Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 1

EU-Russia Regulatory Dialogue: Construction Sector Subgroup EU-Russia Regulatory Dialogue: Construction Sector Subgroup
Seminar Bridge Design with Eurocodes
JRC-Ispra, 1-2 October 2012
O i d d t d b Organized and supported by
European Commission
DG Joint Research Centre
DG Enterprise and Industry
Russian Federation
Federal Highway Agency, Ministry of Transport
European Committee for Standardization European Committee for Standardization
TC250 Structural Eurocodes
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 2
Design of concrete bridges
Prof. Ing. Giuseppe Mancini
Politecnico di Torino - Italy
Sintecna Ltd - Italy
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 3
Pinerolo Bridge (Turin)
Moving scaffolding continuous beam
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 4
PINEROLO BRIDGE
Geographical positioning
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 5
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 6
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 7
Static scheme
General dimensions
Fixed
abutment
Free
abutment
Pier 1 Pier 2 Pier 3 Pier 4 Pier 5
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 8
Static scheme: Bearings Static scheme: Bearings
Rubber expansion joint with
50 mm excursion
Rubber expansion joint with
320 mm excursion
50 mm excursion
320 mm excursion
M free in both directions
UL fixed in transverse direction
Restrain in longitudinal direction
14 bars |=70mm i=65cm
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 9
Finite element model
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 10
Live loads
2 notional lanes in transverse direction
Each lane is 3m wide in transverse direction
q
1,a
= 3 couples of concentrated loads 150kN each =
3 x 2 x 150 = 600 kN
q
1,b
= uniformly distributed load of 3KN/m
2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 11
Live loads lanes transverse position
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 12
q
1,a
has been placed 64 times in different longitudinal
positions on the girder model with stepping of 3 m positions on the girder model with stepping of 3 m
(64x3 = 192m ~ length of the bridge 189)
Longitudinal
view view
Position 1
Prospective
q
1,a
Loads
corresponding to
view
corresponding to
the outermost
notional lane
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 13
q
1,b
has been divided into 3x3m squared areas and
placed 64 times in different longitudinal positions on the placed 64 times in different longitudinal positions on the
girder for each notional lane
Longitudinal
view view
Position 2
Prospective
q
1,a
Loads
corresponding to
view
corresponding to
the outermost
notional lane
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 14
Materials
CONCRETE: deck: Rck > 40Mpa
piers Rck > 35 Mpa piers: Rck > 35 Mpa
abutments and foundations Rck > 30 Mpa
PRESTRESSING STEEL: 0.6 strands
fptk = 1860 MPa p
fp(1)k = 1670 MPa
Es = 200000 MPa
ORDINARY STEEL: Fe B 44 k
fyk > 430 Mpa
Es = 200000 Mpa
fyd = 374 MPa
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 15
PINEROLO BRIDGE PINEROLO BRIDGE
Pictures taken during construction
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 16
Completed bridge
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 17
Completed bridge
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 18
Completed bridge
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 19
Reinforcement cage of g
the pier
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 20
Detail of reinforcement cage at the foot of the pier
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 21
Scaffolding realization
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 22
Moving scaffolding
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 23
Scaffolding near bearing
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 24
Reinforcement just before concreting
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 25
Construction joint between casting i and i+1 before concreting
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 26
Construction joint between casting i and i+1 after concreting
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 27
Tensioning tendons at the beginning of the deck
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 28
Cutting tendons strands after tensioning in the coupler
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 29
Bearing detail Bearing detail
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 30
Bars connecting the deck to the earth-containment wall
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 31
PINEROLO BRIDGE
Construction phases
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 32
Phase 1 & 2:
Day 1 Concreting of span SP1 P1 Day1 ConcretingofspanSP1 P1
Day14 tensioningoftendonsIandremovalofscaffolding
27.7m 8.5m
Detailofscaffolding
foundationslab
Welded mesh |12 / 20x20
AbutmentSP1
PierP1
Weldedmesh|12/20x20
Weldedmesh|12/20x20
stirrups
|8/40x20
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 33
Phase 4:
Day45 ConcretingofspanP1 P2
Day58 tensioningoftendonsIandremovalofscaffolding
24.5m 8.5m 8.5m
PierP1
PierP2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 34
Phase 10: Phase 10:
Day89 ConcretingofspanP2 P3
Day102 tensioningoftendonsIandremovalofscaffolding
24.5m 8.5m 8.5m
PierP2
PierP3
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 35
Phase 1 & 2:
Day1 ConcretingofspanSP1 P1 y g p
Day14 tensioningoftendonsIandremovalofscaffolding
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 36
Phase 4:
Day45 ConcretingofspanP1 P2 y g p
Day58 tensioningoftendonsIandremovalofscaffolding
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 37
Phase 10:
Day89 ConcretingofspanP2 P3 y g p
Day102 tensioningoftendonsIandremovalofscaffolding
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 38
PINEROLO BRIDGE PINEROLO BRIDGE
Prestressing layout
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 39
Internal bonded tendons
19 strands 0.6" tendons A
t
= 26.41 cm.
Prestressing stress: Prestressing stress:
o
spi
= 0.85 f
p(1)k
=0.85 1670= 1420 MPa
Maximum prestressing force in each tendon:
T
max
= 1419.5 N/ mm 26.41 mm = 3749 kN
