling, paints, doors and windows and switchyard equipments. Switchyard consists of structural tower, high-tension power lines, and 40 mm aggregates for metal packing, proper drainage systems, and proper permanent fencing with gates. The average height of the fencing should be minimum 2.00 m. Proper road for the movement of equipments and vehicles. The road should WBM with two layer of bitumen.

4. TUNNEL:

Tunnel is specialist job. For tunnel you need to have dragging equipment. Excavation should be with rock breaker & shifting of materials from tunnel site to outside area.

DESIGN OF MIS FOR CONSTRUCTION PROCESS: Due to vast development of construction technology and techniques of construction management, it has becomes necessary to build up proper

management information system to fulfill the need of the management to monitor and control the pro