Anda di halaman 1dari 1

Technical Corrigendum / Addendum - 1 (WORP-AMD)

Sl. No. Document 1 Disposal List Installation Kalol CTF Ramol GGS Nawagam GGS III Reference Process, Area I, Group A, S. No. 1, Quantity Process, Area II, Group A, S. No. 6, Quantity Process, Area II, Group B Process, Area I, Group A, S. No. 4, Value as per scrap rate(Rs.) Description Instrument Air Compressor HP Separator 2 no.s 90 cu. m Tanks at ETP area Existing Gas Scrubber Existing provision 5 Modified provision* 3

Disposal List

1 Not included in Disposal List 2 1) 2)

0 2 (To be dismantled by LSTK Contractor and handed over to ONGC) 74202.8 Total weight (Ton) and value (Rs.) of scrap mentioned are estimated values. Bidders to follow the instructions provided in the bidding document towards disposal of scrap and dismantled facilities and ascertain the above details by themselves. Bidder to assess the tax liabilities to be borne by him as referred in 10.18 of 'Instructions to the Bidders' of Vol. I and notes of 'Price Proforma'. Any item not mentioned in the Disposal List, but dismantled in course of site execution, shall be handed over to ONGC.

Disposal List

Disposal List

Kalol GGS III

5.

Disposal List

All Installations

General Notes

Nil

3)

4)

6.

I/O List

All Installations

Instrumentation scope of work

Nil

I/O list attached (refer file IO List_SCADA Tags_AMD Asset)

* As there is extremely minor variation in overall estimated weight of disposable item due to removal of few items, all other figures/amount shall remain same.

Anda mungkin juga menyukai