Construction phases prestressing Construction phases prestressing
10 Tendons I1 coupled in each construction joint
End of construction prestressing
8 tendons F1 for positive and negative moments
6 baricentric tendons F2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 40
Phase 1: tendons I1
Sec. AA Sec.A A
19T15 live
anchorage anchorage
19T15 live
anchorage
19T15 dead coupler
X (cm)
l
X (cm)
horizontal
Z (cm)
vertical
The vertical
Position Z of the
tendon is taken
from intrados
I
1
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 41
Phase 2: tendons I2
Sec.BB
19T15 ducts
19T15 live
anchorage
19T15 dead coupler
X (cm)
The vertical
( )
horizontal
Z (cm)
vertical
Position Z of the
tendon is taken
from intrados
I
2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 42
Phase 3: tendons I3
Sec.CC
19T15 ducts
19T15 live
anchorage
19T15 dead coupler
X (cm)
horizontal
The vertical
Position Z of the
3
horizontal
Z (cm)
vertical
Position Z of the
tendon is taken
from intrados
I
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 43
Phase 4: tendons I4
Sec.DD
19T15 dead
co plers couplers
19T15 live
anchorage
19T15 dead coupler
X (cm)
The vertical
( )
horizontal
Z (cm)
vertical
The vertical
Position Z of the
tendon is taken
from intrados
I
4
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 44
Phase 5: tendons I5
Sec.DD
19T15 dead
couplers
19T15 live
anchorage
19T15 dead coupler
X (cm)
Th ti l
X (cm)
horizontal
Z (cm)
vertical
The vertical
Position Z of the
tendon is taken
from intrados
I
5
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 45
Phase 6: tendons I6
Sec.EE
19T15 dead
couplers couplers
19T15 live
anchorage 19T15 live anchorage
X (cm)
h i l
The vertical
f horizontal
Z (cm)
vertical
Position Z of the
tendon is taken
from intrados
I
6
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 46
End of construction: tendons F1 & F2
SpanSP2 P5
19T15 live
Tendons F1
Tendons F2
anchorage
X (cm)
horizontal
Z (cm)
vertical
X (cm)
horizontal
Z (cm)
vertical
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 47
End of construction: tendons F1 & F2
SpanP5 P4
T d F2
Tendons F1
Tendons F2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 48
End of construction: tendons F1 & F2
Sec.AA
Tendons F2
Tendons F1
Sec.BB
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 49
SECONDINO VENTURA BRIDGE (ASTI) SECONDINO VENTURA BRIDGE (ASTI)
Incremental launching continuous beam
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 50
SECONDINO VENTURA BRIDGE
Geographical positioning
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 51
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 52
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 53
BEARINGS BEARINGS
L F / T fi d
Fixed
Free
Long. Free / Transv. fixed
Long. fixed / Transv. free
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 54
Cross section of the two independent decks
Railway
Road + cycle track
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 55
Cross section of the railway deck
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 56
Comparison between construction techniques
Construction of one span (33 m) in ten days Construction of one span (33 m) in ten days
Lauching time: 3 hours
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 57
SECONDINO VENTURA BRIDGE
Launching technique
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 58
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 59
a) Uplift b) Trust
c) Down lift d) Repositioning
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 60
Geometrical limitations:
In vertical plane In horizontal plane
horizontal straight or circular horizontal straight or circular
circular straight
linear inclination circular
circular circular
In the last two cases the projections on the horizontal plane
are ellipse circles
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 61
Launching nose anchoring system
Longitudinal section
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 62
Section S1
|20/20 L70
(interface with the
nose)
|20/20 L70cm
welded to the
plate
C t b d f Concrete bed for
the plate Rck >45
MPa
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 63
Section S3
(2m from the nose)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 64
Section S5
(4m from the nose)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 65
Section S7
(5m from the nose)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 66
SECONDINO VENTURA BRIDGE
Evaluation of the internal actions during
launching and launching prestressing g g p g
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 67
INTERNAL ACTIONS DURING THE LAUNCHING:
BENDING MOMENT BENDING MOMENT
Static scheme :
Actions:
Self weight
Temperature variation between intrados and extrados of 5
Maximum differential settlement between two consecutive
bearings of 5 mm
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 68
Bending moment at end of launching (values in kN*10*m)
-12000
Mg Mced M temp M+ M- Mtot+ Mtot- Fase 95 Step 95 M sett.
1200.0
-1100.0
-1000.0
-900.0
-800.0
-700.0
-600.0
-500.0
-400.0
-300.0
-200.0
-100.0
0.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
100.0
200.0
300.0
400.0
5000 500.0
600.0
700.0
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 69
Bending moment during launching
-1200.0
-1100.0
-1000.0
-900.0
-800.0
Mg Mced M temp M+ M- Mtot+ Mtot- Fase 20
-1200.0
-1100.0
-1000.0
-900.0
-800.0
Mg Mced M temp M+ M- Mtot+ Mtot- Fase 30
Step 20 Step 30
Msett. Msett.
-700.0
-600.0
-500.0
-400.0
-300.0
-200.0
-100.0
0.0
1000
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
-700.0
-600.0
-500.0
-400.0
-300.0
-200.0
-100.0
0.0
1000
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
100.0
200.0
300.0
400.0
500.0
600.0
700.0
100.0
200.0
300.0
400.0
500.0
600.0
700.0
-1200.0
-1100.0
-1000.0
-900.0
-800.0
-700.0
Mg Mced M temp M+ M- Mtot+ Mtot- Fase 50
-1200.0
-1100.0
-1000.0
-900.0
-800.0
-700.0
Mg Mced M temp M+ M- Mtot+ Mtot- Fase 40
Step 40 Step 50
Msett. Msett.
-600.0
-500.0
-400.0
-300.0
-200.0
-100.0
0.0
100.0
2000
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
-600.0
-500.0
-400.0
-300.0
-200.0
-100.0
0.0
100.0
2000
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
200.0
300.0
400.0
500.0
600.0
700.0
200.0
300.0
400.0
500.0
600.0
700.0
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 70
Bending moment during launching
-1200.0
-1100.0
-1000.0
-900.0
-800.0
7000
Mg Mced M temp M+ M- Mtot+ Mtot- Fase 60
-1200.0
-1100.0
-1000.0
-900.0
-800.0
7000
Mg Mced M temp M+ M- Mtot+ Mtot- Fase 70 Step 60 Step 70 Msett. Msett.
-700.0
-600.0
-500.0
-400.0
-300.0
-200.0
-100.0
0.0
100.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
-700.0
-600.0
-500.0
-400.0
-300.0
-200.0
-100.0
0.0
100.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
200.0
300.0
400.0
500.0
600.0
700.0
200.0
300.0
400.0
500.0
600.0
700.0
-1200.0
-1100.0
-1000.0
-900.0
-800.0
-700.0
Mg Mced M temp M+ M- Mtot+ Mtot- Fase 80
-1200.0
-1100.0
-1000.0
-900.0
-800.0
-700.0
Mg Mced M temp M+ M- Mtot+ Mtot- Fase 90
Step 80 Step 90
Msett. Msett.
-600.0
-500.0
-400.0
-300.0
-200.0
-100.0
0.0
100.0
200.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
-600.0
-500.0
-400.0
-300.0
-200.0
-100.0
0.0
100.0
200.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
300.0
400.0
500.0
600.0
700.0
300.0
400.0
500.0
600.0
700.0
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 71
As the bending moments are almost constant in all the sections and
the positive values are only half of the negative ones baricentric the positive values are only half of the negative ones baricentric
prestressing is introduced for the launching phases.
Enlargedsection
A W W W W
Currentsection
A W W W W A
[m
2
]
W
sx,sup
[m
3
]
W
dx,sup
[m
3
]
W
sx,inf
[m
3
]
W
dx,inf
[m
3
]
7.897 2.828 2.631 2.171 2.237
A
[m
2
]
W
sx,sup
[m
3
]
W
dx,sup
[m
3
]
W
sx,inf
[m
3
]
W
dx,inf
[m
3
]
6.458 2.498 2.290 1.590 1.629
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 72
M+ [MP ] i f M+ [MP ] M [MP ] i f M [MP ]
Longitudinal stresses during launching
6.00
supM+[MPa] infM+[MPa] supM [MPa] infM [MPa]
(supM+)+prec (infM+)+prec (supM) +prec (infM) +prec
0.00
2.00
4.00
4.00
2.00
0.00
[
M
P
a
]
8.00
6.00
o
[
14 00
12.00
10.00
14.00
0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00
x[m]
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 73
Shear at end of launching (values in kN*10*m)
-300.0
Vg Vced V temp V+ V- Vtot+ Vtot- Fase 95 Step 95 V sett.
-250.0
-200.0
-150.0
-100.0
-50.0
0.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
50.0
100.0
1500 150.0
200.0
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 74
Shear during launching
-300.0
-250.0
-200.0
Vg Vced V temp V+ V- Vtot+ Vtot- Fase 20
-300.0
-250.0
-200.0
Vg Vced V temp V+ V- Vtot+ Vtot- Fase 30
Step 20 Step 30
Vsett. Vsett.
-150.0
-100.0
-50.0
0.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
-150.0
-100.0
-50.0
0.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
50.0
100.0
150.0
200.0
50.0
100.0
150.0
200.0
-300.0
-250.0
-200.0
-150.0
Vg Vced V temp V+ V- Vtot+ Vtot- Fase 40
-300.0
-250.0
-200.0
-150.0
Vg Vced V temp V+ V- Vtot+ Vtot- Fase 50
Step 40 Step 50
Vsett. Vsett.
-100.0
-50.0
0.0
50.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
-100.0
-50.0
0.0
50.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
100.0
150.0
200.0
100.0
150.0
200.0
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 75
Shear during launching
-300.0
-250.0
-200.0
Vg Vced V temp V+ V- Vtot+ Vtot- Fase 60
-300.0
-250.0
-200.0
Vg Vced V temp V+ V- Vtot+ Vtot- Fase 70 Step 60 Step 70 Vsett. Vsett.
-150.0
-100.0
-50.0
0.0
500
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
-150.0
-100.0
-50.0
0.0
500
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
50.0
100.0
150.0
200.0
50.0
100.0
150.0
200.0
-300.0
-250.0
-200.0
-150.0
Vg Vced V temp V+ V- Vtot+ Vtot- Fase 80
-300.0
-250.0
-200.0
-150.0
Vg Vced V temp V+ V- Vtot+ Vtot- Fase 90 Step 80 Step 90 Vsett. Vsett.
-100.0
-50.0
0.0
50.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
-100.0
-50.0
0.0
50.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
100.0
150.0
200.0
100.0
150.0
200.0
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 76
Prestressing layout 1
st
span Prestressing layout 1 span
19 T15 strands tendons Couplers for
19T15 19T15
19 T15
strands
tendons
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 77
Prestressing layout section AA
Surface
inclined 88 inclined 88
Live
anchorage
for 19 T15
Deck axis
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 78
section 11
section 33
Live
anchorage for
19 T15
Live
anchorage for
19 T15 19 T15
section 22
19 T15
strands
tendons
19 T15
strands
tendons
Live
anchorage for
Bearings
axis
Bearings
axis
anchorage for
19 T15
19 T15 strands tendons
Bearings
axis
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 79
section 55
Live
anchorage for
19 T15 19 T15
Deck axis
19 T15
strands
Bearings
axis
strands
tendons
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 80
Prestressing layout section BB Prestressing layout section BB
Deck axis
19 T15
strands
tendons
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 81
Prestressing layout section CC Prestressing layout section CC
19 T15
t d
Deck axis
strands
tendons
Couplers for Couplers for
19T15
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 82
section 44
Couplers for
19T15
19 T15 strands
Pier
Live anchorage
for 19 T15
19 T15 strands
tendons
axis
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 83
Prestressing layout 2
nd
span Prestressing layout 2 span
Couplers for
19T15
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 84
Prestressing layout section DD
D k i
19 T15
strands
Deck axis
tendons
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 85
Prestressing layout 3
rd
span Prestressing layout 3 span
Couplers for
19T15
Live
h f anchorage for
19 T15
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 86
P t i l t ti GG Prestressing layout section GG
D k i
19 T15
strands
tendons
Deck axis
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 87
section 66
Live
anchorage
19 T15
strands
tendons
for 19 T15
Live
anchorage
for 19 T15
Bearings
axis
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 88
Bending moment
25000
Pesoproprio Precompressione Caduteprecompressione
Permanentiportati Gradiente
Self weight
Permanent loads
Prestressing
Temperature
gradient
Prestressing losses
25000
20000
15000
10000 10000
5000
0
5000 N

m
]
5000
10000
15000
20000
M
[
k
N
20000
25000
30000
35000 35000
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0
x[m]
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 89
Internal actions (M,N) and relative stresses
0.0 80000
PRECOMPRESSIONE DEFINITIVA
M[kNm] N[kN] sup[MPa] inf[MPa]
DEFINITIVE PRESTRESSING
6 0
4.0
2.0 70000
60000
50000
10.0
8.0
6.0 50000
40000
30000
n
i

[
M
P
a
]
m
]
,

[
k
N
]
s
14.0
12.0 20000
10000
T
e
n
s
i
o
n
M

[
k
N
m
S
t
r
e
s
s
e
s
20 0
18.0
16.0 0
10000
20000 20.0 20000
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
x[m]
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 90
S L E IN ASSENZA DI PERMANENTI PORTATI ( )
Internal actions (M,N) and relative stresses
0.0 60000
S.L.E. IN ASSENZA DI PERMANENTI PORTATI (t=)
M N sup[MPa] inf[MPa]
S.L.S. WITHOUT PERMANENT LOADS ( t = )
4.0
2.0 50000
40000
8.0
6.0 30000
20000
n
i

[
M
P
a
]
m
]
,

[
k
N
]
e
s
12.0
10.0 10000
0
T
e
n
s
i
o
M

[
k
N
m
S
t
r
e
s
s
e
16 0
14.0 10000
20000 16.0 20000
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
x[m]
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 91
Internal actions (M,N) and relative stresses
S.L.E. - COMBINAZIONE QUASI PERMANENTE (t=)
M+ N M supM+[MPa]
infM+[MPa] supM [MPa] infM [MPa]
S.L.S. QUASI-PERMANENT COMBINATION ( t = )
2.0
0.0 60000
50000
6.0
4.0 40000
30000
[
M
P
a
]
N

[
k
N
]
10.0
8.0 20000
10000
T
e
n
s
i
o
n
i

[
k
N
m
]
,

S
t
r
e
s
s
e
s
14 0
12.0 0
10000 14.0 10000
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
x[m]
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 92
S L E COMBINAZIONE RARA (t=) S L S CHARACTERISTIC COMBINATION ( t = )
Internal actions (M,N) and relative stresses
S.L.E. - COMBINAZIONE RARA (t=)
M+ N M supM+[MPa]
infM+[MPa] supM [MPa] infM [MPa]
S.L.S. CHARACTERISTIC COMBINATION ( t = )
4 0
2.0
0.0 60000
50000
40000
8 0
6.0
4.0 40000
30000
20000
i

[
M
P
a
]
]
,

[
k
N
]
12.0
10.0
8.0 20000
10000
0
T
e
n
s
i
o
n
M

[
k
N
m
]
S
t
r
e
s
s
e
s
16.0
14.0
12.0 0
10000
20000
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
x[m]
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 93
VEROLENGO BRIDGE
Precast continuous beam
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 94
VEROLENGO BRIDGE
G hi l i i i Geographical positioning
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 95
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 96
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 97
VEROLENGO BRIDGE
General overview
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 98
Static scheme
General dimensions
Abutment 1 Pier 1 Pier 2 Pier 3 Pier 4 Abutment 2
Maximum water
level (200 y)
River bed
Average
water level
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 99
Static scheme: Bearings
M free in both directions
UL fixed in transverse direction
Rubber expansion joints with
350 mm excursion
UT fixed in longitudinal direction
F fixed in both directions
350 mm excursion
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 100
Typical cross
section on a section on a
pier
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 101
Deck and upper part of the pier
Bridge intrados
Maximum water
level (200 years) e e ( 00 yea s)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 102
Deck cross section Deck cross section
Beam type B
Beam type A
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 103
VEROLENGO BRIDGE VEROLENGO BRIDGE
Pictures taken during construction
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 104
Reinforcement cage of abutment n1
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 105
Pier n1 and old pier
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 106
Old and new piers within the river bed
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 107
Positioning of the beams on temporary piers
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 108
Beams on temporary piers
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 109
Inflection of 1
st
span after the removal of its 2 temporary piers
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 110
External tendons
ithi th b within the beams
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 111
Cast in situ transverse beam just before concreting
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 112
Anchorages of transverse beams prestressing
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 113
Reinforcement of
d k l b b f deck slab before
concreting
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 114
C l t d b id Completed bridge
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 115
VEROLENGO BRIDGE
Beams geometry and prestressing layout
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 116
Span element
Longitudinal section Longitudinal section
Pier element
Longitudinal section
Pier Axis
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 117
Beam A
Cross section Cross section
15 0.6 strands
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 118
Beam B
Cross section Cross section
15 0 6 strands 15 0.6 strands
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 119
External tendons
(12 |0.6)
tensed at end of
Transverse
internal unbonded
tendons(4 |0.6)
Section N-N:
construction
tendons(4 |0.6 )
Beam A
Internal and
external external
prestressing
Transverse
internal unbonded
tendons(4 |0.6)
E ternal tendons
Deviators for external
tendons (12 |0.6)
tensed at end of construction
External tendons
(9 |0.6)
tensed during
construction
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 120
Section N-N:
Beam B
Anchorage of
transverse
internal
External tendons (12 |0.6) tensed at end of
construction
Beam B
Internal and
external
unbonded
tendons
(4 |0.6)
prestressing
Internal bonded
tendons
(12 |0.6)
Anchorage of
transverse
internal
unbonded
External tendons
tensed at end of
construction
Tendons
(4 |0.6)
External tendons
(9 |0.6)
tensed during
construction
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 121
Typical transverse beam section
Beam A
Transverse
internal
unbonded
Tendons
a
x
i
s
Beam B
(4 |0.6)
D
e
c
k

Anchorage of
transverse
internal
unbonded unbonded
Tendons
(4 |0.6)
Transverse internal
unbonded tendons
(4 |0.6)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 122
Internal bonded prestressing of pier elements Internal bonded prestressing of pier elements
Tendons S1 and S2
(S3 and S4)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 123
External prestressing of abutments spans (span1 and 5)
External tendons
E1-1 to E1-4 (9 f0.6)
tensed during construction tensed during construction
Internal prestressing of abutments spans (span1 and 5)
Internal tendons
F1-1 to F1-8 (9 f0.6) F1 1 to F1 8 (9 f0.6 )
tensed during construction
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 124
Materials
CONCRETE: precast beams: Rck > 55 Mpa
cast in situ cast in situ
(slab, transverse beams etc.) Rck > 45 Mpa
PRESTRESSING STEEL: 0.6 strands
fptk = 1860 MPa
f (1)k 1670 MP fp(1)k = 1670 MPa
Es = 200000 MPa
ORDINARY STEEL: Fe B 44 k
fyk > 430 Mpa
Es = 200000 Mpa Es 200000 Mpa
fyd = 374 MPa
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 125
Prestressing of beam A: segments 1 and 2 - construction
A
B
C
Internal tendons
F1-1 to F1-8 (9 f0.6 )
4 for each beam
tensed during construction
A
B
Abutment SP1
C
Anchorage for
external tendons
E1-1 to E1-4
Anchorage for
internal tendons
F2-1 to F2-4
A
B
C
Abutment SP1
External tendons Anchorage for
Anchorage for
i t l t d
A
B
C
External tendons
E1-1 to E1-4 (9 f0.6 )
2 for each beam
tensed during construction
Anchorage for
external tendons
E1-1 to E1-4
internal tendons
F2-1 to F2-4
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 126
Prestressing of beam A: segment 3 - construction
Internal tendons
D
Internal tendons
F1-1 to F1-8 (9 f0.6 )
1
st
span
4 for each beam
tensed during construction
D
D
Internal tendons
F2-1 to F2-8 (9 f0.6 )
2
nd
span
4 for each beam
tensed during construction tensed during construction
D
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 127
Prestressing of beam A: segments 1 and 2 END of construction
A
B
D
D
B
Abutment SP1
A
D
B
Prestressing of beam A: segment 3 END of construction
External tendons
F1-1 to F1-8 (9 f0.6 ) D
4 for each beam
tensed at the end of
construction
D
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 128
Beam A
First segment
Cross section AA
Internal tendons F
External tendons External tendons
tensed at the end of
construction
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 129
Beam A
First segment First segment
Cross section BB
PART. 1
Detail of reinforcement to be placed
when internal tendons F change when internal tendons F change
position horizontally
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 130
Beam A
Second segment
Cross section CC
Internal tendons
F1-1 to F1-8
(1
st
span)
External tendons
tensed at the end of
construction
External tendons
tensed during tensed during
construction
Internal tendons
F2-1 to F2-8
(2
nd
span)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 131
Beam A
Second segment
Horizontal section II
Anchorages of Anchorages of
internal tendons
F2-1 to F2-8
(2
nd
span)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 132
Beam A
Thi d t Third segment
Cross section DD
I t l t d Internal tendons
F1-1 to F1-8
(1
st
span)
External tendons
tensed at the end of
t ti construction
Internal tendons S1-
S4 tensed at the birth
of the element
Internal tendons
F2 1 to F2 8 F2-1 to F2-8
(2
nd
span)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 133
VEROLENGO BRIDGE
Finite element model
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 134
2 different models:
1 Construction phases and creep effects: 1 Construction phases and creep effects:
one dimension model
the deck is a single continuous straight beam
deadweight does NOT give rise to torsion
2 SLS and ULS with live load:
girder model:
the deck is a girder made of longit dinal and the deck is a girder made of longitudinal and
transverse beams and slab;
live load gives rise to torsion live load gives rise to torsion
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 135
Live loads on model 2:
3 notional lanes in transverse direction
Each lane is 3m wide in transverse direction
q
1,a
= 3 couples of concentrated loads 150kN each =
3 x 2 x 150 = 600 kN
q
1,b
= uniformly distributed load of 3KN/m
2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 136
q
1,a
has been placed 89 times in different longitudinal
positions on the girder model with stepping of 3 m positions on the girder model with stepping of 3 m
(89x3 = 267m ~ length of the bridge 266)
Longitudinal view
Position 1
Prospective view
q
1,a
Loads
corresponding to the corresponding to the
outermost notional
lane
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 137
q
1,b
has been divided into 3x3m squared areas and placed
89 times in different longitudinal positions on the girder for 89 times in different longitudinal positions on the girder for
each notional lane
Longitudinal view
Position 2
Prospective view
q
1,a
Loads
corresponding to the corresponding to the
outermost notional
lane
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 138
The results given by model 1 for deadweight, prestressing, creep,
shrinkage, construction phases are then divided between the 8 shrinkage, construction phases are then divided between the 8
beams corresponding to the webs of the boxes
Longitudinal view
Position 3
Prospective view
q
1,a
Loads
corresponding to the corresponding to the
outermost notional
lane
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 139
Th b
Prospective view
The webs are
highlighted in red
whereas the offset
elements for the
bearings are evidenced
in green in green.
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 140
VEROLENGO BRIDGE
Construction phases
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 141
Phase 2:
A.prestressingstrandsrelease
B.tensioningoftendonsS1toS4onpierelements
Storage,liftingand
transport scheme transportscheme
L=0.35forspanelements
L=0.50 for pier elements L 0.50forpierelements
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 142
Phase 3: Phase 3:
PositioningofprecastelementsofspanSP1P1andconcretingofrelative
transversebeams
Abutment
SP1
Temporary
pier
Temporary
pier
Temporary
pier
Pier
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 143
Phase 3: 35 days
PositioningofprecastelementsofspanSP1P1andconcretingofrelative
transversebeams
P1
SP1
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 144
Phase 4: Phase 4:
A.TensioningoftendonsF11toF18
B.RemovaloftemporarypiersofspanSP1P1
tendonsF13
toF14
tendonsF11
Temporary
toF12
Abutment
SP1
pier
PierP1
SP1
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 145
Phase 5: Phase 5:
TensioningoftendonsE11toE18
Temporary
tendonsE11
toE12
Pier
Abutment
SP1
pier
PierP1
SP1
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 146
Phase 5: 51 days
TensioningoftendonsE11toE18
P1
SP1 TP TP TP
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 147
Phase 6: 52 days
PositioningofprecastelementsofspanP1P2andconcretingofrelative
transversebeams
P1 P2
SP1 TP TP TP TP
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 148
Ph 8 Phase 8:
A.TensioningoftendonsF21toF28P1P2
B.Removaloftemporarypiersofspan2 C.TensioningtendonsE21toE28
tendonsF23
toF24
Temporary
pier
tendonsE21
toE22
tendonsF21
toF22
PierP1 PierP2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 149
Phase 8: 68 days
A.TensioningoftendonsF21toF28P1P2
B.Removaloftemporarypiersofspan2 C.TensioningtendonsE21toE28
P1 P2
SP1
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 150
Phase 9: 69 days
A.TensioningoftendonsF21toF28P1P2
B.Removaloftemporarypiersofspan2
P1 P2 P3
TP TP TP TP SP1
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 151
Phase 11: 85 days ase 85 days
A.TensioningoftendonsF31toF38P2P3
B.Removaloftemporarypiersofspan3 C.TensioningtendonsE31toE38
tendonsF33
toF34
Temporary
pier
tendonsE31
toE32
tendonsF31
toF32
PierP2 PierP3
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 152
Phase 11: 85 days
A.TensioningoftendonsF31toF38P2P3
B.Removaloftemporarypiersofspan3 C.TensioningtendonsE31toE38
P1 P2 P3
SP1
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 153
Phase 12: 86 days
PositioningofprecastelementsofspanP3P4andconcretingofrelative
transversebeams
P1 P2 P4
SP1
P3TP TP TP TP
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 154
Phase 14: 102 days
A.TensioningoftendonsF41toF48P3P4
B.Removaloftemporarypiersofspan4 C.TensioningtendonsE41toE48
P1 P2 P4
SP1
P3
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 155
Phase 15: 103 days
PositioningofprecastelementsofspanP4SP2andconcretingofrelative
transversebeams
P1 P2 P4
SP1
P3 SP2 TP TP
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 156
Phase 17: 122 days
A.TensioningoftendonsF51toF58P4SP2
B.Removaloftemporarypiersofspan5 C.TensioningtendonsE51toE58
P1 P2 P4
SP1
P3 SP2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 157
Phase 18:
Slabconcreting
Abutment
Pier
Abutment
SP1
Pier
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 158
Phase 19:
A.Endofslabhardening changeofcentroidpositions
B Tensioning of tendons EF1 to EF8 B.TensioningoftendonsEF1toEF8
Abutment
SP1
PierP1 PierP2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 159
Phase 19: 150 days
A.Endofslabhardening changeofcentroidpositions
B.TensioningoftendonsEF1toEF8
P1 P2 P4
SP1
P3 SP2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 160
Phase 38: 70 years
Endofanalysisfortimedependantbehaviour y p
P1 P2 P4
SP1
P3 SP2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 161
ROCCAPREBALZA VIADUCT
Composite box-girder continuous beam
on slender piers on slender piers
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 162
ROCCAPREBALZA VIADUCT
G hi l iti i Geographical positioning
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 163
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 164
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 165
ROCCAPREBALZA VIADUCT
Conceptual design
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 166
Three possible solutions Three possible solutions
Segmental
Classical cantilever Classical cantilever
Segmental
construction with
match cast joints and
use of launching
Classical cantilever
cast in situ segments
and mixed
prestressing
Classical cantilever
with composite deck
and mixed
prestressing
g
girder
p g
(internal/external)
p g
(internal/external)
Very high cost of
launching girder
Too long construction
time (only one couple of
Reduction of execution
time and elimination of
launching girder
(vertical hinge)
time (only one couple of
scaffolding compatible
with the total cost)
time and elimination of
launching girder
(mounting with tower
cranes used for the pier p
construction)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 167
Top view of viaduct
P1 P2
4 x 120 m
SP1a
SP1b P3 P3
P4
SP1
P1
P2
P3
SP2
1 x 71,4 m
P5
SP2
P4
P5
Counterweight
l = 30 m
R
min
= 400 m
H
piers
= 13,2 82,1 m
l 30 m
1 x 42,6 m
Static scheme Static scheme
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 168
Construction phases
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 169
ROCCAPREBALZA VIADUCT ROCCAPREBALZA VIADUCT
Deck construction procedure
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 170
Deck construction procedure Deck construction procedure
PIER SEGMENT
Positioning of steel box pier segment
(f k f t di h ti ) (formwork for concrete diaphragm casting)
Connection to the pier body with vertical prestressing to Connection to the pier body with vertical prestressing to
grant robustness during the construction
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 171
Pier segment steel frame
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 172
Positioning of steel box pier segment
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 173
Prestressing connecting the hammer to the pier
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 174
Pier segment: detail of the anchorages of external tendons
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 175
Webs assembling by bolts and adjustment/stiffening
Deck construction procedure
Webs assembling by bolts and adjustment/stiffening
by temporary ties
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 176
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 177
Hammer construction procedure Hammer construction procedure
SLABS
Positioning of precast slabs (60 mm, stiffened by steel
lattice) on the bottom chord serving as formwork for
the casting
Assembling of scaffolding and formwork for casting of
top slab
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 178
Top slab internal scaffolding
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 179
T l b i t l ff ldi Top slab internal scaffolding
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 180
Deck construction procedure
Insertion and tensioning of internal tendons anchored in
precast blocks designed with indented construction joints
(EN 1992 1 1 and EN 1992 2) (EN 1992-1-1 and EN 1992-2)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 181
Layout of the
connection connection
reinforcement
between precast
anchorage blocks and
upper slab.
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 182
Deck construction procedure
Repetition of previous operations working in parallel
on several piers
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 183
even in severe weather conditions
(500 m on the sea level in northern Italy) ( y)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 184
D k t ti d Deck construction procedure
Planimetric/altimetric
Cantilevers
Planimetric/altimetric
adjustment
supported on jacks
during the
construction
C ti f dj t til d ti f th Connection of adjacent cantilevers and casting of the
keys
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 185
Alignment of bolted joint on webs between two segments
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 186
Pl t d t i i f t l t d
Deck construction procedure
Placement and tensioning of external tendons
(50% of final force)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 187
Pay attention to the geometrical interferences between
external tendons and stiffeners
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 188
Transversal truss
stiffeners detail stiffeners detail.
Longitudinal spacing =
3m
The shape of plenty of
them is modified to
id t l t d avoid external tendons
geometrical
interferences.
(See arrows in the
picture beside and in
th i lid ) the previous slide)
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 189
External tendons
d i t d t il deviators detail.
Trumpeting of the
extremities and contact extremities and contact
localization
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 190
Deviators pipes.
Pay attention to the tube
orientation, theyre not
symmetric! symmetric!
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 191
Deck construction procedure
Completion of tensioning on the final static scheme
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 192
Deck construction procedure
Static check before opening
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 193
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 194
ROCCAPREBALZA VIADUCT
Design aspects
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 195
Design aspects
1. Cumbering
2. Stress redistribution due to creep
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 196
1 Cumbering
Cumbering Function of construction sequence
Compensation of construction errors
Cutting of steel Thickness of
Scattering in
shrinkage and creep
webs concrete slabs
parameters
Accurate
production
Accuracy during Sensitivity analyses
production
technology
casting are necessary
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 197
Cumbering of hammer on pier P1
30.86
30.00
35.00
20.00
25.00
m
]
9.25
5 00
10.00
15.00
M
B
E
R
I
N
G

[
m
m
-5.00
0.00
5.00
200 220 240 260 280 300 320
C
U
M
-15.00
-10.00
LONGITUDINAL POSITION ON THE DECK [m]
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 198
2 Stress redistribution
Redistribution of internal actions, both within the section and within
the whole structure, due to the rheological behaviour of concrete the whole structure, due to the rheological behaviour of concrete
Heterogeneous structure
Principles of linear viscoelasticity CAN NOT be used
General method (Step by step analysis / EN 1992-2)
( ) 1

o o
| |
n
t t
( )
( )
( )
( )
( ) ( )
0 0
0
1
0 28 28
,
1
, ,

o o
c o c
=
| |
= + + + A +
|
\ .

i
c i cs s
i
c c cti c
t t
t t t t t t
E t E E E
Strong redistribution in time of internal actions
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 199
Stresses evolution
in 4 representative points of 2 sections:
S ti 114 Section 114 :
1
st
segment after pier segment of pier n3
Section 128 :
mid-span segment of span between piers n3 and 4
P1
P3
P4
P5
P6
CW
P2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 200
Two different models were used to analyze the y
construction phases:
t
1
st
Model :
Detailed construction of each single hammer
2
nd
Model :
Global assembling of each hammer into the whole structure
The two models have different time histories:
The first one is focused on segments construction and is very detailed. A
different analysis is performed for each pier.
The second one is focused on hammer connection and long term behavior The second one is focused on hammer connection and long term behavior
of the structure.
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 201
Representative points
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 202
1
st
Model
Stresses during construction phases of hammer P3
isolated
Pier
segment segment
P3
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 203
Pier segment : p1 - Concrete top flange stress

p
r
e
s
t
r
e
s
s
i
n
g


m
e
n
t
e

1
4
:

p
r
e
s
t
r
e
s
s
i
n
g

s
e
g
m
e
n
t
r
e
s
t
r
e
s
s
i
n
g


m
e
n
t
t
r
e
s
s
i
n
g


n
t
a
]
h
a
m
m
e
r

o
n

e
n
d
P
h
a
s
e

5
:

p
o
f


1
s
t
s
e
g
m
e
s
s
i
n
g


t
P
h
a
s
e
o
f


4
t
h
P
h
a
s
e

1
7
:

p
r
o
f


5
t
h
s
e
g
m
P
h
a
s
e

2
0
:

p
r
e
s
t
o
f


6
t
h



s
e
g
m
e
n
o
[
M
P
a
P
h
a
s
e

2
3
:

h
c
o
n
s
t
r
u
c
t
i
o
P
h
a
s
e

8
:

p
r
e
s
t
r
e
o
f


2
n
d
s
e
g
m
e
n
t
s
i
n
g


h
a
s
e

1
1
:

p
r
e
s
t
r
e
s
s
f


3
r
d
s
e
g
m
e
n
t
N OF PHASE
P
h
o
f
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 204
Pier segment : p2 - Iron top flange stress
20.00
0.00
10.00
g


p
r
e
s
t
r
e
s
s
i
n
g


g
m
e
n
t
e
s
s
i
n
g


-10.00
0 5 10 15 20 25
[
]
3
:

h
a
m
m
e
r

t
i
o
n

e
n
d
a
s
e

5
:

p
r
e
s
t
r
e
s
s
i
n
g
1
s
t
s
e
g
m
e
n
t
s
t
r
e
s
s
i
n
g


e
n
t
P
h
a
s
e

1
4
:

p
o
f


4
t
h
s
e
g
P
h
a
s
e

1
7
:

p
r
e
s
t
r
e
o
f


5
t
h
s
e
g
m
e
n
t
2
0
:

p
r
e
s
t
r
e
s
s
i
n
g


h



s
e
g
m
e
n
t
o
[
M
P
a
]
-30.00
-20.00
P
h
a
s
e

2
3
c
o
n
s
t
r
u
c
t
P
h
a
o
f


1
P
h
a
s
e

8
:

p
r
e
s
o
f


2
n
d
s
e
g
m
e
:

p
r
e
s
t
r
e
s
s
i
n
g


e
g
m
e
n
t
Po
P
h
a
s
e

o
f


6
t
h
-40.00 P
h
a
s
e

1
1
o
f


3
r
d
s
e
N OF PHASE
-50.00
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 205
Pier segment : p3 - Concrete bottom flange stress
r
e
s
s
i
n
g


7
:

p
r
e
s
t
r
e
s
s
i
n
g


s
e
g
m
e
n
t
g


]
P
h
a
s
e

5
:

p
r
e
s
t
r
o
f


1
s
t
s
e
g
m
e
n
t
8
:

p
r
e
s
t
r
e
s
s
i
n
g


s
e
g
m
e
n
t
1
:

p
r
e
s
t
r
e
s
s
i
n
g


e
g
m
e
n
t
n
g


P
h
a
s
e

1
7
o
f


5
t
h
s
e

2
0
:

p
r
e
s
t
r
e
s
s
i
n
g
t
h



s
e
g
m
e
n
t
o
[
M
P
a
]
a
s
e

2
3
:

h
a
m
m
e
r

s
t
r
u
c
t
i
o
n

e
n
d
P
h
a
s
e

8
o
f


2
n
d
P
h
a
s
e

1
1
o
f


3
r
d
s
e
a
s
e

1
4
:

p
r
e
s
t
r
e
s
s
i
n
4
t
h
s
e
g
m
e
n
tP
h
a
s
o
f


6
t
P
h
a
c
o
n
P
h
a
o
f


4
N OF PHASE
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 206
Pier segment : p4 - Iron bottom flange stress
10 00
0.00
0 5 10 15 20 25
30 00
-20.00
-10.00
i
n
g



p
r
e
s
t
r
e
s
s
i
n
g


e
g
m
e
n
t
g


0 00
-40.00
-30.00
r

h
a
s
e

5
:

p
r
e
s
t
r
e
s
s
i
f


1
s
t
s
e
g
m
e
n
t
e
s
t
r
e
s
s
i
n
g


m
e
n
t
r
e
s
t
r
e
s
s
i
n
g


m
e
n
t

P
h
a
s
e

1
7
:
o
f


5
t
h
s
e
e

2
0
:

p
r
e
s
t
r
e
s
s
i
n
g
t
h



s
e
g
m
e
n
t
o
[
M
P
a
]
-60.00
-50.00
h
a
s
e

2
3
:

h
a
m
m
e
r
o
n
s
t
r
u
c
t
i
o
n

e
n
d
P
h
o
f
P
h
a
s
e

8
:

p
r
o
f


2
n
d
s
e
g
m
P
h
a
s
e

1
1
:

p
r
o
f


3
r
d
s
e
g
m
e

1
4
:

p
r
e
s
t
r
e
s
s
i
n
g

s
e
g
m
e
n
t
P
h
a
s
o
f


6
t
-80.00
-70.00
P
h
c
o
P
h
a
s
e
o
f


4
t
h
-90.00
N OF PHASE
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 207
2
d
M d l 2
nd
Model
Stresses during construction phases after conjunction of
hammer P3 with other hammers
Pier segment
P1
P2
P3
P4
P5
P6
CW
P2
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 208
Pier segment : p1 - Concrete top flange stress
Phases 1314:
closing of
hammer joint
Phase 53:
t=70 years
a
]
r
m
a
n
e
n
t

t
i
o
n
o
[
M
P
a
P
h
a
s
e
4
5
:


p
e
l
o
a
d
s

i
n
t
r
o
d
u
c
t
Phase 33:
2nd prestressing
N OF PHASE
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 209
Pier segment : p2 Iron top flange stress
Phases 1314:
l i f closing of
hammer joint
m
a
n
e
n
t

n
a
]
Phase 33:
P
h
a
s
e
4
5
:


p
e
r
m
l
o
a
d
s

i
n
t
r
o
d
u
c
t
i
o
Phase 53:
t=70 years
o
[
M
P
a
2nd prestressing
N OF PHASE
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 210
Pier segment : p3 - Concrete bottom flange stress
e
n
t

a
]
Phases 1314:
closing of
Phase 33:
h
a
s
e
4
5
:


p
e
r
m
a
n
e
a
d
s

i
n
t
r
o
d
u
c
t
i
o
n
Phase 53:
t=70 years
o
[
M
P
a
hammer joint
2nd prestressing
Pl
o
N OF PHASE
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 211
Pier segment : p4 - Iron bottom flange stress
Phases 1314:
closingof
a
n
e
n
t

n
]
closing of
hammer joint
Phase 33:
2nd prestressing
P
h
a
s
e
4
5
:


p
e
r
m
a
l
o
a
d
s

i
n
t
r
o
d
u
c
t
i
o
n
o
[
M
P
a
]
Phase 53:
t=70 years
N OF PHASE
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 212
Sustainability aspects
Durability No tensile stresses in concrete in SLS
(Frequent combination)
Economy Time saving and elimination of
launching girder launching girder
Environmental impact Elimination of storage areas for
t segments
Maintenance Very easy inspection and control of y y p
external tendons
Rehabilitation Substitution of external tendons without Rehabilitation Substitution of external tendons without
significant limitation to traffic flow
Seminar Bridge Design with Eurocodes JRC Ispra, 1-2 October 2012 213
Thank you for the Thank you for the yy
kind attention kind attention